Search NASA⌕ Search

SEARCH · Search NASA

Results for “Deployable Boom”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Solar Cruiser TRAC Boom Development

The TRAC boom studied is a 30 meter, high-aspect ratio and highly nonlinear structural element planned for the NASA Solar Cruiser spacecraft where it would serve as the solar sail’s skeletal system designed to deploy the packaged reflective sail membrane as well as support operational sail tension loads for flight. Key design drivers for this boom are understanding and characterizing load-deformation behavior and quantifying buckling performance–under flight conditions (zero gravity). Knowing that the full-scale solar sail system cannot be feasibly tested for flight conditions under Earth’s gravity, a building block approach is methodically followed to verify finite element analysis (FEA) predictions and to evolve the finite element model (FEM) accordingly, beginning with the lowest level complexity to match global elastic behavior to the highest level complexity to bound theoretical responses under conservative expected flight conditions. Although the testing campaign for the TRAC boom has not developed yet to produce a full-scale test data point that loads the boom to failure, the fidelity of simulations have evolved with success and warrant further interest and work on this high-aspect ratio, but highly stable, deployable structural boom.

Lee Nguyen↗

Analysis of Triangular Rollable and Collapsible (TRAC) Composite Booms under the Effects of Gravity and Twist

Finite element analysis is used to investigate Triangular Rollable and Collapsible (TRAC) composite booms. The TRAC booms are subjected to a suite of loading conditions, including in-plane bending, out-of-plane bending, and axial compression. Simulations containing as-designed boom geometry are performed, as are simulations with geometric deviations associated with the as-built conditions of a sample TRAC boom. Namely, a cross-sectional twist along the length of the boom is incorporated into the analysis to study the effect of the twist on the deformation characteristics of the boom. Twisting in the sample boom was observed after short-term storage in a rolled configuration and may be attributed to differential creep deformation between the inner and outer flanges of the TRAC boom. Simulations are conducted with and without the effects of gravity to understand the significance of gravity on testing conditions. Booms of three lengths are evaluated: 3 meters, 7.5 meters and 30 meters. The mechanical responses of the TRAC booms are discussed with reference to the effects of gravity, boom length and cross-sectional twisting. Gravity is found to have a more significant effect on boom mechanical response as boom length is increased. Cross-sectional twisting is found to have a more significant effect on boom mechanical response in the shorter booms.

High-strain composites↗

Effects of Manufacturing and Deployment on Thin Films for the NGTS Sunshade

The Next Generation Space Telescope (NGST) is being developed as an advanced astronomical observatory. The NGST proposes to utilize several thin film membrane layers to create a shield for protection of the telescope from solar thermal energy and stray light, The shield will take the form of a polygon, approximately 15 x 30 m, with individual membrane layers positioned so that they do not come in contact with one another. The membrane shield will be deployed and supported by a series of booms, which will be packed into a small volume for launch. Finally, the shield will be deployed on orbit. Several film materials are being considered for the membrane shield, including CPI, Kapton E, Kapton RN, and Upilex. Each of these polyimide materials was tested to determine their durability over the 10-year mission. New facets of materials testing have been introduced in this study to develop performance data with greater realism to actual use, particularly that of degradation from packing, launch and deployment processing. Materials were exposed to handling that simulated the life of the materials from manufacture through deployment with standardized fixtures and then exposed to a simulated, L2, 10-year radiation environment. Mechanical and thermal radiative properties were measured before and after each phase of testing. This paper summarizes the program and test results.

Wooldridge, Eve M.↗

Analysis of Triangular Rollable and Collapsible Composite Booms Under the Effects of Gravity and Twist

Finite element analysis is used to investigate Triangular Rollable and Collapsible (TRAC) composite booms. The TRAC booms are subjected to a suite of loading conditions, including in-plane bending, out-of-plane bending, and axial compression. Simulations containing as-designed boom geometry are performed, as are simulations with geometric deviations associated with the as-built conditions of a sample TRAC boom. Namely, a cross-sectional twist along the length of the boom is incorporated into the analysis to study the effect of the twist on the deformation characteristics of the boom. Twisting in the sample boom was observed after short-term storage in a rolled configuration and may be attributed to differential creep deformation between the inner and outer flanges of the TRAC boom. Simulations are conducted with and without the effects of gravity to understand the significance of gravity on testing conditions. Booms of three lengths are evaluated: 3 meters, 7.5 meters and 30 meters. The mechanical responses of the TRAC booms are discussed with reference to the effects of gravity, boom length and cross-sectional twisting. Gravity is found to have a more significant effect on boom mechanical response as boom length is increased. Cross-sectional twisting is found to have a more significant effect on boom mechanical response in the shorter booms.

