Search NASA⌕ Search

SEARCH · Search NASA

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

The Continuously Evolving Land Use Control Climate in FUSRAP - 12285

In recent years the topic of Land Use Controls (LUCs) has become much more prevalent in the Formerly Utilized Sites Remedial Action Program (FUSRAP) for a number of reasons. Some regulatory agencies have been placing much more emphasis on this topic than they historically did. Also as the FUSRAP has matured, more sites are approaching a point in the project lifecycle that LUCs are needed to be implemented. There are many issues, some site specific, some agency specific, and some programmatic, that may arise when addressing LUCs on a FUSRAP site. These issues can span the life of a project from planning to implementation. As the emphasis on LUCs increases at a fast pace, USACE is faced with the task of developing consistency in how we respond, and at the same time leaving enough latitude for projects to accomplish their individual missions while taking into consideration the site specific concerns. The Land Use Controls arena encompasses a large number of tools to address the matter at hand. There are numerous mechanisms that can accomplish Land Use Control goals, some of which include administrative controls and engineering controls. This paper will discuss some of the mechanisms being utilized by USACE at our FUSRAP projects. Having a better understanding of how LUCs are currently being handled in the FUSRAP will be beneficial to project delivery teams in order to make the best decisions moving through the project lifecycle. Being aware of LUC requirements and options at an early stage in a project will help a team effectively plan for and execute the chosen alternative for remedial action. There are a number of guidance tools from various other agencies that exist for consideration during Land Use Control planning and implementation. The USACE is currently evaluating these guidance tools to determine applicability and impact to FUSRAP projects. Some of these tools are under review at Army and the Department of Defense. Critical to this evaluation is internal team coordination as well as coordination and input from stakeholders. With guidance on LUCs available from a number of entities, the USACE now has the opportunity to develop consistency in determining how LUCs are handled on FUSRAP projects. The FUSRAP ER, ER 200-1-4, is currently being revised and will broadly touch on LUCs. This broad approach was a result of recognizing the magnitude of variances and site specific components that come into play when applying LUCs to our FUSRAP sites. As land use controls scenarios continue to arise on our FUSRAP sites, the methods for how our project teams address those will continue to evolve. The Program is continuing to develop guidance on how to address LUCs. In the interim, our FUSRAP projects can share lessons learned on the LUCs they are implementing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Visible, Durable, Enforceable Institutional Controls: Weldon Spring Site - A 10-Year Journey - 13190

The DOE Office of Legacy Management's (LM's) mission is to manage the DOE's post-closure responsibilities and ensure the future protection of human health and the environment. LM has control and custody of legacy land, structures, and facilities and is responsible for maintaining them at levels suitable for their long-term use. This includes all engineered and institutional controls (ICs) designed as another level of assurance to prevent exposure to residual contamination and waste. The development and management of ICs has been, and continues to be, a critical component to the success of LM surveillance and maintenance activities. Many major federal laws, Executive Orders, regulations, and various other drivers influence the establishment and use of ICs at LM sites. LM uses a wide range of ICs to appropriately limit access to, or uses of, land, facilities, and other real and personal properties; protect the environment; maintain the physical safety and security of DOE facilities; and prevent or limit inadvertent human and environmental exposure to residual contaminants and other hazards. The ICs at the Weldon Spring, Missouri, Site were developed in close coordination with federal and state regulators. An Explanation of Significant Differences (ESD) was issued in February 2005, which clarified the use restrictions necessary for the remedial actions specified in the Records of Decision for the separate operable units to remain protective over the long-term. The operable units included the Chemical Plant Operable Unit, the Chemical Plant Groundwater Operable Unit, and the Quarry Residuals Operable Unit. The ESD clarified specific requirements for each site area that needed use restrictions and established how DOE would implement, maintain, and monitor the specific requirements. DOE developed the Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy Weldon Spring, Missouri, Site (LTS and M Plan) that addressed the full scope of the site management activities necessary to ensure that the Weldon Spring Site remains protective over the long-term. The LTS and M Plan is revised periodically to ensure its applicability to changing site, regulatory, or procedural conditions. In addition to addressing such activities as long-term groundwater monitoring and disposal cell maintenance, the LTS and M Plan was developed and issued to ensure that the use restrictions identified in the ESD were properly imposed and maintained. The LTS and M Plan included a detailed IC Implementation Plan, which includes a process for evaluating and identifying specific IC mechanisms that best accomplish the objectives set out in the ESD. Consistent with EPA guidance on selecting ICs, various IC mechanisms were evaluated, including government controls, proprietary controls, enforcement tools, and informational devices. Where appropriate, redundant mechanisms were employed to increase the effectiveness of the ICs. Information in the IC Implementation Plan includes: (1) a discussion of current site conditions (reflecting post-remedial action conditions for the Chemical Plant and Quarry Areas and the risk-basis for why use restrictions are needed); (2) the objectives of, or performance expectations for, the use restrictions; (3) specific ICs already in place and additional mechanisms identified for implementation; (4) a schedule for implementing additional ICs; (5) procedures for maintaining the ICs and for conducting periodic inspections; and (6) general provisions for the implementing ICs for the site. The actual agreements and documentation of the various ICs are included in an appendix of the LTS and M Plan. These documents are also available via the internet from the authorizing agencies (County, Missouri Department of Natural Resources, EPA, etc.) The Weldon Spring Site personnel have been successful in finalizing each of the ICs that were established for the site. The planning, establishment, and implementation of the ICs was a long and detailed process with several lessons-learned that were identified along the way. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recommendations on Implementing the Energy Conservation Building Code in Visakhapatnam, AP, India

