Search NASA⌕ Search

SEARCH · Search NASA

Results for “CARGO SPACECRAFT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Testing programs for the Multimission Modular Spacecraft

The Multimission Modular Spacecraft (MMS) provides a standard spacecraft bus to a user for a variety of space missions ranging from near-earth to synchronous orbits. The present paper describes the philosophy behind the MMS module test program and discusses the implementation of the test program. It is concluded that the MMS module test program provides an effective and comprehensive customer buy-off at the subsystem contractor's plant, is an optimum approach for checkout of the subsystems prior to use for on-orbit servicing in the Shuttle Cargo Bay, and is a cost-effective technique for environmental testing.

Greenwell, T. J.↗

NASA CEV Reference Entry GN&C System and Analysis

As part of its overall objectives, the Orion spacecraft will be required to perform entry and Earth landing functions for Low Earth Orbit (LEO) and Lunar missions. Both of these entry scenarios will begin with separation of the Service Module (SM), making them unique from other Orion mission phases in that only the Command Module (CM) portion of the Crew Exploration Vehicle (CEV) will be involved, requiring a CM specific Guidance, Navigation and Control (GN&C) system. Also common to these mission scenarios will be the need for GN&C to safely return crew (or cargo) to earth within the dynamic thermal and structural constraints of entry and within acceptable accelerations on the crew, utilizing the limited aerodynamic performance of the CM capsule. The lunar return mission could additionally require an initial atmospheric entry designed to support a precision skip and second entry, all to maximize downrange performance and ensure landing in the United States. This paper describes the Entry GN&C reference design, developed by the NASA-led team, that supports these entry scenarios and that was used to validate the Orion System requirements. Description of the reference design will include an overview of the GN&C functions, avionics, and effectors and will relate these to the specific design drivers of the entry scenarios, as well as the desire for commonality in vehicle systems to support the different missions. The discussion will also include the requirement for an Emergency Entry capability beyond that of the nominal performance of the multi-string GNC system, intended to return the crew to the earth in a survivable but unguided manner. Finally, various analyses will be discussed, including those completed to support validation efforts of the current CEV requirements, along with those on-going and planned with the intention to further refine the requirements and to support design development work in conjunction with the prime contractor. Some of these ongoing analyses will include work to size effectors (jets) and fuel budgets, to refine skip entry concepts, to characterize navigation performance and uncertainties, to provide for SM disposal offshore and to identify requirements to support target site selection.

Munday, S.↗

The design and fabrication of the Centaur neutral buoyancy trainer and related hardware

Two full scale mockups of the Centaur upper stage were designed, fabricated and delivered to NASA. One was the Centaur Weightless Environment Training Facility (WETF) trainer and the other was the Centaur 1-G mockup. The Centaur upper stage booster is designed to carry the spacecraft Galileo to Jupiter, and the spacecraft Ulysses to an orbit around the Sun after launch from the Space Shuttle. The flight vehicle has several Extravehicular Activity (EVA) contingency tasks that require crew training. This need for crew training generated the requirement for the Centaur WETF crew trainer, which is high fidelity in areas of expected crew interface. During the production of the Centaur WETF crew trainer, the need for a jumper cable from Centaur to the Orbiter was identified. This EVA contingency task would be the installation of a cable from the Orbiter cargo bay sill to various command data boxes on Centaur to allow crew control deployment should a failure occur. This task required the upgrading of volumetric boxes on the trainer to a high fidelity configuration including electrical connector installation and cable routing.

Ware, Alan S.↗

Human Transportation System (HTS) study, volume 2

This report summarizes work completed under the Human Transportation System Study. This study was conducted by the New Initiatives Office at JSC with the technical support of Boeing, General Dynamics, Lockheed, McDonnell-Douglas, Martin Marietta, and Rockwell. The study was designed to generate information on determining the appropriate path to follow for new system development to meet the Nation's space transportation needs. The study evaluates 18 transportation architecture options using a parametric set of mission requirements. These options include use of current systems (e.g., Shuttle, Titan, etc. ) as well as proposed systems (e.g., PLS, Single-Stage-to-Orbit, etc.) to assess the impact of various considerations, such as the cost of alternate access, or the benefit of separating people and cargo. The architecture options are compared to each other with six measurable evaluation criteria or attributes. They are: funding profile, human safety, probability of mission success, architecture cost risk, launch schedule confidence, and environmental impact. Values for these attributes are presented for the architecture options, with pertinent conclusions and recommendations.

