Search NASA⌕ Search

SEARCH · Search NASA

Results for “COMMAND”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

XBox Input -Version 1.0

Contains class for connecting to the Xbox 360 controller, displaying the user inputs {buttons, triggers, analog sticks), and controlling the rumble motors. Also contains classes for converting the raw Xbox 360 controller inputs into meaningful commands for the following objects: • Robot arms - Provides joint control and several tool control schemes • UGV's - Provides translational and rotational commands for "skid-steer" vehicles • Pan-tilt units - Provides several modes of control including velocity, position, and point-tracking • Head-mounted displays (HMO)- Controls the viewpoint of a HMO • Umbra frames - Controls the position andorientation of an Umbra posrot object • Umbra graphics window - Provides several modes of control for the Umbra OSG window viewpoint including free-fly, cursor-focused, and object following.

Source record↗

Automated metadata, provenance cataloging and navigable interfaces: ensuring the usefulness of extreme-scale data

The MPO (Metadata, Provenance, Ontology) Project successfully addressed the goal of improving the usefulness and traceability of scientific data by building a system that could capture and display all steps in the process of creating, analyzing and disseminating that data. Throughout history, scientists have generated handwritten logbooks to keep track of data, their hypotheses, assumptions, experimental setup, and computational processes as well as reflections on observations and issues encountered. Over the last several decades, with the growth of personal computers, handheld devices, and the World Wide Web, the handwritten logbook has begun to be replaced by electronic logbooks. This transition has brought increased capability such as supporting multi-media, hypertext, and fast searching. However, content creation and metadata (a set of data that describes and gives information about other data) capturing has for the most part remained a manual activity just as it was with handwritten logbooks. This has led to a fragmentation of data, processing, and annotation that has only accelerated as scientific workflows continue to increase in complexity. From a scientific perspective, it is very important to be able to understand the lineage of any piece of data: who, what, when, how, and why. This is typically referred to as data provenance. The fragmentation discussed previously often means that data provenance is lost. As scientific workflows move to powerful computers and become more complex, the ability to track all of the steps involved in creating a piece of data become even more difficult. It was the goal of the MPO (Metadata, Provenance, Ontology) Project to create a system (the MPO System) that allows for automatic provenance and metadata capturing in such a way to allow easy searching and browsing. This goal needed to be accomplished in a general way so that it may be used across a broad range of scientific domains, yet allow the addition of vocabulary (Ontology) that is domain specific as is required for intelligent searching and browsing in the scientific context. Through the creation and deployment of the MPO system, the goals of the project were achieved. An enhanced metadata, provenance, and ontology storage system was created. This was combined with innovative methodologies for navigating and exploring these data using a web browser for both experimental and simulation-based scientific research. In addition, a system to allow scientists to instrument their existing workflows for automatic metadata and provenance is part of the MPO system. In that way, a scientist can continue to use their existing methodology yet easily document their work. Workflows and data provenance can be displayed either graphically or in an electronic notebook format and support advanced search features including via ontology. The MPO system was successfully used in both Climate and Magnetic Fusion Energy Research. The software for the MPO system is located at https://github.com/MPO-Group/MPO and is open source distributed under the Revised BSD License. A demonstration site of the MPO system is open to the public and is available at https://mpo.psfc.mit.edu/. A Docker container release of the command line client is available for public download using the command docker pull jcwright/mpo-cli at https://hub.docker.com/r/jcwright/mpo-cli.

97 MATHEMATICS AND COMPUTING↗

Training on Transport Security of Nuclear/Radioactive Materials for Key Audiences