High-strain composites↗

A demonstration of the value of general purpose, on-board satellite computers

Failure of the solar panels to erect and spin stabilize the TRANSIT Improvement Program (TIP) satellites is discussed, with emphasis on how the flight computer was reprogrammed to perform various control functions in order to achieve a partial mission success. These functions include: (1) power management to avoid troublesome spacecraft blackouts; (2) achieve enough spin stability to fire the OATS thruster; (3) raise the parking orbit to a workable altitude; (4) remove a high tumble rate which was the indirect result of the failure; and (5) deploy the gravity-gradient boom successfully on TIP-3.

Jenkins, R. E.↗

GEOS-20 m cable boom mechanism

The GEOS cable boom mechanism allows the controlled deployment of a 20 m long cable in a centrifugal force field. In launch configuration the flat cable is reeled on a 240 mm diameter drum. The electrical connection between the rotating drum and the stationary housing is accomplished via a flexlead positioned inside the drum. Active motion control of this drum is achieved by a self locking worm gear, driven by a stepper motor. The deployment length of the cable is monitored by an optical length indicator, sensing black bars engraved on the cable surface.

Schmidt, B. K.↗

In situ measurement of atomic hydrogen in the upper mesosphere

In situ measurements of H abundance between 73 and 93 km are reported for conditions of winter solstice, magnetic quiet, and a solar depression angle of 12 deg. The data were obtained by a rocket-borne instrument using the resonance fluorescence technique. A discharge source emitting photons at 1216 A was an integral part of the instrument. The instrument was radially deployed 80 cm by a boom from the front of the payload in order to avoid the shock created by the gas flow over the front of the payload. An attitude control system oriented the payload so that the gas flow was nearly perpendicular to the plane containing the incident and scattered photons, thus minimizing any correction for Doppler shift. The resonance radiation detector viewed a black backstop in order to minimize background radiation from the hydrogen geocorona; however, the background was not entirely eliminated. The signal-to-noise ratio was improved by summing the data in 1.8-s bins. The observed hydrogen concentration maximized at 85 km at 1.5 + or - 1.1 x 10 to the 8th atoms/cu cm.

Sharp, W. E.↗

The 31st Aerospace Mechanisms Symposium

The proceedings of the 31st Aerospace Mechanisms Symposium are reported. Topics covered include: robotics, deployment mechanisms, bearings, actuators, scanners, boom and antenna release, and test equipment. A major focus is the reporting of problems and solutions associated with the development and flight certification of new mechanisms.

Foster, C. L.↗

32nd Aerospace Mechanisms Symposium

The proceedings of the 32nd Aerospace Mechanism Symposium are reported. NASA John F. Kennedy Space Center (KSC) hosted the symposium that was held at the Hilton Oceanfront Hotel in Cocoa Beach, Florida on May 13-15, 1998. The symposium was cosponsored by Lockheed Martin Missiles and Space and the Aerospace Mechanisms Symposium Committee. During these days, 28 papers were presented. Topics included robotics, deployment mechanisms, bearing, actuators, scanners, boom and antenna release, and test equipment.

