Search NASA⌕ Search

SEARCH · Search NASA

Results for “LAUNCHING FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Flight Reynolds Number Testing of the Orion Launch Abort Vehicle in the NASA Langley National Transonic Facility

A 6%-scale unpowered model of the Orion Launch Abort Vehicle (LAV) ALAS-11-rev3c configuration was tested in the NASA Langley National Transonic Facility to obtain static aerodynamic data at flight Reynolds numbers. Subsonic and transonic data were obtained for Mach numbers between 0.3 and 0.95 for angles of attack from -4 to +22 degrees and angles of sideslip from -10 to +10 degrees. Data were also obtained at various intermediate Reynolds numbers between 2.5 million and 45 million depending on Mach number in order to examine the effects of Reynolds number on the vehicle. Force and moment data were obtained using a 6-component strain gauge balance that operated both at warm temperatures (+120 . F) and cryogenic temperatures (-250 . F). Surface pressure data were obtained with electronically scanned pressure units housed in heated enclosures designed to survive cryogenic temperatures. Data obtained during the 3-week test entry were used to support development of the LAV aerodynamic database and to support computational fluid dynamics code validation. Furthermore, one of the outcomes of the test was the reduction of database uncertainty on axial force coefficient for the static unpowered LAV. This was accomplished as a result of good data repeatability throughout the test and because of decreased uncertainty on scaling wind tunnel data to flight.

Chan, David T.↗

Mission planning and scheduling concept for the Advanced X-ray Astrophysics Facility (AXAF)

Projected for launch in the latter part of 1998, the Advanced X-ray Astrophysics Facility (AXAF), the third satellite in the Great Observatory series, promises to dramatically open the x-ray sky as the Hubble and Compton observatories have done in their respective realms. Unlike its companions, however, AXAF will be placed in a high altitude, highly elliptical orbit (10,000 x 100,000 km), and will therefore be subject to its own unique environment, spacecraft and science instrument constraints and communication network interactions. In support of this mission, ground operations personnel have embarked on the development of the AXAF Offline System (OFLS), a body of software divided into four basic functional elements: (1) Mission Planning and Scheduling, (2) Command Management, (3) Altitude Determination and Sensor Calibration and (4) Spacecraft Support and Engineering Analysis. This paper presents an overview concept for one of these major elements, the Mission Planning and Scheduling subsystem (MPS). The derivation of this concept is described in terms of requirements driven by spacecraft and science instrument characteristics, orbital environment and ground system capabilities. The flowdown of these requirements through the systems analysis process and the definition of MPS interfaces has resulted in the modular grouping of functional subelements depicted in the design implementation approach. The rationale for this design solution is explained and capabilities for the initial prototype system are proposed from the user perspective.

Newhouse, M.↗

Prokaryotic and Fungal Characterization of the Facilities Used to Assemble, Test, and Launch the OSIRIS-REx Spacecraft

To characterize the ATLO (Assembly, Test, and Launch Operations) environment of the OSIRIS-REx spacecraft, we analyzed 17 aluminum witness foils and two blanks for bacterial, archaeal, fungal, and arthropod DNA. Under NASA’s Planetary Protection guidelines, OSIRIS-REx is a Category II outbound, Category V unrestricted sample return mission. As a result, it has no bioburden restrictions. However, the mission does have strict organic contamination requirements to achieve its primary objective of returning pristine carbonaceous asteroid regolith to Earth. Its target, near-Earth asteroid (101955) Bennu, is likely to contain organic compounds that are biologically available. Therefore, it is useful to understand what organisms were present during ATLO as part of the larger contamination knowledge effort—even though it is unlikely that any of the organisms will survive the multi-year deep space journey. Even though these samples of opportunity were not collected or preserved for DNA analysis, we successfully amplified bacterial and archaeal DNA (16S rRNA gene) from 16 of the 17 witness foils containing as few as 7 ± 3 cells per sample. Fungal DNA (ITS1) was detected in 12 of the 17 witness foils. Despite observing arthropods in some of the ATLO facilities, arthropod DNA (COI gene) was not detected. We observed 1,009 bacterial and archaeal sOTUs (sub-operational taxonomic units, 100% unique) and 167 fungal sOTUs across all of our samples (25–84 sOTUs per sample). The most abundant bacterial sOTU belonged to the genus Bacillus. This sOTU was present in blanks and may represent contamination during sample handling or storage. The sample collected from inside the fairing just prior to launch contained several unique bacterial and fungal sOTUs that describe previously uncharacterized potential for contamination during the final phase of ATLO. Additionally, fungal richness (number of sOTUs) negatively correlates with the number of carbon-bearing particles detected on samples. The total number of fungal sequences positively correlates with total amino acid concentration. These results demonstrate that it is possible to use samples of opportunity to characterize the microbiology of low-biomass environments while also revealing the limitations imposed by sample collection and preservation methods not specifically designed with biology in mind.

