Search NASA⌕ Search

SEARCH · Search NASA

Results for “JPL projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

OPALS: A COTS-based Tech Demo of Optical Communications

I. Objective: Deliver video from ISS to optical ground terminal via an optical communications link. a) JPL Phaeton/Early Career Hire (ECH) training project. b) Implemented as Class-D payload. c) Downlink at approx.30Mb/s. II. Flight System a) Optical Head Beacon Acquisition Camera. Downlink Transmitter. 2-axis Gimbal. b) Sealed Container Laser Avionics Power distribution Digital I/O board III. Implementation: a) Ground Station - Optical Communications Telescope Laboratory at Table Mountain Facility b) Flight System mounted to ISS FRAM as standard I/F. Attached externally on Express Logistics Carrier.

optical communications↗

Architecture Modeling on the Europa Project

In 2015 NASA chartered a partnership between the Jet Propulsion Laboratory (JPL) and the Johns Hopkins Applied Physics Laboratory (APL) to begin planning a mission to study the Jovian moon Europa. The project has adopted a Model-Based Systems Engineering (MBSE) approach to its architecting process since its early formulation, developing certain modeling practices and tools as needed, with the expectation that this process would result in a more consistent and verifiable architecture than with a more traditional document-based approach. A sound architecture is essential to provide the rationale for requirements on the system design, and to define the trade space of acceptable design points within which technical and programmatic concerns as well as project objectives can be addressed. This paper provides an overview of the framework used by the Europa project to describe the mission architecture and discusses how a system model was instrumental in providing a single-source-of-truth for this description. Several key modeling patterns to represent the architecture are presented, along with audit methods to ensure the consistency and the correctness of the model. Finally, the benefits and challenges of using a model-based approach to generate traditional requirements documents and other gate products are assessed.

Dubos, Gregory F.↗

Spacecraft Contamination Control Challenges for Space Missions with Organic Compound Detection Capabilities and for Potential Sample Return

Contamination control is critical to missions with organic compound detection capabilities, and for missions targeting acquisition of samples for potential return to Earth. Significant challenges are being addressed in the design of current flight projects and conceptual mission studies at JPL. These challenges extend to both orbiting spacecraft, as well as landed missions, for future missions to Mars and Europa, and potential missions to Titan and Enceladus. Contamination control during all phases of a mission, from preliminary design through operation, is fundamental to ensure that organic compounds of terrestrial origin are controlled to ensure successful completion of science objectives. This presentation summarizes contamination control challenges specific to landed missions (which include sample acquisition, encapsulation, caching, potential sample return, and UV instruments), and orbiting missions (modeling interactions between the spacecraft, and local exospheres and plumes).

Soares, Carlos↗

Incorporating CCSDS Telemetry Standards and Philosophy on Cassini

The Cassini project at the Jet Propulsion Laboratory (JPL) is implementing a spacecraft telemetry system based on the Consultative Committee for Space Data Systems (CCSDS) packet telemetry standards. Resolving the CCSDS concepts with a Ground Data System designed to handle time-division-multiplexed telemetry and also handling constraints unique to a deep-space planetary spacecraft (such as fixed downlink opportunities, small downlink rates and requirements for on-board data storage) have resulted in spacecraft and ground system design challenges. Solving these design challenges involved adapting and extending the CCSDS telemetry standards as well as changes to the spacecraft and ground system designs. The resulting spacecraft/ground system design is an example of how new ideas and philosophies can be incorporated into existing systems and design approaches without requiring significant rework. In addition, it shows that the CCSDS telemetry standards can be successfully applied to deep-space planetary spacecraft.

CCSDS↗

Spacecraft Contamination Control Challenges for Space Missions with Organic Compound Detection Capabilities and for Potential Sample Return

Spacecraft contamination control is critical to space exploration missions with organic compound detection capabilities, and also for missions targeting acquisition of samples for potential return to Earth. Significant challenges are being addressed and resolved in the design of current flight projects and conceptual mission studies at JPL. These challenges extend to both orbiting spacecraft, as well as landed missions, for future missions to Mars and Europa, and potential missions to Titan and Enceladus. Contamination control during all phases of a mission, from preliminary design through operation, is fundamental to ensure that organic compounds of terrestrial origin are controlled to ensure successful completion of science objectives. This paper examines contamination control challenges specific to landed missions (which include sample acquisition, encapsulation, caching, potential sample return, and UV instruments), and orbiting missions (modeling interactions between the spacecraft and local exospheres and plumes).

