Search NASA⌕ Search

SEARCH · Search NASA

Results for “LINAC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Compact, High-Power Superconducting Electron Linear Accelerators for MW Industrial Applications

Fermilab has developed a novel concept for an industrial electron linac using Nb₃Sn coating technology and conduction cooling. We will show the range of multi-cavity linac designs targeted toward various applications. We will also discuss technology development status with results on conduction cooling of SRF cavities based on cryocoolers, which removes the need for liquid Helium, thus making SRF technology accessible to industrial applications. These conduction-cooled linacs can generate electron beam energies up to 10 MeV in continuous-wave operation and can reach higher power (>=1 MW) by combing several modules. Compact and light enough to mount on mobile platforms, our machine is anticipated to enable new in-situ environmental remediation applications such as waste-water treatment for urban areas, X-ray medical device sterilization, and innovative pavement applications. We also show cost-economics and key R&D areas that much be addressed for a practical machine.

43 PARTICLE ACCELERATORS↗

First N-Doping and Mid-T Baking of Medium-ß 644 MHz 5-Cell Elliptical Superconducting RF Cavities for Michigan State University’s Facility for Rare Isotope Beams

Two hadron linacs currently under development in the US, the PIP-II linac at Fermi National Accelerator Laboratory (FNAL) and the upgrade for Michigan State University’s Facility For Rare Isotope Beams (FRIB), will employ 650 and 644 MHz ß-0.6 elliptical superconducting cavities respectively to meet their design energy requirements. The desired CW operation modes of these two linacs sets Q-factor requirements well above any previously achieved for cavities at this operating frequency and velocity, driving the need to explore new high-Q treatments. The N-doping technique developed at FNAL and employed at an industrial scale to the LCLS-II cryomodules is a strong candidate for high-Q treatments, but work is needed to refine the treatment to the lower operating frequency and velocity regime. We present the first results of the first N-doping tests and a "mid-T" bake test in the FRIB 644 MHz 5-cell elliptical cavities.

43 PARTICLE ACCELERATORS↗

Cross Section Measurements of Photonuclear Reaction Pathways Towards Promising Medical Radioisotopes

Project Objectives: The goal of this project was to generate data relevant to radioisotope production while developing innovative technologies that foster and enhance novel production of radioisotopes, and, also, while providing opportunities for cultivating and training future generations of scientists. This work has provided the foundation for methodologies for determination of photonuclear cross sections over multiple energies in a single irradiation. Simultaneously, the feasibility of electron LINAC production of several in-demand radioisotopes such as 47 Sc, 67 Cu, 77 As, and 186 Re has been demonstrated. To accomplish these objectives a collaboration was formed between two complimentary facilities, the Low Energy Accelerator Facility (LEAF) at Argonne National Laboratory and the High Intensity Gamma-ray Source (HIGS) at Triangular Universities Nuclear Laboratory (TUNL). The involvement of the research group from North Carolina Central University gave students at this Historically Black University experience in forefront nuclear-physics research relevant to addressing a high-priority interdisciplinary issue. Project Description: HIGS provides a nearly monoenergetic gamma-ray beam by intra-cavity Compton backscattering of free-electron photons from electrons circulating in a storage ring. This beam can be collimated to produce a very precise energy beam. If the beam is un-collimated a calculated and precise energy spread of the beam occurs radially. The γ-flux can be evenly distributed over the radial distribution of energy and used to perform activation experiments on concentric ring targets. Thus providing multiple energy ranges in a single irradiation. Each concentric ring target can be counted separately in order to determine activation at the given energy and successively be correlated to the activation cross section. Targets were activated to determine production feasibility using electron beams at LEAF. Potential Impact: The Nuclear Science Advisory Committee recently named production of radioisotopes with electron LINACs as one of the most compelling and largest-impact opportunities for the production of high specific activity radioisotopes. Improving the photonuclear cross sectional data base with experimentally verified results will greatly enhance a researcher’s ability to rationalize electron LINAC production routes towards desired radioisotopes. This work will provide the foundation for methodologies for determination of photonuclear cross sections over multiple energies and multiple targets in a single irradiation. The techniques developed in this project will enable future studies to continue verifying theoretically predicted photonuclear cross section with experimental results. These data will also enable adaptation of models and support more precise theoretical calculation of photonuclear cross sections. This research will involve undergraduates, graduate students, and post-docs to give them a valuable research experience leading towards the next generation of scientists in the field of medical isotopes.

