Search NASA⌕ Search

SEARCH · Search NASA

Results for “Logistics Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Evaluation of MPLM Design and Mission 6A Coupled Loads Analyses

Through the development of a space shuttle payload, there are usually several coupled loads analyses (CLA) performed: preliminary design, critical design, final design and verification loads analysis (VLA). A final design CLA is the last analysis conducted prior to model delivery to the shuttle program for the VLA. The finite element models used in the final design CLA and the VLA are test verified dynamic math models. Mission 6A is the first of many flights of the Multi-Purpose Logistics Module (MPLM). The MPLM was developed by Alenia Spazio S.p.A. (an Italian aerospace company) and houses the International Standard Payload Racks (ISPR) for transportation to the space station in the shuttle. Marshall Space Flight Center (MSFC), the payload integrator of the MPLM for Mission 6A, performed the final design CLA using the M6.OZC shuttle data for liftoff and landing conditions using the proper shuttle cargo manifest. Alenia performed the preliminary and critical design CLAs for the development of the MPLM. However, these CLAs did not use the current Mission 6A cargo manifest. An evaluation of the preliminary and critical design performed by Alenia and the final design performed by MSFC is presented.

Bookout, Paul S.↗

Development Testing and Analysis of the Integrated Gateway-ESPRIT Bipropellant Refuelling System

The Gateway will be humanity’s first space station orbiting the Moon completed by NASA in partnership with ESA and other US and international partners. The Gateway will provide critical support to sustainable human exploration on the moon through the Artemis program. To enable the Lunar Gateway to complete its mission, on orbit refuelling is essential. The ESPRIT Refuelling Module (ERM) will provide the capability to transfer propellants, MMH and MON-3, through the Habitation and Logistics Outpost (HALO) to the Power and Propulsion Element (PPE). The transfer of these propellants carries known risks and hazards. These hazards include overpressure of the propellant lines during priming sequences between modules and during refuelling pause operations. To support the early system development and to mitigate these risks, a collaborative test program between NASA, ESA and Thales Alenia Space was completed at the Thales Alenia Space test facility in Harwell, UK. This test program integrated fluidic breadboards of the ERM, HALO and PPE modules. The objectives of the test program were to demonstrate and characterise critical performance and transient operations, inform refuelling concept of operations and to calibrate and validate numerical models of the refuelling subsystem in EcosimPro. To support the completion of this final objective a detailed model of the integrated breadboard was developed in EcosimPro and key steady-state and transient test cases were simulated. As an industry first, a National Institute of Standards and Technology (NIST) database correlation for Hydrofluoroether (HFE-7000) was used as a mixed oxides of nitrogen (MON-3) simulant with EcosimPro and European Space Propulsion System Simulation (ESPSS) libraries to result in a more accurate analysis for transient phenomenon such as priming. The test and simulation data showed good agreement validating the model for further system analysis as the ERM design progresses.

Refuelling↗

An advanced manned launch system concept

A two-stage fully reusable rocked powered concept is defined and analyzed in detail for the Advanced Manned Launch System missions. The concept elements include a Mach 3 staging unmanned glideback booster and a 149-ft long winged orbiter with an external payload canister with a 15-ft diameter and 30-ft long payload bay. The booster and orbiter main propulsion system is a lightweight derivative of the current Space Shuttle Main Engine. The primary mission is the Space Station Freedom logistics mission, 40,000-lb payload with two crew members and eight passengers. The structural design and material selection, the thermal protection system, the integral cryogenic tanks and insulation, the propulsion system, and the modular payload canister system are described. The ground and flight operations approach analysis, the manufacturing and certification plan, and the technology development requirements are also discussed.