S. W. Walker↗

Orbit Determination for Mars Global Surveyor During Mapping

The Mars Global Surveyor (MGS) spacecraft reached a low-altitude circular orbit on February 4, 1999, after the termination of the second phase of aerobraking. The MGS spacecraft carries the Mars Orbiter Laser Altimeter (MOLA) whose primary goal is to derive a global, geodetically referenced 0.2 deg x 0.2 deg topographic grid of Mars with a vertical accuracy of better than 30 meters. During the interim science orbits in the' Hiatus mission phase (October - November 1997), and the Science Phasing Orbits (March - April, 1998, and June - July 1998) 208 passes of altimeter data were collected by the MOLA instrument. On March 1, 1999 the first ten orbits of MOLA altimeter data from the near-circular orbit were successfully returned from MGS by the Deep Space Network (DSN). Data will be collected from MOLA throughout the Mapping phase of the MCS mission, or for at least one Mars year (687 days). Whereas the interim orbits of Hiatus and SPO were highly eccentric, and altimeter data were only collected near periapsis when the spacecraft was below 785 km, the Mapping orbit of MGS is near circular, and altimeter data will be collected continuously at a rate of 10 Hz. The proper analysis of the altimeter data requires that the orbit of the MGS spacecraft be known to an accuracy comparable to that of the quality of the altimeter data. The altimeter has an ultimate precision of 30 cm on mostly flat surfaces, so ideally the orbits of the MGS spacecraft should be known to this level. This is a stringent requirement, and more realistic goals of orbit error for MGS are ten to thirty meters. In this paper we will discuss the force and measurement modelling required to achieve this objective. Issues in force modelling include the proper modelling of the gravity field of Mars, and the modelling of non-conservatives forces, including the development of a 'macro-model', in a similar fashion to TOPEX/POSEIDON and TDRSS. During Cruise and Aerobraking, the high gain antenna (HGA) was stowed on the +X face of the spacecraft. On March 29, 1999 the HGA will be deployed on a meter long boom which will remain Earth-pointing while the instrument panel (including the MOLA instrument) remains pointed at nadir. The tracking data must be corrected for the regular motion of the high gain antenna with respect to the center of mass, and the success of the MGS determination during Mapping will depend on correctly accounting for this offset in the measurement model.

Lemoine, F. G.↗

GPM Timeline Inhibits For IT Processing

The Safety Inhibit Timeline Tool was created as one approach to capturing and understanding inhibits and controls from IT through launch. Global Precipitation Measurement (GPM) Mission, which launched from Japan in March 2014, was a joint mission under a partnership between the National Aeronautics and Space Administration (NASA) and the Japan Aerospace Exploration Agency (JAXA). GPM was one of the first NASA Goddard in-house programs that extensively used software controls. Using this tool during the GPM buildup allowed a thorough review of inhibit and safety critical software design for hazardous subsystems such as the high gain antenna boom, solar array, and instrument deployments, transmitter turn-on, propulsion system release, and instrument radar turn-on. The GPM safety team developed a methodology to document software safety as part of the standard hazard report. As a result of this process, a new tool safety inhibit timeline was created for management of inhibits and their controls during spacecraft buildup and testing during IT at GSFC and at the launch range in Japan. The Safety Inhibit Timeline Tool was a pathfinder approach for reviewing software that controls the electrical inhibits. The Safety Inhibit Timeline Tool strengthens the Safety Analysts understanding of the removal of inhibits during the IT process with safety critical software. With this tool, the Safety Analyst can confirm proper safe configuration of a spacecraft during each IT test, track inhibit and software configuration changes, and assess software criticality. In addition to understanding inhibits and controls during IT, the tool allows the Safety Analyst to better communicate to engineers and management the changes in inhibit states with each phase of hardware and software testing and the impact of safety risks. Lessons learned from participating in the GPM campaign at NASA and JAXA will be discussed during this session.

Inhibits↗

Deployment Analysis of a Simple Tape-Spring Hinge Using Probabilistic Methods

Acceptance of new deployable structures architectures and concepts requires validated design methods to minimize the expense involved with technology validation flight testing. Deployable concepts for large lightweight spacecraft include booms, antennae, and masts. This paper explores the implementation of probabilistic methods in the design process for the deployment of a strain-energy mechanism, specifically a simple tape-spring hinge. Strain-energy mechanisms are attractive for deployment in very lightweight systems because they do not require the added mass and complexity associated with motors and controllers. However, designers are hesitant to include free deployment, strain-energy mechanisms because of the potential for uncontrolled behavior. In the example presented here, the tapespring cross-sectional dimensions have been varied and a target displacement during deployment has been selected as the design metric. Specifically, the tape-spring should reach the final position in the shortest time with the minimal amount of overshoot and oscillations. Surrogate models have been used to reduce computational expense. Parameter values to achieve the target response have been computed and used to demonstrate the approach. Based on these results, the application of probabilistic methods for design of a tape-spring hinge has shown promise as a means of designing strain-energy components for more complex space concepts.

