Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ev Charging”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Enhancing the EVI-X National Framework to Address Emerging Questions on Charging Infrastructure Deployment

As national investments in EV charging infrastructure accelerate, this project advances the state-of-the-art in infrastructure analysis to better inform deployment strategies. It enhances NLR's EVI-X Suite, a set of tools supporting national network planning, local site design, and financial evaluation. These capabilities will position VTO to provide timely analysis to the DOT/DOE Joint Office, and to guide the strategic buildout of the national charging network. EVI-X development is closely coordinated with other VTO-funded efforts to ensure consistent, integrated use of key inputs and outputs, including EV adoption scenarios from TEMPO and infrastructure designs developed through EVs@Scale.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advancing Grid Resilience through Smart Charge Management: Findings from Maryland’s Pilot

This report presents research findings from a four-year Smart Charge Management (SCM) pilot program conducted by Maryland’s largest electric utilities—Baltimore Gas and Electric (BGE), Potomac Electric Power Company (Pepco), and Delmarva Power & Light (DPL)—to evaluate strategies for optimizing electric vehicle (EV) charging loads and enhancing grid stability. Supported by the U.S. Department of Energy (DOE), Argonne National Laboratory collaborated with all project partners and examined the effectiveness of Time-of-Use (TOU) and Load Balancing (LB) strategies in managing peak demand, deferring costly infrastructure upgrades, and reducing grid constraints at the feeder level. Using charging data from over 4,600 EV drivers, the study analyzed SCM’s impact on the distribution systems of BGE and Pepco, which consists of over 2000 feeders. Unlike prior research that focused on system-wide trends or synthetic feeders, this analysis offers granular, feeder-level insights based on real-world operational data. It highlights how transformer density, load profiles, and infrastructure constraints influence smart charging performance. Results show feeder-level conditions play a crucial role in SCM effectiveness, with most feeders benefiting more from LB, while TOU-based SCM may be sufficient for others. By 2035, LB reduced peak charging loads by 27% on average, compared to 23% under TOU-based SCM, though some feeders saw reductions exceeding 35%, while others experienced minimal impact. Feeders with higher transformer utilization and limited capacity benefited more from LB, which more effectively distributed charging demand during off-peak hours. Beyond reducing grid constraints, SCM offers long-term operational and financial benefits. By shifting EV charging demand strategically, utilities can optimize asset utilization, delay infrastructure investments, and enhance grid performance. In terms of infrastructure upgrade deferrals, at the feeder level, LB consistently reduced peak charging loads and resulting infrastructure upgrade costs, particularly in high EV enrollment areas, decreasing the number of overloaded transformers by up to 35%, while TOU-based SCM achieved 20-30% reductions depending on feeder characteristics. At the system level, LB has the potential to defer total upgrade costs by $\$$186 million for BGE, compared to $\$$159 million under TOU-based SCM. For Pepco, TOU-based SCM performed slightly better, deferring upgrade costs by $\$$30 million, compared to $\$$29 million under LB. Section 4.5 reviews some of the system differences between BGE and Pepco. However, as EV adoption scales, TOU-based SCM will introduce secondary peak charging loads, reinforcing the need for more advanced, adaptive SCM approaches to prevent new grid challenges. As EV adoption continues to grow, feeder-level managed charging strategies will be essential for mitigating grid stress, improving infrastructure efficiency, and maintaining energy affordability for consumers. This report provides critical insights for utilities, Public Utility Commissions (PUCs), and state agencies on the role of feeder-specific smart charging in infrastructure planning, policy development, and grid modernization. The findings underscore the importance of tailored, data-driven SCM solutions that align with local grid conditions, ensuring a resilient, cost-effective transition to increasing EV adoption while safeguarding distribution system performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LA100 Equity Strategies. Chapter 10: Household Transportation Electrification