Stone, H. W.↗

Evaluation of SAGE II and Balloon-Borne Stratospheric Aerosol Measurements

Under funding from this proposal we evaluated measurements of stratospheric sulfate aerosols from three platforms. Two were satellite platforms providing solar extinction measurements, the Stratospheric Aerosol and Gas Experiment (SAGE) II using wavelengths from 0.386 - 1.02 microns, and the Halogen Occultation Experiment (HALOE) using wavelengths from 2.45 to 5.26 microns. The third set of measurements was from in situ sampling by balloonborne optical particle counters (OPCs). The goal was to determine the consistency among these data sets. This was accomplished through analysis of the existing measurement records, and through additional balloonborne OPC flights coinciding with new SAGE II observations over Laramie, Wyoming. All analyses used the SAGE II v 6.0 data. This project supported two balloon flights per year over Laramie dedicated to SAGE II coincidence. Because logistical factors, such as poor surface weather or unfavorable payload impact location, can make it difficult to routinely obtain close coincidences with SAGE II, we attempt to conduct nearly every Laramie flight (roughly one per month) in conjunction with a SAGE II overpass. The Laramie flight frequency has varied over the years depending on field commitments and funding sources. Current support for the Laramie measurements is from the National Science Foundation in addition to support from this NASA grant. We have also completed a variety of comparisons using aerosol measurements from SAGE II, OPCs, and HALOE. The instruments were compared for their various estimates of aerosol extinction at the SAGE II wavelengths and for aerosol surface area. Additional results, such as illustrated here, can be found in a recently accepted manuscript describing comparisons between SAGE II, HALOE, and OPCs for the period 1982 - 2000. While overall, the impression from these results is encouraging, the agreement of the measurements changes with latitude, altitude, time, and parameter. In the broadest sense, these comparisons fall into two categories: high aerosol loading (volcanic periods) and low aerosol loading (background periods and altitudes above 25 km). When the aerosol amount is low SAGE II and HALOE extinctions are higher than the OPC estimates, while the SAGE II surface areas are lower than HALOE and the OPCS. Under high loading conditions, all three instruments mutually agree to within 50%.

Source record↗

Is a Space Laundry Needed for Exploration?

Future human space exploration missions will lengthen to years, and keeping crews clothed without a huge resupply burden is an important consideration for habitation systems. A space laundry system could be the solution; however, the resources it uses must be accounted for and must win out over the very reliable practice of bringing along enough spare underwear. Through NASA's Logistics Reduction and Repurposing project, trade off studies have been conducted to compare current space clothing systems, life extension of that clothing, traditional water based clothes washing and other sanitizing techniques. The best clothing system of course depends on the mission and assumptions, but in general, analysis results indicate that washing clothes on space missions will start to pay off as mission durations push past a year.

Ewert, Michael K.↗

Optical Fiber Assemblies for Space Flight from the NASA Goddard Space Flight Center, Photonics Group

The Photonics Group at NASA Goddard Space Flight Center in the Electrical Engineering Division of the Advanced Engineering and Technologies Directorate has been involved in the design, development, characterization, qualification, manufacturing, integration and anomaly analysis of optical fiber subsystems for over a decade. The group supports a variety of instrumentation across NASA and outside entities that build flight systems. Among the projects currently supported are: The Lunar Reconnaissance Orbiter, the Mars Science Laboratory, the James Webb Space Telescope, the Express Logistics Carrier for the International Space Station and the NASA Electronic Parts. and Packaging Program. A collection of the most pertinent information gathered during project support over the past year in regards to space flight performance of optical fiber components is presented here. The objective is to provide guidance for future space flight designs of instrumentation and communication systems.

Ott, Melanie N.↗

Analyzing Double Delays at Newark Liberty International Airport

When weather or congestion impacts the National Airspace System, multiple different Traffic Management Initiatives can be implemented, sometimes with unintended consequences. One particular inefficiency that is commonly identified is in the interaction between Ground Delay Programs (GDPs) and time based metering of internal departures, or TMA scheduling. Internal departures under TMA scheduling can take large GDP delays, followed by large TMA scheduling delays, because they cannot be easily fitted into the overhead stream. In this paper we examine the causes of these double delays through an analysis of arrival operations at Newark Liberty International Airport (EWR) from June to August 2010. Depending on how the double delay is defined between 0.3 percent and 0.8 percent of arrivals at EWR experienced double delays in this period. However, this represents between 21 percent and 62 percent of all internal departures in GDP and TMA scheduling. A deep dive into the data reveals that two causes of high internal departure scheduling delays are upstream flights making up time between their estimated departure clearance times (EDCTs) and entry into time based metering, which undermines the sequencing and spacing underlying the flight EDCTs, and high demand on TMA, when TMA airborne metering delays are high. Data mining methods (currently) including logistic regression, support vector machines and K-nearest neighbors are used to predict the occurrence of double delays and high internal departure scheduling delays with accuracies up to 0.68. So far, key indicators of double delay and high internal departure scheduling delay are TMA virtual runway queue size, and the degree to which estimated runway demand based on TMA estimated times of arrival has changed relative to the estimated runway demand based on EDCTs. However, more analysis is needed to confirm this.

