Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ground Support Equipment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Lunar orbital mass spectrometer experiment

The design, development, manufacture, test and calibration of five lunar orbital mass spectrometers with the four associated ground support equipment test sets are discussed. A mass spectrometer was installed in the Apollo 15 and one in the Apollo 16 Scientific Instrument Module within the Service Module. The Apollo 15 mass spectrometer was operated with collection of 38 hours of mass spectra data during lunar orbit and 50 hours of data were collected during transearth coast. The Apollo 16 mass spectrometer was operated with collection of 76 hours of mass spectra data during lunar orbit. However, the Apollo 16 mass spectrometer was ejected into lunar orbit upon malfunction of spacecraft boom system just prior to transearth insection and no transearth coast data was possible.

Lord, W. P.↗

MSFC Skylab airlock module, volume 2

System design and performance of the Skylab Airlock Module and Payload Shroud are presented for the communication and caution and warning systems. Crew station and storage, crew trainers, experiments, ground support equipment, and system support activities are also reviewed. Other areas documented include the reliability and safety programs, test philosophy, engineering project management, and mission operations support.

Source record↗

MSFC Skylab Orbital Workshop, volume 4

The design and development of specific systems on the Skylab Orbital Laboratory are discussed. The subjects considered are: (1) pressure garment conditioning system, (2) stowage system, (3) ground support equipment systems, and (4) marking systems illustrations of the system components are provided. Results of performance tests are discussed.

Source record↗

System safety checklist Skylab program report

Design criteria statement applicable to a wide variety of flight systems, experiments and other payloads, associated ground support equipment and facility support systems are presented. The document reflects a composite of experience gained throughout the aerospace industry prior to Skylab and additional experience gained during the Skylab Program. It has been prepared to provide current and future program organizations with a broad source of safety-related design criteria and to suggest methods for systematic and progressive application of the criteria beginning with preliminary development of design requirements and specifications. Recognizing the users obligation to shape the checklist to his particular needs, a summary of the historical background, rationale, objectives, development and implementation approach, and benefits based on Skylab experience has been included.

Mcnail, E. M.↗

GSE, data management system programmers/User' manual

The GSE data management system is a computerized program which provides for a central storage source for key data associated with the mechanical ground support equipment (MGSE). Eight major sort modes can be requested by the user. Attributes that are printed automatically with each sort include the GSE end item number, description, class code, functional code, fluid media, use location, design responsibility, weight, cost, quantity, dimensions, and applicable documents. Multiple subsorts are available for the class code, functional code, fluid media, use location, design responsibility, and applicable document categories. These sorts and how to use them are described. The program and GSE data bank may be easily updated and expanded.

Schlagheck, R. A.↗

Systems design study of the Pioneer Venus spacecraft. Volume 2. Preliminary program development plan

The preliminary development plan for the Pioneer Venus program is presented. This preliminary plan treats only developmental aspects that would have a significant effect on program cost. These significant development areas were: master program schedule planning; test planning - both unit and system testing for probes/orbiter/ probe bus; ground support equipment; performance assurance; and science integration Various test planning options and test method techniques were evaluated in terms of achieving a low-cost program without degrading mission performance or system reliability. The approaches studied and the methodology of the selected approach are defined.

Source record↗

Spacelab software development and integration concepts study report, volume 1

The proposed software guidelines to be followed by the European Space Research Organization in the development of software for the Spacelab being developed for use as a payload for the space shuttle are documented. Concepts, techniques, and tools needed to assure the success of a programming project are defined as they relate to operation of the data management subsystem, support of experiments and space applications, use with ground support equipment, and for integration testing.

Rose, P. L.↗

Study on Spacelab software development and integration concepts

A study was conducted to define the complexity and magnitude of the Spacelab software challenge. The study was based on current Spacelab program concepts, anticipated flight schedules, and ground operation plans. The study was primarily directed toward identifying and solving problems related to the experiment flight application and tests and checkout software executing in the Spacelab onboard command and data management subsystem (CDMS) computers and electrical ground support equipment (EGSE). The study provides a conceptual base from which it is possible to proceed into the development phase of the Software Test and Integration Laboratory (STIL) and establishes guidelines for the definition of standards which will ensure that the total Spacelab software is understood prior to entering development.