Unmanned spacecraft↗

Human Transportation System (HTS) study: Executive summary

This report summarizes work completed under the Human Transportation System Study. This study was conducted by the New Initiatives Office at JSC with the technical support of Boeing, General Dynamics, Lockheed, McDonnell-Douglas, Martin Marietta, and Rockwell. The study was designed to generate information on determining the appropriate path to follow for new system development to meet the Nation's space transportation needs. The study evaluates 18 transportation architecture options using a parametric set of mission requirements. These options include use of current systems (e.g., Shuttle, Titan, etc.) as well as proposed systems (e.g., PLS, Single-Stage-to-Orbit, etc.) to assess the impact of various considerations, such as the cost of alternate access, or the benefit of separating people and cargo. The architecture options are compared to each other with six measurable evaluation criteria or attributes. They are: funding profile, human safety, probability of mission success, architecture cost risk, launch schedule confidence, and environmental impact. Values for these attributes are presented for the architecture options, with pertinent conclusions and recommendations.

Unmanned spacecraft↗

Human Transportation System (HTS) study, volume 1

This report summarizes work completed under the Human Transportation System Study. This study was conducted by the New Initiatives Office at JSC with the technical support of Boeing, General Dynamics, Lockheed, McDonnell-Douglas, Martin Marietta, and Rockwell. The study was designed to generate information on determining the appropriate path to follow for new system development to meet the Nation's space transportation needs. The study evaluates 18 transportation architecture options using a parametric set of mission requirements. These options include use of current systems (e.g., Shuttle, Titan, etc.) as well as proposed systems (e.g., PLS, Single-Stage-to-Orbit, etc.) to assess the impact of various considerations, such as the cost of alternate access, or the benefit of separating people and cargo. The architecture options are compared to each other with six measurable evaluation criteria or attributes. They are: funding profile, human safety, probability of mission success, architecture cost risk, launch schedule confidence, and environmental impact. Values for these attributes are presented for the architecture options, with pertinent conclusions and recommendations.

Unmanned spacecraft↗

Corrosion Protection for Space and Beyond

Florida is home to NASA's Launch Operations Center. Since its establishment in July 1962, the spaceport has served as the departure gate for every American manned mission and hundreds of advanced scientific spacecraft under the Launch Services Program. The center was renamed the John F. Kennedy Space Center in late 1963 to honor the president who put America on the path to the moon. Today, NASA is on the edge of a bold new chaIlenge: the ConsteIlation Program. ConsteIlation is a NASA program to create a new generation of spacecraft for human spaceflight, consisting primarily of the Ares I and Ares V launch vehicles, the Orion crew capsule, the Earth Departure stage and the Lunar access module. These spacecraft will be capable of performing a variety of missions, from Space Station resupply to lunar landings. The ambitious new endeavor caIls for NASA to return human explorers to the moon and then venture even farther, to Mars and beyond. As the nation's premier spaceport, Kennedy Space Center (KSC) will playa critical role in this new chapter in exploration, particularly in the conversion of the launch facilities to accommodate the new launch vehicles. To prepare for this endeavor, the launch site and facilities for the next generation of crew and cargo vehicles must be redesigned, assembled and tested. One critical factor that is being carefuIly considered during the renovation is protecting the new facilities and structures from corrosion and deterioration.

