Search NASA⌕ Search

SEARCH · Search NASA

Results for “Maintainability Requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Understanding the Costs and Barriers of Residential Electrical Panel and Service Upgrades

Upgrading electrical panels and services in U.S. homes represents a significant barrier to building modernization, imposing considerable costs, delays, and procedural uncertainties on homeowners, contractors, utilities, and building departments. Although cost databases document individual infrastructure activities, they rarely capture the integrated, whole-project perspective required to understand how electrical upgrades are planned, executed, and regulated. Existing research is often geographically constrained, narrowly scoped, or derived from limited samples, leaving significant knowledge gaps unaddressed. This study examines the timelines and costs associated with residential electrical panel and service upgrades using data from a national cross- sectional survey conducted in summer 2025. The survey captured responses from 140 stakeholders across 34 states, including building industry professionals, utility staff, and building department staff. Findings indicate that project duration and cost increase substantially with building size though patterns vary by infrastructure type. Most single-family and small multifamily projects were completed within 30 days, whereas medium and large multifamily buildings show longer and less predictable timelines. Service rating increases modestly extend project duration, but building type and size were the primary determinants of delays. Cost patterns were similar: customer-side equipment and panel replacements scale predictably with building size, while utility-side costs are highly variable, often triggered by threshold-driven infrastructure upgrades such as transformer replacements. Permit fees vary considerably between jurisdictions but generally represent a minor proportion of total project costs. These findings identify electrical upgrades as a significant barrier to residential building costs and highlight the need for improved stakeholder coordination, streamlined permitting, and strategies that reduce upgrade requirements while maintaining safety and code compliance.

Casquero-Modrego, Nuria↗

Regenerative Fuel Cell System (Cooperative Research and Development Final Report, CRADA Number CRD-16-635)

Grid energy storage is required to maintain reliable electricity delivery from energy producers to their customers. As electrical loads on the grid change throughout the day, stored energy supplies electricity during increased power demand periods. Further, as more renewable and alternative energy sources are added, energy storage will maximize the usefulness of these technologies. Currently, the United States has over 24.6 GW of grid storage, about 2% of the total electrical production capacity. About 95% of energy storage comes from pumped hydro. However, pumped hydro energy storage is dependent on existing geographic features, making it difficult to integrate with widespread renewable energy sources. As energy demands continue to expand, and more renewable energy (i.e. wind and solar) is added to the grid, new energy storage technologies will be needed that are not dependent on geographic features. Battery technologies can provide energy storage for some applications, but are not economically well-suited for long duration charge/discharges, such as load-leveling of renewable energy. Consequently, development of new energy storage devices will augment the existing grid and reduce the capital investment in construction upgrades. As ever-increasing mandates for renewable energy are implemented, lower-cost energy storage solutions for renewable energy will be necessary to keep electricity costs low for consumers.

13 HYDRO ENERGY↗

Optimization of a buncher for High Energy H- Beam Transport [Slides]

Accelerators and beam transport systems typically contain numerous beamline devices, diagnostics, system study, and upgrade. Routinely TRACE, MADX and TRANSPORT codes are used for the beam envelope prediction and optimization. Unknown problems of accelerators and beam-transport are addressed based on R&D, such as LFB voltage variation effect study. A nominal diagnostic have used in non-traditional beam transport path to address scientific question (such as use of a BPM in the air). High energy beam operation is a methodical process and routine R&D is required to maintain high standards to deliver beam.

