Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Abstraction Planning in Real Time

When a planning agent works in a complex, real-world domain, it is unable to plan for and store all possible contingencies and problem situations ahead of time. The agent needs to be able to fall back on an ability to construct plans at run time under time constraints. This thesis presents a method for planning at run time that incrementally builds up plans at multiple levels of abstraction. The plans are continually updated by information from the world, allowing the planner to adjust its plan to a changing world during the planning process. All the information is represented over intervals of time, allowing the planner to reason about durations, deadlines, and delays within its plan. In addition to the method, the thesis presents a formal model of the planning process and uses the model to investigate planning strategies. The method has been implemented, and experiments have been run to validate the overall approach and the theoretical model.

ARTIFICIAL INTELLIGENCE↗

Development of Space Shuttle Rescue and Recovery Operations

As the first Space Shuttle launch was still in our future, many from NASA, the Department of Defense (DoD) and NASA contractors were busy planning for not only a nominal launch and return, but contingency operations at the launch pad and landing sites. Prior to the first launch, detailed coordination, planning and simulations were conducted at all three locations and internal rescue procedures were taught at Kennedy Space Center (KSC). Later in the Program, the Transoceanic Abort Landing (TAL) sites were added in Europe and Africa. For the 51L mission a new TAL site was brought on line in Morocco. However, upon launch, the Shuttle Program experienced it's first lost. During the following months a complete review of all contingency operations (launch and landing) was completed. Many enhancements were made based on the reviews following. A Mode VIII water rescue was developed for NASA by the DoD before the STS-26 launch. Different concepts were explored and being debated by NASA. Training of the contingency forces was required before final decisions were made forcing the teaching of two different sets of procedures. To assist with training, a video was developed for the fire/crash/rescue personnel. This accompanied the detailed extraction procedures that were developed by a combination of KSC and DoD firemen. Training for the fire/crash/rescue personnel at Vandenberg AFB was also being planned before the accident happen. The fire/crash/rescue mockup that was being built at Chanute AFB was diverted to Edwards AFB. Educational Objectives: With the emphasis on Commercial Crew Programs for Space flight it is important that all involved understand what is required to prepare for contingencies. Cost effective means of being prepared for contingencies are needed. Questions: 1. When should planning for nominal and contingency operations begin? 2. What type of training aids are needed for contingency operations? 3. Who were the major contributors to Shuttle contingency operations?

Chandler, Michael↗

Determining Thermal Capabilities for External Transfer Operations on the International Space Station

External transfers on the International Space Station (ISS) have a degree of difficulty caused by the severity of the radiative thermal environment and the complexity of the operational choreography to perform the installation and activation of the hardware. These transfers can be performed robotically, by astronauts during an Extra Vehicular Activity (EVA - spacewalk), or combination of robotic/crew operations. Robotic transfers may include capability to intermittently power the hardware; while the hardware remains unpowered for EVA operations. Robotic transfers can be staged to occur in a favorable thermal environment, though typically take longer than a transfer by crew during an EVA where the hardware may not be robotically compatible. The hardware is under passive thermal control, use of optics/multi-layer insulation/heaters, while being transferred from/to a visiting vehicle, airlock, stowage platform, or external ISS structure and may include additional design components, such as removable protective blankets, to meet the transfer requirements. Thermal analysis must be performed to determine the capability of the hardware being transferred to provide the Mission Control team the products necessary to plan and execute the operation while establishing an awareness for any contingency response. An overview of the thermal aspects in planning these types of transfer operations, the analytical approaches and assumptions, and examples of results are provided in this paper.

Thermal↗

Pelvic Radiotherapy for Cancer of the Cervix: Is What You Plan Actually What You Deliver?

Purpose: Whole pelvic intensity-modulated radiotherapy (IMRT) is increasingly being used to treat cervix cancer and other gynecologic tumors. However, tumor and normal organ movement during treatment can substantially detract from the benefits of this approach. This study explored the effect of internal anatomic changes on the dose delivered to the tumor and organs at risk using a strategy integrating deformable soft-tissue modeling with simulated dose accumulation. Methods and Materials: Twenty patients with cervix cancer underwent baseline and weekly pelvic magnetic resonance imaging during treatment. Interfraction organ motion and delivered (accumulated) dose was modeled for three treatment scenarios: four-field box, large-margin whole pelvic IMRT (20-mm planning target volume, but 10 mm inferiorly) and small-margin IMRT (5-mm planning target volume). Results: Individually, the planned dose was not the same as the simulated delivered dose; however, when taken as a group, this was not statistically significant for the four-field box and large-margin IMRT plans. The small-margin IMRT plans yielded adequate target coverage in most patients; however, significant target underdosing occurred in 1 patient who displayed excessive, unpredictable internal target movement. The delivered doses to the organs at risk were significantly reduced with the small-margin plan, although substantial variability was present among the patients. Conclusion: Simulated dose accumulation might provide a more accurate depiction of the target and organ at risk coverage during fractionated whole pelvic IMRT for cervical cancer. The adequacy of primary tumor coverage using 5-mm planning target volume margins is contingent on the use of daily image-guided setup.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Lessons Learned in Risk Management on NCSX

