Search NASA⌕ Search

SEARCH · Search NASA

Results for “GLOBAL POSITIONING SYSTEM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Extreme ionospheric storms and their impact on WAAS

Satellite-based augmentation systems (SBAS) in the absence of selective availability, the ionosphere represents the largest source of positioning error for single-frequency users of the Global Positioning System (GPS).

ionosphere↗

Using GPS Receiver 1PPS Output to Verify Time Stamp Accuracy and Measure Propagation Delay

A simple pulse overlay circuit using a logic OR gate was developed to overlay a precise leading edge 1 pulse per second time reference marker from a global positioning system receiver onto a non-return -to- zero-level pulse code modulation telemetry data stream to validate time stamp accuracy and measure propagation delay in telemetry equipment. A pulse overlay (PO) circuit was designed to produce a time reference marker within a pulse code modulation (PCM) telemetry data stream that was recorded and analyzed to validate an IRIG Standard 106-17 Chapter 10 recorder’s time stamp accuracy [1]. A manufacturer of a newly purchased Chapter 10 recorder claimed the time stamp accuracy to be better than 10 microseconds (μs) with only IRIG-B120 (IRIG-B) input and better than 1 μs with IRIG-B and one pulse per second (1PPS) inputs. The PO circuit and a Chapter 10 recorder test setup were used to verify the vendor’s data-time synchronization claims and to justify infrastructure upgrade costs to connect additional cables to each purchased recorder. The circuit was also used to measure the propagation delay (PD) of a long distance Telemetry multiplexer/demultiplexer telecommunication system which the manufacturer did not provide a PD specification. Using the one pulse per second time reference marker of the global positioning system receiver and the pulse overlay circuit to overlay the one pulse per second variable pulse width signal into a pulse code modulation telemetry stream provided an excellent means to validate time stamp accuracy within a Chapter 10 recorder and to measure propagation delays within a normal telemetry operating environment. The positive results from the Chapter 10 recorder tests validated the vendor’s claims and justified the implementation to add the one pulse per second signal to the range Chapter 10 recorders. The pulse overlay circuit and test setups defined in this paper can easily be used to measure other telemetry equipment.

Knudtson, Kevin↗

An Autonomous Distributed Fault-Tolerant Local Positioning System

We describe a fault-tolerant, GPS-independent (Global Positioning System) distributed autonomous positioning system for static/mobile objects and present solutions for providing highly-accurate geo-location data for the static/mobile objects in dynamic environments. The reliability and accuracy of a positioning system fundamentally depends on two factors; its timeliness in broadcasting signals and the knowledge of its geometry, i.e., locations and distances of the beacons. Existing distributed positioning systems either synchronize to a common external source like GPS or establish their own time synchrony using a scheme similar to a master-slave by designating a particular beacon as the master and other beacons synchronize to it, resulting in a single point of failure. Another drawback of existing positioning systems is their lack of addressing various fault manifestations, in particular, communication link failures, which, as in wireless networks, are increasingly dominating the process failures and are typically transient and mobile, in the sense that they typically affect different messages to/from different processes over time.

Mahyar R Malekpour↗

GOES-R Series GEO Side-Lobe Capable GPSR Post-Launch Refinements and Operational Capabilities