Aaron B. Regberg↗

Launching of the telstar satellite

The launching of the Telstar satellite from Cape Canaveral is described, with emphasis on the pre-launch testing and test facilities.

LAUNCHING FACILITY↗

The Kennedy Space Center role in Skylab

The Skylab Program had a major impact on the Kennedy Space Center due to the one-of-a-kind nature of its components. KSC was designed as a launch operations Center, with hardware and facilities suitable for repeated launches of the same vehicles. This paper presents a brief description of the Skylab Program, as it was conducted at KSC, and its hardware, along with a broad overview of the problems encountered and their resolution.

Rock, W. H.↗

Orbital transfer vehicle launch operations study: Manpower summary and facility requirements, volume 5

All manpower numbers, number of heads (by skill), serial time and manhours have been accumulated and compiled on a per subtask basis in spreadsheet format for both the ground based and the space based data flows. To aid in identifying the facility resources required to process the Ground Based Orbital Transfer Vehicle (GBOTV) and/or the space based orbital transfer vehicle (SBOTV) through the ground facilities at Kennedy Space Center (KSC), a software application package was developed using a general purpose data base management system known as Data Flex. The facility requirements are used as the basic input to this software application. The resources of the KSC facility that could be used by orbital transfer vehicle program were digitized in the same format used to identify facility requirements. The facility capabilities were digitized in this format for subsequent, automated comparative analyses. Composite facility requirements are compared to each of the baseline facility capabilities and the system generates a relative score that indicates how each facility weighs against the composite requirements in relation to the other facilities in the set.

Source record↗

Lockheed Martin Response to the OSP Challenge

The Lockheed Martin Orbital Space Plane System provides crew transfer and rescue for the International Space Station more safely and affordably than current human space transportation systems. Through planned upgrades and spiral development, it is also capable of satisfying the Nation's evolving space transportation requirements and enabling the national vision for human space flight. The OSP System, formulated through rigorous requirements definition and decomposition, consists of spacecraft and launch vehicle flight elements, ground processing facilities and existing transportation, launch complex, range, mission control, weather, navigation, communication and tracking infrastructure. The concept of operations, including procurement, mission planning, launch preparation, launch and mission operations and vehicle maintenance, repair and turnaround, is structured to maximize flexibility and mission availability and minimize program life cycle cost. The approach to human rating and crew safety utilizes simplicity, performance margin, redundancy, abort modes and escape modes to mitigate credible hazards that cannot be designed out of the system.

Sullivan, Robert T.↗

KSC facilities status and planned management operations

A status report is presented on facilities and planned operations at the Kennedy Space Center with reference to Space Shuttle launch activities. The facilities are essentially complete, with all new construction and modifications to existing buildings almost finished. Some activity is still in progress at Pad A and on the Mobile Launcher due to changes in requirements but is not expected to affect the launch schedule. The installation and testing of the ground checkout equipment that will be used to test the flight hardware is now in operation. The Launch Processing System is currently supporting the development of the applications software that will perform the testing of this flight hardware.