The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Review of extravehicular activity for Shuttle program

Extravehicular activity (EVA) is a baselined Shuttle Orbiter capability. It can provide cost-effective servicing operations for payloads, on-orbit repair, and techniques for meeting various on-orbit contingencies. The basic EVA system planned consists of Orbiter-integral provisions, carry-on life support provisions, and EVA support equipment provisions. The Orbiter-integral provisions include the internal airlock, the EVA Egress module, and the docking module, each of which provides an egress path. The carry-on life support provisions will be two Extravehicular Mobility Units (EMU), composed of an Astronaut Life Support Assembly (ALSA) and a Space Suit Assembly (SSA). The support equipment includes tethers, special tools, translation aids, and workstations. The Shuttle Orbiter EVA requirements and possible tasks, EVA crew rescue equipment and techniques, crew support, EVA training, and EVA timeline activities are described.

Covington, J. H.↗

Visiting Vehicle Ground Trajectory Tool

The International Space Station (ISS) Visiting Vehicle Group needed a targeting tool for vehicles that rendezvous with the ISS. The Visiting Vehicle Ground Trajectory targeting tool provides the ability to perform both realtime and planning operations for the Visiting Vehicle Group. This tool provides a highly reconfigurable base, which allows the Visiting Vehicle Group to perform their work. The application is composed of a telemetry processing function, a relative motion function, a targeting function, a vector view, and 2D/3D world map type graphics. The software tool provides the ability to plan a rendezvous trajectory for vehicles that visit the ISS. It models these relative trajectories using planned and realtime data from the vehicle. The tool monitors ongoing rendezvous trajectory relative motion, and ensures visiting vehicles stay within agreed corridors. The software provides the ability to update or re-plan a rendezvous to support contingency operations. Adding new parameters and incorporating them into the system was previously not available on-the-fly. If an unanticipated capability wasn't discovered until the vehicle was flying, there was no way to update things.

Hamm, Dustin↗

Conceptual Drivers for an Exploration Medical System

Interplanetary spaceflight, such as NASA's proposed three-year mission to Mars, provides unique and novel challenges when compared with human spaceflight to date. Extended distance and multi-year missions introduce new elements of operational complexity and additional risk. These elements include: inability to resupply medications and consumables, inability to evacuate injured or ill crew, uncharted psychosocial conditions, and communication delays that create a requirement for some level of autonomous medical capability. Because of these unique challenges, the approaches used in prior programs have limited application to a Mars mission. On a Mars mission, resource limitations will significantly constrain available medical capabilities, and require a paradigm shift in the approach to medical system design and risk mitigation for crew health. To respond to this need for a new paradigm, the Exploration Medical Capability (ExMC) Element is assessing each Mars mission phase-transit, surface stay, rendezvous, extravehicular activity, and return-to identify and prioritize medical needs for the journey beyond low Earth orbit (LEO). ExMC is addressing both planned medical operations, and unplanned contingency medical operations that meld clinical needs and research needs into a single system. This assessment is being used to derive a gap analysis and studies to support meaningful medical capabilities trades. These trades, in turn, allow the exploration medical system design to proceed from both a mission centric and ethics-based approach, and to manage the risks associated with the medical limitations inherent in an exploration class mission. This paper outlines the conceptual drivers used to derive medical system and vehicle needs from an integrated vision of how medical care will be provided within this paradigm. Keywords: (Max 6 keywords: exploration, medicine, spaceflight, Mars, research, NASA)

Antonsen, Erik↗

JWST REAL-TIME MID-COURSE CORRECTION MANEUVER MONITORING CONTINGENCY PREPARATION

The NASA James Webb Space Telescope (JWST) mission successfully launched on Dec 25, 2021, at 12:20 Coordinated Universal Time (UTC). During the 30-day transfer to the second Sun-Earth-Moon (SEM) libration point (L2), JWST executed three mid-course correction (MCC) maneuvers to insert into a quasi-halo orbit about L2. This paper covers the design and modeling for these three maneuvers with a focus on the timeline around the execution of each MCC maneuver. It will summarize the actual on-board events as well as the contingency preparation done for maneuver planning, monitoring, and final post-burn reconstruction of all three MCC maneuvers.

