Search NASA⌕ Search

SEARCH · Search NASA

Results for “INTERCONNECTED POWER SYSTEMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Impact of Transmission on Resource Adequacy in Systems with Wind and Solar Power: Preprint

Variable generation is on track to become a significant contributor to electric power systems worldwide. Thus, it is important to analyze the effect that renewables will have on the reliability of systems. In this paper we present a new tool being implemented at the National Renewable Energy Laboratory, which allows the inclusion of variable generation in the power system resource adequacy. Thetool is used to quantify the potential contribution of transmission to reliability in highly interconnected systems and an example is provided using the Western Interconnection footprint.

14 SOLAR ENERGY↗

Fault Clearing Operation in Low-Frequency High-Voltage AC Systems

Abstract—Low-frequency high-voltage ac (LF-HVac) system has been proposed as an alternative to HVdc and HVac systems to reduce transmission losses and improve grid flexibility. LF-HVac system employs back-to-back (BTB) converters to interconnect and control the voltage and power interchange between two power grid operating at different frequencies. While there are multiple studies on LF-HVac system in the literature, the fault clearing method in the LF-HVac system has not been analyzed. Therefore, this paper focuses on fault clearing operation in LFHVac system and proposes a novel method to reduce fault current by changing operating frequency of power source and converter. The performance of the proposed method is validated using detailed models of BTB converters developed in PSCAD/EMTDC. The ability to change operating frequency at the onset of a fault condition allows breakers to rapidly clear the fault and recloses. The results obtained by using the proposed method substantially diminish the fault current.

Kim, Woosung↗

Reliability Study: On-Site Electrical System, 1998-2015

This report documents an analysis of the reliability of on-site electrical systems at U.S. commercial nuclear plants during the period 1998-2015. The study contains both individual component studies and system studies. The component studies are focused on key electrical components including circuit breakers, battery chargers, buses, batteries, and transformers. Data from the range of 1998 to 2015 were gathered, reviewed, and statistically evaluated for impacts on reliability as a function of relevant parameters: manufacturer, system, operating environment, inspection/testing regimen, operating range (voltages, amperes), setpoints, and other factors. The system studies identify seven operating nuclear power plants/units that represent different designs of offsite power sources and interconnecting power circuit paths, develop electrical single line diagrams and detailed fault tree models for the representing designs, and evaluate the electrical system reliability using the reliability data obtained from the component studies.

99 GENERAL AND MISCELLANEOUS↗

Cross-Border Electricity Trade between India and Sri Lanka: Impact on Power System Operations

Recent developments in South Asia have the potential to increase the incentives for cross-border energy trade (CBET) between India and Sri Lanka. India's surplus power, including from its rapid expansion of wind and solar generation, provides an incentive for it to increase investment returns through exports. Sri Lanka is considering options to increase its power supply, and CBET could alleviate the need for investments in new thermal generation capacity, while giving it access to India's large and diverse power system. Finally, CBET can facilitate renewable energy (RE) integration by allowing the two countries to more efficiently harness balancing resources and smooth out wind and solar variability over larger geographic areas. This study builds on several prior analyses of a potential high-voltage direct current transmission link between India and Sri Lanka. Uniquely, the study makes use of a detailed one-year, 30-minute resolution unit commitment and economic dispatch (UC&ED) model of both countries to examine the technical and economic impacts of CBET between India and Sri Lanka in the year 2025. The study finds that CBET, enabled by a 500-MW high voltage direct current transmission link, could generate annual production cost savings of USD 180 million and improve power system operations. Through better utilization of the most efficient generators, generation from relatively expensive natural gas plants in Sri Lanka is displaced by lower cost imports from India. In addition, increased flexibility through exports reduces RE curtailment in India's Southern region by 400 GWh annually. While the study captures many previously unconsidered intertemporal operational constraints, it does not provide a complete characterization of system operations with a high-voltage direct current interconnection. Additional work should include a dynamic analysis of system stability following interruptions to the direct current interconnection, an AC power flow analysis and consideration of any non-technical barriers to trade which might prevent the optimization of CBET between India and Sri Lanka at 30-minute timescales.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NEFTSec: Networked federation testbed for cyber-physical security of smart grid: Architecture, applications, and evaluation

