The DOE ETV-1 Electric Test Vehicle. Phase 3: Performance Testing and system evaluation
Engineering tests were conducted in order to characterize overall system performance and component efficiencies within the system environment. A dynamometer was used in order to minimize the ambient effects and large uncertainties present in track testing. Extensive test requirements were defined and procedures were carefully controlled in order to maintain a high degree of credibility. Limited track testing was performed in order to corroborate the dynamometer results. Test results include an energy flow analysis through the major subsystems and incorporate the aerodynamic and rolling losses under cyclic and various steady speed conditions. The major output from all relevant dynamometer and track tests is also included.