Calle, Luz Marina↗

Options for Offloading a 90-Ton Common Habitat from its Lander on the Surface of Mars

The Common Habitat is a large, long-duration habitat being explored as part of a conceptual study (not an active NASA program) that uses an SLS core stage liquid oxygen (LOX) tank as its primary structure. Measuring 8.4 meters in diameter and 15.6 meters in length, it is manufactured as a habitat and launched as such into space. It is intended for use on the Moon as part of a permanently occupied outpost, on Mars as part of an outpost that will be occupied for hundreds of days at a time, and in deep space as part of the Deep Space Exploration Vehicle where it will support crewed missions up to 1200 days in duration. A study of internal orientation and crew size resulted in a Common Habitat configuration sized for a crew of eight with a three-deck horizontal orientation. There are obvious challenges associated with the delivery of such a large habitat, which may mass as much as 90-tons when initially deployed. The Mars destination in particular imposes extreme challenges due to Martian gravity. This paper identifies initial options for the offloading of a 90-ton Common Habitat from a lander spacecraft on the surface of Mars. On Mars, the Common Habitat is part of a surface outpost where a Habitation Zone includes the Common Habitat docked to a two-chamber airlock node, up to two logistics modules, and up to two pressurized rovers. It is connected by underground conduit to a radiator farm and communications tower assembly. These elements and other surface infrastructure, including robotic systems for surface preparation, are landed prior to the Common Habitat. In the baseline Common Habitat Architecture, the Common Habitat is delivered on the third heavy cargo flight. The Habitation Zone configuration dictates that the Common Habitat needs to be offloaded from the lander. All of the docked elements require direct access to the surface and the Common Habitat must actually be placed in a trench to lower its docking ports to be level with those of the mated elements. Additionally, the habitat must be emplaced in a horizontal configuration, while for any conceivable Earth launch system it must be launched in a vertical configuration. It is true that the Common Habitat must be offloaded from its lander on both the Moon and Mars and a common offloading system must therefore work in both destinations. Mars, however, is considered the driving case for offloading in most, but not all, aspects. A four-day internal study in 2021 recommended that a modified Starship be used to land the Common Habitat on Mars and considered multiple approaches to offload the Common Habitat from the payload section and lower it to the surface. The topic was presented at a public hackathon organized by the Johnson Space Center’s Emerge Employee Resource Group. One team took on the challenge and proposed a concept in some ways similar to the previously considered jib crane. Despite the excellent innovation in the team’s work, a number of study refinements are necessary to truly establish feasibility. These and other future work needed to mature the concept are discussed in this work.

Lander Offloading↗

Use of Shuttle Heritage Hardware in Space Launch System (SLS) Application-Structural Assessment

NASA is moving forward with the development of the next generation system of human spaceflight to meet the Nation's goals of human space exploration. To meet these goals, NASA is aggressively pursuing the development of an integrated architecture and capabilities for safe crewed and cargo missions beyond low-Earth orbit. Two important tenets critical to the achievement of NASA's strategic objectives are Affordability and Safety. The Space Launch System (SLS) is a heavy-lift launch vehicle being designed/developed to meet these goals. The SLS Block 1 configuration (Figure 1) will be used for the first Exploration Mission (EM-1). It utilizes existing hardware from the Space Shuttle inventory, as much as possible, to save cost and expedite the schedule. SLS Block 1 Elements include the Core Stage, "Heritage" Boosters, Heritage Engines, and the Integrated Spacecraft and Payload Element (ISPE) consisting of the Launch Vehicle Stage Adapter (LVSA), the Multi-Purpose Crew Vehicle (MPCV) Stage Adapter (MSA), and an Interim Cryogenic Propulsion Stage (ICPS) for Earth orbit escape and beyond-Earth orbit in-space propulsive maneuvers. When heritage hardware is used in a new application, it requires a systematic evaluation of its qualification. In addition, there are previously-documented Lessons Learned (Table -1) in this area cautioning the need of a rigorous evaluation in any new application. This paper will exemplify the systematic qualification/assessment efforts made to qualify the application of Heritage Solid Rocket Booster (SRB) hardware in SLS. This paper describes the testing and structural assessment performed to ensure the application is acceptable for intended use without having any adverse impact to Safety. It will further address elements such as Loads, Material Properties and Manufacturing, Testing, Analysis, Failure Criterion and Factor of Safety (FS) considerations made to reach the conclusion and recommendation.