As today's power grid is evolving into a densely interconnected cyber-physical system (CPS), a high fidelity and multifaceted testbed environment is needed to perform cybersecurity experiments in a realistic grid environment. Traditional standalone CPS testbeds lack the ability to emulate complex cyber-physical interdependencies between multiple smart grid domains in a real-time environment. Therefore, there are ongoing research and development (R&D) efforts to develop an interconnected CPS testbed by sharing geographically dispersed testbed resources to perform distributed simulation while analysing simulation fidelity. This paper presents a networked federation testbed for cybersecurity evaluation of today's and emerging smart grid environments. Specifically, it presents two novel testbed architectures, including cyber federation and cyber-physical federation, identifies R&D applications, and also describes testbed building blocks with experimental case studies. It also presents a novel co-simulation interface algorithm to facilitate distributed simulation within cyber-physical federation. The resources available at the PowerCyber CPS security testbed at Iowa State University (ISU) and the US Army Research Laboratory are utilised to develop this platform for performing multiple experimental case studies pertaining to wide-area protection and control applications in power system. Finally, experimental results are presented to analyse the simulation fidelity and real-time performance of the testbed federation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

PMU Placement for Enhancing Dynamic Observability of a Power Grid

Power grids are operated in an increasingly complicated environment. However, operators lack effective and accurate tools for real-time monitoring and control of power systems. The U.S. Department of Energy, along with several utilities and system operators, is making a major $108 million investment in the Western Interconnection for phasor measurement unit (PMU) installation and phasor application development. This phasor measurement network opens up many opportunities for the estimation and prediction of power system states in real time, which enable operators to evaluate the system dynamic security in advance and allow them more time to respond to disturbances. Kalman filter based dynamic state estimation offers a solution suitable for this purpose. Our work indicates that the performance of Kalman filters in dynamic state estimation would degrade if PMU measurements cannot adequately capture the system dynamics. This paper develops a framework to identify how to place PMUs to improve dynamic observability of the power grid. Simulation results validate the concept, and the guidelines for PMU placement are derived.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Experimental Validation of a Modular All-Electric Power Take-Off Topology for Wave Energy Converter Enabling Marine Renewable Energy Interconnection

Power electronic converters are an enabling technology for the emerging marine energy applications, such as using ocean waves to produce electricity. This paper outlines the power take-off system and its key components used in a wave energy converter offering modularity and scalability to generate power efficiently. The proposed power take-off system was implemented based on a modular multilevel converter and could be deployed to convert any alternating current electrical energy to a different alternating current for interconnection to grid or non-grid applications. Examples of widespread deployment are supplying electricity to coastal communities or producing clean drinking water. The analysis using both the simulation tests and laboratory experiments verified the design objectives and basic functionality of the developed power take-off system. An acceptable response using a field programmable gate array-based controlled laboratory testbench was achieved, complying with guidelines specified in the prevalent industry standards. Seamless operation during steady-state and transients for the studied wave energy converter was achieved as supported by the obtained results. The key findings of this work were experimentally examined under different load conditions, direct current bus voltage fluctuations, and generator speed–torque regulation. The ability of the power take-off system to generate high-power quality of the waveforms, e.g., against adhering to the IEEE 519-2022 standard for total harmonic distortion limits, is also confirmed.

Engineering↗

IM3 GO WEST Parameter Search Dataset

GO WEST is an open-source power grid modeling framework for U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It is developed to address weather and water dynamics, and associated vulnerabilities in this bulk power system. It covers 28 balancing authorities (BA) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of U.S. Western Interconnection created by Texas A&M University. Users can try and select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. Therefore, GO WEST can help researchers to strike a balance between model fidelity (i.e. accuracy) and computational complexity (i.e. runtime). This dataset includes model inputs and outputs from 600 model versions for each 2019, 2020, and 2021. The folder naming convention is as follows: Exp{Number of Nodes}_{Mathematical Formulation}_{Transmission Line Limit Scaling Factor in MW}_{Hurdle Rate Scaling Factor in %}_{Year}. Linear programming is designated with "simple" label whereas mixed-integer linear programming is designated with "coal" label. For example, "Exp100_simple_1000_50_2019" folder contains inputs and outputs from 2019 model version with 100 nodes, linear programming, +1000 MW transmission line limit scaling factor, and +50% hurdle rate scaling factor. GO WEST GitHub repository hosts all raw datasets, processing scripts, and model scripts. Please refer to the README file for a detailed description of the included files.