43 PARTICLE ACCELERATORS↗

WSF PISA example for SAFER pilot

On October 15, 2021, the Radioactive and Hazardous Waste Management Facility Manager declared a Potential Inadequacy in the Safety Analysis (PISA) due to a new information relating to an error discovered in calculation AB-WSF-20-002. Calculation AB-WSF-20-002 is used to determine source terms and heat release rates for vehicle and aircraft impacts with fuel fires involving TRU waste containers. The source term for an aircraft’s impact has different source terms factors (i.e., DR, ARF, RF, LPF) that are applied to multiple categories of drums impacted in the accident scenario based on the physical stresses of the aircraft impact and involvement in the subsequent fuel pool fire. The source terms of the multiple categories of affected drums are summed to determine the final source term for the accident scenario. Certain categories of affected drums are modeled to lose their lid, causing material to eject and burn unconfined on the ground. For these specific categories, a lower ARF value was incorrectly applied in AB-WSF-20-002 (i.e., an ARF value of 1E-3 was used instead of the DOE-STD-5506-2007 directed ARF value of 1E-2). For these categories, the ARF is applied to a relatively small number of low-activity drums (i.e., 17 drums at 2.9 PE-Ci each) compared to the total number of drums affected (i.e., 166 drums totaling 621.8 PE-Ci). Therefore, this error is not expected to significantly increase final dose for the accident scenario. No immediate actions or compensatory measures are required to maintain the facility in a safe condition.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Smart Ventilation Controls for Occupancy and Auxiliary Fan Use Across U.S. Climates

Smart Ventilation has been developed as a way to reduce the energy associated with ventilation by changing when ventilation happens and how much ventilation occurs at any given time. In high performance buildings with low envelope and appliance related loads, ventilation is becoming a bigger part of the total building energy use and needs to be addressed if performance targets are to be met. This work explores the development and performance of smart ventilation controls based on occupancy and auxiliary fan operation that provide annual dwelling unit ventilation equivalence to ASHRAE Standard 62.2-2016. A prototype high performance home compliant with U.S. DOE Building America Zero Energy Ready program requirements was simulated using the REGCAP tool with and without smart controls across 15 U.S. DOE climate zones. Balanced and unbalanced IAQ fans were independently simulated, and all smart controlled fans had airflows double the reference 62.2-2016 airflow. Three idealized occupancy patterns were examined: 1st shift (a typical daily work/school absence), an extended 1st shift with more time spent out of the home evenings and weekends and 3rd shift (night work). The Occupancy controller turns the IAQ fan off during unoccupied periods, and it resumes ventilation upon their return. While unoccupied, contaminants are allowed to accumulate in the space, because occupants are not exposed to these contaminants. When occupants return home, they are exposed to these higher contaminant concentrations, and the controller increases the ventilation rate sufficiently to ensure equivalence with a continuous IAQ fan. Accounting for pollutant emissions that occur during unoccupied periods (as required by ASHRAE 62.2-2016), sharply distinguishes our occupancy controls from past Demand Controlled Ventilation systems. This new accounting method results in equivalent contaminant exposure, as well as lower reductions in average ventilation rates and lower energy savings. Smart controls were demonstrated that saved HVAC energy (i.e., avoided heating/cooling load, as well as fan energy)—averaging between 6 and 46% of ventilation-related energy use depending on the control strategy and occupancy pattern assumptions. The greatest savings were in the combined Auxiliary Fan + Occupancy control. Energy savings increased with climate heating demand and longer unoccupied time periods. The 3rd shift occupancy pattern had better performance, due to the thermal benefit of reducing the ventilation rate during the cold nighttime hours. This same effect provided a cooling energy benefit in hotter locations for the 1st shift. Overall, savings from occupancy-based smart controls were low, because of the recovery period required after occupants return home, during which the airflow is double the 62.2 reference. This recovery is required to maintain equivalence with the ASHRAE standard. Occupancy-based control performance was improved when combined with sensing auxiliary fans and when providing a pre-occupancy flush out of one- or two-hours. Performance was similarly improved if the ASHRAE Standard were to recognize that pollutant emissions are lower during unoccupied periods, iii allowing a lower target ventilation rate during unoccupied periods (not currently in the standard) (see Full vs. Half AEQ in this report). Finally, over-sized unbalanced fans that are cycled on-and-off by a smart controller (or timer) were found to substantially increase annual average air exchange and energy use relative to a continuous unbalanced fan due to the effects of superposition with natural infiltration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Los Alamos National Laboratory Floodplain Assessment for the Technical Area 72 Outdoor Live Fire Range Safety Upgrades Project

The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing new construction and upgrade activities in lower Sandia Canyon at Technical Area (TA) 72 at the Outdoor Live Fire Range facility at Los Alamos National Laboratory (LANL). The proposed upgrades are intended to improve range safety to help fulfill the mission requirements of maintaining a trained and qualified armed Protective Force.