07 ISOTOPE AND RADIATION SOURCES↗

Orbit response measurements with oscillating trajectories

Optical properties of components in a linac can be reconstructed from analysis of the orbit response matrix, composed from responses of BPMs to changes in currents of dipole correctors. An efficient way to record such response, discussed in this note, is to excite the corrector current with a sine wave and record its Fourier component of the BPM spectrum. Because of a narrow band of the excitation signal, response to multiple correctors can be recorded at the same time without significantly affecting the signal-to-noise ratio. For that, the correctors are oscillated at different frequencies, and the corresponding BPM Fourier components are recorded. In an ion (non-relativistic) linac, similar measurements can be performed for the longitudinal plane as well. Examples of measurements at the PIP2IT test linac are shown.

43 PARTICLE ACCELERATORS↗

H- Injection Simulations for a Multi-MW Upgrade

Fermilab intends to increase its Main Injector (MI) beam power to 2.4 MW in an effort to advance its flagship long-baseline neutrino program. Two scenarios are proposed for this ”PIP-III” upgrade, a 2-8 GeV RCS or an 8 GeV Linac. A Python tracking simulation was developed to model foil injection for these cases. First, the simulation was matched to the well established PIP-II case. From the matched simulation, investigations established that an on-momentum longitudinal injection increases foil traversals in PIP-II. Then the simulation was changed to model the RCS and Linac PIP-III scenarios, for both correlated and anti-correlated beam painting. The results of the PIP-III studies indicate that correlated painting is preferable for both the Linac and RCS scenarios. This research creates a baseline of foil injection performance for PIP-III.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Deployable Cryocooler Based Cryomodule

Superconducting Radio Frequency (SRF) linear accelerators (linacs) have shown tremendous promise in extending the intensity frontier of particle accelerator technology. However, they are large and complex systems, requiring a central refrigeration system and complex piping to distribute liquid helium and nitrogen to the accelerating cavities. In response to these problems, RadiaBeam Technologies, LLC. proposes to develop a small mobile cryomodule that can be safely deployed to its planned field location. The scope of this work is to provide RadiaBeam with the specifications for a complete 650 MHz RF cavity model that can be incorporated into a compact SRF accelerator. Fermilab’s contribution will involve sharing contact resistance measurements, design parameters, and solid models. Design parameters will include the cavity frequency and gradient, length of the linac, number of cryocoolers, etc. This will ensure that the design is useful for practical linacs. A complete cryomodule design is envisioned. Radiabeam will design the cryomodule based on input from Fermilab’s experience on conduction cooling and the needs for a compact SRF accelerator.

43 PARTICLE ACCELERATORS↗

PIPII cryoplant non thermal cycling updates

The Proton Improvement Plan-II (PIP-II) is a crucial upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) with 23 cryomodules operating at 2K. The LINAC thermohydraulic conditions are satisfied by the cryogenic subsystems: Cryogenic Distribution System (CDS), a helium refrigerator cold box (CB), a warm compression station (WCS) and a helium recovery system (RSYS). The accelerator has a strict requirement of non-thermal cycling of the LINAC cryomodules during planned and unplanned subsystem outages. This paper presents an integrated operating modes analysis of the of the LINAC/CDS thermohydraulic loads satisfied by the CB/WCS cooling system supported by the RSYS inventory management system. The study is based on latest cryoplant and CDS engineering deliverables, as well as the recent performance data from single cryomodule qualification tests performed at the Fermilab PIP-II Injector Test test s tand. The study evaluates both normal and abnormal operating modes, with a focus on identifying integrated scenarios that put subsystems components under stress. The conclusions of this study will help build redundancy to reduce the risk of thermal cycles during planned and unplanned subsystem outages.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A Simulation of the Photoionization of H- Together With the Subsequent Tracking of the Liberated Electrons