This paper addresses three topics: 1) EOPP (EOP (Earth Orientation Prediction) Parameters) file modification, 2) Kalman filter parameter tuning regarding maneuvers and 3) off-pointing GPS (Global Positioning System) tracking capability. GOES-R (Geostationary Operational Environmental Satellite-R Series) is the first in a 4-part series of new weather satellites set to replace and upgrade the older GOES constellation. Two GOES-R series have been launched to date, GOES-S and GOES-R. GOES-R is operational over the Eastern United States and GOES-S over the West. The Global Positioning System Receiver (GPSR) on board this geostationary weather satellite is a mission critical enabling technology which has been both tested on the ground and evaluated on-orbit to verify its effectivity. Since becoming operational in November 2016, the GPSR onboard has performed extremely well under nominal circumstances. Further refinements regarding a variety of facets have taken place since the launch of GOES-R. One such refinement was the implementation of a modified EOP (Earth Orientation Prediction) parameter set to improve ECEF (Earth Centered Earth Fixed) to ECI (Earth Centered Inertial) transformation by restoring zonal tides removed from the EOP parameter fit per tech note 36. Another relevant refinement combined thermal consideration with Kalman filter tuning to improve orbit determination performance during maneuvers. Now with two years of data and two vehicles in orbit many capabilities of the GPSR have been identified and defined to a higher degree. For example, metrics on side-lobe tracking and off-Nadir tracking capabilities have been quantified to a high degree. This paper will seek to supplement the ESA (European Space Agency) GNC 2017 GOES-R GPSR performance paper as a deeper dive on specific tracking capabilities and performance improvements now implemented on the GOES-R and GOES-S vehicles.

GPS Receiver↗

Combined Global Navigation Satellite Systems in the Space Service Volume

Besides providing position, velocity, and timing (PVT) for terrestrial users, the Global Positioning System (GPS) is also being used to provide PVT information for earth orbiting satellites. In 2006, F. H. Bauer, et. al., defined the Space Service Volume in the paper GPS in the Space Service Volume , presented at ION s 19th international Technical Meeting of the Satellite Division, and looked at GPS coverage for orbiting satellites. With GLONASS already operational, and the first satellites of the Galileo and Beidou/COMPASS constellations already in orbit, it is time to look at the use of the new Global Navigation Satellite Systems (GNSS) coming into service to provide PVT information for earth orbiting satellites. This presentation extends GPS in the Space Service Volume by examining the coverage capability of combinations of the new constellations with GPS GPS was first explored as a system for refining the position, velocity, and timing of other spacecraft equipped with GPS receivers in the early eighties. Because of this, a new GPS utility developed beyond the original purpose of providing position, velocity, and timing services for land, maritime, and aerial applications. GPS signals are now received and processed by spacecraft both above and below the GPS constellation, including signals that spill over the limb of the earth. Support of GPS space applications is now part of the system plan for GPS, and support of the Space Service Volume by other GNSS providers has been proposed to the UN International Committee on GNSS (ICG). GPS has been demonstrated to provide decimeter level position accuracy in real-time for satellites in low Earth orbit (centimeter level in non-real-time applications). GPS has been proven useful for satellites in geosynchronous orbit, and also for satellites in highly elliptical orbits. Depending on how many satellites are in view, one can keep time locked to the GNSS standard, and through that to Universal Time as long as at least one satellite is in view (the longest duration with no satellites in view is important in determining the maximum clock drift from GNSS time). Instantaneous position requires four satellites in view, but because orbital motion is predictable, it is possible to build up knowledge of the orbital position gradually through time without a need for constant four satellite coverage. However, it is desirable to have four satellite coverage when performing satellite maneuvers, since there can be significant changes in velocity, leading to large changes in orbit parameter, causing substantial divergence in position over time. The Space Service Volume has been defined as the volume between three thousand km altitude and geosynchronous altitude, and can be divided into medium orbit services between three thousand km altitude and eight thousand km altitude, and high orbit services above eight thousand km. The Terrestrial Service Volume includes the Earth s surface, the atmosphere, and space below the altitude of three thousand km. The Terrestrial Service Volume is the volume within which the GNSS systems will have very similar performance to the Earth surface, and satellites need only use the signals specified to provide terrestrial performance. Above three thousand km the use of signals passing by the Earth s limb becomes important, so it is desirable to have additional information on signal strength, phase delay, and group delay covering wider beam angles than are needed for terrestrial service (and which can be obtained by monitoring GNSS signals from the Earth s surface). This presentation will look at each of the new GNSS constellations in combination with GPS (GLONASS with GPS, Galileo with GPS, Beidou/COMPASS with GPS), and also at the combination of all four GNSS systems. The presentation will largely follow the format of GPS in the Space Service Volume , presenting data on the availability of one, two, three, or four of the various combinations of GNSS constellation satelles at approximately two thousand grid points evenly spaced and fixed in longitude and latitude, the duration of the longest single-fold outages (intervals when no satellites are available), and the duration of the longest four-fold outages (intervals when fewer than four satellites are available) at several altitudes. Following the original paper, we will use the altitudes of three hundred km (typical LEO satellite, and within the Terrestrial Service Volume), at three thousand km (border between Terrestrial Service Volume and Space Service Volume), at eight thousand km (the border between medium and high orbit service within the Space Service Volume), at fifteen thousand km (just below the GNSS constellations), at twenty five thousand km (just above the GNSS constellations), at thirty six thousand, five hundred km (limit of Space Service Volume definition, geosynchronous altitude), and at seventy thousand km (to show the potential usefulness of GNSS beyond geosynchronous altitude).