Aggarwal, Pravin↗

Space Transformation -- Localizing the Remote and Connecting the Isolated

In motivating the Space Transformation theme for this year’s 4S symposium, the organizers provided the following context, “Transformation of economies are driven by a change in values and accelerated by new technologies.” These words rang particularly true when I read them at the beginning of the holiday season. Like so many others, I was in the early phases of my Christmas shopping procrastination campaign, and I’d just been reflecting on how Amazon Prime was the transformational tool I’d been waiting for. Basic limiting principles of time and space, supply and demand, were all but erased by the Amazon Prime phenomenon. Coupled with emerging 3D printing and other adaptive manufacturing technologies, a transformation from deliberate planning to “think it … have it” had occurred, empowering me to procrastinate longer than I’d ever dreamed possible. The organizers went on to ponder, “Will space transformation also affect society?”, just as our team at the Air Force Research Lab’s (AFRL) Center for Rapid Innovation (CRI) were working alongside partners within our larger Integrated Capabilities Directorate, NASA’s Flight Opportunities and Small Spacecraft Technology programs, and DARPA’s Luna-10 program to develop technologies and execute demonstration missions that leverage the space domain to genuinely connect even the most remote and austere domains on the timeline of need. Picking apart the miracle that is Amazon prime, where does the model fail, and why? More relevantly to the theme of this year’s symposium, how can the space domain be used to overcome its limitations and minimize its weaknesses? Perhaps it is best assessed in the context of Use Cases. What are the Amazon delivery cost, schedule, and cargo limiters to the Amundsen-Scott South Pole Research Station, or the Lunar South Pole Research Station? This paper will explore enabling infrastructure that allows Amazon prime to thrive and assess the transformational enabling technologies that would be necessary to extend that miracle to the truly remote or the truly austere. Localizing the Remote • First, it will evaluate the ability of the on-going AFRL Rocket Cargo and Space Initiatives Ringside Seats systems, coupled with Astrobotic’s Xodiak and Xogdor capabilities, developed to support the NASA Flight Opportunities Program (FOP), to supply orbital/suborbital delivery to both improved and austere sites on the Earth and Moon. • Then, it will add the surface terminal distribution leg, with an examination of Lunar Outpost’s Mobile Autonomous Prospecting Platform (MAPP), equipped with Mobile Autonomous Robotic Swarm (MARS) software, and Intuitive Machine’s Hopper, developed with support of AFRL and NASA’s Commercial Lunar Payload Services (CLPS) program. Connecting the Isolated From there, it will focus on the destination, asking what implied destination services are required to support highly assured autonomous delivery. • Specifically, it will highlight Astrobotic’s Skymage mesh-networked publish and subscribe communication and navigation service, as well as AFRL’s on-going developments of radioisotope and reactor nuclear-sourced thermoelectric power generation and distribution systems under development under the Joint Emergent Technology Supplying On-orbit Nuclear Power (JETSON) program by Lockheed Martin, Westinghouse, Intuitive Machines, and Zeno Power, to provide the power service to locations well off the grid. • Finally, the paper will connect to the “human machine”. What connects the remote or in-situ human consumer to the remote domain? What connects the diverse international government and commercial services to each other? The former will focus on AFRL’s OraCloud feeding their Space Defense Control and Characterization System (SDCCS) and Lunar Station’s MoonHacker systems, while the latter will focus on the BlueHalo/Tensor LunX Technology Platform for the Cislunar Commodity Marketplace. In 1984, Krafft Ehricke famously remarked that, “If God wanted man to become a spacefaring species, He would have given man a Moon.” This paper is not about the Moon, but is about humans as a spacefaring species, shedding the pesky land/air limitations of the Amazon Prime model … so that we can all live a procrastinator’s “think it … have it” existence.