Economics↗

Comparative Analysis of Inter-Area Oscillations in the US Eastern and Western Interconnections

This paper presents a comparative analysis of interarea oscillations in the US Eastern and Western Interconnections using frequency disturbance data collected from the advanced wide-area Frequency Monitoring Network (FNET/GridEye), enabling us to investigate and compare the oscillation characteristics of both regions. The study analyzes the statistical data from the two interconnections, including total oscillation events, average dominant frequencies, damping ratios, and maximum amplitudes. We also explore the impact of seasonal and daily variations on oscillation occurrences and the influence of different grid topologies and operational practices. The results provide insights into both interconnections' stability and control characteristics, offering valuable information for power system operators to enhance grid stability and oscillation suppression measures.

Fu, Hao [University of Tennessee, Knoxville (UTK)]↗

Microbial communities of the Laurentian Great Lakes reflect connectivity and local biogeochemistry

The Laurentian Great Lakes are a vast, interconnected freshwater system spanning strong physicochemical gradients, thus constituting a powerful natural laboratory for addressing fundamental questions about microbial ecology and evolution. We present a comparative analysis of pelagic microbial communities across all five Laurentian Great Lakes, focusing on Bacterial and Archaeal picoplankton characterized via 16S rRNA amplicon sequencing. We collected samples throughout the water column from the major basins of each lake in spring and summer over 2 years. Two oligotypes, classified as LD12 (Alphaproteobacteria) and acI-B1 (Actinobacteria), were among the most abundant in every sample. At the same time, microbial communities showed distinct patterns with depth during summer stratification. Deep hypolimnion samples were frequently dominated by a Chloroflexi oligotype that reached up to 19% relative abundance. Stratified surface communities differed between the colder, less productive upper lakes (Superior, Michigan, Huron) and warmer, more productive lower lakes (Erie, Ontario), in part due to an Actinobacteria oligotype (acI-C2) that averaged 7.7% of sequences in the lower lakes but <0.2% in the upper lakes. Together, our findings suggest that both hydrologic connectivity and local selective pressures shape microbial communities in the Great Lakes and establish a framework for future investigations.

59 BASIC BIOLOGICAL SCIENCES↗

Probabilistic Deliverability Assessment of Distributed Energy Resources via Scenario-Based AC Optimal Power Flow

As electric grids decarbonize and distributed energy resources (DERs) become increasingly prevalent, interconnection assessments must evolve to reflect operational variability and control flexibility. This paper highlights key modeling limitations observed in practice and reviews approaches for modeling uncertainty. It then introduces a Probabilistic Deliverability Assessment (PDA) framework designed to complement and extend existing procedures. The framework integrates scenario-based AC optimal power flow (AC OPF), corrective dispatch, and optional multi-temporal constraints. Together, these form a structured methodology for quantifying DER utilization, deliverability, and reliability under uncertainty in load, generation, and topology. Outputs include interpretable metrics with confidence intervals that inform siting decisions and evaluate compliance with reliability thresholds across sampled operating conditions. A case study on Puerto Rico’s publicly available bulk power system model demonstrates the framework’s application using minimal input data, consistent with current interconnection practice. Across staged fossil generation retirements, the PDA identifies high-value DER sites and regions requiring additional reactive power support. Results are presented through mean dispatch signals, reliability metrics, and geospatial visualizations, demonstrating how the framework provides transparent, data-driven siting recommendations. The framework’s modular design supports incremental adoption within existing workflows, encouraging broader use of AC OPF in interconnection and planning contexts.

14 SOLAR ENERGY↗

Recommendations for Data-in-Transit Requirements for Securing DER Communications

With the adoption of Distributed Energy Resource (DER) interoperability standards, common communication protocols are now being deployed between power system operators and DER devices. In 2018, a revision to the US interconnection and interoperability standard, Institute of Electrical and Electronics Engineers (IEEE) Std. 1547, required DER equipment to have an IEEE 2030.5, IEEE 1815, or SunSpec Modbus communication exchange interface. This change supports the future transition to secure connection and exchange of information between the DER equipment and implementing parties, such as grid operators. Adoption of standardized communication protocols and associated information models is a critical step toward interoperability between power system operators and DER, such as photovoltaic (PV) and energy storage systems. However, security requirements for these standardized communication protocols are not comprehensive, resulting in non-standard and vendor-specific implementation that may leave DER equipment susceptible to cyberattacks. This paper examines the data-in-flight security requirements for standardized DER communication protocols, per IEEE 1547-2018 revision, as it relates to device authentication, key management, and encryption. The state of the art for these security features is also explored, addressing their impact on communication and performance of low-cost single board computers, which are typical of DER devices. In conclusion, a recommendation is provided to adopt a common set of communication requirements, which are intended to achieve interoperability and implement data security over DER network pathways, while ensuring reliable, secure, and real-time information delivery.