Sylvia, Margarite↗

The software product assurance metrics study: JPL's software systems quality and productivity

The findings are reported of the Jet Propulsion Laboratory (JPL)/Software Product Assurance (SPA) Metrics Study, conducted as part of a larger JPL effort to improve software quality and productivity. Until recently, no comprehensive data had been assembled on how JPL manages and develops software-intensive systems. The first objective was to collect data on software development from as many projects and for as many years as possible. Results from five projects are discussed. These results reflect 15 years of JPL software development, representing over 100 data points (systems and subsystems), over a third of a billion dollars, over four million lines of code and 28,000 person months. Analysis of this data provides a benchmark for gauging the effectiveness of past, present and future software development work. In addition, the study is meant to encourage projects to record existing metrics data and to gather future data. The SPA long term goal is to integrate the collection of historical data and ongoing project data with future project estimations.

Bush, Marilyn W.↗

Reducing NPR 7120.5D to Practice: Preparing for a Life-Cycle Review

In March 2007, NASA issued revised rules for space flight project management, NPR 7120.5D, 'NASA Space Flight Program and Project Management Requirements.' Central to the new rules was the construct of Key Decision Points, maturity gates that the project team must pass in order to continue development. In order that the KDP decision be fully informed, the NPR required, as entrance criteria for the gate, the generation and delivery of specified planning, technical, and cost/schedule documents (gate products) and a life-cycle review, the Preliminary Design Review. Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. Key actions were taken to proactively interact with the SRB, produce high-quality gate products with stakeholder review, generate review presentation materials, and handle a myriad of supporting logistical functions. A review preparation team was established, including a Review Captain and leads for documentation, information systems, and logistics, and their roles, responsibilities and task assignments were identified. Aids were produced, including a detailed review preparation schedule and a comprehensive gate products production table. Institutional support was leveraged early and often. Implementation strategy reflected the needs of a nationally-distributed team, as well as applicable export control and IT security requirements. This paper gives a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project PMSR and PDR preparation and execution activities, including positive and negative lessons learned, and identifies recommendations for future NASA (and non-NASA) project teams.

NPR 7120.5D↗

Galileo Science Writers' Briefing

This NASA Kennedy video production presents Part 1 of a press conference held at JPL on August 8, 1989. The briefing in its entirety covers the Galileo Project's mission design from launch to completion in 1997 and is moderated by JPL Public Information Mgr. Robert Macmillan. Part 1 of the 3 part video series includes presentations by Richard J. Spehalski (Galileo Project Manager) and Clayne M. Yeates (Acting Science Mission Design Manager). Mr. Spehalski's presentation includes actual footage of spacecraft preparations at Kennedy Space Center and slides of mission timelines. Dr. Yeates discusses the Galileo mission in chronological order and includes slides of the interplanetary trajectory, encounter geometry, propellant margins vs. launch date, and planned earth images.

Source record↗

How to Quickly Import CAD Geometry into Thermal Desktop

There are several groups at JPL (Jet Propulsion Laboratory) that are committed to concurrent design efforts, two are featured here. Center for Space Mission Architecture and Design (CSMAD) enables the practical application of advanced process technologies in JPL's mission architecture process. Team I functions as an incubator for projects that are in the Discovery, and even pre-Discovery proposal stages. JPL's concurrent design environment is to a large extent centered on the CAD (Computer Aided Design) file. During concurrent design sessions CAD geometry is ported to other more specialized engineering design packages.