Force, Dale A.↗

Landsat/4/Global Positioning System navigation results

An experimental GPSPAC flown on the Landsat-4 spacecraft was the first spaceborne navigation system to use the NAVSTAR Global Position System (GPS). In order to validate the accuracy and reliability of GPSPAC orbit solutions, definitive Landsat-4 ephemerides, derived from ground based tracking data, were generated and compared with GPSPAC estimates. In addition, Landsat-4 orbital solutions were reconstructed from raw GPS measurement data with a GPSPAC navigation simulator program using different Kalman filter constants. Ephemeris comparisons and simulator results are presented, as well as recommendations for the navigation filter.

Heuberger, H.↗

Precise synchronization of phasor measurements in electric power systems

Phasors representing positive sequence voltages and currents in a power network are in the most important parameters in several monitoring, control, and protection functions in interconnected electric power networks. Recent advances in computer relaying have led to very efficient and accurate phasor measurement systems. When the phasors to be measured are separated by hundreds of miles, it becomes necessary to synchronize the measurement processes, so that a consistent description of the state of the power system can be established. Global Positioning System (GPS) transmissions offer an ideal source for synchronization of phasor measurements. The concept and implementation of this technique are described. Several uses of synchronized phasor measurements are also described. Among these are improved state estimation algorithms, state estimator enhancements, dynamic state estimates, improved control techniques, and improved protection concepts.

Phadke, Arun G.↗

Implementing Mixed Reality Tools to Support Mission Delivery at Hanford - 20520

Mission Support Alliance's (MSA) Public Works and Information Systems organizations have been working with Microsoft Corporation to develop and implement mixed reality operational solutions using their HoloLens technology. This collaborative effort is intended to drive innovative solutions and significantly improve MSA's efficiency in performing work at the Hanford Site. HoloLens, a mixed reality tool, is a commercial off-the-shelf technology that combines a head-mounted viewing screen with applications to help people and organizations learn, communicate, and collaborate more effectively through the use of mixed reality. https://microsoft.com/en-us/hololens MSA's initial pilot successfully demonstrated its ability to use mixed reality utilizing HoloLens' advanced features in a variety of ways, illustrating the potential efficiency gains previously stated as goals of this pilot. These achievements include the development of proprietary technology that allows synchronization between a HoloLens device and a mobile device or alternate global positioning system (GPS) device. This synchronization enables the HoloLens device to access real time GPS location data anywhere on the Hanford Site. This real time location data, combined with MSA's improved Hanford Geographical Information System (GIS) data, enables the mixed reality pilot application to identify underground utility systems as well as related utility attributes. This ability will aid utility workers in several areas, including excavation activities, the placement of large cranes, identifying interactions and conflicts with future underground utility placements and, eventually, recognizing and de-conflicting tank waste transfer system valve alignments. The HoloLens mixed reality application is also able to provide full or small scale holographic images of a facility's digital twin. This feature will allow MSA's Water and Sewer Utilities team to train and validate procedures associated with the new water treatment facility virtually, before it is constructed. This reduces the amount of time it takes to complete the training and procedure validation, and accelerates the overall construction schedule. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