54 ENVIRONMENTAL SCIENCES↗

Improving Unit Flexibility Utilizing Plasma Ignitors

Coal fired steam generation operators face increasing market challenges, including competition from low cost generation, renewables, and regulatory pressure. These market conditions are forcing utilities to operate their coal assets in a more flexible mode, including more frequent starts and stops, faster ramp rates, frequent cycling, and extended operation at the lowest possible loads. Without upgrades to firing and control systems, pressure parts, and auxiliary systems, CAPEX and OPEX costs will increase significantly. Typically, expensive support fuels (Oil or Gas) are required to maintain safe, stable coal ignition when operating below 25% to 35% MCR (Maximum Continuous Rating). The exact minimum load without support fuel differs depending upon unit design specifications and fuel being burned. Frequent starts also increase the use of support fuels. The firing and burner control systems must be designed to allow for proper operation over the unit’s load range, ensuring that all mechanical components operate properly, and proper control of air and fuel streams can be maintained. To address the need for frequent starts and the need for stable low load operation on coal fired steam generators, this paper discusses options available, including, Firing Systems upgrades, Digital solutions, and pressure part upgrades. Several case studies are included that highlight options available allowing units to stay in operation and reduce CAPEX and OPEX costs.

01 COAL, LIGNITE, AND PEAT↗

Nondestructive Evaluation of Rexolite Insulators for the Purpose of Monitoring the Structural Health of Particle Accelerator

Rexolite is a cross-linked polystyrene plastic with stable electrical properties into the gigahertz frequency range. The ability to withstand high voltage makes Rexolite one of the most used materials as insulators for particle accelerators. Although, Rexolite’s poor outgassing performance relative to traditional vacuum materials such as stainless steel or aluminum deems the necessity to treat Rexolite prior to its use as insulators. Insulators are mandatory for an accelerator system because a uniform electric field is required to ensure the alignment of the accelerated particles. Furthermore, to operate properly, a particle accelerator is required to maintain a high vacuum or even an ultrahigh vacuum. Although, because outgassing is the major contributor to the gas load of a vacuum system, Rexolite insulators with uncontrolled outgassing characteristics can severely damage the particle accelerator. Disassembly and reassembly of a complex system like a particle accelerator is also time consuming.

36 MATERIALS SCIENCE↗

PUR-1 Water Processing and Cooling System Upgrade

The project objective was to purchase equipment related to the safety and operational capability of PUR-1. Following a 10x power uprate and the return to an active operational cycle, a water process system replacement is required to maintain the bulk coolant temperature within the bounds of the Technical Specification limit at the PUR-1. The replacement project will ensure safety and availability of the PUR-1 for long duration operational cycles and applicability to the largest possible customer base. The equipment to be purchased for this work includes a new main coolant pump rated to at least 30 gallons per minute, a heat exchanger to remove heat from the primary coolant, and a chiller system to release the heat to the environment via city water. The proposed system exactly replicates the installed system with a slight increase in capacity.

42 ENGINEERING↗

RCT Continuing Training: RCT Job Coverage and CONOPS

RCT Continuing Training covering all of the necessary steps associated with RCT, and how conduct of operations ties in with this process. The terminal objective of this training is: Given the need to perform radiological job coverage, recognize the requirements to maintain radiological work control in accordance with P121, Radiation Protection, RP-PROG-TP-200, Radiation Protection Manual, and P315, Conduct of Operations.

61 RADIATION PROTECTION AND DOSIMETRY↗

Performance Assessment Closure Plan for the Active Low-Level Burial Ground Trenches 31, 34, and 94 at the Hanford Site

This report documents the closure plan for the active trenches within the Low-Level Burial Grounds of the Hanford Site, namely Trenches 31 and 34 in the 200 West Area and Trench 94 in 200 East Area. This closure plan is developed to meet the requirements of DOE O 435.1, Radioactive Waste Management. It is one of the several technical basis documents, along with the performance assessment (DOE/RL-2021-26, Performance Assessment of Active Trenches in 200 East and West Low-Level Burial Grounds at the Hanford Site), which is required for maintaining the Operating Disposal Authorization Statement as described in DOE-STD-5002-2017, Disposal Authorization Statement and Tank Closure Documentation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ARCUS Vertical-Axis Wind Turbine (Final Scientific/Technical Report)