Visakhapatnam can play an important role in improving energy efficiency in its buildings by implementing ECBC. This document seeks to capture stakeholder recommendations on a road map for implementation, which can help all market players plan for implementation. Visakhapatnam also has an opportunity to serve as a role model for other Smart Cities and cities in general in India. The road map and steps that VUDA adopts to implement ECBC can provide helpful examples to these other cities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Foundational Report Series: Advanced Distribution Management Systems for Grid Modernization, DMS Industry Survey

The objective of this survey is to benchmark current practices for DMS implementation to serve as a guide for future system implementations. The survey sought information on current plans to implement DMS, DMS functions of interest, implementation challenges, functional benefits achieved, and other relevant information. These survey results were combined (where possible) with results of similar surveys conducted in the previous four years to observe trends over time.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Underground test coordination at the waste isolation pilot plant - 15229

Underground test coordination is a critical component of safe and efficient conduct of testing operations in a working underground research laboratory (URL). This is particularly important when planning and implementing large, multi-organizational field-scale test programs, when the URL is co-located with an operating repository, or when the host facility, such as the Waste Isolation Pilot Plant (WIPP), is recovering from off-normal events. As such, the Department of Energy Carlsbad Field Office developed an Integrated Project Team (IPT) charter in late 2013 establishing the WIPP underground Test Coordination Office (TCO). The IPT was established to ensure that underground science activities are coordinated, implemented, and managed in an integrated, consistent, efficient, cost-effective, safe, and environmentally compliant manner that maintains quality assurance standards. This is done while ensuring testing operations do not interfere with the WIPP's primary mission, the disposal of transuranic (TRU) waste, and at present, the recovery of WIPP operations. This paper reports the current status of the WIPP underground science and testing programs within the framework of the WIPP stabilization and recovery activities and describes the role of the TCO for current activities as well as for the long-term success of an underground research laboratory. As a result of the underground fire and radiological incident of early February 2014, during this recent period of WIPP recovery, the TCO is ensuring the requirements of the scientific programs are met and that work activities are planned and implemented in compliance with enhanced work control processes and corrective actions imposed at WIPP. This paper addresses the impacts of the accidents at WIPP on the many science experiments that were in process when the events occurred. It presents the plans for their recovery in concert with WIPP's recovery plans, and summarizes the impacts of new underground processes and procedures that will be imposed on the science work as a result. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Drilling, Completion, and Data Collection Plans An Assessment of Geological Carbon Sequestration Options in the Illinois Basin: Phase III

Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO₂ captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO₂ into the basal sands of the Mt. Simon Sandstone over a three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and execution phases of the project. The implementation included an HSE Bridging Document, which served to unify the HSE policies of the project partners and key subcontractors. The HSE plan and actual HSE results are presented in this document. There were no recordable HSE incidents during the project. A detailed logging program was developed based on project needs. The log data were acquired in accordance with the plan, and both the plan and log results are presented in this report. Log data were heavily utilized by the research staff, modelers, reservoir engineers, and for technical and permitting efforts. 5 Several key lessons were learned during the project: • Safety in operations and execution is paramount and is only achieved through proper planning and behavior control. The certainty of this was reinforced through implementation of this lesson and the resultant flawless HSE performance during the project. • Losses of drilling fluid circulation were larger than anticipated within the Potosi Formation. Circulation was only recovered through cementing the loss zones. • When possible, minimizing complexity in permit requirements and well designs is preferable. • The size of the wells were outside of the standard experience and expertise typical within the basin, and therefore required substantial planning and ramp-up of contractors and partners to meet project objectives. • With multiple stakeholders and research partners, establishing objectives and requirements early and adhering to change request procedures throughout the project are critical to manage competing data and sampling objectives that may be detrimental to overall progress. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. Data collection from logging, coring, and testing was excellent. Time and effort spent with the associated contractors and suppliers to develop a well plan beyond normal scope proved highly successful, resulting in a well-construction and completion project that surpassed expectations. The world-class HSE results also demonstrate the commitment of all stakeholders in the project. The details follow in the body of this document

01 COAL, LIGNITE, AND PEAT↗

Handbook: Collecting Groundwater Samples from Monitoring Wells in Frenchman Flat, CAU 98

Frenchman Flat basin on the Nevada National Security Site (NNSS) contains Corrective Action Unit (CAU) 98, which is comprised of ten underground nuclear test locations. Environmental management of these test locations is part of the Underground Test Area (UGTA) Activity conducted by the U.S. Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended) with the U.S. Department of Defense (DOD) and the State of Nevada. A Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) has been approved for CAU 98 (DOE, 2011). The CADD/CAP reports on the Corrective Action Investigation that was conducted for the CAU, which included characterization and modeling. It also presents the recommended corrective actions to address the objective of protecting human health and the environment. The recommended corrective action alternative is “Closure in Place with Modeling, Monitoring, and Institutional Controls.” The role of monitoring is to verify that Contaminants of Concern (COCs) have not exceeded the Safe Drinking Water Act (SDWA) limits (Code of Federal Regulations, 2014) at the regulatory boundary, to ensure that institutional controls are adequate, and to monitor for changed conditions that could affect the closure conditions. The long-term closure monitoring program will be planned and implemented as part of the Closure Report stage after activities specified in the CADD/CAP are complete. Groundwater at the NNSS has been monitored for decades through a variety of programs. Current activities were recently consolidated in an NNSS Integrated Sampling Plan (DOE, 2014). Although monitoring directed by the plan is not intended to meet the FFACO long-term monitoring requirements for a CAU (which will be defined in the Closure Report), the objective to ensure public health protection is similar. It is expected that data collected in accordance with the plan will support the transition to long-term monitoring at each CAU. The sampling plan is designed to ensure that monitoring activities occur in compliance with the UGTA Quality Assurance Plan (DOE, 2012). The sampling plan should be referenced for Quality Assurance (QA) elements and procedures governing sampling activities. The NNSS Integrated Sampling Plan specifies the groundwater monitoring that will occur in CAU 98 until the long-term monitoring program is approved in the Closure Report. The plan specifies the wells that must be monitored and categorizes them by their sampling objective with the associated analytical requirements and frequency. Possible sample collection methods and required standard operating procedures are also presented. The intent of this handbook is to augment the NNSS Integrated Sampling Plan by providing well-specific details for the sampling professional implementing the Sampling Plan in CAU 98, Frenchman Flat. This handbook includes each CAU 98 well designated for sampling in the NNSS Integrated Sampling Plan. The following information is provided in the individual well sections: 1. The purpose of sampling. 2. A physical description of the well. 3. The chemical characteristics of the formation water. 4. Recommended protocols for purging and sampling. The well-specific information has been gathered from numerous historical and current sources cited in each section, but two particularly valuable resources merit special mention. These are the USGS NNSS website (http://nevada.usgs.gov/doe_nv/ntsarea5.cfm) and the UGTA Field Operations website (https://ugta.nv.doe.gov/sites/Field%20Operations/default.aspx). 2 Land surface elevation and measuring point for water level measurements in Frenchman Flat were a focus during CAU investigations (see Appendix B, Attachment 1 in Navarro-Intera, 2014). Both websites listed above provide information on the accepted datum for each well. A summary is found on the home page for the well on the USGS website. Additional information is available through a link in the “Available Data” section to an “MP diagram” with a photo annotated with the datum information. On the UGTA Field Operations well page, the same information is in the “Wellhead Diagram” link. Well RNM-2s does not have an annotated photo at this time. All of the CAU 98 monitoring wells are located within Area 5 of Frenchman Flat, with the exception of ER-11-2 in Area 11 (Figure 1). The wells are clustered in two areas: the northern area (Figure 2) and the central area (Figure 3). Each well is discussed below in geographic order from north to south as follows: ER-11-2, ER-5-3 shallow piezometer, ER-5-3-2, ER-5-5, RNM-1, RNM-2s, and UE-5n.