Wright, Shonte↗

Re-engineering the Multimission Command System at the Jet Propulsion Laboratory

The Operations Engineering Lab (OEL) at JPL has developed the multimission command system as part of JPL's Advanced Multimission Operations System. The command system provides an advanced multimission environment for secure, concurrent commanding of multiple spacecraft. The command functions include real-time command generation, command translation and radiation, status reporting, some remote control of Deep Space Network antenna functions, and command file management. The mission-independent architecture has allowed easy adaptation to new flight projects and the system currently supports all JPL planetary missions (Voyager, Galileo, Magellan, Ulysses, Mars Pathfinder, and CASSINI). This paper will discuss the design and implementation of the command software, especially trade-offs and lessons learned from practical operational use. The lessons learned have resulted in a re-engineering of the command system, especially in its user interface and new automation capabilities. The redesign has allowed streamlining of command operations with significant improvements in productivity and ease of use. In addition, the new system has provided a command capability that works equally well for real-time operations and within a spacecraft testbed. This paper will also discuss new development work including a multimission command database toolkit, a universal command translator for sequencing and real-time commands, and incorporation of telecommand capabilities for new missions.

Alexander, Scott↗

Space Mission Concept Development Using Concept Maturity Levels

Over the past five years, pre-project formulation experts at the Jet Propulsion Laboratory (JPL) has developed and implemented a method for measuring and communicating the maturity of space mission concepts. Mission concept development teams use this method, and associated tools, prior to concepts entering their Formulation Phases (Phase A/B). The organizing structure is Concept Maturity Level (CML), which is a classification system for characterizing the various levels of a concept's maturity. The key strength of CMLs is the ability to evolve mission concepts guided by an incremental set of assessment needs. The CML definitions have been expanded into a matrix form to identify the breadth and depth of analysis needed for a concept to reach a specific level of maturity. This matrix enables improved assessment and communication by addressing the fundamental dimensions (e.g., science objectives, mission design, technical risk, project organization, cost, export compliance, etc.) associated with mission concept evolution. JPL's collaborative engineering, dedicated concept development, and proposal teams all use these and other CML-appropriate design tools to advance their mission concept designs. This paper focuses on mission concept's early Pre-Phase A represented by CMLs 1- 4. The scope was limited due to the fact that CMLs 5 and 6 are already well defined based on the requirements documented in specific Announcement of Opportunities (AO) and Concept Study Report (CSR) guidelines, respectively, for competitive missions; and by NASA's Procedural Requirements NPR 7120.5E document for Projects in their Formulation Phase.

Concept Maturity Levels (CMLs)↗

Software Transition Project Retrospectives and the Application of SEL Effort Estimation Model and Boehm's COCOMO to Complex Software Transition Projects

The Multimission Image Processing Subsystem (MIPS) at the Jet Propulsion Laboratory (JPL) has managed transitions of application software sets from one operating system and hardware platform to multiple operating systems and hardware platforms. As a part of these transitions, cost estimates were generated from the personal experience of in-house developers and managers to calculate the total effort required for such projects. Productivity measures have been collected for two such transitions, one very large and the other relatively small in terms of source lines of code. These estimates used a cost estimation model similar to the Software Engineering Laboratory (SEL) Effort Estimation Model. Experience in transitioning software within JPL MIPS have uncovered a high incidence of interface complexity. Interfaces, both internal and external to individual software applications, have contributed to software transition project complexity, and thus to scheduling difficulties and larger than anticipated design work on software to be ported.

SEL Boehm COCOMO↗

Developing a Standard Test Program for CubeSats

Developers of CubeSats and other miniaturized satellites often lack the schedule and budget to devise and implement an extensive environmental test campaign. CubeSat projects have become increasingly common at Jet Propulsion Laboratory (JPL) over the past few years, revealing the need for a standard CubeSat test program to maximize the likelihood of mission success while meeting project cost and schedule constraints. In this paper, we describe our efforts to develop a general protoflight test program for CubeSats in low-Earth orbit (LEO) and compare this test program with a typical test program for non-CubeSat LEO satellites and instruments. We investigate the effectiveness of the CubeSat test program—both as a design and workmanship screen and as a standard needing minimal project-specific tailoring—and discuss potential areas for improvement.

Seal, Gabriella L.↗

Error analysis for Mariner Venus/Mercury 1973 conducted at the JPL Mesa west antenna range

Theoretical analysis and experimental data are combined to yield the errors to be used with antenna gain, antenna patterns, and RF cable insertion loss measurements for the Mariner Venus-Mercury 1973 Flight Project. These errors apply to measurements conducted at the JPL Mesa, West Antenna Range, on the high gain antenna, low gain antenna, and RF coaxial cables.