While land-based wind energy has become economically competitive with traditional energy generation sources in the U.S., offshore wind is not. For floating offshore wind this difference is even more substantial where the levelized cost of energy (LCOE) is projected to be around 3-5 times more expensive than land-based wind. The turbine capital costs represent around 50% of the LCOE for land-based wind sites, but the increased system costs for floating offshore wind reduce this to 20%. The platform and mooring costs are the single largest contributor to the LCOE for floating offshore wind where their mass must counteract the overturning moment caused by the turbine’s thrust force. Despite the high costs of the platform and relatively low cost of the turbine, current offshore wind turbines are designed essentially the same as for land-based sites. Reducing the LCOE is the greatest challenge to realize the benefits of sustained development of floating offshore wind in the U.S. Reducing the complicated system costs of floating offshore wind will enable the industry to continue to grow and outpace current projections if reduced cost curves can be reached. The ideal wind energy system would remove all mass and cost that is not directly capturing energy from the wind. For floating offshore wind energy systems, this objective is even more significant as increased mass above the water level must be supported by larger and more expensive floating platforms. For this reason, vertical-axis wind turbines (VAWTs) are ideal for floating offshore sites and have several advantages over horizontal-axis wind turbines (HAWTs) at this scale. Large VAWTs offer opportunities for improved energy capture over HAWTs as single units and with reduced wind plant aerodynamic losses through enhanced wake recovery. Additionally, the platform-level placement of the VAWT drivetrain greatly reduces the demands placed on the floating platform and its mass and cost. The ARCUS vertical-axis wind turbine concept (U.S. 11,421,650 B2) is an iteration beyond traditional Darrieus-type VAWTs that replaces the rigid tower with blades that are bent into shape and held in place with tensioned center supports, like a bow. The ARCUS design has been shown to further decrease the VAWT rotor mass properties, with a 50% reduction over traditional Darrieus VAWTs quantified in the ATLANTIS program. The ARCUS VAWT’s efficient use of material for the rotor and turbine support structures combined with its lowered center of gravity enables a tension-leg platform (TLP) with simplified installation procedures. TLPs have been an emerging platform architecture in the Oil and Gas industry and demonstrated to have the lowest hull mass requirements while maintaining stability with minimal roll and pitch deflections in operation. A 22 MW ARCUS turbine has been designed with a three-column TLP that enables quayside integration of the turbine while maintaining system stability during tow-out and installation and having optimal mass and cost properties. A comprehensive analysis shows the optimal ARCUS TLP system design minimizes LCOE through efficient material usage and increased energy capture to yield a competitive LCOE estimate of $\$$55/MWh. A comparison with a reference HAWT, having the same swept area, quantifies the advantages that helped to produce this improved LCOE for the ARCUS concept: (1) 30% reduction in total turbine mass, (2) 70% reduction in turbine center of gravity, and (3) 45% increase in energy production over what is optimal for a HAWT. Intellectual property has been generated through the ATLANTIS program providing opportunities to further reduce the LCOE and improve the performance of the ARCUS turbine and TLP system, expanding the list of innovations to support commercial development of the ARCUS concept.

17 WIND ENERGY↗

Typical Use Cases for Energy Storage in Rural Areas

Public power utilities and cooperatives play a crucial role in delivering reliable and affordable electricity to remote and sparsely populated regions. Unlike their urban counterparts, these utilities often face a unique set of challenges that can complicate their operations and service delivery. One of the primary challenges is the vast geographical area they must cover, which often results in higher transmission and distribution costs per customer. Additionally, public power utilities in rural areas often cannot afford the investments required to maintain and upgrade aging grid infrastructure to provide reliable and resilient power or withstand the impacts of recurring, severe weather events, which can cause extended outages and disrupt service delivery. Energy storage has emerged as a promising tool to help public power utilities meet these challenges. By enabling the storage of excess energy during low demand periods and providing a source of backup electricity during outages, energy storage systems can help utilities balance supply and demand more effectively. Additionally, they can help integrate a portfolio of various energy sources, reduce the need for expensive peak power purchases and provide ancillary services that stabilize the grid. This white paper describes potential use cases for energy storage in rural areas as well as documents a set of relevant example projects by project types.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transfer Learning for HVAC System Fault Detection