Lyle, Karen H.↗

Development of inflatable antenna structures

Self-rigidizable spring-tape-reinforced (STR) booms were used to develop structural systems for large-aperture space inflatable radar antennas. The lightweight planar frames built with STR booms can be compactly stowed for launch, deployed by inflation pressure in space, and used to tension the RF membrane apertures of the antennas. Engineering models of a Ka-band reflectarray antenna and a L-band synthetic-aperture radar antenna were developed and have successfully demonstrated stowage and deployment, as well as RF performance. A design improvement was also being implemented to enhance long-term configuration stability and widen the application range of the STR booms.

inflatable antenna structures deployment↗

Plasma physics and environmental perturbation laboratory

Current work aimed at identifying the active magnetospheric experiments that can be performed from the Space Shuttle, and designing a laboratory to carry out these experiments is described. The laboratory, known as the PPEPL (Plasma Physics and Environmental Perturbation Laboratory) consists of 35-ft pallet of instruments connected to a 25-ft pressurized control module. The systems deployed from the pallet are two 50-m booms, two subsatellites, a high-power transmitter, a multipurpose accelerator, a set of deployable canisters, and a gimbaled instrument platform. Missions are planned to last seven days, during which two scientists will carry out experiments from within the pressurized module. The type of experiments to be performed are outlined.

Vogl, J. L.↗

A General Closed-Form Solution for the Lunar Reconnaissance Orbiter (LRO) Antenna Pointing System

The National Aeronautics and Space Administration s (NASA) Lunar Reconnaissance Orbiter (LRO) launched on June 18, 2009 from the Cape Canaveral Air Force Station aboard an Atlas V launch vehicle into a direct insertion trajectory to the Moon LRO, designed, built, and operated by the NASA Goddard Space Flight Center in Greenbelt, MD, is gathering crucial data on the lunar environment that will help astronauts prepare for long-duration lunar expeditions. During the mission s nominal life of one year its six instruments and one technology demonstrator will find safe landing site, locate potential resources, characterize the radiation environment and test new technology. To date, LRO has been operating well within the bounds of its requirements and has been collecting excellent science data images taken from the LRO Camera Narrow Angle Camera (LROC NAC) of the Apollo landing sites have appeared on cable news networks. A significant amount of information on LRO s science instruments is provided at the LRO mission webpage. LRO s Attitude Control System (ACS), in addition to controlling the orientation of the spacecraft is also responsible for pointing the High Gain Antenna (HGA). A dual-axis (or double-gimbaled) antenna, deployed on a meter-long boom, is required to point at a selected Earth ground station. Due to signal loss over the distance from the Moon to Earth, pointing precision for the antenna system is very tight. Since the HGA has to be deployed in spaceflight, its exact geometry relative to the spacecraft body is uncertain. In addition, thermal distortions and mechanical errors/tolerances must be characterized and removed to realize the greatest gain from the antenna system. These reasons necessitate the need for an in-flight calibration. Once in orbit around the moon, a series of attitude maneuvers was conducted to provide data needed to determine optimal parameters to load onboard, which would account for the environmental and mechanical errors at any antenna orientation. The nominal geometry for the HGA involves an outer gimbal axis that is exactly perpendicular to the inner gimbal axis, and a target direction that is exactly perpendicular to the outer gimbal axis. For this nominal geometry, closed-form solutions of the desired gimbal angles are simple to get for a desired target direction specified in the spacecraft body fame. If the gimbal axes and the antenna boresight are slightly misaligned, the nominal closed-form solution is not sufficiently accurate for computing the gimbal angles needed to point at a target. In this situation, either a general closed-form solution has to be developed for a mechanism with general geometries, or a correction scheme has to be applied to the nominal closed-form solutions. The latter has been adopted for Solar Dynamics Observatory (SDO) as can be seen in Reference 1, and the former has been used for LRO. The advantage of the general closed-form solution is the use of a small number of parameters for the correction of nominal solutions, especially in the regions near singularities. Singularities here refer to cases when the nominal closed-form solutions have two or more solutions. Algorithm complexity, however, is the disadvantage of the general closed-form solution.

Shah, Neerav↗

Large Deployable Reflectarray Antenna

A report discusses a 7-meter-diameter reflectarray antenna that has been conceived in a continuing effort to develop large reflectarray antennas to be deployed in outer space. Major underlying concepts were reported in three prior NASA Tech Briefs articles: "Inflatable Reflectarray Antennas" (NPO-20433), Vol. 23, No. 10 (October 1999), page 50; "Tape-Spring Reinforcements for Inflatable Structural Tubes" (NPO-20615), Vol. 24, No. 7 (July 2000), page 58; and "Self-Inflatable/Self-Rigidizable Reflectarray Antenna" (NPO-30662), Vol. 28, No. 1 (January 2004), page 61. Like previous antennas in the series, the antenna now proposed would include a reflectarray membrane stretched flat on a frame of multiple inflatable booms. The membrane and booms would be rolled up and folded for compact stowage during transport. Deployment in outer space would be effected by inflating the booms to unroll and then to unfold the membrane, thereby stretching the membrane out flat to its full size. The membrane would achieve the flatness for a Ka-band application. The report gives considerable emphasis to designing the booms to rigidify themselves upon deployment: for this purpose, the booms could be made as spring-tape-reinforced aluminum laminate tubes like those described in two of the cited prior articles.