(1996↗

Determining the Appropriate Emergency Planning Attributes for Microreactors

Micro-reactor designs incorporate design features that provide very low reactor decay heat power at 24 hours after shutdown that is manageable in comparison with larger reactors. This attribute translates into a low probability of core damage negligible offsite dose. This paper provides the conceptual framework for appropriately structuring emergency planning requirements for micro-reactors while ensuring the U.S. Nuclear Regulatory Commission’s (NRC) commitment to safety is met. Due to the diversity in reactor designs comprising the micro-reactor community, this paper identifies the necessary concepts that should be considered to ensure emergency plans for micro-reactors are appropriate for the risk. This paper does not mandate specific design features for micro-reactors but provides reactor designers a conceptual framework for a scalable, graded approach to Emergency Planning Standards that should be considered in their individual designs in order to support simplified emergency plans. Given that accident source terms associated with micro-reactors are essentially negligible when compared with those for large light water reactors, revisions to emergency planning standards are justified. A graded approach to implementing emergency planning guidance can be used to appropriately structure micro-reactor emergency plans and reduce the size of the emergency planning zone and plume exposure pathway. Appropriately structuring emergency planning requirements will better optimize licensee and offsite agencies emergency planning resources and reduce the resources associated with emergency planning.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Scotts Valley Energy Office and Human Capacity Project: Scotts Valley Band of Pomo Indians

The primary goal of this project is to develop a Scotts Valley Energy Development Office (SVEDO). This office will further support the mission of the Tribe's existing leadership position as the DOE Tribal Multi-County Weatherization Energy Program (TMCWEP) in creating jobs and providing tribal homes and buildings with weatherization assistance to increase energy efficiency, occupant comfort and improved indoor air quality. This office will also spearhead efforts to move the Tribe towards its further strategic energy goals of implementing renewable energy systems through specific training, resource evaluation, feasibility planning, and implementation. Human capacity building and continuing operations are two key elements of the SVEDO objectives. Therefore, the project will 1) train and employ additional Tribal members in energy efficiency, conservation and renewable resource analyses and implementation; 2) purchase materials and equipment required to implement the strategic priorities as developed by the Scotts Valley Tribe which specifically include implementing energy conservation measures and alternative energy strategies to reduce energy costs for the Tribe and its members; and 3) obtain a dedicated office and storage space for ongoing SVEDO operations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 577 AREA 5 CHROMIUM CONTAINING WASTE DISPOSAL CELLS

Report will be submitted to the state of Nevada Corrective Action Unit (CAU) 577, “Area 5 Chromium Containing Waste Disposal Cells,” includes five low-level waste cells at the Nevada National Security Site (NNSS) Area 5 Radioactive Waste Management Site (RWMS) where buried waste received from Nuclear Fuel Services, Inc. (NFS), was subsequently determined to contain chromium that exceeded the Toxicity Characteristic Leaching Procedure regulatory limit, which would require the waste to carry hazardous waste code D007. CAU 577 was created to satisfy the requirements of the Settlement Agreement (SA) executed between the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office on April 25, 2019. The SA required that the chromium-containing waste received from NFS would be addressed following the closure process laid out in the Federal Facility Agreement and Consent Order (FFACO). The FFACO process ensures proper closure of the chromium-containing waste cells and documentation of that closure through FFACO-type documents (NDEP 2019). As stipulated in Paragraph 5C of the SA, a Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) was prepared that identified and evaluated risks and corrective action alternatives (CAAs) for CAU 577, provided the plan for implementing the recommended CAA, and presented the post-closure plan (U.S. Department of Energy [DOE] Environmental Management [EM] Nevada Program 2021).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Clinical Implementation of an Online Adaptive Plan-of-the-Day Protocol for Nonrigid Motion Management in Locally Advanced Cervical Cancer IMRT