Charles Finley↗

Human and Robotic Exploration Missions to Phobos Prior to Crewed Mars Surface Missions

Phobos is a scientifically significant destination that would facilitate the development and operation of the human Mars transportation infrastructure, unmanned cargo delivery systems and other Mars surface systems. In addition to developing systems relevant to Mars surface missions, Phobos offers engineering, operational, and public engagement opportunities that could enhance subsequent Mars surface operations. These opportunities include the use of low latency teleoperations to control Mars surface assets associated with exploration science, human landing‐site selection and infrastructure development which may include in situ resource utilization (ISRU) to provide liquid oxygen for the Mars Ascent Vehicle (MAV). A human mission to Mars' moons would be preceded by a cargo predeploy of a surface habitat and a pressurized excursion vehicle (PEV) to Mars orbit. Once in Mars orbit, the habitat and PEV would spiral to Phobos using solar electric propulsion based systems, with the habitat descending to the surface and the PEV remaining in orbit. When a crewed mission is launched to Phobos, it would include the remaining systems to support the crew during the Earth‐Mars transit and to reach Phobos after insertion in to Mars orbit. The crew would taxi from Mars orbit to Phobos to join with the predeployed systems in a spacecraft that is based on a MAV, dock with and transfer to the PEV in Phobos orbit, and descend in the PEV to the surface habitat. A static Phobos surface habitat was chosen as a baseline architecture, in combination with the PEV that was used to descend from orbit as the main exploration vehicle. The habitat would, however, have limited capability to relocate on the surface to shorten excursion distances required by the PEV during exploration and to provide rescue capability should the PEV become disabled. To supplement exploration capabilities of the PEV, the surface habitat would utilize deployable EVA support structures that allow astronauts to work from portable foot restraints or body restrain tethers in the vicinity of the habitat. Prototype structures were tested as part of NEEMO 20. PEVs would contain closed loop guidance and provide life support and consumables for two crew for 2 weeks plus reserves. The PEV has a cabin that uses the exploration atmosphere of 8.2 psi with 34% oxygen, enabling use of suit ports for rapid EVA with minimal oxygen prebreathe as well as dust control by keeping the suits outside the pressurized volume. When equipped with outriggers and control moment gyros, the PEV enables EVA tasks of up to 8 pounds of force application without the need to anchor. Tasks with higher force requirements can be performed with PEV propulsion providing the necessary thrust to react forces. Exploration of Phobos builds heavily from the developments of the cis‐lunar proving ground, and significantly reduces Mars surface risk by facilitating the development and testing of habitats, MAVs, and pressurized rover cabins that are all Mars surface forward. A robotic precursor mission to Phobos and Deimos is also under consideration and would need to launch in 2022 to support a 2031 human Phobos mission.

Gernhardt, Michael L.↗

Human and Robotic Exploration Missions to Phobos Prior to Crewed Mars Surface Missions

Phobos is a scientifically significant destination that would facilitate the development and operation of the human Mars transportation infrastructure, unmanned cargo delivery systems and other Mars surface systems. In addition to developing systems relevant to Mars surface missions, Phobos offers engineering, operational, and public engagement opportunities that could enhance subsequent Mars surface operations. These opportunities include the use of low latency teleoperations to control Mars surface assets associated with exploration science, human landing-site selection and infrastructure development, which may include in situ resource utilization (ISRU) to provide liquid oxygen for the Mars Ascent Vehicle (MAV). A human mission to Mars' moons would be preceded by a cargo pre-deploy of a surface habitat and a pressurized excursion vehicle (PEV) to Mars orbit. Once in Mars orbit, the habitat and PEV would spiral to Phobos using solar electric propulsion based systems, with the habitat descending to the surface and the PEV remaining in orbit. When a crewed mission is launched to Phobos, it would include the remaining systems to support the crew during the Earth-Mars transit and to reach Phobos after insertion in to Mars orbit. The crew would taxi from Mars orbit to Phobos to join with the predeployed systems in a spacecraft that is based on a MAV, dock with and transfer to the PEV in Phobos orbit, and descend in the PEV to the surface habitat. A static Phobos surface habitat was chosen as a baseline architecture, in combination with the PEV that was used to descend from orbit as the main exploration vehicle. The habitat would, however, have limited capability to relocate on the surface to shorten excursion distances required by the PEV during exploration and to provide rescue capability should the PEV become disabled. To supplement exploration capabilities of the PEV, the surface habitat would utilize deployable EVA support structures that allow astronauts to work from portable foot restraints or body restrain tethers in the vicinity of the habitat. Prototype structures were tested as part of NEEMO 20.