The LA100 Equity Strategies project integrates community guidance with robust research, modeling, and analysis to identify strategy options that can increase equitable outcomes in Los Angeles' clean energy transition. This chapter focuses on residential electric vehicle (EV) incentive programs and multimodal electrified transportation services as means to increase equity in household transportation electrification. Specifically, NREL modeled EV adoption and affordability under business-as-usual and enhanced low-income incentives scenarios and transportation-related energy burdens under multimodal electric travel scenarios, including shared EVs, e-bikes, and improved transit services. Based on our analysis and community guidance, we identified strategies for 1)?increasing equity in new and used light-duty EV adoption and EV charging infrastructure distribution, focused on household used EV ownership and home charging access and 2) affordable, time-efficient, and equitable multimodal electrified transportation options, specifically considering the non-vehicle-owning population. Research was guided by input from the community engagement process, and associated equity strategies are presented in alignment with that guidance.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Consequence-Driven Cybersecurity for High-Power Electric Vehicle Charging Infrastructure

Cybersecurity of high-power charging infrastructure for electric vehicles (EVs) is critical to the safety, reliability, and consumer confidence in this publicly accessible technology. Cybersecurity vulnerabilities in high-power EV charging infrastructure may also present risks to broader transportation and energy-infrastructure systems. Here, this paper details a methodology used to analyze and prioritize high-consequence events that could result from cybersecurity sabotage to high-power charging infrastructure. The highest prioritized events are evaluated under laboratory conditions for the severity of impact and the complexity of cybersecurity manipulation. Mitigation solutions and strategies are presented to secure the vulnerabilities that potentially lead to high-consequence events. These mitigations can be immediately implemented by industry or executed during the design stage.

25 ENERGY STORAGE↗

EV Profile Capture

NextGen Profiles' EV profile capture efforts aimed to explore the variance in performance and evaluate how different operational conditions influence production EV charging behavior. Data were collected at a frequency of 10 Hz from both the EV and EVSE during each charge session. These charge session parameters were then entered into a time-series database for further analysis. The data were gathered under different operational conditions to examine the effects of various factors such as battery state of charge, battery temperature, vehicle condition, smart charge management, and EVSE limitations. The EV profile capture dataset includes extensive high-power charging data from 16 different EVs—comprising light-, medium-, and heavy-duty vehicles—along with EVSE from various suppliers. To protect confidentiality, the EV and EVSE metadata are anonymized, and the publicly released datasets are aggregated to 0.1-Hz frequency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

MUTCD 11th Edition - What's New in Signage for Electric Vehicle Charging and Parking

This handout summarizes key changes to the Manual on Uniform Traffic Control Devices for Streets and Highways (MUTCD) with respect to signage for electric vehicle (EV) charging and parking. The final rule for the 11th edition of the MUTCD was published in the Federal Register on Dec. 19, 2023, and became effective Jan. 18, 2024. The previous edition was issued in 2009. Going forward, the Bipartisan Infrastructure Law requires updates every four years. Visit the MUTCD 11th Edition for full details.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

High-Power Electric Vehicle Charging Hub Integration Platform (eCHIP): Site Energy Management System Platform Development

A site energy management system is a critical component of future high-power EV charging hubs. It monitors and supervises all inter-hub operations, coordinates grid interactions, and implements energy management strategies and load-sharing controls at various levels and time scales. This report provides a comprehensive high-level overview and guidelines on the essential elements of such energy management systems. These elements primarily focus on the core functions, architecture, and monitoring aspects of site energy management. The core functions define the grid services and operational objectives that a charging hub is expected to provide and achieve. The architectural section investigates the coordination between hub assets, different control schemes, and their potential benefits and drawbacks. Lastly, the report discusses the needs, types, and functionalities of a monitoring and visualization system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Charging-management And Infrastructure-planning (cmip) Model

CMIP model explores various charging infrastructure network designs to serve a free-floating car-sharing fleet and determine the charging downtime experienced by the fleet for each design. Development of the CMIP model had two major steps: (1) describing modeling assumptions and (2) developing an integer program (IP) that jointly optimizes decisions about locations to install DC fast chargers and EV-to-charger assignments. The CMIP model integrates an EV charging model, EV energy consumption model, and heterogeneous, real-world vehicle use data with an integer programming optimization model to identify optimal location of new charging stations and calculate vehicle downtime for charging. The CMIP model can be applied to understand: (a) the reduction of EV fleet downtime if an additional fast-charging station is added to the current infrastructure and (b) to what extent total vehicle downtime would be sensitive to additional charging infrastructure.