42 ENGINEERING↗

Exploring sustainable electricity system development pathways in South America’s MERCOSUR sub-region

South America has abundant natural water and energy resources, and exploiting these resources to achieve a clean energy future is central to the continent’s economic and sustainable development objectives for the next several decades. Designing pathways to achieving this clean energy future requires better understanding the structural, techno-economic, and policy forces that may influence the future development of the electricity sector in the region. Here, we focus on an interconnected electricity system of five South American countries – Argentina, Brazil, Chile, Paraguay, and Uruguay – which represent major electricity generation, consumption, and trade dynamics in the region. We explore the implications of various forces that could shape the future composition of the power sector in the sub-region, including: evolving renewable energy cost and performance, natural gas prices, cross-border interconnection facilities, early retirement of installed hydropower, and different decarbonization goals. We use a model framework based on a power system planning platform (GridPath) to co-optimize investment and operations of generation, storage, and transmission facilities out to 2050. Our results in a Reference scenario indicate that the electricity system can maintain a relatively clean energy portfolio by leveraging existing hydropower capacity and integrating increasingly cost-competitive wind and solar power. However, dependence on natural gas in the region is likely to remain high. A low-carbon electricity system can cost-effectively be achieved through policy interventions (e.g., renewable portfolio standards) and by diversifying investments in wind, solar, battery storage, and some new hydropower capacity. We also find that existing hydropower is critical for maintaining reliable future grid operations. Enhanced regional electricity trade, mostly based on existing interconnection capacities with nominal investment in new transmission, can significantly benefit the clean energy transition in the region.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Bulk Power System Flow Control

On July 28, 2023, the Federal Energy Regulatory Commission (FERC) issued Order Number 2023, targeting an improved generation-interconnection process in the United States. FERC Order No. 2023 requires transmission providers to evaluate transmission technologies, other than network expansion, that could provide system improvements and help expand bulk-power system capacity. Transmission providers must consider technologies that would fall under the category of Grid Enhancing Technologies (GETs), which provide capacity-expansion options other than conventional transmission expansion.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Unsupervised Power System Event Detection and Classification Using Unlabeled PMU Data

This paper proposes a novel data-driven power system event detection and classification method based on 5TB of actual PMU measurements collected from the US western interconnect. Firstly, a set of comprehensive power quality rules are proposed to pre-filter the raw data and extract the regions of interest (ROI). Six distinct event categories are defined and corresponding patterns are chosen as references. Meanwhile, detailed characteristics of patterns are summarized to enhance our understanding of the actual events. Then, the time-independent feature vectors are generated by extracting the statistical, temporal, and spectral features from the raw time-series data. Furthermore, an ensemble model is proposed to cluster the events by combining multiple K-means clustering models using a voting strategy. Besides, both system-level and PMU-level clustering models are developed. The accuracy and robustness of the event detection method are further improved through interactive evaluation of the two-level clustering results. This paper summarizes the actual characteristics of each event category and provides a reliable basis for accurate label generation. The experiments demonstrate the effectiveness of the proposed event detection and classification method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Unsupervised Power System Event Detection and Classification Using Unlabeled PMU Data

This paper proposes a novel data-driven power system event detection and classification method based on 5TB of actual PMU measurements collected from the US western interconnect. Firstly, a set of comprehensive power quality rules are proposed to pre-filter the raw data and extract the regions of interest (ROI). Six distinct event categories are defined and corresponding patterns are chosen as references. Meanwhile, detailed characteristics of patterns are summarized to enhance our understanding of the actual events. Then, the time-independent feature vectors are generated by extracting the statistical, temporal, and spectral features from the raw time-series data. Furthermore, an ensemble model is proposed to cluster the events by combining multiple K-means clustering models using a voting strategy. Besides, both system-level and PMU-level clustering models are developed. The accuracy and robustness of the event detection method are further improved through interactive evaluation of the two-level clustering results. This paper summarizes the actual characteristics of each event category and provides a reliable basis for accurate label generation. The experiments demonstrate the effectiveness of the proposed event detection and classification method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impedance-Based Characterization of Power System Frequency Response: Preprint