Gray, R. H.↗

Life sciences utilization of Space Station Freedom

Space Station Freedom will provide the United States' first permanently manned laboratory in space. It will allow, for the first time, long term systematic life sciences investigations in microgravity. This presentation provides a top-level overview of the planned utilization of Space Station Freedom by NASA's Life Sciences Division. The historical drivers for conducting life sciences research on a permanently manned laboratory in space as well as the advantages that a space station platform provides for life sciences research are discussed. This background information leads into a description of NASA's strategy for having a fully operational International Life Sciences Research Facility by the year 2000. Achieving this capability requires the development of the five discipline focused 'common core' facilities. Once developed, these facilities will be brought to the space station during the Man-Tended Capability phase, checked out and brought into operation. Their delivery must be integrated with the Space Station Freedom manifest. At the beginning of Permanent Manned Capability, the infrastructure is expected to be completed and the Life Sciences Division's SSF Program will become fully operational. A brief facility description, anticipated launch date and a focused objective is provided for each of the life sciences facilities, including the Biomedical Monitoring and Countermeasures (BMAC) Facility, Gravitational Biology Facility (GBF), Gas Grain Simulation Facility (GGSF), Centrifuge Facility (CF), and Controlled Ecological Life Support System (CELSS) Test Facility. In addition, hardware developed by other NASA organizations and the SSF International Partners for an International Life Sciences Research Facility is also discussed.