Wayne Yu↗

JWST Real-Time Mid-Course Correction Maneuver Monitoring Contingency Preparation

The NASA James Webb Space Telescope (JWST) mission successfully launched on Dec 25, 2021, at 12:20 Coordinated Universal Time (UTC). During the 30-day transfer to the second Sun-Earth-Moon (SEM) libration point (L2), JWST executed three mid-course correction (MCC) maneuvers to insert into a quasi-halo orbit about L2. This paper covers the design and modeling for these three maneuvers with a focus on the timeline around the execution of each MCC maneuver. It will summarize the actual on-board events as well as the contingency preparation done for maneuver planning, monitoring, and final post-burn reconstruction of all three MCC maneuvers.

Toni Santacroce↗

Candidate Performance Metrics for Generalized Control for Autonomous Flight

Contingency management is the most challenging aspect of autonomous flight. In order to accommodate the most flexible response to unpredicted events and unexpected circumstances, i.e. contingencies, a new integrated path planning, trajectory following, flight control architecture is required that would maximize the safe operating envelope. For this highly integrated generalized control architecture, a new set of performance metrics that extends beyond traditional stability and performance is required. This paper proposes a candidate set of new performance metrics relevant to urban air mobility mission scenarios.

Control metrics↗

Candidate Performance Metrics for Generalized Control for Autonomous Flight

Contingency management is the most challenging aspect of autonomous flight. In order to accommodate the most flexible response to unpredicted events and unexpected circumstances, i.e. contingencies, a new integrated path planning, trajectory following, flight control architecture is required that would maximize the safe operating envelope. For this highly integrated generalized control architecture, a new set of performance metrics that extends beyond traditional stability and performance is required. This paper proposes a candidate set of new performance metrics relevant to urban air mobility mission scenarios.

Control metrics↗

Transit Habitat Concept and Mars Analog in Cislunar Orbit

- Transit Habitat Overview - Supports 4-crew during Lunar-Mars Analog missions leading up to a 700-1110-day Mars mission - Hybrid inflatable-metallic habitat structure - Launched commercially and outfitted with logistics in cis-lunar orbit (NRHO) - Docks w/ an interim propulsion bus or Gateway for first ~5 years until Mars Propulsion System (MPS) elements available - Extends Gateway operations beyond 60 days - Contingency Airlock and EVA capability - Planned reuse for multiple missions over 15-year lifetime - Builds on ISS and commercial investment in deep space habitation - Mid-2030s launch with late 2030s Mars Departure

Mars↗

Lessons Learned in Risk Management on NCSX

The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and subassemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, which was established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-2008. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks were ultimately unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Lessons Learned in Risk Management on NCSX

The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Lessons Learned in Risk Management on NCSX

The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A Study of the Impact of Peak Demand on Increasing Vulnerability of Cascading Failures to Extreme Contingency Events

The vulnerability of large power systems to cascading failures and major blackouts has become evident since the Northeast blackout in 1965. Based on analyses of the series of cascading blackouts in the past decade, the research community realized the urgent need to develop better methods, tools, and practices for performing cascading-outage analysis and for evaluating mitigations that are easily accessible by utility planning engineers. PNNL has developed the Dynamic Contingency Analysis Tool (DCAT) as an open-platform and publicly available methodology to help develop applications that aim to improve the capabilities of power planning engineers to assess the impact and likelihood of extreme contingencies and potential cascading events across their systems and interconnections. DCAT analysis will help identify potential vulnerabilities and allow study of mitigation solutions to reduce the risk of cascading outages in technically sound and effective ways. Using the DCAT capability, we examined the impacts of various load conditions to identify situations in which the power grid may encounter cascading outages that could lead to potential blackouts. This paper describes the usefulness of the DCAT tool and how it helps to understand potential impacts of load demand on cascading failures on the power system.

indexes↗

EOS Terra Constellation Exit Review

This package presents the plans for Terra lowering its orbit by 5-6 kms and effectively removing itself from the 705km constellation in October 2022. Also, presented is all the work done to get ready for these maneuvers from both the Flight Dynamics and Flight Operations Team perspective, as well discussion of any contingencies and their associated pre-planned responses.

Dimitrios Mantziaras↗