Beginning in 2013, the U.S. Department of Energy (DOE) Packaging Certification Program (PCP), Office of Packaging and Transportation, Office of Environmental Management has sponsored a series of three training courses on Security of Nuclear and Other Radioactive Materials during Transport. These courses were developed and hosted by Argonne National Laboratory staff with guest lecturers from both the U.S. and international organizations and agencies including the U.S. Nuclear Regulatory Commission (NRC), Federal Bureau of Investigation (FBI), the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), DOE national laboratories, the International Atomic Energy Agency (IAEA), the World Nuclear Transport Institute (WNTI), and the World Institute for Nuclear Security (WINS). Each of the three courses held to date were one-week in length. The courses delved in detail into the regulatory requirements for transport security, focusing on international and U.S.-domestic requirements and guidance documents. Lectures, in-class discussions and small group exercises, including tabletop (TTX) and field exercises were designed to enhance the learning objectives for the participants. For example, the field exercise used the ARG-US radio frequency identification (RFID) remote surveillance system developed by Argonne for DOE/PCP to track and monitor packages in a mock shipment, following in-class exercises of developing a transport security plan (TSP) for the mock shipment, performing a readiness review and identifying needed corrective actions. Participants were able to follow the mock shipment on the webpage in real time in the ARG-US Command Center at Argonne including “staged” incidents that were designed to illustrate the importance of control, command, communication and coordination in ensuring transport security. Great lessons were learned based on feedback from the participant’s course evaluations with the series of the courses. Since the development of the relevant teaching materials for the course have largely been completed, tailoring the course for targeted audiences becomes a relatively easy task, requiring less effort and providing more flexibility for both the lecturers and future participants. One-day or two-day courses with focus specifically on the U.S. transport security requirements can be delivered, at locations away from Argonne, by one or two principal lecturers to targeted audiences such as regulators, shippers, carriers, state and local law enforcement personnel, and emergency responders. This paper will highlight the lessons learned in hosting previous one-week courses and discuss the development of options for detailed and/or customized courses/workshops for targeted key audiences.

2016 Waste Management March 6-10 Training on Trans↗

Performance regression manager for large scale systems

System and computer program product to perform an operation comprising generating, based on a first output generated by a first execution instance of a command, a first output file specifying a value of at least one performance metric, wherein the first output file is formatted according to a predefined format, comparing the value of the at least one performance metric in the first output file to a value of the performance metric in a second output file, the second output file having been generated based on a second output generated by a second execution instance of the command, and outputting for display an indication of a result of the comparison of the value of the at least one performance metric of the first output file to the value of the at least one performance metric of the second output file.

97 MATHEMATICS AND COMPUTING↗

Performance regression manager for large scale systems

Methods comprising generating, based on a first output generated by a first execution instance of a command, a first output file specifying a value of at least one performance metric, wherein the first output file is formatted according to a predefined format, comparing the value of the at least one performance metric in the first output file to a value of the performance metric in a second output file, the second output file having been generated based on a second output generated by a second execution instance of the command, and outputting for display an indication of a result of the comparison of the value of the at least one performance metric of the first output file to the value of the at least one performance metric of the second output file.

97 MATHEMATICS AND COMPUTING↗

Performance regression manager for large scale systems

System and computer program product to perform an operation comprising generating, based on a first output generated by a first execution instance of a command, a first output file specifying a value of at least one performance metric, wherein the first output file is formatted according to a predefined format, comparing the value of the at least one performance metric in the first output file to a value of the performance metric in a second output file, the second output file having been generated based on a second output generated by a second execution instance of the command, and outputting for display an indication of a result of the comparison of the value of the at least one performance metric of the first output file to the value of the at least one performance metric of the second output file.

97 MATHEMATICS AND COMPUTING↗

Electrified vehicle DC power conversion with distributed control

An electrified vehicle has a battery pack comprising series-connected battery units providing a main voltage. To supply a lower voltage bus equally from all battery units, a plurality of DC/DC converters are powered by respective units and have their outputs in parallel. A central module has an outer loop controller generating a target current to regulate the bus voltage to a predetermined voltage and has an allocator distributing the target current into a plurality of allocated current commands according to respective states of charge of the battery units. A plurality of local controllers each adjusts a current of a respective DC/DC converter. Each local controller receives a respective allocated current command as a respective feedforward control variable. Each local controller uses an error between the bus voltage and the predetermined voltage to be integrated as a respective feedback control variable only when the error is above a threshold.

33 ADVANCED PROPULSION SYSTEMS↗

System and method for efficient pointer chasing

Described is a system and method for efficient pointer chasing in systems having a single memory node or a network of memory nodes. In particular, a pointer chasing command is sent along with a memory request by an issuing node to a memory node. The pointer chasing command indicates the number of interdependent memory accesses and information needed for the identified interdependent memory accesses. An address computing unit associated with the memory node determines the relevant memory address for an interdependent memory access absent further interaction with the issuing node or without having to return to the issuing node.