The Proton Improvement Plan - II (PIP-II) is a new linear accelerator (LINAC) complex being built at Fermilab. It is based on superconducting radiofrequency cavities and will accelerate H- ions to 800 MeV kinetic energy before injection into the existing Booster ring. Measurements of the profile of the beam along the LINAC must be done by non-intercepting methods due to the superconducting cavities. The method chosen is photoionization of a small number of H- by a focused infrared laser, aka laserwire. The number of ionized electrons is measured as a function of laser position within the H- beam. To aid in the design of the collection mechanism, a simulation was written in MATLAB with input from the commercial electromagnetic simulation, CST. This simulation calculates the number and positions of the liberated electrons and tracks them through the magnetic collection and H- beam fields to the collection point. Results from this simulation for various points along the LINAC will be shown.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Status of CEBAF Upgrades

Extending CEBAF energy reach by increasing the number of recirculations, while using the existing SRF system is being explored. Proposed energy upgrade is based on a new approach to multi-pass acceleration of electrons in a single Fixed Field Alternating Gradient (FFA) beam line, configured with Halbach-style permanent magnets. Encouraged by recent success of CBETA, a proposal was formulated to nearly ?double? CEBAF energy by replacing the highest energy arcs with a pair of FFA arcs. The new non-scaling FFA arcs would support simultaneous transport of additional 6 passes with energies spanning a factor of two. One of the challenges of the multi-pass (11) linac optics is to assure uniform focusing in a vast range of energies, in a fixed field lattice. Here, we propose a triplet lattice that would provide a stable periodic solution covering energy ratio of 1:33. The current CEBAF injection at 123 MeV, makes optical matching in the first linac virtually impossible due to extremely high energy span ratio (1:175). Replacement of the current injector with a 650 MeV recirculating injector will alleviate that problem. Orbital and optical matching from the FFA arcs to the linacs is implemented as a compact non-adiabatic insert. Presented scheme would promise to deliver a 22 GeV beam with normalized emittance of 76 mm·mrad and with a relative energy spread of 1×10-3. Further recirculation beyond 22 GeV is limited by large, 974 MeV per electron, energy loss due to synchrotron radiation

Bogacz, Alex↗

22 GeV CEBAF with Novel Fixed Field Alternating Gradient Design

Extending the energy reach of CEBAF up to 22 GeV within the existing tunnel is being explored. Proposed energy upgrade can be achieved by increasing the number of recirculations, while using the existing CEBAF SRF cavity system. Presented scheme is based on an exciting new approach to acceleratie electrons efficiently with multiple passes in a single FFA beam line. Encouraged by recent success of the CBETA Test Accelerator, a proposal was formulated raise CEBAF energy by replacing the highest-energy arcs with Fixed Field Alternating Gradient (FFA) arcs. The new pair of arcs configured with FFA lattice would support simultaneous transport of additional 6 passes with energies spanning a factor of two, using the non-scaling FFA principle implemented with Halbach-derived permanent magnets - a novel magnet technology that significantly saves energy and lowers operating costs. One of the challenges of the multi-pass (11) linac optics is to provide uniform focusing in a vast range of energies, using fixed field lattice. Here, we propose a triplet lattice scaled up with increasing momentum along the linac. This would provide a stable periodic solution covering energy ratio of 1:33. The current CEBAF configured with a 123 MeV injector, makes optical matching in the first linac virtually impossible due to extremely high energy span ratio (1:175). Therefore, we envision replacement of the current injector with a 650 MeV 3-pass recirculating injector based on the existing LERF facility. Finally, the 22 GeV CEBAF would promise to deliver in 10-passes a beam with normalized emittance of 80 mm·mrad and with a relative energy spread of 1.5 × 10-3. Further recirculation beyond 22 GeV is limited by large, 974 MeV per electron, energy loss due to synchrotron radiation.