traffic management advisor↗

Computations on the massively parallel processor at the Goddard Space Flight Center

Described are four significant algorithms implemented on the massively parallel processor (MPP) at the Goddard Space Flight Center. Two are in the area of image analysis. Of the other two, one is a mathematical simulation experiment and the other deals with the efficient transfer of data between distantly separated processors in the MPP array. The first algorithm presented is the automatic determination of elevations from stereo pairs. The second algorithm solves mathematical logistic equations capable of producing both ordered and chaotic (or random) solutions. This work can potentially lead to the simulation of artificial life processes. The third algorithm is the automatic segmentation of images into reasonable regions based on some similarity criterion, while the fourth is an implementation of a bitonic sort of data which significantly overcomes the nearest neighbor interconnection constraints on the MPP for transferring data between distant processors.

Strong, James P.↗

Manned systems utilization analysis (study 2.1). Volume 5: Program listing for the LOVES computer code

The LOVES computer code developed to investigate the concept of space servicing operational satellites as an alternative to replacing expendable satellites or returning satellites to earth for ground refurbishment is presented. In addition to having the capability to simulate the expendable satellite operation and the ground refurbished satellite operation, the program is designed to simulate the logistics of space servicing satellites using an upper stage vehicle and/or the earth to orbit shuttle. The program not only provides for the initial deployment of the satellite but also simulates the random failure and subsequent replacement of various equipment modules comprising the satellite. The program has been used primarily to conduct trade studies and/or parametric studies of various space program operational philosophies.

Wray, S. T., Jr.↗

Ballistic Lunar Return Trajectories for Sustainable Cargo Return and Entry System Technology Development

As part of the sustained approach for the lunar Gateway and Artemis program as a whole, NASA is extending the logistics supply chain beyond low Earth orbit and to the Moon. This supply chain includes the possibility of lunar sample and cargo return. To enable these future return missions, the possibility for incorporating demonstration payloads including various entry, descent, and landing technologies is examined. Possible implementations include deployable entry vehicles, high speed sample return capsules, aeroassist technologies, and control technologies for guided hypersonic flight. The mission concepts utilize the secondary payload capabilities provided on a relatively low-cost logistic module. The logistic module may perform close Earth flyby, pointing, and release of return systems prior to disposal, with reentry velocities for payloads on the order of 11.5 km/sec. In this paper, we study the various return mission architectures available during the Artemis program to define the range of mission possibilities. Potential options include a reusable logistics module using a hypersonic inflatable aerodynamic decelerator, externally mounted entry system vehicle technologies, and a reusable sample return vehicle using a similar inflatable architecture with a feathered configuration with applied aerodynamic control. In these cases, the use of a ballistic lunar return trajectory is assumed, and a sensitivity analysis of midcourse corrections and the possibility of a lunar gravity assist for refining Earth entry interface points is provided. Furthermore, a novel controller for controlling a vehicle during reentry imposing heating limitations is introduced.

Matthew M. Wittal↗

On-Orbit Maintenance Operations Strategy for the International Space Station - Concept and Implementation

The International Space Station (ISS) has an operational mission and profile that makes it a Logistics and Maintenance (L&M) support challenge different from previous programs. It is permanently manned, assembled on orbit, and multi-national. With this technical and operational challenge, a unique approach is needed to support the hardware and crew. The key is the integration of on-orbit and ground analysis, supply, maintenance, and crew training into a coherent functional process that supports ISS goals and objectives. To integrate all the necessary aspects of hardware and personnel to support on-orbit maintenance, a myriad of products and processes must be created and coordinated, such that the right resources are in the right place at the right time to ensure continued ISS functionality. This paper will familiarize the audience with ISS On-Orbit Maintenance (OOM) concepts and capabilities for different maintenance tasks and discuss some of the logic behind their selection. It will also identify the operational maintenance support responsibility split between the U.S. and the various International Partners (IPs).