Aguilera Diez, Paula↗

Methods and apparatus for parallel execution of a process

In one embodiment, a process may be performed in parallel on a parallel server by defining a data type that may be used to reference data stored on the parallel server and overloading a previously-defined operation, such that when the overloaded operation is called, a command is sent to the parallel server to manipulate the data stored on the parallel server. In some embodiments, the previously-defined operation that is overloaded may be an operation of an operating system. Further, in some embodiments, when the data stored on the parallel server is no longer needed, a command may be sent to the parallel server to reallocate the memory used to store the data.

97 MATHEMATICS AND COMPUTING↗

Control circuits for asynchronous circuits

The described embodiments include a computing device with one or more asynchronous circuits and control circuits that control the operation of the asynchronous circuits. In some embodiments, the control circuits are arranged in a hierarchy with a top-level control circuit atop the hierarchy and one or more local control circuits lower in the hierarchy. In these embodiments, the top-level control circuit processes operating information for the one or more asynchronous circuits and/or other functional blocks in the computing device to determine an operating state for the computing device. Based on the operating state, the top-level control circuit communicates commands to the local control circuits to cause the local control circuits to operate in corresponding operating modes. Based on a corresponding operating mode command, each local control circuit sets one or more operating parameters for corresponding asynchronous circuits (and/or one or more other functional blocks).

42 ENGINEERING↗

The Department of Energy Savannah River Operations Office Savannah River National Laboratory Unmanned Aircraft System Aviation Implementation Plan

The Department of Energy Savannah River Operations Office Savannah River National Laboratory Unmanned Aircraft System Aviation Implementation Plan was written to provide guidance for the safe, efficient, and lawful operation of the SRNL small Unmanned Aircraft System (sUAS) Program. It shall be the intent of every sUAS remote pilot in command to make reasonable effort not to invade a person's reasonable expectation of privacy when operating the sUAS. SRS sUAS operations will be conducted in accordance all applicable Federal Aviation Administration (FAA), Department of Energy (DOE), and DOE-Savannah River Operations Office (DOE-SR) regulations, policies and procedures. All sUAS operations will be conducted in accordance with the applicable FAA issued DOE Certificate of Authorization (COA) and be approved by the applicable DOE-SR Flight Readiness Review Board (FRRB). The scope of this document is limited to remote pilots in command of sUAS's in support of the DOE, DOE-SR, or SRS missions, research & development (R&D) and national security strategic initiatives supported by SRNL, and other approved missions as required in the US National Airspace (NAS) as defined by the FAA.

99 GENERAL AND MISCELLANEOUS↗

Obfuscation for high-performance computing systems

An example method includes initializing, by an obfuscation computing system, communications with nodes in a distributed computing platform, the nodes including one or more compute nodes and a controller node, and performing at least one of: (a) code-level obfuscation for the distributed computing platform to obfuscate interactions between an external user computing system and the nodes, wherein performing the code-level obfuscation comprises obfuscating data associated with one or more commands provided by the user computing system and sending one or more obfuscated commands to at least one of the nodes in the distributed computing platform; or (b) system-level obfuscation for the distributed computing platform, wherein performing the system-level obfuscation comprises at least one of obfuscating system management tasks that are performed to manage the nodes or obfuscating network traffic data that is exchanged between the nodes.

97 MATHEMATICS AND COMPUTING↗

Coordinated net-load management

A management device includes at least one processor communicatively coupled to at least one energy resource controller controlling at least one energy resource and to at least one deferrable load controller controlling power to at least one deferrable load. The is configured to receive an indication, determined based on a frequency value of an electrical network and a nominal frequency value, that a frequency anomaly event has occurred. Responsive to receiving the indication that the frequency anomaly event has occurred, the processor is also configured to determine, for at least one of the energy resource and the deferrable load, based on the frequency value, the nominal frequency value, and a power value of the electrical network, a respective power command, and cause at least one of the at least one energy resource and the at least one deferrable load to modify operation based on the respective power command.

42 ENGINEERING↗

Multimodal communication system

A multimodal communication system includes a vehicle controller that controls one or more systems or subsystems of an unmanned vehicle. The communication controller manages communication and logical access to the unmanned vehicle. One or more sensors in communication with the communication controller detects and measures physical properties in proximity to the unmanned vehicle. Transceivers receive the unmanned vehicle commands that are transmitted simultaneously or concurrently and a monotonic generator generates a monotonic object each time the unmanned vehicle's operating state changes. The communication controller executes the first unmanned vehicle command received that has the correct cryptographic hash validating knowledge of the unmanned vehicle's current operating state.