Fang, Houfei↗

Tethered Space Satellite-1 (TSS-1): Technical Roundabouts

In the early 1990's US and Italian scientists collaborated to study the electrodynamics of dragging a satellite on a tether through the electrically charged portion of Earth's atmosphere called the ionosphere. An electrical current induced in the long wire could be used for power and thrust generation for a satellite. Other tether uses include momentum exchange, artificial gravity, deployment of sensors or antennas, and gravity-gradient stabilization for satellites. Before the Tethered Space Satellite (TSS-1), no long tether had ever been flown, so many questions existed on how it would actually behave. The TSS consisted of a satellite with science experiments attached to a 12.5 mile long, very thin (0.10 inch diameter) copper wire assembly wound around a spool in the deployer reel mechanism. With the Space Shuttle at an altitude of 160 nautical miles above earth, the satellite was to be deployed by raising it from the Shuttle bay on a boom facing away from Earth. Once cleared of the bay, the deployer mechanism was to slowly feed out the 12-plus miles of tether. Scientific data would be collected throughout the operation, after which the satellite would be reeled back in. Pre-flight testing system level tests involved setting up a tether receiver to catch the 12.5 mile tether onto another reel as it was being unwound by the deployer reel mechanism. Testing only the reel mechanism is straightforward. This test becomes more complicated when the TSS is mounted on the flight pallet at Kennedy Space Center (KSC). The system level tests must be passed before the pallet can be installed into the Space Shuttle cargo bay. A few months before flight, the TSS payload had been integrated onto the Spacelab pallet and system level tests, including unreeling and reeling the tether, had been successfully completed. Some of this testing equipment was then shipped back to the contractor Martin Marietta. Systems-level load analyses, which cannot be run until all information about each payload is finalized, was run in parallel with the physical integration of the hardware into the Shuttle payload bay. The coupled loads analysis, as it is called, incorporates any updates to the model due to system level tests, and any changes that were found during integration. The coupled loads analysis revealed that a single bolt attaching the deployer reel mechanism to the support structure had a "negative margin" - which is an indication that it might fail during operation. Hardware certification rules do not allow for hardware to fly with negative margins, so this issue had to be resolved before the flight. Since there is conservatism in engineering analysis, there is an option to "waive" the margin requirement, and fly the experiment as is. On the other hand, a structural failure of one payload could have serious or catastrophic consequences to other payloads and possibly the mission. Minor design changes or fixes might be feasible within the payload bay prior to launch. Any major design changes that required the spooling test to validate the hardware, or for the pallet to be removed, would cause TSS not to be ready for the Shuttle launch.

O'Connor, Brian↗

Using DIC for Long Slender Structures

High-strain composite deployable structures have been developed for systems such as solar arrays, camera masts or solar sailing propulsion elements. Composite booms in such applications are often flattened and then rolled into a small footprint for low-packaged volume and are then deployed in space. There is a need to obtain deformation for long, slender composite booms on earth through gravity offloading by suspending them vertically and applying distal end (tip) loads. Three-dimensional digital image correlation (3D-DIC), along with other measurement techniques, were used to obtain strain and displacement along the length of a 7.5 m subscale composite Triangular, Rollable, and Collapsible (TRAC) boom in preparation for full scale testing of a 30 m boom. However, incorporating 3D-DIC as a primary measurement tool on long, slender, high-aspect-ratio boom structures presents significant challenges. Challenges include small correlated area due to high aspect ratio, limited standoff distance due to size of test area, coordinate system alignment of multiple camera systems along the length of the boom, nodal mesh extraction for adequate test/analysis correlation, as well as measurement comparison between DIC and other instrumentation used such as fiber optic strain sensing (FOSS) and laser displacement tracking. The contents of the proposed paper will focus on techniques and methods for overcoming the previously mentioned challenges associated with applying 3D-DIC to long, slender boom structures. Results from subscale test along with lessons learned will be discussed.

Deployable Boom↗