Patterson, Linda P.↗

Ad-Hawk Aerial Connectivity Network: An Integrated and Empirical System Evaluation

Wildfires in the United States have been increasing significantly in both frequency and size in recent decades, requiring unprecedented resource and communication efficiency on the part of wildfire management organizations. However, while the methodology and technology to combat wildfires have improved, the connectivity infrastructure in rural regions of the country is either incompatible with newer technology or altogether non-existent. Due to this, many modern communication methods are rendered useless in areas where a connection is needed most, complicating the overall fire management procedure. To improve communication and logistics between responders on the front lines and headquarters, a team of NASA research associates has developed the schematic for a rapidly deployable mobile ad-hoc internet-enabled Wi-Fi network that can bring stable internet access to any desired area. This paper contains the testing and analysis of the Ad-Hawk project conceived in the summer of 2022 and developed in the summer of 2023.

Wildfire↗

Early Assessments of Crew Timelines for the Lunar Surface Habitat

As NASA progresses towards sustained crewed space missions, crew timelines will become increasingly important to achieving mission goals. While it is desirable to spend as much time as possible during crewed space missions on science activities and experiments, there are a large number of activities that crew members must perform each day in order to maintain both crew and vehicle health and safety. The time available for science activities in space is highly dependent on mandatory tasks required for crew and vehicle health and safety. The different crewed activities need to be planned accordingly long before the start of a mission in order to optimize crew time for science. To begin assessing the potential crew time for available for science, an understanding of the requirements to maintain crew and vehicle health and safety is needed. These additional activities may include sleep, exercise, vehicle maintenance, logistics handling, crew personal time, as well as many other tasks. The remaining time outside of these required tasks, within a reasonable crew work schedule, can be dedicated to science operations. This paper will detail a collaborative effort to analyzing crew times for sustained spaceflight missions and how the results of that analysis are applied to the crew timeline for the proposed Lunar Surface Habitat (SH).To determine the crew time for all of these required activities, an analysis was conducted utilizing defined agency requirements and historical crewed mission data. Predicted crew activity times were integrated into a daily schedule in order to optimize the crew’s time during the mission. This methodology was utilized to produce expected crew timelines for NASA’s proposed Artemis Base Camp (ABC) missions. The current plans for the ABC contain two different sustained habitats, the Pressurized Rover (PR) and the Surface Habitat (SH). While the crew are separated between the two habitats, the timelines for each element are dependent on the other element’s operations, so the two element timelines are formed in conjunction with one another. The results described in this paper, however, will focus solely on the crew timeline in the SH. This paper will explain the methodology behind predicting the required crew time spent in the SH for each activity, and the process of incorporating these predicted crew times into a coherent schedule.

Crew Time↗

The elements of a space operations system

The Space Shuttle has completed its flight test program and is entering operational service with its fifth flight in November 1982. With the completion of Shuttle development, its entry to operational service, and delivery of additional units into field service, it is timely to initiate development of the next elements of the system. The elements of a Space Operations System are the Shuttle, a Station in low earth orbit, and upper stages for low and high energy orbit delivery. To design these elements properly will require a substantial operations analysis effort to characterize the most effective performance tradeoffs among the discrete elements. The Shuttle establishes a new context for the design and execution of operations in space. The components of the Shuttle, Space Station, and upper stages will need to share technology and components to minimize the cost and complexity of the logistics of ownership and operation.

Loftus, J. P., Jr.↗

Launch Vehicle/Carrier Interaction, Improving the Analytical Integration Process

A goal of the aerospace industry is to reduce the cost of space transportation by a significant within the next decade. The present cost of launching a space transportation system which includes propulsion system, vehicle, carrier, and payload integrated together to form a system, encompasses much more than the design of the propulsion system and vehicle. The total cost includes the recurring cost of the process of integrating carriers, and payloads into the vehicle for each flight. The recurring cost of the integration of carrier/payloads systems is driven by the interaction of the vehicle. If the interaction can be well characterized and made to be very predictable for a range of payloads, or if it can be minimized then the cost of integrating a payload can be reduced significantly from today's levels. The Space Shuttle is very interactive with the payload. The interaction has been well characterized through finite element modeling and is reasonably predictable for a specific payload. Experience has shown, however, that the interaction is very manifest dependent, and small changes in one portion of a payload complement can change the interaction significantly in another portion. That is the affects of one on the other are such that if one or the other is changed slightly the environment at the interfaces can change significantly. To date the Shuttle has made in excess of one hundred flights. For each of these flights several iterations of dynamic analyses have been required in the development of each vehicle/carrier/payload system. The iterative analyses are needed because of the sensitivity of the interaction of the launch vehicle to the attached carrier/payload. The Multi Purpose Logistics Module (MPLM) is a carrier designed for flight in the Space Shuttle carrying a wide variation of cargo, supplies, and experiments to and from Space Station. Its integration process provides a unique area for improvement in the template in use today for transporting items to space. Discussion of the present MPLM integration analysis requirements and possible areas for improvement of the process are provided in the subject paper. Special emphasis is placed on reduction of requirements based on similarity of items being transported, and the use of carrier hardware for protection of the Shuttle Orbiter.