Duncan, Andrew M.↗

Control architecture for predictive and optimal vehicle operations in a single vehicle environment

There is disclosed a cloud computing control system for vehicle speed control and also for control of a vehicle in a platoon. The cloud computing control system determines a speed trajectory and neutral coasting command for a first vehicle of the platoon and a vehicle controller determines a reference speed for the first vehicle in response to the speed trajectory and the neutral coasting command, and is response to one or more vehicle specific factors associated with the first vehicle.

Borhan, Hoseinali↗

A Self-Synchronizing Underwater Acoustic Network for Mooring Load Monitoring of a Wave Energy Converter

This paper reports on the development of a self-synchronizing underwater acoustic network developed for remote monitoring of mooring loads in Wave Energy Converters (WECs). This network uses Time Division Multiple Access and operates self-contained with the ability for users to remotely transmit commands to the network as needed. Each node is a self-contained unit, consisting of a protocol adaptor board, an FAU-DPAM underwater acoustic modem and a battery pack. A node can be connected to a load cell, to a topside user or to the WEC. Every node is swapable. The protocol adaptor board, named Protocol Adaptor for Digital LOad Cell (PADLOC) supports a variety of digital load cell message formats (CAN, MODBUS, custom ASCII) and underwater acoustic modem serial formats. PADLOC enables topside users to connect to separate load cells through a user-specific command. This is especially important if the user is monitoring multiple load cells during deployment or maintenance, when the primary data system may be offline. Each PADLOC board handles formatting, buffering and has a one-on-one serial connection with each pair (node) of a digital load cell and acoustic modem. In addition, each PADLOC board handles the timekeeping and power saving features for each node. The only limitation is the data bit rate and delay limitations associated with the underwater acoustic modem. A four node self-synchronizing network has been developed to demonstrate the load cell monitoring capability using the PADLOC technology on the CalWave WEC.

acoustic↗

Coordinated net-load management

A management device includes at least one processor communicatively coupled to at least one energy resource controller controlling at least one energy resource and to at least one deferrable load controller controlling power to at least one deferrable load. The is configured to receive an indication, determined based on a frequency value of an electrical network and a nominal frequency value, that a frequency anomaly event has occurred. Responsive to receiving the indication that the frequency anomaly event has occurred, the processor is also configured to determine, for at least one of the energy resource and the deferrable load, based on the frequency value, the nominal frequency value, and a power value of the electrical network, a respective power command, and cause at least one of the at least one energy resource and the at least one deferrable load to modify operation based on the respective power command.

Lundstrom, Blake Richard↗

Detailed Laboratory Evaluation of Electric Demand Load Shifting Potential of Controlled Heat Pump Water Heaters

The demand profile management of electric end uses is vital research for utilities and policymakers planning greenhouse gas emission reductions. In this study, detailed laboratory research was conducted on the load shifting potential of 4 grid-connected HPWHs and one electric resistance water heaters (ERWH). The testing applied different CTA-2045 shed and critical peak command designs under three water draw profiles. Highly-controlled laboratory experiments were conducted in Florida. One of the four HPWHs was a prototype incorporating the new CTA-2045-B protocol feature allowing ‘advanced’ load-up above tank setpoint. A three-hour morning (6 – 9 AM) and four-hour evening curtailment (4 – 8 PM) were defined as the shed or critical peak periods reflecting high-value control periods for utility coincident load for system-wide electric demand reductions. Tests were performed under baseline conditions (no load shift) and under varied load-shifting schemes, including load up and advanced load up, ahead of shed and critical peak commands. Data were collected from December 2020 – February 2022 in the laboratory and compared with field experiments in Florida and the Pacific Northwest. Grid-connected HPWHs were found to reduce peak demand by up to 0.47 kW compared to uncontrolled HPWH units, depending on time of day, control scheme, draw profile, and temperature cluster. The load up strategy demonstrated the ability of all units to utilize heat pump mode for extended periods ahead of peak events. Demand reductions for the HPWHs were much larger when compared with the ERWH— up to 1.64 kW with large hot water draws in winter.

Fenaughty, Karen↗