Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mission Control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Designing an Alternate Mission Operations Control Room

The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a service-oriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building.

Montgomery, Patty↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Exploration Medical Capability Clinical Decision Support System Concept of Operations

The Clinical Decision Support (CDS) project supports the Exploration Medical Capability (ExMC) Element of the Human Research Program (HRP). Specifically, the CDS project addresses the ExMC gap, Medical-701: Enhance medical capabilities within an exploration medical system. For long-duration, deep space missions, computational and data resources will play an important role in maintaining crew health, wellness and performance where the crew will need to be more self-reliant as we enter a new era in space exploration to return to the moon and explore Mars. These ambitious goals will require significant change in in-flight medical care due to constraints on mass, volume, power, crew time, skills reduction over time and medical evacuation capabilities. These constraints make it absolutely necessary to develop transformative solutions using new technologies. Unlike the current paradigm for crew health in low-Earth orbit missions that rely on constant communication with Mission Control, the deep space missions will experience communication delays and possibly, no communications for finite periods of time. Hence, crew health management will benefit from analytics’ capabilities to augment decision support. A comprehensive, multi-functional on-board clinical decision support system (CDSS) will help crews assess and diagnose conditions, decide appropriate responses, and guide the provision of tailored and evidence-based treatments, while reflecting contextual factors and constraints. The context may include present and historical data, viable diagnostic equipment, available supplies and medications, and vehicle and environmental health. Communication time with ground-based personnel is delayed or non-existent during significant portions of the mission so the crew will need to autonomously respond to health, performance and medical situations, particularly those that are unplanned. The CDSS must also provide additional capabilities as complex as training for an emergency situation while augmenting non-expert practitioner skillsets if the Crew Medical Officer (CMO) is incapacitated, and as routine as facilitating delayed communication with flight surgeons on the ground. The CDSS must connect complex issues involving health, wellness, task performance and environmental domains. Furthermore, CDSS functionality will focus on semi-autonomous and autonomous decision-making by the crew that is necessary to address challenges in executing a self-contained medical system that enables health care without assistance from ground clinical experts. The document, ExMC CDSS Architecture Recommendation, (HRP- 48032) establishes a description of the envisioned CDSS architecture. The analytics, descriptive or advanced, contained in a CDSS will interface with the integrated crew health and performance architecture that provides the appropriate data sets. The aim of the CDS project is to develop requirements for a CDSS through a series of test-bed prototype developments and demonstrations.

HRP↗

A strip chart recorder pattern recognition tool kit for Shuttle operations

During Space Shuttle operations, Mission Control personnel monitor numerous mission-critical systems such as electrical power; guidance, navigation, and control; and propulsion by means of paper strip chart recorders. For example, electrical power controllers monitor strip chart recorder pen traces to identify onboard electrical equipment activations and deactivations. Recent developments in pattern recognition technologies coupled with new capabilities that distribute real-time Shuttle telemetry data to engineering workstations make it possible to develop computer applications that perform some of the low-level monitoring now performed by controllers. The number of opportunities for such applications suggests a need to build a pattern recognition tool kit to reduce software development effort through software reuse. We are building pattern recognition applications while keeping such a tool kit in mind. We demonstrated the initial prototype application, which identifies electrical equipment activations, during three recent Shuttle flights. This prototype was developed to test the viability of the basic system architecture, to evaluate the performance of several pattern recognition techniques including those based on cross-correlation, neural networks, and statistical methods, to understand the interplay between an advanced automation application and human controllers to enhance utility, and to identify capabilities needed in a more general-purpose tool kit.

Hammen, David G.↗

Innovative Contamination Certification of Multi-Mission Flight Hardware

Maintaining contamination certification of multi-mission flight hardware is an innovative approach to controlling mission costs. Methods for assessing ground induced degradation between missions have been employed by the Hubble Space Telescope (HST) Project for the multi-mission (servicing) hardware. By maintaining the cleanliness of the hardware between missions, and by controlling the materials added to the hardware during modification and refurbishment both project funding for contamination recertification and schedule have been significantly reduced. These methods will be discussed and HST hardware data will be presented.

Hansen, Patricia A.↗

Innovative Contamination Certification of Multi-Mission Flight Hardware

Maintaining contamination certification of multi-mission flight hardware is an innovative approach to controlling mission costs. Methods for assessing ground induced degradation between missions have been employed by the Hubble Space Telescope (HST) Project for the multi-mission (servicing) hardware. By maintaining the cleanliness of the hardware between missions, and by controlling the materials added to the hardware during modification and refurbishment both project funding for contamination recertification and schedule have been significantly reduced. These methods will be discussed and HST hardware data will be presented.