Chambers, Lawrence P.↗

22 N HPGP Thruster Life Testing

In the ever-changing paradigm of efficient and capable spacecraft design, scientific missions continue pushing the envelope enabling spacecraft subsystems to deliver effective solutions to meet challenging new mission/spacecraft needs. From an in-space storable liquid chemical propulsion perspective, monopropellant hydrazine has been, and continues to be, a dependable propellant with considerable flight heritage, a variety of engine thrust classes available from multiple vendors, with repeatable and reliable performance. Additionally, the space propulsion industry has learned to successfully handle hydrazine, its regulations, the safety protocols, the personnel protective equipment, and the unique training standards–all requisite for loading spacecraft propulsion systems with toxic hypergolic hydrazine. The question now arises as to “what is next for in-space chemical propulsion?” Further, with the evolution and concrete advancements in innovative in-space green propellant technologies, capable of providing realizable benefits to scientific missions, concern over the reliability and availability of this higher performing and safer to handle class of propellants is waning. As science missions move forward with the potential flight in fusion of High Performance Green Propulsion (HPGP), NASA and its industry partners are working to address any gaps in system reliability, performance, or unique operational considerations. Propellant technology that offers both higher performance and significant reduction in personnel hazards compared to hydrazine presents an attractive propulsion subsystem design opportunity. Increased propulsion subsystem performance can result in lower spacecraft launch mass, larger scientific payloads, or extended on-orbit lifetimes. Mission trades using green propulsion technologies have been documented on multiple NASA Goddard Space Flight Center (GSFC) mission classes, examining various parameters and requirements to support mission architectures in Low Earth Orbit (LEO), High Earth Orbit (HEO), geostationary, lunar, planetary, and Quasi-halo orbit around Sun-Earth Lagrange point (L2). The results of these trade studies show promising, attainable benefits. The perceived programmatic risk of flying a newer propulsion technology has, unfortunately, not outweighed the benefits to date. To take advantage of the improved performance and mitigate programmatic risk, HPGP engines must demonstrate life testing at higher propellant throughputs than have currently been demonstrated. In an effort to proactively address the challenges with technology infusion into a risk-averse community, NASA and the Swedish National Space Agency (SNSA) outlined a collaborative Implementing Arrangement (IA) for the respective agencies to pursue increased HPGP technology maturation. This initial IA effort began in 2013, fresh off the heels of the successful PRISMA HPGP technology demonstration mission. The IA targeted objective is to reduce risk to potential future HPGP missions and fully characterize the LMP-103S propellant and associated engine performance. Over the past eight years, HPGP has flown in propulsion systems on twenty-five(25) spacecraft from seven(7) different Launch Ranges around the globe and on seven (7) different Launch Vehicles. Six(6) of these launches involved multiple loading operations for multiple spacecraft. For U.S. Range operations, nine (9) HPGP systems have been processed at Vandenberg Space Force Base(VSFB):six(6) in 2017, and three (3) in 2018. Six (6) more have been processed at Cape Canaveral Air Force Station (CCAFS)in May 2020, with three (3) systems launched in June 2020 and the remaining three (3) system were left loaded and ready until their launch in August of 2020. Three (3) more systems have been processed at Wallops Flight Facility(WFF)and launched in June 2021. In addition, these propulsion subsystems employed heritage propulsion subsystem component such as valves, filters, and pressure transducers, and have further demonstrated nominal functionality in both diaphragm and Propellant Management Device (PDM) propellant tanks. Based on these successes, HPGP technology continues to be considered for NASA Science Mission Directorate missions at GSFC. The work presented herein represents many years of development and collaborative efforts to successfully align higher performance, low toxicity hydrazine alternatives into scientific missions. NASA GSFC Propulsion Engineering, in collaboration with Bradford ECAPS, has developed mission specific thruster design and testing requirements to establish GSFC’s desired test conditions and firing sequences.In2017, the first flight-like 22N HPGP thruster Engineering Qualification Model (EQM-1)was designed and built by Bradford ECAPS to prove out the thruster design, materials, build process, and test campaign with respect to NASA GSFC critical component and mission requirements. This test program was developed to comprehensively test the thruster, the technology, and ultimately increase the 22N HPGP Technology Readiness Level(TRL). EQM-1was tested to environmental qualification levels prior to hot fire performance testing to represent the relevant end-to-end environment (launch to on-orbit operation)with required margin. This thruster demonstrated steady-state and pulse mode operational capability with propellant thruster throughput up to~53kg.At this throughput level, the EQM-1 engine began to present off-nominal performance and the test campaign was halted to allow for non-destructive testing and identify the root cause for the an omalous performance. Capitalizing on the successful elements of the EQM-1 campaign, an upgraded 22N HPGP EQM-2 has been manufactured by Bradford ECAPS to meet the complete GSFC requirements. The EQM-2 thruster’s test campaign has further demonstrated the robustness of the HPGP propulsion technology and increased the Technology Readiness Level (TRL) by undergoing a full acceptance test program, then proceeding into qualification, including environmental testing (vibration and shock to qualification levels),as well as hot-fire life testing, operating at steady-state and pulse modes with increased propellant thruster throughput to~150kg. The HPGP thruster performance testing enables effective HPGP thruster readiness evaluation to meet NASA candidate mission requirements in the future.

High↗

AS-511 facilities and environmental measurements program

A list is presented of the facilities and environmental measurements to be monitored in support of the Apollo/Saturn vehicle AS-511. The measurement identification number, description, transducer operating range, recorder type and drawings illustrating measurement location are included. The following launch complex 39 facilities will be used on this vehicle: launch complex 39 pad A, and launcher umbilical tower number 3.

Source record↗

Small Projects Rapid Integration and Test Environment (SPRITE): Application for Increasing Robustness

Marshall Space Flight Center's (MSFC) Small Projects Rapid Integration and Test Environment (SPRITE) is a Hardware-In-The-Loop (HWIL) facility that provides rapid development, integration, and testing capabilities for small projects (CubeSats, payloads, spacecraft, and launch vehicles). This facility environment focuses on efficient processes and modular design to support rapid prototyping, integration, testing and verification of small projects at an affordable cost, especially compared to larger type HWIL facilities. SPRITE (Figure 1) consists of a "core" capability or "plant" simulation platform utilizing a graphical programming environment capable of being rapidly re-configured for any potential test article's space environments, as well as a standard set of interfaces (i.e. Mil-Std 1553, Serial, Analog, Digital, etc.). SPRITE also allows this level of interface testing of components and subsystems very early in a program, thereby reducing program risk.

