Search NASA⌕ Search

SEARCH · Search NASA

Results for “Complexity management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Manned versus unmanned space-based astronomy.

Discussion of the pros and cons of manned and unmanned space-based astronomical observatory systems. Rather than compete with one another, manned and unmanned systems, it is felt, should complement themselves mutually. The paramount factor inhibiting the growth of both manned and unmanned systems is shown to be the high cost per pound of payload equipment. The main hope for reducing this cost is the advent of a space station or shuttle sortie mode of operation in which the frequency of flights will reduce the necessity to guarantee experiment success. This, in turn, should reduce the complexity of experiment management and the cost of experiment hardware.

Henize, K. G.↗

MSFC Skylab lessons learned

Key lessons learned during the Skylab Program that could have impact on on-going and future programs are presented. They present early and sometimes subjective opinions; however, they give insights into key areas of concern. These experiences from a complex space program management and space flight serve as an early assessment to provide the most advantage to programs underway. References to other more detailed reports are provided.

Source record↗

NASA/ESA CV-990 spacelab simulation

Due to interest in the application of simplified techniques used to conduct airborne science missions at NASA's Ames Research Center, a joint NASA/ESA endeavor was established to conduct an extensive Spacelab simulation using the NASA CV-990 airborne laboratory. The scientific payload was selected to perform studies in upper atmospheric physics and infrared astronomy with principal investigators from France, the Netherlands, England, and several groups from the United States. Communication links between the 'Spacelab' and a ground based mission operations center were limited consistent with Spacelab plans. The mission was successful and provided extensive data relevant to Spacelab objectives on overall management of a complex international payload; experiment preparation, testing, and integration; training for proxy operation in space; data handling; multiexperimenter use of common experimenter facilities (telescopes); multiexperiment operation by experiment operators; selection criteria for Spacelab experiment operators; and schedule requirements to prepare for such a Spacelab mission.

Source record↗

NASA/ESA CV-990 spacelab simulation

Simplified techniques were applied to conduct an extensive spacelab simulation using the airborne laboratory. The scientific payload was selected to perform studies in upper atmospheric physics and infrared astronomy. The mission was successful and provided extensive data relevant to spacelab objectives on overall management of a complex international payload; experiment preparation, testing, and integration; training for proxy operation in space; data handling; multiexperimenter use of common experimenter facilities (telescopes); multiexperiment operation by experiment operators; selection criteria for spacelab experiment operators; and schedule requirements to prepare for such a spacelab mission.

Reller, J. O., Jr.↗

NASA/ESA CV-990 airborne simulation of Spacelab

The paper describes the joint NASA/ESA extensive Spacelab simulation using the NASA CV-990 airborne laboratory. The scientific payload was selected to conduct studies in upper atmospheric physics and infrared astronomy. Two experiment operators from Europe and two from the U.S. were selected to live aboard the aircraft along with a mission manager for a six-day period and operate the experiments in behalf of the principal scientists. The mission was successful and provided extensive data relevant to Spacelab objectives on overall management of a complex international payload; experiment preparation, testing, and integration; training for proxy operation in space; data handling; multiexperimenter use of common experimenter facilities (telescopes); and schedule requirements to prepare for such a Spacelab mission.

Mulholland, D.↗

Airborne simulation of Shuttle/Spacelab management and operation

The ASSESS (Airborne Science/Spacelab Experiments System Simulation) program is discussed. A simulated Spacelab operation was carried out aboard the CV-990 airborne laboratory at Ames Research Center. A scientific payload was selected to conduct studies in upper atmospheric physics and infrared astronomy with principal investigators from France, the Netherlands, England and the U.S. Two experiment operators (EOs) from the U.S. and two from Europe were trained to function as proxies for the principal investigators in operating, maintaining, and repairing the scientific instruments. The simulated mission, in which the EOs and a Mission Manager were confined to the aircraft and living quarters for a 1-week period while making scientific observations during nightly flights, provided experience in the overall management of a complex international payload, experiment preparation, testing, and integration, the training and selection of proxy operators, and data handling.