Gernhardt, Michael L.↗

Safety in earth orbit study. Volume 3: Analysis of tumbling spacecraft, escape and rescue

Detailed and supporting analyses of the hazards of a disabled spacecraft in a tumbling mode and of crew escape, rescue, and survivability are presented for earth orbital operations of the space shuttle program. Tumbling conditions, arresting tumbling by external means, and escape from a tumbling vehicle are discussed. Details on design concepts for the modular space station, integral tank orbiter, drop tank orbiter, and a small space vehicle are included. Results of the crew safety study indicate that the shuttle orbiter should be the primary vehicle for dealing with emergencies and one vehicle should be available for rapid emergency rescue. An Apollo command module should be carried in the orbiter cargo bay in case an orbiter is not available. Approaches for a quicker escape or rescue capability are also recommended.

Source record↗

Ares Launch Vehicles Overview: Space Access Society

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission in ways that promote leadership in space and economic expansion on the new frontier. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed to return people to the Moon and go to Mars. The Vision commits NASA and the nation to an agenda of exploration that also includes robotic exploration and technology development, while building on lessons learned over 50 years of hard-won experience. NASA is building on common hardware, shared knowledge, and unique experience derived from the Apollo Saturn, Space Shuttle, and contemporary commercial launch vehicle programs. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, which transports the Orion Crew Exploration Vehicle, and the Ares V Cargo Launch Vehicle, which transports the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit, where it will rendezvous with the Lunar Module in the Earth Departure Stage, which will then propel the combination into lunar orbit. The imperative to explore space with the combination of astronauts and robots will be the impetus for inventions such as solar power and water and waste recycling. This next chapter in NASA's history promises to write the next chapter in American history, as well. It will require this nation to provide the talent to develop tools, machines, materials, processes, technologies, and capabilities that can benefit nearly all aspects of life on Earth. Roles and responsibilities are shared between a nationwide Government and industry team. The Exploration Launch Projects Office at the Marshall Space Flight Center manages the design, development, testing, and evaluation of both vehicles and serves as lead systems integrator. A little over a year after it was chartered, the Exploration Launch Projects team is testing engine components, refining vehicle designs, performing wind tunnel tests, and building hardware for the first flight test of Ares I-X, scheduled for spring 2009. The Exploration Launch Projects team conducted the Ares I System Requirements Review (SRR) at the end of 2006. In Ares' first year, extensive trade studies and evaluations were conducted to refine the design initially recommended by the Exploration Systems Architecture Study, conceptual designs were analyzed for fitness, and the contractual framework was assembled to enable a development effort unparalleled in American space flight since the Space Shuttle. Now, the project turns its focus to the Preliminary Design Review (PDR), scheduled for 2008. Taking into consideration the findings of the SRR, the design of the Ares I is being tightened and refined to meet the safety, operability, reliability, and affordability goals outlined by the Constellation Program. The Ares V is in the early design stage, focusing its activities on requirements validation and ways to develop this heavy-lift system so that synergistic hardware commonality between it and the Ares I can reduce the operational footprint and foster sustained exploration across the decades ahead.