Purpose: To evaluate the clinical implementation of an online adaptive plan-of-the-day protocol for nonrigid target motion management in locally advanced cervical cancer intensity modulated radiation therapy (IMRT). Methods and Materials: Each of the 64 patients had four markers implanted in the vaginal fornix to verify the position of the cervix during treatment. Full and empty bladder computed tomography (CT) scans were acquired prior to treatment to build a bladder volume-dependent cervix-uterus motion model for establishment of the plan library. In the first phase of clinical implementation, the library consisted of one IMRT plan based on a single model-predicted internal target volume (mpITV), covering the target for the whole pretreatment observed bladder volume range, and a 3D conformal radiation therapy (3DCRT) motion-robust backup plan based on the same mpITV. The planning target volume (PTV) combined the ITV and nodal clinical target volume (CTV), expanded with a 1-cm margin. In the second phase, for patients showing >2.5-cm bladder-induced cervix-uterus motion during planning, two IMRT plans were constructed, based on mpITVs for empty-to-half-full and half-full-to-full bladder. In both phases, a daily cone beam CT (CBCT) scan was acquired to first position the patient based on bony anatomy and nodal targets and then select the appropriate plan. Daily post-treatment CBCT was used to verify plan selection. Results: Twenty-four and 40 patients were included in the first and second phase, respectively. In the second phase, 11 patients had two IMRT plans. Overall, an IMRT plan was used in 82.4% of fractions. The main reasons for selecting the motion-robust backup plan were uterus outside the PTV (27.5%) and markers outside their margin (21.3%). In patients with two IMRT plans, the half-full-to-full bladder plan was selected on average in 45% of the first 12 fractions, which was reduced to 35% in the last treatment fractions. Conclusions: The implemented online adaptive plan-of-the-day protocol for locally advanced cervical cancer enables (almost) daily tissue-sparing IMRT.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Natural Resource Damages Settlement Projects at the Fernald Preserve - 12316

This paper describes the development and implementation of two ecological restoration projects at the Fernald Preserve that are funded through a CERCLA natural resource damage settlement. The Paddys Run Tributary Project involves creation of vernal pool wetland habitat with adjacent forest restoration. The Triangle Area Project is a mesic tall-grass prairie establishment, similar to other efforts at the Fernald Preserve. The goal of the Fernald Natural Resource Trustees is to establish habitat for Ambystomatid salamander species, as well as grassland birds. Planning and implementation of on-property ecological restoration projects is one component of compensation for natural resource injury. As with the rest of the Fernald Preserve, ecological restoration has helped turn a DOE liability into a community asset. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WE-E-BRE-02: BEST IN PHYSICS (THERAPY) - Stereotactic Radiotherapy for Renal Sympathetic Ablation for the Treatment of Refractory Hypertension

Purpose: To determine the safety and efficacy of stereotactic radiotherapy as a novel treatment for patients with refractory hypertension in a swine model. Uncontrolled hypertension is a significant contributor to morbidity and mortality, substantially increasing the risk of ischemic stroke, ischemic heart disease, and kidney failure. Methods: High-resolution computed tomography (CT) images of anesthetized pigs were acquired and treatment plans for each renal artery and nerve were developed using our clinically implemented treatment planning system. Stereotactic radiotherapy, 40Gy in single fraction was delivered bilaterally to the renal nerves using a state-of-the-art medical linear accelerator under image guidance utilizing dynamic conformal arcs. Dose to nearby critical organs was evaluated by dosevolume histogram analysis and correlated to toxicity data obtained through follow up pathology analysis. The animals were observed for six months with serial measurements of blood pressure, urine analysis, serum laboratories, and overall clinical and behavioral status. Results: All animals survived to the follow-up point without evidence of renal dysfunction (stable serum creatinine), skin changes, or behavioral changes that might suggest animal discomfort. Plasma norepinephrine levels (ng/ml) were followed monthly for 6 months. The average reduction observed was 63%, with the median reduction at 73.5%. Microscopic evaluation 4–6 weeks after treatment showed evidence of damage to the nerves around treated renal arteries. Considerable attenuation in pan neurofilament expression by immunohistochemistry was observed with some vacuolar changes indicative of injury. There was no histological or immunohistochemical evidence of damage to nearby spinal cord or spinal nerve root structures. Conclusion: Our preclinical studies have shown stereotactic radiotherapy to the renal sympathetic plexus to be safe and effective in reducing blood pressure, thus this approach holds great promise as a novel treatment modality for patients with refractory hypertension. This study was funded by the Stanford University Cardiovascular Institute. B. Loo and P. Maxim have received funding from RaySearch Laboratories.