Rakoczy, John↗

NASA's Corrosion Technology Laboratory at the Kennedy Space Center: Anticipating, Managing, and Preventing Corrosion

Corrosion is the degradation of a material that results from its interaction with the environment. The marine environment at NASAs Kennedy Space Center (KSC) has been documented by ASM International (formerly American Society for Metals) as the most corrosive in the United States. With the introduction of the Space Shuttle in 1981, the already highly corrosive conditions at the launch pads were rendered even more severe by the 70 tons of highly corrosive hydrochloric acid that were generated by the solid rocket boosters. Numerous failures at the launch pads are caused by corrosion.The structural integrity of ground infrastructure and flight hardware is critical to the success, safety, cost, and sustainability of space missions. As a result of fifty years of experience with launch and ground operations in a natural marine environment that is highly corrosive, NASAs Corrosion Technology Laboratory at KSC is a major source of corrosion control expertise in the launch and other environments. Throughout its history, the Laboratory has evolved from what started as an atmospheric exposure facility near NASAs launch pads into a world-wide recognized capability that provides technical innovations and engineering services in all areas of corrosion for NASA and external customers.This presentation will provide a historical overview of the role of NASAs Corrosion Technology in anticipating, managing, and preventing corrosion. One important challenge in managing and preventing corrosion involves the detrimental impact on humans and the environment of what have been very effective corrosion control strategies. This challenge has motivated the development of new corrosion control technologies that are more effective and environmentally friendly. Strategies for improved corrosion protection and durability can have a huge impact on the economic sustainability of human spaceflight operations.

Corrosion↗

Flow Boiling and Condensation Experiment: Flow Boiling in a Rectangular Channel with Subcooled Inlet Conditions in Microgravity

Two-phase thermal management subsystems that take advantage of both the sensible and latent heat of a working fluid can potentially yield significant enhancements in overall performance by adopting heat transfer processes that are based on phase transition like boiling and condensation. Performance of terrestrial two-phase flow systems may be predictable because the hydrodynamic and body forces are understood, however, in microgravity, which is predominant during planetary space travel, forces that are masked by the strong body force on Earth (gravitational or buoyancy force) reappear with different magnitude and influence. The need arose for a facility that provides for two-phase flow with phase transition testing in microgravity. The Flow Boiling and Condensation Experiment (FBCE) is a facility that was launched to the International Space Station in August of 2021 and is in operation since February of 2022. This facility enables investigators to perform two-phase flow and phase transition research in flow boiling and condensation. Along with the test module that is experiment specific, the FBCE system consists of the fluid, avionics, and software subsystems. Currently two test modules, namely, the Flow Boiling Module (FBM) and the Condensation Module for Heat Transfer (CM-HT) are available. A third module, the Transfer Line test Module (TL) is being developed. The fluid subsystem conditions and delivers the fluid at the desired thermodynamic state to the test module. It consists of two fluid modules and a heater module that are connected by flex hoses for fluid circulation and by data and electrical cables for control and data acquisition. Two avionics modules acquire pressure and temperature data from various sensors in the flow loop. For FBM, a high-speed camera is available to acquire images of the boiling process. Experiments are operated autonomously by software and are based on an Experiment Parameters Master Table (EPMT) that is uploaded to ISS and is executed by the FBCE flight software. This presentation briefly introduces the objectives of FBCE and provides a system description of the experiment onboard of the ISS/Fluid Integrated Rack (FIR). Results of the test campaign carried out using the FBM are presented. Specifically, microgravity flow boiling of n-perfluorohexane (test fluid) is discussed with subcooled inlet conditions in a single-side-heated rectangular channel of dimensions 114.6-mm heated length, 2.5-mm heated width, and 5.0-mm height. Key operating parameters investigated are mass velocity (199.90 – 3200.13 kg/m2s), inlet subcooling (0.10 – 45.76°C), and inlet pressure (113.30 – 164.29 kPa). Image sequences acquired via high-speed-video are shown to elucidate the interfacial flow physics. The effects of various parameters on flow boiling heat transfer in microgravity, from the onset of boiling to the critical heat flux are discussed. Heat transfer results are presented in terms of flow boiling curves, streamwise profiles of wall temperature and heat transfer coefficient, and parametric trends of local and averaged heat transfer coefficient, and the critical heat flux.