Roni, MohammadS↗

Expanding Access to Charging at Home (EACH) Technical Report

This report summarizes the implementation, outcomes, and key learnings of Expanding Access to Charging at Homes (EACH), a nationwide multifamily housing charging initiative focused on accelerating deployment of electric vehicle charging infrastructure at multifamily housing properties. The program combined education, outreach, and technical assistance to support property owners, managers, residents, and industry stakeholders in overcoming barriers to EV charging adoption. The report highlights program strategies, stakeholder engagement, resources developed, and recommendations to help scale charging access at multifamily housing nationwide.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluations of Connectors, Inlets, and Adapters on Side-Load and Withstand Force

This report examines the mechanical forces that direct current fast charging (DCFC) electric vehicle supply equipment (EVSE) connectors and electric vehicle (EV) inlet ports experience during normal usage. As we witness the fast and growing variety of EVs, charge port locations, and bigger and more powerful EVSE configurations including the SAE J3400 North American Charging Standard (NACS), which has increased the use of adapters with J3400 and J1772 compatibility. These new conditions contribute to increased mechanical forces due to their size, weight and lever arm effect, which creates the need to study and compare these forces to the limits on UL2251 and IEC 62196-1 standards. This report focuses solely on high power DC charging EVSE connectors, EV inlets and adapters for the specific compatibility cases on J3400 with J1772. We first describe the details of the 100N and the 750N side-load evaluations as described in the standards, then present the data obtained by replicating these tests to finally go into more detail on the findings and our recommendations.

100N↗

Intelligent, grid-friendly, modular extreme fast charging system with solid-state DC protection

The development of electric vehicle (EV) charging infrastructure is crucial for the widespread adoption of electric transportation. However, implementing such infrastructure is a complex task that requires consideration of factors such as space limitations, adherence to industry standards, grid capacity, and other technical and policy issues. This project seeks to create a framework for the efficient design of compact medium voltage (MV) extreme fast charging (XFC) stations for EVs. The station design involves the use of a solid-state transformer (SST) that connects to the MV distribution network, delivering power to a shared DC bus. This innovative approach eliminates the need for a step-down transformer to provide low-voltage service by connecting directly to the MV distribution network. Eliminating the low-frequency transformer not only reduces the system footprint and losses but also eliminates inrush currents during grid black-start. Additionally, placing power electronics directly on the distribution system allows for high-bandwidth filtering and power factor correction. The inclusion of a shared DC bus enables multiple charging dispensers and DC storage/generation units to connect, forming a DC microgrid. This setup facilitates power sharing with minimal conversion stages. The project showcases a DC distribution network protected by intelligent solid-state (SS) DC circuit breakers (DCCB) capable of isolating the smallest section of the faulted circuit much faster than existing mechanical solutions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

V1G Frequency Regulation: Algorithm Development, Validation & Analysis at Scale

Researchers at Argonne National Laboratory developed and validated a high-fidelity digital twin of a smart charging (V1G) ecosystem to model the participation of up to 1,000 unique electric vehicles (EVs) in the PJM frequency regulation market. Utilizing a discrete-event framework, the simulation models complex interactions, from dynamic grid signals (updated every 2 seconds) to individual EV charging dynamics. The simulation incorporates multiple EV models created from real-world lab test data. Researchers tested multiple control algorithms to balance the dual objectives of maximizing aggregator’s revenue and driver charging needs. Results demonstrate that aggregated EVs function as a controllable, highly effective grid resource, achieving high PJM Performance Scores (80–90%). Additionally, an optimized, market-aware bidding strategy was identified as key to profitability. The platform was shown to provide drivers with an average charging discount of nearly 50%. The algorithm was further validated in the lab using production EVs and charging stations to compare simulation results with real-world performance.