Hansen, Patricia A.↗

Innovative Contamination Certification of Multi-Mission Flight Hardware

Maintaining contamination certification of multi-mission flight hardware is an innovative approach to controlling mission costs. Methods for assessing ground induced degradation between missions have been employed by the Hubble Space Telescope (HST) Project for the multi-mission (servicing) hardware. By maintaining the cleanliness of the hardware between missions, and by controlling the materials added to the hardware during modification and refurbishment both project funding for contamination recertification and schedule have been significantly reduced. These methods will be discussed and HST hardware data will be presented.

Hansen, Patricia A.↗

An approach to the design of operations systems

The MultiMission Control Team (MMCT) consists of mission controllers which provides Real-Time operations support for the Mars Observer project. The Real-Time Operations task is to insure the integrity of the ground data system, to insure that the configuration is correct to support the mission, and to monitor the spacecraft for the Spacecraft Team. Operations systems are typically developed by adapting operations systems from previous projects. Problems tend to be solved empirically when they are either anticipated or observed in testing. This development method has worked in the past when time was available for extensive Ops testing. In the present NASA budget environment, a more cost conscious design approach has become necessary. Cost is a concern because operations is an ongoing, continuous activity. Reducing costs entails reducing staff. Reducing staffing levels potentially increases the risk of mission failure. Therefore, keeping track of the risk level is necessary.

Chafin, Roy L.↗

Earth-Independent Medical Operations (EIMO) Concept of Operations

In contrast to the current crew health paradigm for low-Earth orbit and Lunar missions, which depends on real-time communication with Mission Control, deep-space exploration missions will require a significant shift in medical operations. This shift is driven by the constraints of operating at a considerable distance from Earth, such as resource limitations—lack of resupply, restricted mass, power, volume, and data—as well as communication delays and the inability to evacuate back to Earth during emergencies. To move toward a more self-reliant medical model, a strategy is needed to gradually increase space-based crew autonomy and reduce risks to mission success in the challenging environment of deep space. This transformative change, known as "Earth-Independent Medical Operations" (EIMO), explores the gradual transfer of medical care and decision-making from Earth-based support to space-based systems. The goal of this transition is to enhance astronaut health and performance while minimizing mission risks. EIMO requires the development of a medical system that integrates seamlessly with mission planning, vehicle and spacesuit design, and data architecture. This integration is crucial for building a robust medical infrastructure that not only safeguards astronaut well-being but also ensures overall mission success. The Human Research Program (HRP) Exploration Medical Capability (ExMC) Element has revised the EIMO model-based Concept of Operations (ConOps) which outlines an initial vision for EIMO. The ConOps, which is built on the stakeholders’ need, system goals, and objectives (NGOs), presents an array of in-mission scenarios that span a wide range of medical conditions demonstrating the system’s capabilities from basic to complex events. Developed by a multidisciplinary team of systems engineers, scientists, and clinicians within ExMC, the ConOps revision includes two new scenarios(Barotrauma and Self-Medical Management and Behavioral Health and Chronic Medical Care), and implementation of findings from EIMO technical interchange meetings that focused on data and training. The envisioned EIMO Medical System (MS) operates as a system of systems, gathering data from various sources such as reference databases, real-time wearable sensors, point-of-care diagnostics, and environmental controls. The MS also incorporates advanced training tools to support autonomous medical care, assisting the Crew Medical Officer (CMO) during medical events where Ground Support is either unavailable or communication-delayed beyond practicality. Furthermore, MS functions and capabilities were decomposed from the scenarios to establish foundational requirements for EIMO and traced to the NASA Spaceflight Human-System Standard(NASA-STD-3001, Volumes 1 and 2). These traces were performed to gain insights on the alignment of EIMO requirements with the NASA standard. This work serves as an initial recommendation to increase crew autonomy gradually and safely for Mars missions and future deep-space exploration.

medical system↗

Large space system control technology model order reduction study

The mission control requirements for large space structures are presented as well as some of the problems associated with the active control of large structures in space. A generic model is introduced that contains most of the desired features in the modeling and control problem for large space structures.

Skelton, R. E.↗

Propellant Savings during Soyuz Undock from the International Space Station

As a vehicle continuously orbiting Earth for over a decade, the International Space Station (ISS) must be conscious of ways to conserve consumables to maximize the efficiency of cargo flights to ISS. One such consumable is propellant. As part of an ongoing effort to minimize propellant usage onboard ISS and use control moment gyroscopes as much as possible for ISS control, an effort was made in late 2014 to allow Soyuz manned vehicle undockings without requiring the use of thrusters. This method, which has been used for four Soyuz undockings, saves up to 160 kg of propellant each year. Fiona completed a B.S. is Mechanical Engienering at Washington University in St. Louis in 2009, after which she moved to Houston, TX to begin working at NASA Johnson Space Center. She currently works in the Flight Operations Directorate as an ADCO (Attitude Determination and Control Officer) flight controller and MCG (Motion Control Group) instructor. Her responsibilities include operating the motion control systems of the ISS in Mission Control, interfacing with Russian colleagues, mentoring and teaching flight controller trainees, and training astronauts for their missions to ISS.