Shariett, Charles A.↗

Global Positioning System (GPS) Precipitable Water in Forecasting Lightning at Spaceport Canaveral

This paper evaluates the use of precipitable water (PW) from Global Positioning System (GPS) in lightning prediction. Additional independent verification of an earlier model is performed. This earlier model used binary logistic regression with the following four predictor variables optimally selected from a candidate list of 23 candidate predictors: the current precipitable water value for a given time of the day, the change in GPS-PW over the past 9 hours, the KIndex, and the electric field mill value. This earlier model was not optimized for any specific forecast interval, but showed promise for 6 hour and 1.5 hour forecasts. Two new models were developed and verified. These new models were optimized for two operationally significant forecast intervals. The first model was optimized for the 0.5 hour lightning advisories issued by the 45th Weather Squadron. An additional 1.5 hours was allowed for sensor dwell, communication, calculation, analysis, and advisory decision by the forecaster. Therefore the 0.5 hour advisory model became a 2 hour forecast model for lightning within the 45th Weather Squadron advisory areas. The second model was optimized for major ground processing operations supported by the 45th Weather Squadron, which can require lightning forecasts with a lead-time of up to 7.5 hours. Using the same 1.5 lag as in the other new model, this became a 9 hour forecast model for lightning within 37 km (20 NM)) of the 45th Weather Squadron advisory areas. The two new models were built using binary logistic regression from a list of 26 candidate predictor variables: the current GPS-PW value, the change of GPS-PW over 0.5 hour increments from 0.5 to 12 hours, and the K-index. The new 2 hour model found the following for predictors to be statistically significant, listed in decreasing order of contribution to the forecast: the 0.5 hour change in GPS-PW, the 7.5 hour change in GPS-PW, the current GPS-PW value, and the KIndex. The new 9 hour forecast model found the following five independent variables to be statistically significant, listed in decreasing order of contribution to the forecast: the current GPSPW value, the 8.5 hour change in GPS-PW, the 3.5 hour change in GPS-PW, the 12 hour change in GPS-PW, and the K-Index. In both models, the GPS-PW parameters had better correlation to the lightning forecast than the K-Index, a widely used thunderstorm index. Possible future improvements to this study are discussed.

Kehrer, Kristen C.↗

Mapping permafrost in the boreal forest with Thematic Mapper satellite data

A geographic data base incorporating Landsat TM data was used to develop and evaluate logistic discriminant functions for predicting the distribution of permafrost in a boreal forest watershed. The data base included both satellite-derived information and ancillary map data. Five permafrost classifications were developed from a stratified random sample of the data base and evaluated by comparison with a photo-interpreted permafrost map using contingency table analysis and soil temperatures recorded at sites within the watershed. A classification using a TM thermal band and a TM-derived vegetation map as independent variables yielded the highest mapping accuracy for all permafrost categories.

Morrissey, L. A.↗

Heat Melt Compaction as an Effective Treatment for Eliminating Microorganisms from Solid Waste

One of the technologies being tested at NASA Ames Research Center (ARC) for the Advance Exploration Systems program and as part of the logistics and repurposing project is heat melt compaction (HMC) of solid waste. Reduces volume, removes water and renders a biologically stable and safe product. The HMC compacts and reduces the trash volume as much as 90o/o greater than the current manual compaction used by the crew.The project has three primary goals or tasks. 1. Microbiological analysis of HMC hardware surfaces before and after operation. 2. Microbiological and physical characterizations of heat melt tiles made from trash at different processing times and temperatures. 3. Long term storage and stability of HMC trash tiles or "Do the bugs grow back?"

Hummerick, Mary P.↗