27th Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting

This document is a compilation of technical papers presented at the 27th Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting, held November 29 - December 1, 1995 at San Diego, CA. Papers are in the following categories: Recent developments in rubidium, cesium, and hydrogen-based frequency standards; and in cryogenic and trapped-ion technology; International and transnational applications of PTTI technology with emphasis on satellite laser tracking, GLONASS timing, intercomparison of national time scales and international telecommunications; Applications of PTTI technology to the telecommunications, power distribution, platform positioning, and geophysical survey industries; Applications of PTTI technology to evolving military communications and navigation systems; and Dissemination of precise time and frequency by means of Global Positioning System (GPS), Global Satellite Navigation System (GLONASS), MILSTAR, LORAN, and synchronous communications satellites.

Sydnor, Richard L.↗

Pulsar Based Timing for Grid Synchronization

Existing synchronization systems in the power grid, such as the global positioning system, are susceptible to temporary or permanent failures due to various unpredictable and uncontrollable factors such as cyber-attack and electromagnetic interferences, thus affecting the accuracy and reliability of generated timing signal. In this article, a pulsar astronomy-based timing system is proposed to provide an alternative synchronization signal. Further, this clock will offer significant security improvements to power grid applications, such as a wide-area monitoring system, which depends on a precise timing signal. The hardware and software frameworks are described in detail. First, a high-speed sampling hardware platform is designed to collect signals from radio telescopes. Then a periodic pulse extraction method with three steps is proposed to process the pulsar signal, including polyphase filterbanks, incoherent de-dispersion, and sliding window folding. Lastly, three experiments are conducted to verify the effectiveness of the frameworks. The generated pulsar timing pulse is presented, and the factors affecting its accuracy are also discussed. The analysis results demonstrate that the pulsar signals can provide high-accurate timing pulses for grid synchronization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

GPS Navigation for the Magnetospheric Multi-Scale Mission

In 2014. NASA is scheduled to launch the Magnetospheric Multiscale Mission (MMS), a four-satellite formation designed to monitor fluctuations in the Earth's magnetosphere. This mission has two planned phases with different orbits (1? x 12Re and 1.2 x 25Re) to allow for varying science regions of interest. To minimize ground resources and to mitigate the probability of collisions between formation members, an on-board orbit determination system consisting of a Global Positioning System (GPS) receiver and crosslink transceiver was desired. Candidate sensors would be required to acquire GPS signals both below and above the constellation while spinning at three revolutions-per-minute (RPM) and exchanging state and science information among the constellation. The Intersatellite Ranging and Alarm System (IRAS), developed by Goddard Space Flight Center (GSFC) was selected to meet this challenge. IRAS leverages the eight years of development GSFC has invested in the Navigator GPS receiver and its spacecraft communication expertise, culminating in a sensor capable of absolute and relative navigation as well as intersatellite communication. The Navigator is a state-of-the-art receiver designed to acquire and track weak GPS signals down to -147dBm. This innovation allows the receiver to track both the main lobe and the much weaker side lobe signals. The Navigator's four antenna inputs and 24 tracking channels, together with customized hardware and software, allow it to seamlessly maintain visibility while rotating. Additionally, an extended Kalman filter provides autonomous, near real-time, absolute state and time estimates. The Navigator made its maiden voyage on the Space Shuttle during the Hubble Servicing Mission, and is scheduled to fly on MMS as well as the Global Precipitation Measurement Mission (GPM). Additionally, Navigator's acquisition engine will be featured in the receiver being developed for the Orion vehicle. The crosslink transceiver is a 1/4 Watt transmitter utilizing a TDMA schedule to distribute a science quality message to all constellation members every ten seconds. Additionally the system generates one-way range measurements between formation members which is used as input to the Kalman filter. In preparation for the MMS Preliminary Design Review (PDR), the Navigator was required to pass a series of Technology Readiness Level (TRL) tests to earn the necessary TRL-6 classification. The TRL-6 level is achieved by demonstrating a prototype unit in a relevant end-to-end environment. The IRAS unit was able to meet all requirements during the testing phase, and has thus been TRL-6 qualified