Bogacz, Slawomir↗

TRANSFER LEARNING FOR FIELD EMISSION MITIGATION IN CEBAF SRF CAVITIES

The Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab operates hundreds of super-conducting radio frequency (SRF) cavities in its two linear accelerators (linacs). Field emission (FE) is an ongoing operational challenge in higher gradient SRF cavities. FE generates high levels of neutron and gamma radiation leading to damaged accelerator hardware and a radiation hazard environment. During machine development periods, we performed gradient scans to record data capturing the relationship between cavity gradients and radiation levels measured throughout the linacs. However, the field emission environment at CEBAF varies considerably over time as the configuration of the radio frequency (RF) gradients changes and due to the changing behaviour of field emitters. An artificial intelligence/machine learning (AI/ML) approach with transfer learning could be a valuable tool to mitigate FE and lower the radiation levels. In this work, we mainly focus on leveraging the RF trip data gathered during CEBAF operations. We develop a transfer learning-based surrogate model for radiation detector readings given RF cavity gradients to track the CEBAF?s changing configuration and environment. Then, we could use the developed model as an optimization process for redistributing the RF gradients within a linac to minimize radiation levels.

Ahammed, K.↗

Beam Loss Assessment Through Use of Photomultiplier Tubes

The first machine in the Fermilab Accelerator chain, the Linac, delivers a 400 MeV proton beam. The first portion of the Fermilab Linac, the Drift Tube Linac, lacks the degree of instrumentation necessary for beam tuning. To compensate for this, photomultiplier tube (PMT s) based loss monitors were installed on either side of the first two drift tube tanks, but are not yet operational. One of the main goals in this is to make PMT's operational beam loss monitors for tuning. Noise reduction and peak finding on the PMT data is a requirement for this. A method for noise reduction and peak finding has been developed and implemented to produce a consistent and stable output. Future work includes integration with ACNET to automate input and output of data for analysis of beam loss.

Waggoner, Alexander↗

Successful Cleanroom Installation of PIP-II SSR2 Coupler Using Robotic Arm

The Fermilab Side-Coupled Linac accelerates H- beam from 116 MeV to 400 MeV through seven 805 MHz modules. Twelve wire scanners are present in the Side Coupled Linac and four are present in the transfer line between the Linac and the Booster synchrotron ring. These wire scanners act as important diagnostic instruments to directly collect information on the beam s transverse distribution. The manipulation of the conditions of wire scanner data collection enables further characterization of the beamline, such as calculating emittance and the Twiss parameters of the beam at select regions. Here we present the results of these studies and characterization of the non-Gaussian transverse beam distribution observed.

Narug, C.↗

Proton Improvement Plan II (PIP-II) Clock and Timing

The PIP-II timing system is planned to be a two-part system consisting of a global timing system (referred to as ACLK) that provides high level, event-based timing for the whole Fermilab accelerator complex while the second part is a RF synchronized clock system unique to the PIP-II Linac itself (referred to as LCLK). The ACLK System will make use of an external 10 MHz GPS based signal source as a reference for its 650 MHz phase lock as it is the reference frequency for the TCLK output of the system (needed to support legacy hardware around complex). The LCLK System will use a PIP-II Linac RF reference (162.5 MHz) from the Linac LLRF system to allow beam synchronized event placement. Both the ACLK and LCLK systems will have a clock output with a data frame of 16 event bits + 32 data bits with frames broadcast at 650 MHz, phase locked to the 10MHz reference in the case of ACLK and the PIP-II LLRF sourced 162.5 MHz reference in the case of LCLK.