Two-phase flow and phase transition↗

Launch Pad Flame Trench Refractory Materials

The launch complexes at NASA's John F. Kennedy Space Center (KSC) are critical support facilities for the successful launch of space-based vehicles. These facilities include a flame trench that bisects the pad at ground level. This trench includes a flame deflector system that consists of an inverted, V-shaped steel structure covered with a high temperature concrete material five inches thick that extends across the center of the flame trench. One side of the "V11 receives and deflects the flames from the orbiter main engines; the opposite side deflects the flames from the solid rocket boosters. There are also two movable deflectors at the top of the trench to provide additional protection to shuttle hardware from the solid rocket booster flames. These facilities are over 40 years old and are experiencing constant deterioration from launch heat/blast effects and environmental exposure. The refractory material currently used in launch pad flame deflectors has become susceptible to failure, resulting in large sections of the material breaking away from the steel base structure and creating high-speed projectiles during launch. These projectiles jeopardize the safety of the launch complex, crew, and vehicle. Post launch inspections have revealed that the number and frequency of repairs, as well as the area and size of the damage, is increasing with the number of launches. The Space Shuttle Program has accepted the extensive ground processing costs for post launch repair of damaged areas and investigations of future launch related failures for the remainder of the program. There currently are no long term solutions available for Constellation Program ground operations to address the poor performance and subsequent failures of the refractory materials. Over the last three years, significant liberation of refractory material in the flame trench and fire bricks along the adjacent trench walls following Space Shuttle launches have resulted in extensive investigations of failure mechanisms, load response, ejected material impact evaluation, and repair design analysis (environmental and structural assessment, induced environment from solid rocket booster plume, loads summary, and repair integrity), assessment of risk posture for flame trench debris, and justification of flight readiness rationale. Although the configuration of the launch pad, water and exhaust direction, and location of the Mobile Launcher Platform between the flame trench and the flight hardware should protect the Space Vehicle from debris exposure, loss of material could cause damage to a major element of the ground facility (resulting in temporary usage loss); and damage to other facility elements is possible. These are all significant risks that will impact ground operations for Constellation and development of new refractory material systems is necessary to reduce the likelihood of the foreign object debris hazard during launch. KSC is developing an alternate refractory material for the launch pad flame trench protection system, including flame deflector and flame trench walls, that will withstand launch conditions without the need for repair after every launch, as is currently the case. This paper will present a summary of the results from industry surveys, trade studies, life cycle cost analysis, and preliminary testing that have been performed to support and validate the development, testing, and qualification of new refractory materials.

Calle, Luz M.↗

Government conceptual estimating for contracting and management

The use of the Aerospace Price Book, a cost index, and conceptual cost estimating for cost-effective design and construction of space facilities is discussed. The price book consists of over 200 commonly used conceptual elements and 100 systems summaries of projects such as launch pads, processing facilities, and air locks. The cost index is composed of three divisions: (1) bid summaries of major Shuttle projects, (2) budget cost data sheets, and (3) cost management summaries; each of these divisions is described. Conceptual estimates of facilities and ground support equipment are required to provide the most probable project cost for budget, funding, and project approval purposes. Similar buildings, systems, and elements already designed are located in the cost index in order to make the best rough order of magnitude conceptual estimates for development of Space Shuttle facilities. An example displaying the applicability of the conceptual cost estimating procedure for the development of the KSC facilities is presented.

Brown, J. A.↗