This paper presents an impedance-based noninvasive approach for the characterization of power system frequency response in real time in the absence of a transient event. It measures transfer function response from the injected active power to the frequency at the point of interconnection for the estimation of inertia and primary frequency response of the system. The so-called frequency response function also shows the effects of the speed of primary frequency control. The paper also derives the relationship between the frequency response function and the network impedance seen from the point of interconnection. This relationship highlights how impedance captures the frequency response behavior of a network. The proposed methodology is demonstrated on a modified IEEE 9-bus system with 25% penetration of wind and PV generation; a 5-MW battery energy storage system is used for the injection of active power perturbations for the measurement of the frequency response function.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Draft Electric Rule 21 Test Protocols for Advanced Inverter Functions

Disclaimer: The following document includes draft certification protocols and should not be viewed as a consensus-based performance standard. Distributed energy resources (DERs), such as photovoltaic (PV) systems, when deployed in a large scale, are capable of significantly influencing the operation of bulk and local power systems. Looking to the future, European and American stakeholders are working on standards to make it possible to manage the potentially complex interactions between DER and the power system. One of the jurisdictions considering modifications to the DER interconnection requirements is California. To determine what changes could improve electric grid reliability and allow greater penetrations of renewable energy, the California Public Utilities Commission (CPUC) and the California Energy Commission (CEC), in conjunction with consultant Frances Cleveland, convened the Smart Inverter Working Group (SIWG) in January 2013. The SIWG--composed of state agencies, utility engineers, national laboratories, manufacturers, trade associations, and advocacy groups--provided the CPUC a set of recommendations in early 2014 1 . The recommendations included specific advanced DER functions and interoperability requirements, along with a proposed timeline, for California to add new capabilities to grid-interconnected DER. On August 18, 2014 the three California Investor-Owned Utilities (IOUs)--Pacific Gas and Electric Company (PG&E), Southern California Edison Company (SCE) and San Diego Gas & Electric Company (SDG&E)--drafted a Advice Letter filing to the CPUC setting forth revisions to Electric Tariff Rule 21 to conform to the seven recommendations made by the Working Group 2 . After a comment period, the CPUC issued an update to the IOU recommendations 3 . At the time of this publication, there was no final legal ruling on the CPUC Rulemaking (R.) 11-09-011 ("Order Instituting Rulemaking on the Commission's Own Motion to improve distribution level interconnection rules and regulations for certain classes of electric generators and electric storage resources"). In the U.S., Nationally Recognized Test Laboratories (NRTLs) independently verify products to safety and functional standards. PV inverters are certified to Underwriters Laboratories (UL) Standard 1741 4 . However, new advanced inverter functions described in the SIWG and IOU proposals are not included in this standard, so there is a critical need to develop test protocols for these functions in preparation of a positive ruling by the CPUC. Through a California Solar Initiative Grant, Sandia National Laboratories (Sandia or SNL), Underwriters Laboratories (UL), Electric Power Research Institute, Inc. (EPRI), Xanthus Consulting, SunSpec Alliance, Loggerware, and utility and PV inverter manufacturers have collaborated to draft this certification protocol for the Rule 21 SIWG Phase 1 advanced inverter functions. This report also includes test procedures for Phase 2 and Phase 3 functions that will be demonstrated later in the CSI4 project. This collaborative effort was performed in close junction with the UL 1741 Standards Technical Panel (STP) working group. This document represents a snapshot of the draft testing protocols at the time of publication and not a consensus certification protocol for advanced inverters. 1 California Public Utilities Commission, "Recommendations for Updating the Technical Requirements for Inverters in Distributed Energy Resources, Smart Inverter Working Group Recommendations," Filed 7 Feb 2014. 2 J.J. Newlander, R.G. Litteneker, S.W. Walter, M. Dwyer, Joint motion of Pacific Gas and Electric Company (U 39 E), Southern California Edison Company (U 338 E) and San Diego Gas & Electric Company (U 902 E) regarding implementation of smart inverter functionalities, Rulemaking 11-09-011 Advice Letter, 18 July, 2014. 3 J.T. Sullivan, CPUC Rulemaking 11-09-011 Agenda ID #13460, 13 Nov, 2014. 4 Underwriters Laboratories Std. 1741 Ed. 2, "Inverters, Converters, Controllers and Interconnection System Equipment for use with Distributed Energy Resources," 2010.

42 ENGINEERING↗