Cook, Steve↗

NASA Tech Briefs, November 2009

Topics covered include: Cryogenic Chamber for Servo-Hydraulic Materials Testing; Apparatus Measures Thermal Conductance Through a Thin Sample from Cryogenic to Room Temperature; Rover Attitude and Pointing System Simulation Testbed; Desktop Application Program to Simulate Cargo-Air-Drop Tests; Multimodal Friction Ignition Tester; Small-Bolt Torque-Tension Tester; Integrated Spacesuit Audio System Enhances Speech Quality and Reduces Noise; Hardware Implementation of a Bilateral Subtraction Filter; Simple Optoelectronic Feedback in Microwave Oscillators; Small X-Band Oscillator Antennas; Free-Space Optical Interconnect Employing VCSEL Diodes; Discrete Fourier Transform Analysis in a Complex Vector Space; Miniature Scroll Pumps Fabricated by LIGA; Self-Assembling, Flexible, Pre-Ceramic Composite Preforms; Flight-speed Integral Image Analysis Toolkit; Work Coordination Engine; Multi-Mission Automated Task Invocation Subsystem; Autonomously Calibrating a Quadrupole Mass Spectrometer; Determining Spacecraft Reaction Wheel Friction Parameters; Composite Silica Aerogels Opacified with Titania; Multiplexed Colorimetric Solid-Phase Extraction; Detecting Airborne Mercury by Use of Polymer/Carbon Films; Lattice-Matched Semiconductor Layers on Single Crystalline Sapphire Substrate; Pressure-Energized Seal Rings to Better Withstand Flows; Rollerjaw Rock Crusher; Microwave Sterilization and Depyrogenation System; Quantifying Therapeutic and Diagnostic Efficacy in 2D Microvascular Images; NiF2/NaF:CaF2/Ca Solid-State High-Temperature Battery Cells; Critical Coupling Between Optical Fibers and WGM Resonators; Microwave Temperature Profiler Mounted in a Standard Airborne Research Canister; Alternative Determination of Density of the Titan Atmosphere; Solar Rejection Filter for Large Telescopes; Automated CFD for Generation of Airfoil Performance Tables; Progressive Classification Using Support Vector Machines; Active Learning with Irrelevant Examples; A Data Matrix Method for Improving the Quantification of Element Percentages of SEM/EDX Analysis; Deployable Shroud for the International X-Ray Observatory; Improved Model of a Mercury Ring Damper; Optoelectronic pH Meter: Further Details; X-38 Advanced Sublimator; and Solar Simulator Represents the Mars Surface Solar Environment.

Source record↗

Risk Management of Jettisoned Objects in LEO

The construction and maintenance of the International Space Station (ISS) has led to the release of many objects into its orbital plane, usually during the course of an extra-vehicular activity (EVA). Such releases are often unintentional, but in a growing number of cases, the jettison has been intentional, conducted after a careful assessment of the net risk to the partnership and to other objects in space. Since its launch in 1998 the ISS has contributed on average at least one additional debris object that is simultaneously in orbit with the station, although the number varies widely from zero to eight at any one moment. All of these objects present potential risks to other objects in orbit. Whether it comes from known and tracked orbiting objects or from unknown or untrackable objects, collision with orbital debris can have disastrous consequences. Objects greater than 10cm are generally well documented and tracked, allowing orbiting spacecraft or satellites opportunities to perform evasive maneuvers (commonly known as Debris Avoidance Maneuvers, or DAMs) in the event that imminent collision is predicted. The issue with smaller debris; however, is that it is too numerous to be tracked effectively and yet still poses disastrous consequences if it intercepts a larger object. Due to the immense kinetic energy of any item in orbit, collision with debris as small as 1cm can have catastrophic consequences for many orbiting satellites or spacecraft. Faced with the growing orbital debris threat and the potentially catastrophic consequences of a collision-generated debris shower originating in an orbit crossing the ISS altitude band, in 2007 the ISS program manger asked program specialists to coordinate a multilateral jettison policy amongst the ISS partners. This policy would define the acceptable risk trade rationale for intentional release of a debris object, and other mandatory constraints on such jettisons to minimize the residual risks whenever a jettison was accepted. Although ISS-related debris often presents untenable risks to the EVA crew, IVA crew, or to a departing cargo vehicle for a controlled disposal, such released objects also present a ballistic nuisance to the visiting vehicle traffic, and a potential fragmentation threat to the hundreds of other functional and debris objects whose perigees lie below the ISS orbital altitude. Thus, every such jettison decision is a conscious risk trade.