Manne, Nithin↗

Electric Vehicle Supply Equipment Cybersecurity Through Emulation

As the grid evolves, it is paramount to understand the risks that cyberattacks pose before assets are deployed. Leveraging the ARIES Cyber Range, NREL has created a platform to conduct analysis of EV charging protocol cybersecurity to understand the risks and impacts that cyberattacks may pose to critical infrastructure.

bug bounty prize↗

Challenges to Rural Service Transformers on Increased Electric Vehicle Charging Infrastructure

As Electric Vehicle (EV) electric charging demand increases so to does the corresponding load requirements for charging the vehicles. The expansion of power distribution assets is therefore a critical issue to address on whether rural service transformers can handle the increase in EV load demand. Large-scale EV deployment is likely to cause problems in the localized distributions systems bringing challenges such as increased load demand, increased system losses, and additional voltage drops. This paper investigates how rural service transformer resiliency plays an important role in these challenges. EV charging can create new load peaks exceeding the service transformer's rated capacity, thereby accelerating equipment aging. EV charging can also both positively and negatively affect transformer aging. The core purpose of this paper is to investigate that change in service life of rural service transformers.

Mukherjee, Srijib↗

Managing Increased Electric Vehicle Shares on Decarbonized Bulk Power Systems

Transportation electrification and power sector decarbonization - the convergence of these two trends present a complex planning problem requiring realistic, region-specific modeling and analysis to ensure that both can happen rapidly and cost effectively. This project, funded through the U.S. Department of Energy's Vehicle Technologies Office, models the evolution of the U.S. bulk power system (through 2050) in response to large-scale EV charging across all on-road vehicle segments. We will assess the opportunity and value of demand-side flexibility (i.e., "smart" charging) for reducing energy costs, increasing renewable generation shares, and managing future EV loads on the bulk power system. Overall, this study aims to provide an improved understanding of least-cost solutions for managing EV load growth on the grid and will make high-resolution EV load data sets publicly available for further analysis.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

County Electric Vehicle Home Charging Access Shares from the 2030 National Charging Network Study

This file contains modeled county-level home electric vehicle (EV) charging access shares from the study, "The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure" by Wood et al. (2023). These are based on modeling in "There's No Place Like Home: Residential Parking, Electrical Access, and Implications for the Future of Electric Vehicle Charging Infrastructure" by Ge et al. (2021). Wood, Eric, et al. 2023. The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure. Golden, CO: National Renewable Energy Laboratory. NREP/TP-5400-85654. https://www.nlr.gov/docs/fy23osti/85654.pdf . Ge, Yanbo, et al. 2021. There's No Place Like Home: Residential Parking, Electrical Access, and Implications for the Future of Electric Vehicle Charging Infrastructure. Golden, CO: National Renewable Energy Laboratory. NREL/TP-5400-81065. https://www.nlr.gov/docs/fy22osti/81065.pdf .

24 POWER TRANSMISSION AND DISTRIBUTION↗

I-80 Mid-America Clean Fuels Corridor: Deployment Plan Report

The I-80 Mid-America Clean Fuels Corridor, which spans I-80 from Fort Lee, New Jersey, to Council Bluffs, Iowa, was designated an Alternative Fuels Corridor (AFC) in Round 1 of the Alternative Fuels Corridor program administered by the U.S. Department of Transportation’s (DOT’s) Federal Highway Administration (FHWA). Originally called the “I-80 Mid-America Alternative Fuels Corridor,” it is now named the “I-80 Mid-America Clean Fuels Corridor.” As of Round 6 AFC designation, parts of the corridor have sufficient direct current fast charging (DCFC) stations to be designated Electric Vehicle (EV)-Ready and sufficient compressed natural gas (CNG) fueling stations to be designated CNG-Ready. However, much of the corridor’s approximately 1,240 miles (mi) are not yet EV- or CNG-Ready. This includes about 1,130 mi that are designated EV-Pending and 700 mi that are designated CNG-Pending. This report presents a plan to develop EV charging and CNG fueling infrastructure sufficient to convert the entire length of the corridor to EV-Ready and CNG-Ready. Specific sites are not identified for future infrastructure. Rather, priority exits are identified, and information, analysis, and additional steps are recommended to support further refinement of these locations, as well as additional outreach and deployment efforts.

24 POWER TRANSMISSION AND DISTRIBUTION↗