Turett, Fiona↗

Operational efficiency

Space transportation avionics technology operational efficiency issues are presented in viewgraph form. Information is given on ascent flight design, autonomous spacecraft control, operations management systems, advanced mission control, telerobotics/telepresence, advanced software integration, advanced test/checkout systems, advanced training systems, and systems monitoring.

Bland, Dan↗

Metamorphoses of ONAV console operations: From prototype to real time application

The ONAV (Onboard Navigation) Expert System is being developed as a real time console assistant to the ONAV flight controller for use in the Mission Control Center at the Johnson Space Center. Currently the entry and rendezvous systems are in verification, and the ascent is being prototyped. To arrive at this stage, from a prototype to real world application, the ONAV project has had to deal with not only AI issues but operating environment issues. The AI issues included the maturity of AI languages and the debugging tools, what is verification, and availability, stability, and the size of the expert pool. The environmental issues included real time data acquisition, hardware stability, and how to achieve acceptance by users and management.

Millis, Malise↗

Advanced flight software reconfiguraton

Information is given in viewgraph form on advanced flight software reconfiguration. Reconfiguration is defined as identifying mission and configuration specific requirements, controlling mission and configuration specific data, binding this information to the flight software code to perform specific missions, and the release and distribution of the flight software. The objectives are to develop, demonstrate, and validate advanced software reconfiguration tools and techniques; to demonstrate reconfiguration approaches on Space Station Freedom (SSF) onboard systems displays; and to interactively test onboard systems displays, flight software, and flight data.

Porcher, Bryan↗

Ammonia Vent of the External Active Thermal Control System (EATCS) Radiator #3 Flow Path #2 on the International Space Station (ISS)

The External Active Thermal Control System (EATCS) provides cooling for all pressurized modules and the main Power Distribution Electronics (PDE) on the International Space Station (ISS). There are 2 EATCS loops (Loop A and Loop B) which includes 3 deployable radiators. Each deployable radiator contains 2 flow paths to provide heat rejection.Telemetry monitoring identified a coolant (liquid ammonia) leak in EATCS Loop B. Robotic External Leak Locator (RELL) scans found higher concentrations of vaporous ammonia near the EATCS Loop B Radiator #3 Flow Path #2. On May 3, 2017, the EATCS Loop B Radiator #3 Flow Path #2 was isolated and vented. As of the data to date, the ammonia leak has ceased. The purpose of this presentation is to discuss the analysis for venting the EATCS Loop B Radiator #3 Flow Path #2. Venting analysis is performed to determine the worst case time to empty the flow path and maximum thrusts imposed on the ISS. Flight controllers and engineers in the Mission Control Center (MCC) uses this data to develop operational procedures and perform the vent safely. It was predicted that the worst case time to empty the EATCS Loop B Radiator #3 Flow Path #2 was ~ 60 minutes. The predicted maximum thrusts were ~ 11 lbf (49 N) at the start of the vent and ~10 lbf (45 N) after the system reaches saturation.The vent was successfully performed and took ~ 20 minutes to empty the EATCS Loop B Radiator #3 Flow Path #2. Using telemetry from the day of the vent, analysis determined the time to empty the EATCS Loop B Radiator #3 Flow Path #2 would be ~13 minutes. The predictive analysis used worst case inputs and assumptions which bounded the actual results. Telemetry is not available to correlate actual thrust with the predicted maximum thrusts. However, by using Russian Thrusters for ISS attitude control, attitude control telemetry indicated the flight attitude was maintained.

Cowan, Darnell T.↗

Onboard navigation rendezvous expert system

The Onboard Navigation rendezvous expert system is designed to aid the ground flight controller in monitoring the shuttle onboard navigation system. The system is designed to keep track of the navigation sensors and relative state vectors. In addition, the system also keeps an event log and fills out forms usually handled by the flight controller. This expert system is one of the few rendezvous specific systems being developed for the Mission Control Center. The expert system has been in development for six years. Through these years the system has seen hardware, software, and personnel changes. Initial development was done by the Information Systems Directorate (ISD) and Mission Operations Directorate (MOD) at Johnson Space Center. As of October 1, 1991 the system has been turned over to MOD. The system is completely developed except for some minor adjustments to the user interface. The rule base is in the verification stage with total certification of the system due to be completed by May 1992. Test cases for verification are obtained by saving data used for flight controller integrated simulations. The actual data comes from both the shuttle mission simulator and the Mission Control Center Computer. So far no actual flight data has been available. This paper covers all aspects of the system from the development history to the current hardware, software, and use of the system.

Kocen, Michelle↗