Bacon, John B.↗

Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) Mission Overview, Science Return, and Future Applications of This Technology

The Low-Earth Orbit (LEO) Flight Test of an Inflatable Decelerator (LOFTID) mission was the culmination of two decades of research and development for Hyper-sonic Inflatable Aerodynamic Decelerator (HIAD) technology. LOFTID was a project overseen by the Technology Demonstration Mission (TDM) program within NASA’s Space Technology Mission Directorate. The success of the LOFTID mission could enable new NASA missions to Mars, Venus, and most solar-system destinations with atmospheres, as well as cost-effective payload returns to Earth, including in-space manufactured materials and launch vehicle asset recovery. LOFTID, with its unique inflatable heat shield, was the first-of-a-kind orbital reentry flight, and the largest blunt body atmospheric entry of any kind. On November 10, 2022, just over 10 years since the previous flight test of the smaller sub-orbital Inflatable Reentry Vehicle Experiment-3 (IRVE-3) [1], NASA Langley Research Center, with partner United Launch Alliance (ULA), successfully launched and achieved reentry and recovery of the LOFTID Reentry Vehicle (RV), further demonstrating the viability of the HIAD technology for large-diameter, inflatable heat shields to safely and accurately deliver large payloads through an atmosphere via a controlled descent and landing. Launching as a secondary payload with the Joint Polar Satellite System 2 (JPSS-2) from Vandenberg Space Force Base, California, stowed inside an ex-tended payload adapter of the Atlas V 401 launch vehicle, the LOFTID mission officially began after the JPSS-2 payload was delivered to its orbit by the Centaur second stage. The LOFTID RV was flying solo on its spin-stabilized ballistic reentry trajectory about one hour after launch, and the flight ended approximately one hour later with a gentle splashdown under parachute in the Pacific Ocean off the east coast of Hawaii, where the RV was recovered and later shipped back to NASA Langley. LOFTID endured the harsh environments of atmospheric reentry while demonstrating stable aerodynamics through the entire spectrum of hypersonic, supersonic, transonic, and subsonic flight. The LOFTID RV was exposed to an aeroheating environment representative of many Mars and LEO HIAD applications, while successfully demonstrating the ability of the heat-affected inflatable structure to with-stand aerodynamic forces that exceeded those expected at Mars. This flight demonstration of a 6m diameter HIAD confirmed the technology structural and thermal performance as it protected the 1100kg RV entering Earth’s atmosphere at 8 km/s, reaching Mach 30, and experiencing 9g deceleration before deploying parachutes and splashing down in the Pacific Ocean. HIAD technology involves an aeroshell that can be hard packed into a small volume for launch and then deployed prior to atmospheric entry for a controlled deceleration through the atmosphere. Large deployable heat shields enable spacecraft to carry bigger, heavier payloads, including scientific instruments and human support systems for planetary landing and exploration. Much larger than traditional fixed diameter aeroshells that are constrained by the size of launch vehicle shrouds, inflatable decelerators create more drag and start the deceleration process in the upper reaches of the atmosphere with greater efficiency and stability. LOFTID’s successful demonstration of the HIAD technology has greatly expanded NASA’s options for future planetary missions and opened new commercial opportunities for lower-cost mission pay-load recovery including recovery of launch vehicle assets, or as a delivery system to return cargo from the International Space Station or cislunar space. The developments for some of these applications are al-ready underway. While LOFTID was indeed a first-of-a-kind flight for an inflatable heatshield, the largest blunt-body entry ever, its remarkable performance assured that it will not be the last of its kind.

John DiNonno↗

Supervisory Control of a Humanoid Robot in Microgravity for Manipulation Tasks

Teleoperation is the dominant form of dexterous robotic tasks in the field. However, there are many use cases in which direct teleoperation is not feasible such as disaster areas with poor communication as posed in the DARPA Robotics Challenge, or robot operations on spacecraft a large distance from Earth with long communication delays. Presented is a solution that combines the Affordance Template Framework for object interaction with TaskForce for supervisory control in order to accomplish high level task objectives with basic autonomous behavior from the robot. TaskForce, is a new commanding infrastructure that allows for optimal development of task execution, clear feedback to the user to aid in off-nominal situations, and the capability to add autonomous verification and corrective actions. This framework has allowed the robot to take corrective actions before requesting assistance from the user. This framework is demonstrated with Robonaut 2 removing a Cargo Transfer Bag from a simulated logistics resupply vehicle for spaceflight using a single operator command. This was executed with 80% success with no human involvement, and 95% success with limited human interaction. This technology sets the stage to do any number of high level tasks using a similar framework, allowing the robot to accomplish tasks with minimal to no human interaction.

Farrell, Logan C.↗