Mulholland, D. R.↗

Relocation of the Deep Space Network Maintenance Center

The Jet Propulsion Laboratory maintains a Deep Space Network (DSN) maintenance center (DMC), whose task is to engineer and manage the repair and calibration program for the electronic and mechanical equipment used in the tracking stations located at Madrid, Spain, and Canberra, Australia. The DMC also manages the Goldstone complex maintenance facility (GCMF), whose task is to repair and calibrate the Goldstone electronic and mechanical equipment. The rationale for moving the facility to Barstow, California, and the benefits derived from the move are discussed.

Beutler, K. F.↗

Object-oriented development

Object Oriented Development (OOD) is one of the extremely few software development methods actually designed for modern Ada language, real-time, embedded applications. OOD is a significant improvement over more traditional functional decomposition and modeling methods in that ODD: Better manages the size, complexity, and concurrancy of today's systems; Better addresses important software engineering principles such as abstract data types, levels of abstraction, and information hiding; Produces a better design that more closely matches reality; Produces more maintainable software by better localizing data and thus limiting the impact of requirements changes; and Specifically exploits the power of Ada. OOD is further explored in detail.

Firesmith, Donald G.↗

Tensoral: A system for post-processing turbulence simulation data

Many computer simulations in engineering and science -- and especially in computational fluid dynamics (CFD) -- produce huge quantities of numerical data. These data are often so large as to make even relatively simple post-processing of this data unwieldy. The data, once computed and quality-assured, is most likely analyzed by only a few people. As a result, much useful numerical data is under-utilized. Since future state-of-the-art simulations will produce even larger datasets, will use more complex flow geometries, and will be performed on more complex supercomputers, data management issues will become increasingly cumbersome. My goal is to provide software which will automate the present and future task of managing and post-processing large turbulence datasets. My research has focused on the development of these software tools -- specifically, through the development of a very high-level language called 'Tensoral'. The ultimate goal of Tensoral is to convert high-level mathematical expressions (tensor algebra, calculus, and statistics) into efficient low-level programs which numerically calculate these expressions given simulation datasets. This approach to the database and post-processing problem has several advantages. Using Tensoral the numerical and data management details of a simulation are shielded from the concerns of the end user. This shielding is carried out without sacrificing post-processor efficiency and robustness. Another advantage of Tensoral is that its very high-level nature lends itself to portability across a wide variety of computing (and supercomputing) platforms. This is especially important considering the rapidity of changes in supercomputing hardware.

Dresselhaus, Eliot↗

The Network Operations Control Center upgrade task: Lessons learned

This article synthesizes and describes the lessons learned from the Network Operations Control Center (NOCC) upgrade project, from the requirements phase through development and test and transfer. At the outset, the NOCC upgrade was being performed simultaneously with two other interfacing and dependent upgrades at the Signal Processing Center (SPC) and Ground Communications Facility (GCF), thereby adding a significant measure of complexity to the management and overall coordination of the development and transfer-to-operations (DTO) effort. Like other success stories, this project carried with it the traditional elements of top management support and exceptional dedication of cognizant personnel. Additionally, there were several NOCC-specific reasons for success, such as end-to-end system engineering, adoption of open-system architecture, thorough requirements management, and use of appropriate off-the-shelf technologies. On the other hand, there were several difficulties, such as ill-defined external interfaces, transition issues caused by new communications protocols, ambivalent use of two sets of policies and standards, and mistailoring of the new JPL management standard (due to the lack of practical guidelines). This article highlights the key lessons learned, as a means of constructive suggestions for the benefit of future projects.