Source record↗

From A-4 to Explorer 1

Historical review of the development of rocket and missile technology in the United States over the period from 1945 to 1958. Attention is given to the organization of activities, the launch facilities, and the scope of test rocket firings at the White Sands Proving Ground area during the initial phase of research with captured German V2 rockets. The development of the Redstone missiles is outlined by discussing aspects of military involvement, cooperation with industrial suppliers, details of ground support equipment, and results of initial test firings. Subsequent development of the Jupiter missiles is examined in a similar manner, and attention is given to activities involved in the launching of the Explorer 1 satellite.

Debus, K. H.↗

Spacelab program requirements, level 1

The design and development of Spacelab is reported including the ground support equipment, facilities, and operational planning. The shuttle interface, and user requirements are discussed along with product assurance and safety.

Source record↗

TERSSE: Definition of the Total Earth Resources System for the Shuttle Era. Volume 6: An Early Shuttle Pallet Concept for the Earth Resources Program

A space shuttle sortie mission which can be performed inexpensively in the early shuttle era and which, if the necessary intermediate steps are accomplished provides a major technological advance for the user organization-the U.S. Bureau of Census is described. The orbital configuration created for the Urban Land Use/1980 Census mission is illustrated including sensors and ground support equipment along with the information flow for the mission. Factors discussed include: specific Census Bureau functions to be supported by the mission; hardware and flight operations necessary for implementation of the mission; and integration of the TERSSE pallet into a shuttle mission.

Source record↗

Launch Vehicle Operations Simulator

The Saturn Launch Vehicle Operations Simulator (LVOS) was developed for NASA at Kennedy Space Center. LVOS simulates the Saturn launch vehicle and its ground support equipment. The simulator was intended primarily to be used as a launch crew trainer but it is also being used for test procedure and software validation. A NASA/contractor team of engineers and programmers implemented the simulator after the Apollo XI lunar landing during the low activity periods between launches.

Blackledge, J. W.↗

Apollo experience report: Development of the extravehicular mobility unit

The development and performance history of the Apollo extravehicular mobility unit and its major subsystems is described. The three major subsystems, the pressure garment assembly, the portable life-support system, and the oxygen purge system, are defined and described in detail as is the evolutionary process that culminated in each major subsystem component. Descriptions of ground-support equipment and the qualification testing process for component hardware are also presented.

Lutz, C. C.↗

Preliminary design study. Shuttle modular scanning spectroradiometer

Fundamental concepts on which to base a detailed design for a Shuttle Modular Scanning Spectroradiometer were developed, and a preliminary design is presented. The recommended design features modularity and flexibility. It includes a 75-cm f/1.7-telescope assembly in an all-reflective Schmidt configuration, a solid state scan system (pushbroom) with high resolution over a 15 deg field of view, and ten detector channels covering the spectral range from 0.45 to 12.5 micrometers. It uses charge transfer device techniques to accommodate a large number of detector elements for earth observation measurements. Methods for in-flight radiometric calibration, for image motion compensation, and for data processing are described. Recommendations for ground support equipment are included, and interfaces with the shuttle orbiter vehicle are illustrated.

Source record↗

TDRSS multimode transponder program S-band modification

The S-Band TDRS multimode transponder and its associated ground support equipment is described. The transponder demonstrates candidate modulation techniques to provide the required information for the design of an eventual S-band transponder suitable for installation in a user satellite, capable of operating as part of a Tracking and Data Relay Satellite (TDRS) system.

Mackey, J. E.↗

HELIOS dual swept frequency radiometer

The HELIOS dual swept frequency radiometer, used in conjunction with a dipole antenna, was designed to measure electromagnetic radiation in space. An engineering prototype was fabricated and tested on the HELIOS spacecraft. Two prototypes and two flight units were fabricated and three of the four units were integrated into the HELIOS spacecraft. Two sets of ground support equipment were provided for checkout of the radiometer.

White, J. R.↗

Electronic delay ignition module for single bridgewire Apollo standard initiator

An engineering model and a qualification model of the EDIM were constructed and tested to Scout flight qualification criteria. The qualification model incorporated design improvements resulting from the engineering model tests. Compatibility with single bridgewire Apollo standard initiator (SBASI) was proven by test firing forty-five (45) SBASI's with worst case voltage and temperature conditions. The EDIM was successfully qualified for Scout flight application with no failures during testing of the qualification unit. Included is a method of implementing the EDIM into Scout vehicle hardware and the ground support equipment necessary to check out the system.

Ward, R. D.↗