43 PARTICLE ACCELERATORS↗

Experimental investigation of longitudinal scraping of $H-$ bunches via photo-detachment

Longitudinal emittance growth is a significant challenge in RF linacs, especially for poorly bunched beams. This stems from particles occupying outer synchrotron oscillation orbits in the LBET, causing unwanted bunch-bunch interactions and degraded beam quality. To address this, we proposed using temporally spaced laser pulses to selectively photo-detach electrons from the longitudinal head and tail regions of H- ion bunches. This approach aims to reduce particle density in extreme orbits, enhancing beam uniformity and limiting emittance growth. Our experiments employed Fermilab's 'LaserNotcher' system at the font end of the linac, delivering 1.6 MW peak power with sub-nanosecond precision. By neutralizing the first and last half-nanosecond of several H- bunches, we measured their propagation injection into the booster. Measurements of pulse width, average height, and temporal spacing over booster cycles were compared between the scraped and unscraped bunches. Statistical analysis evaluated the results’ significance, highlighting the feasibility of laser-based scraping for future linac designs to achieve higher beam energies with improved emittance control.

Landon, P. [Boston U.; Fermilab]↗

Measurement of the Dispersion in the CeC Beamlines

The coherent electron cooling requires to match the relativistic factors of the hadron and electron beam within 10 -4 accuracy. Initial matching is based on the energy measurement of the electron beam using solenoid with accuracy about 10 -3 (the hadron relativistic factor can be found from the revolution frequency). Further matching is done with observation of the recombination rate with fine tuning based on the cooling rate. The last two steps require change of the electron energy which is achieved by change of the linac voltage. The interaction of the hadron and electron beams is affected by the transverse overlap of two beams. To minimize the effect, we need zero dispersion in the common section. The merge of the beams a dogleg transfer line is used containing two dipoles and three quadrupoles. The zeroing of dispersion is performed by settings of the quadrupoles. We have developed two ways to measure the dispersion. In the first mostly commonly used we change both dipoles by the same value creating the mismatch between the electron energy and bending magnet. In the compensated dogleg the position in the second dipole should not change, and the trajectory angle will change by the same amount as deflecting angle but in opposite direction. Therefore, the trajectory in the common section will not change. The value of the dispersion can be calculated from the beam displacement divided by the relative chang of the dipoles’ current. The second method is based on the change of the electron beam energy using linac. This method requires electron orbit alignment with linac axis to avoid beam steering. The results are shown in Fig.1 and Fig. 2. The first figure shows the dispersion prior the correction, and the second figure after the correction.

43 PARTICLE ACCELERATORS↗

ERL-BASED COMPACT X-RAY FEL

We propose to develop an energy-recovery-linac (ERL)- based X-ray free-electron laser (XFEL). Taking advantage of the demonstrated high-efficiency energy recovery of the beam power in the ERL, the proposed concept offers the following benefits: i) recirculating the electron beam through high-gradient superconducting RF (SRF) cavities shortens the linac, ii) energy recovery in the SRF linac saves the klystron power and reduces the beam dump power, iii) the high average beam power produces a high average photon brightness. In addition, such a concept has the capability of delivering optimized high-brightness CW X-ray FEL performance at different energies with simultaneous multipole sources. In this paper, we will present the preliminary results on the study of feasibility, optics design and parameter optimization of such a device.

Lin, Fanglei↗

Warm Compressor system Overview and status of the PIP-II cryogenic system

The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (Linac) powering the accelerator complex to provide the world's most intense high-energy neutrino beam. The PIP-II Linac consists of 23 SRF cryomodules operating at 2 K, 5 K, and 40 K temperature levels supplied by a single helium cryoplant providing 2.5 kW of cooling capacity at 2.0 K. The PIP-II cryogenic system consists of two major systems: a helium cryogenic plant and a cryogenic distribution system. The cryogenic plant includes a refrigerator cold box, a warm compressor system, and helium storage, recovery, and purification systems. The cryogenic distribution system includes a distribution box, intermediate transfer line, and a tunnel transfer line consisting of modular bayonet cans which supply and return cryogens to the cryomodules. A turnaround can is located at the end of the Linac to turnaround cryogenic flows. This paper describes the layout, design, and current status of the PIP-II cryogenic system.

43 PARTICLE ACCELERATORS↗