Sherif, J. S.↗

Ideas for Future GPS Timing Improvements

Having recently met stringent criteria for full operational capability (FOC) certification, the Global Positioning System (GPS) now has higher customer expectations than ever before. In order to maintain customer satisfaction, and the meet the even high customer demands of the future, the GPS Master Control Station (MCS) must play a critical role in the process of carefully refining the performance and integrity of the GPS constellation, particularly in the area of timing. This paper will present an operational perspective on several ideas for improving timing in GPS. These ideas include the desire for improving MCS - US Naval Observatory (USNO) data connectivity, an improved GPS-Coordinated Universal Time (UTC) prediction algorithm, a more robust Kalman Filter, and more features in the GPS reference time algorithm (the GPS composite clock), including frequency step resolution, a more explicit use of the basic time scale equation, and dynamic clock weighting. Current MCS software meets the exceptional challenge of managing an extremely complex constellation of 24 navigation satellites. The GPS community will, however, always seek to improve upon this performance and integrity.

Hutsell, Steven T.↗

Meta-Modeling: A Knowledge-Based Approach to Facilitating Model Construction and Reuse

In this paper, we introduce a new modeling approach called meta-modeling and illustrate its practical applicability to the construction of physically-based ecosystem process models. As a critical adjunct to modeling codes meta-modeling requires explicit specification of certain background information related to the construction and conceptual underpinnings of a model. This information formalizes the heretofore tacit relationship between the mathematical modeling code and the underlying real-world phenomena being investigated, and gives insight into the process by which the model was constructed. We show how the explicit availability of such information can make models more understandable and reusable and less subject to misinterpretation. In particular, background information enables potential users to better interpret an implemented ecosystem model without direct assistance from the model author. Additionally, we show how the discipline involved in specifying background information leads to improved management of model complexity and fewer implementation errors. We illustrate the meta-modeling approach in the context of the Scientists' Intelligent Graphical Modeling Assistant (SIGMA) a new model construction environment. As the user constructs a model using SIGMA the system adds appropriate background information that ties the executable model to the underlying physical phenomena under investigation. Not only does this information improve the understandability of the final model it also serves to reduce the overall time and programming expertise necessary to initially build and subsequently modify models. Furthermore, SIGMA's use of background knowledge helps eliminate coding errors resulting from scientific and dimensional inconsistencies that are otherwise difficult to avoid when building complex models. As a. demonstration of SIGMA's utility, the system was used to reimplement and extend a well-known forest ecosystem dynamics model: Forest-BGC.

Keller, Richard M.↗

Earth benefits of interdisciplinary CELSS-related research by the NSCORT in Bioregenerative Life Support

Earth benefits of research from the NSCORT in Bioregenerative Life Support will include the following: development of active control mechanisms for light, CO2, and temperature to maximize photosynthesis of crop plants during important phases of crop development; automation of crop culture systems; creation of novel culture systems for optimum productivity; creation of value-added crops with superior nutritional, yield, and waste-process characteristics; environmental control of food and toxicant composition of crops; new process technologies and novel food products for safe, nutritious, palatable vegetarian diets; creation of menus for healthful vegetarian diets with psychological acceptability; enzymatic procedures to degrade recalcitrant crop residues occurring in municipal waste; control-system strategies to ensure sustainabilty of a CELSS that will enable management of diverse complex systems on Earth.

NASA Discipline Number 93-10↗

Autonomic Computing: Panacea or Poppycock?

Autonomic Computing arose out of a need for a means to cope with rapidly growing complexity of integrating, managing, and operating computer-based systems as well as a need to reduce the total cost of ownership of today's systems. Autonomic Computing (AC) as a discipline was proposed by IBM in 2001, with the vision to develop self-managing systems. As the name implies, the influence for the new paradigm is the human body's autonomic system, which regulates vital bodily functions such as the control of heart rate, the body's temperature and blood flow-all without conscious effort. The vision is to create selfivare through self-* properties. The initial set of properties, in terms of objectives, were self-configuring, self-healing, self-optimizing and self-protecting, along with attributes of self-awareness, self-monitoring and self-adjusting. This self-* list has grown: self-anticipating, self-critical, self-defining, self-destructing, self-diagnosis, self-governing, self-organized, self-reflecting, and self-simulation, for instance.