Bamford, William↗

The impact of ancillary space systems on tomorrow's spacecraft

This paper provides an overview of three major systems that will be available in the 1980's from the perspective of a spacecraft systems designer. While major systems themselves, the NAVSTAR Global Positioning System (GPS), the Tracking and Data Relay Satellite System (TDRSS) and the Manned Maneuvering Unit (MMU) will provide services that are destined to change the way spacecraft systems of the future will be designed. Each system is described in some detail with examples of their applications given.

Townsend, M. R.↗

The EMC impact of SPS operations on low Earth orbit satellites

The susceptibility of various operational and planned low Earth orbit satellites to solar power satellite (SPS) operations was examined. Functional degradation for the electronic systems on LANDSAT, the global positioning system, and the space telescope is described in relation to the amplitude of the SPS illumination components. Analyses include the modes of coupling to devices and subsystems, and performance effects in relation to satellite mission.

Grant, W. B.↗

A study of the charged particle calibration requirements for the Deep Space Network

A study made of the Deep Space Network charged particle calibration requirements is discussed. The effects of charged particles on navigation and timing systems were reviewed and it was proposed that a system based upon the Global Positioning System satellites be used to measure the charged particle content of the ionosphere. The system would be required to measure the total electron content of the ionosphere to the order of 10 to the 16th power electron per square meter. Two types of systems were suggested as possible candidates for making these measurements.

Townes, S. A.↗

Navigation system and method

In a global positioning system (GPS), such as the NAVSTAR/GPS system, wherein the position coordinates of user terminals are obtained by processing multiple signals transmitted by a constellation of orbiting satellites, an acquisition-aiding signal generated by an earth-based control station is relayed to user terminals via a geostationary satellite to simplify user equipment. The aiding signal is FSK modulated on a reference channel slightly offset from the standard GPS channel. The aiding signal identifies satellites in view having best geometry and includes Doppler prediction data as well as GPS satellite coordinates and identification data associated with user terminals within an area being served by the control station and relay satellite. The aiding signal significantly reduces user equipment by simplifying spread spectrum signal demodulation and reducing data processing functions previously carried out at the user terminals.

Taylor, R. E.↗

GPS-based certification for the microwave landing system

An MLS (microwave landing system) certification system based on the Global Positioning System (GPS) is described. To determine the position history of the flight inspection aircraft during runway approach, signals from the GPS satellites, together with on-board radar altimetry, are used. It is shown that the aircraft position relative to a fixed point on the runway at threshold can be determined to about 30 cm vertically and 1 m horizontally. A requirement of the system is that the GPS receivers be placed on each flight inspection aircraft and at selected ground sites. The effects of different error sources on the determination of aircraft instantaneous position and its dynamics are analyzed.

Thornton, C. L.↗

Evaluation of the usefulness of various simulation technology options for TERPS enhancement

Current approved terminal instrument procedures (TERPS) do not permit the full exploitation of the helicopter's unique flying characteristics. Enhanced TERPS need to be developed for a host of non-standard landing sites and navigation aids. Precision navigation systems such as microwave landing systems (MLS) and the Global Positioning System (GPS) open the possibility of curved paths, steep glide slopes, and decelerating helicopter approaches. This study evaluated the feasibility, benefits, and liabilities of using helicopter cockpit simulators in place of flight testing to develop enhanced TERPS criteria for non-standard flight profiles and navigation equipment. Near-term (2 to 5 year) requirements for conducting simulator studies to verify that they produce suitable data comparable to that obtained from previous flight tests are discussed. The long-term (5 to 10 year) research and development requirements to provide necessary modeling for continued simulator-based testing to develop enhanced TERPS criteria are also outlined.

Phatak, A. V.↗