60 APPLIED LIFE SCIENCES↗

Potential Suitability of Subirrigation for Field Crops in the U.S. Midwest

Subirrigation through subsurface tile drains has potential to increase crop yields and improve water quality in tile-drained landscapes, but it has not been widely implemented. Identifying locations with high potential suitability for subirrigation may help the planning and implementation of this practice. In this study, we developed a fuzzy rating system for subirrigation suitability using the Gridded Soil Survey Geographic Database (gSSURGO). Maps of the fuzzy rating system identified locations of high potential suitability for subirrigation and highlighted physiographic regions highly conducive to the practice. We identified 78,500 km2, about 9%, of agricultural land in the Midwest with high potential suitability for subirrigation where onsite investigation may be targeted. The largest areas of high potential suitability were found in Minnesota, Illinois, and Indiana. Results from the fuzzy rating analysis are provided to the public through three channels: a downloadable data repository, map service, and web map tool. Ultimately, this study can facilitate the adoption of subirrigation by highlighting areas where subirrigation may potentially be a viable practice.

54 ENVIRONMENTAL SCIENCES↗

EIA and green procurement: Opportunities for strengthening their coordination

EIA plays an important role in enhancing the environmental performance of the construction sector. In recent years, the construction sector has been developing green procurement practices. Green procurement is a process that involves the incorporation of environmental requirements during the procurement of services and products. However, discussion on green procurement is rarely seen during the EIA phase. This paper addresses possible opportunities for improving the coordination between EIA and green procurement within the construction sector. The linking of EIA and green procurement has been postulated in the paper as an aid to strengthen the coordination between project planning and implementation. The paper is based on a literature review and is an outcome of an on-going research project concerning EIA and green procurement. This study indicated that it would be appropriate to introduce green procurement during the pre-decision phase of an EIA. In the present study, the opportunities for integrating green procurement at the stage of EIA are associated with the integration of project planning and EIA. Future research should investigate the mechanism through which the link can be established. - Highlights: Black-Right-Pointing-Pointer This paper identifies opportunities to link EIA and green procurement. Black-Right-Pointing-Pointer Pre-decision phase of EIA could be appropriate for planning green procurement. Black-Right-Pointing-Pointer Future research should investigate the mechanism for establishing the link.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Radiological Characterization for Decommissioning: International Good Practice and Experience - 18396

The 'Task Group on Radiological Characterization for Decommissioning (TGRCD)' functions under the umbrella of the Nuclear Energy Agency' (NEA) 'Working Party on Decommissioning and Dismantling (WPDD),' which is currently reporting to NEA Radioactive Waste Management Committee (RWMC). The TGRCD task group, which is composed of international experts, has been working since 2014 on a commitment to provide a high-level guidance for characterization practitioners working in nuclear decommissioning. The work has focused on facility characterization from a waste and materials perspective. Radiological characterization is a key activity enabling planning and implementation of decommissioning of nuclear facilities. Effective characterization allows the extent, location and nature of contamination to be determined providing crucial information to facilitate facility dismantling, the management of material and arising waste, protection of workers, the public, the environment and associated cost estimation. The report is written for characterization practitioners who carry out the tactical planning, preparation, optimization and implementation of characterization to support the decommissioning of nuclear facilities and the management of associated materials and waste. It compiles recent experience of NEA member countries in radiological characterization, including the experience of international experts and practitioners; the learning from international case studies and international conferences; and national approaches to the application of international and national regulations, standards and guidance documents. Using this comprehensive approach and evaluation studies, the report identifies relevant good practices and sets out set out practical guidance covering all stages of the characterization process as related to decommissioning. This paper provides a summary of the work conducted and the main findings from the detailed report. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