Vincent, N. L.↗

Ada software productivity prototypes: A case study

A case study of the impact of Ada on a Command and Control project completed at the Jet Propulsion Laboratory (JPL) is given. The data for this study was collected as part of a general survey of software costs and productivity at JPL and other NASA sites. The task analyzed is a successful example of the use of rapid prototyping as applied to command and control for the U.S. Air Force and provides the U.S. Air Force Military Airlift Command with the ability to track aircraft, air crews and payloads worldwide. The task consists of a replicated database at several globally distributed sites. The local databases at each site can be updated within seconds after changes are entered at any one site. The system must be able to handle up to 400,000 activities per day. There are currently seven sites, each with a local area network of computers and a variety of user displays; the local area networks are tied together into a single wide area network. Using data obtained for eight modules, totaling approximately 500,000 source lines of code, researchers analyze the differences in productivities between subtasks. Factors considered are percentage of Ada used in coding, years of programmer experience, and the use of Ada tools and modern programming practices. The principle findings are the following. Productivity is very sensitive to programmer experience. The use of Ada software tools and the use of modern programming practices are important; without such use Ada is just a large complex language which can cause productivity to decrease. The impact of Ada on development effort phases is consistent with earlier reports at the project level but not at the module level.

Hihn, Jairus M.↗

Ion drive technology readiness for the 1985 Halley Comet rendezvous mission

This paper summarizes the results of an assessment performed by the Jet Propulsion Laboratory (JPL) in FY 77 of the technology readiness of ion propulsion technology to support a 1985 Halley Comet Rendezvous (HCR) mission. The assessment identifies the status of ion propulsion technology and risk of its utilization to perform the HCR mission as of July 1977 and provides projections of status and risk at the required date for an HCR project start, October 1978. These projections are based on the assumed completion of the development activities ongoing at the time of this assessment and the recommended new activities identified in this paper. The conclusions of the study indicate that a National Aeronautics and Space Administration (NASA) commitment to the performance-demanding HCR mission would involve significant risk, greater than that experienced in any post-1964 planetary mission, despite years of supporting research and advanced development funding for ion propulsion and even assuming the success of an ambitious, aggressive FY 78 pre-project advanced systems technology (AST) program proposed by JPL. Contributing principally to the identified risk are a marginal mass margin of 6.7%, driven by uncertainties in ion drive vehicle masses and an unconfirmed solar array power degradation model of 12%, and technology currently undemonstrated to meet HCR mission requirements in two of the six subsystems of the ion propulsion module: the thrust and solar array subsystems.

John L West↗

Image Acquisition in Real Time

In 1995, Carlos Jorquera left NASA s Jet Propulsion Laboratory (JPL) to focus on erasing the growing void between high-performance cameras and the requisite software to capture and process the resulting digital images. Since his departure from NASA, Jorquera s efforts have not only satisfied the private industry's cravings for faster, more flexible, and more favorable software applications, but have blossomed into a successful entrepreneurship that is making its mark with improvements in fields such as medicine, weather forecasting, and X-ray inspection. Formerly a JPL engineer who constructed imaging systems for spacecraft and ground-based astronomy projects, Jorquera is the founder and president of the three-person firm, Boulder Imaging Inc., based in Louisville, Colorado. Joining Jorquera to round out the Boulder Imaging staff are Chief Operations Engineer Susan Downey, who also gained experience at JPL working on space-bound projects including Galileo and the Hubble Space Telescope, and Vice President of Engineering and Machine Vision Specialist Jie Zhu Kulbida, who has extensive industrial and research and development experience within the private sector.

Source record↗

Design and construction of a reverberation chamber for high-intensity acoustic testing.

A high-intensity acoustic test facility was constructed at the Jet Propulsion Laboratory (JPL) to support the Mariner Mars 1971 project. For ease of construction, the reverberation chamber itself is rectangular, which resulted in very little sacrifice in acoustic performance. Levels as high as 156 dB can be achieved with the chamber empty and test levels of 150 dB have been used with a Mariner Mars spacecraft model (full size) in the chamber. Levels as high as this must be generated using electropneumatic transducers, which modulate gaseous nitrogen to this facility.

Slusser, R. A.↗