Sterritt, Roy↗

Space Shuttle GN and C Development History and Evolution

Completion of the final Space Shuttle flight marks the end of a significant era in Human Spaceflight. Developed in the 1970 s, first launched in 1981, the Space Shuttle embodies many significant engineering achievements. One of these is the development and operation of the first extensive fly-by-wire human space transportation Guidance, Navigation and Control (GN&C) System. Development of the Space Shuttle GN&C represented first time inclusions of modern techniques for electronics, software, algorithms, systems and management in a complex system. Numerous technical design trades and lessons learned continue to drive current vehicle development. For example, the Space Shuttle GN&C system incorporated redundant systems, complex algorithms and flight software rigorously verified through integrated vehicle simulations and avionics integration testing techniques. Over the past thirty years, the Shuttle GN&C continued to go through a series of upgrades to improve safety, performance and to enable the complex flight operations required for assembly of the international space station. Upgrades to the GN&C ranged from the addition of nose wheel steering to modifications that extend capabilities to control of the large flexible configurations while being docked to the Space Station. This paper provides a history of the development and evolution of the Space Shuttle GN&C system. Emphasis is placed on key architecture decisions, design trades and the lessons learned for future complex space transportation system developments. Finally, some of the interesting flight operations experience is provided to inform future developers of flight experiences.

Zimpfer, Douglas↗

The Legacy of Space Shuttle Flight Software

The initial goals of the Space Shuttle Program required that the avionics and software systems blaze new trails in advancing avionics system technology. Many of the requirements placed on avionics and software were accomplished for the first time on this program. Examples include comprehensive digital fly-by-wire technology, use of a digital databus for flight critical functions, fail operational/fail safe requirements, complex automated redundancy management, and the use of a high-order software language for flight software development. In order to meet the operational and safety goals of the program, the Space Shuttle software had to be extremely high quality, reliable, robust, reconfigurable and maintainable. To achieve this, the software development team evolved a software process focused on continuous process improvement and defect elimination that consistently produced highly predictable and top quality results, providing software managers the confidence needed to sign each Certificate of Flight Readiness (COFR). This process, which has been appraised at Capability Maturity Model (CMM)/Capability Maturity Model Integration (CMMI) Level 5, has resulted in one of the lowest software defect rates in the industry. This paper will present an overview of the evolution of the Primary Avionics Software System (PASS) project and processes over thirty years, an argument for strong statistical control of software processes with examples, an overview of the success story for identifying and driving out errors before flight, a case study of the few significant software issues and how they were either identified before flight or slipped through the process onto a flight vehicle, and identification of the valuable lessons learned over the life of the project.

Hickey, Christopher J.↗

MINK Workshop Presentations for SERVIR

Topics include: MINX Document 1 MISR : The instrument, its orbit and data products. MINX Document 2 MISR : Tools for ordering and viewing data. MINX Document 3 : MINX : Overview and plume case studies. MINX Document 4 : MINX basic features. MINX Document 5 : Measuring aerosol height and motion with MINX. MINX Document 5 : Handling complexities in height retrievals. Plume boundaries, Wind direction, Low Optical Thickness, Other complexities. Digitizing options. Managing plume projects.

MINX↗

Project Assessment Framework through Design (PAFTD) - A Project Assessment Framework in Support of Strategic Decision Making

Research and development organizations that push the innovation edge of technology frequently encounter challenges when attempting to identify an investment strategy and to accurately forecast the cost and schedule performance of selected projects. Fast moving and complex environments require managers to quickly analyze and diagnose the value of returns on investment versus allocated resources. Our Project Assessment Framework through Design (PAFTD) tool facilitates decision making for NASA senior leadership to enable more strategic and consistent technology development investment analysis, beginning at implementation and continuing through the project life cycle. The framework takes an integrated approach by leveraging design principles of useability, feasibility, and viability and aligns them with methods employed by NASA's Independent Program Assessment Office for project performance assessment. The need exists to periodically revisit the justification and prioritization of technology development investments as changes occur over project life cycles. The framework informs management rapidly and comprehensively about diagnosed internal and external root causes of project performance.

Depenbrock, Brett T.↗