Faults in HVAC systems degrade thermal comfort and energy efficiency in buildings and have received significant attention from the research community, with data driven methods gaining in popularity. Yet the lack of labeled data, such as normal versus faulty operational status, has slowed the application of machine learning to HVAC systems. In addition, for any particular building, there may be an insufficient number of observed faults over a reasonable amount of time for training. To overcome these challenges, we present a transfer methodology for a novel Bayesian classifier designed to distinguish between normal operations and faulty operations. The key is to train this classifier on a building with a large amount of sensor and fault data (for example, via simulation or standard test data) then transfer the classifier to a new building using a small amount of normal operations data from the new building. We demonstrate a proof-of-concept for transferring a classifier between architecturally similar buildings in different climates and show few samples are required to maintain classification precision and recall.

transfer learning, Building HVAC, Bayesian framewo↗

CT584 Is Not a Protective Vaccine Antigen against Respiratory Chlamydial Challenge in Mice

Background: Chlamydia trachomatis is the most prevalent bacterial sexually transmitted pathogen in humans worldwide. Since chlamydial infection is largely asymptomatic with the potential for serious complications, a preventative vaccine is likely the most viable long-term answer to this public health threat. Cell-free protein synthesis (CFPS) utilizes the cellular protein manufacturing machinery decoupled from the requirement for maintaining cellular viability, offering the potential for flexible, rapid, and decentralized production of recombinant protein vaccine antigens. Methods: Here, we use CFPS to produce the full-length putative chlamydial type three secretion system (T3SS) needle-tip protein, CT584, for evaluation as a vaccine antigen in mouse models. High-speed atomic force microscopy (HS-AFM) (RIBM, Tsukuba, Japan) imaging and computer simulations confirm that CFPS-produced CT584 retains a native-like structure prior to immunization. Female mice were primed with CT584 adjuvanted with CpG-1826 intranasally (i.n.) or CpG-1826 + Montanide ISA 720 intramuscularly (i.m.), followed four weeks later by an i.m. boost before respiratory challenge with 10 4 inclusion forming units (IFU) of Chlamydia muridarum. Results: Immunization with CT584 generated robust antibody responses but weak cell-mediated immunity and failed to protect against i.n. challenge as demonstrated by body weight loss, increased lung weights, and the presence of high numbers of IFUs in the lungs. Conclusion: While CT584 was not a protective vaccine candidate, the speed and flexibility with which CFPS can be used to produce other potential chlamydial antigens make it an attractive technique for antigen production.

60 APPLIED LIFE SCIENCES↗

SPACECRAFT LIFE SUPPORT SYSTEMS

Requirements of life support for the crew members considered in relation to man's metabolic requirements Appropriate methods and equipment are related to these characteristics of various manned space missions. Among the provisions required for maintaining physical well-being are systems for (1) the removal of carbon dioxide, (2) the reclamation and supplying of oxygen, (3) the control of temperature, humidity, and toxic gases, (4) the reclamation of water, (5) the management of wastes, and (6) the supplying of food. Some of the research being performed at the Langley Research Center with life support systems is discussed and the research objectives are stressed. Descriptions are given of the various types of equipment used in this research, together with criteria for system evaluations.

MANNED SPACECRAFT↗

Rock bit requires no flushing medium to maintain drilling speed

Steel drill bit having terraces of teeth intersected by spiral grooves with teeth permits the boring of small holes through rock with low power. The cuttings are stored in a chamber behind the cutting head. Could be used as sampling device.

Source record↗

Automatic method of measuring silicon-controlled-rectifier holding current

Development of automated silicon controlled rectifier circuit for measuring minimum anode current required to maintain rectifiers in conducting state is discussed. Components of circuit are described and principles of operation are explained. Illustration of circuit is provided.

Maslowski, E. A.↗