Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operating experience”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Cryogenic gear technology for an orbital transfer vehicle engine and tester design

Technology available for gears used in advanced Orbital Transfer Vehicle rocket engines and the design of a cryogenic adapted tester used for evaluating advanced gears are presented. The only high-speed, unlubricated gears currently in cryogenic service are used in the RL10 rocket engine turbomachinery. Advanced rocket engine gear systems experience operational load conditions and rotational speed that are beyond current experience levels. The work under this task consisted of a technology assessment and requirements definition followed by design of a self-contained portable cryogenic adapted gear test rig system.

Calandra, M.↗

A review of recent programs and future plans for rotorcraft in-flight simulation at Ames Research Center

A new flight research vehicle, the Rotorcraft-Aircrew Systems Concepts Airborne Laboratory (RASCAL), is being developed by the U.S. Army and NASA at Ames Research Center. The requirements for this new facility stem from a perception of rotorcraft system technology requirements for the next decade together with operational experience with the CH-47B research helicopter that was operated as an in-flight simulator at Ames during the past 10 years. Accordingly, both the principal design features of the CH-47B variable-stability system and the flight-control and cockpit-display programs that were conducted using this aircraft at Ames are reviewed. Another U.S. Army helicopter, a UH-60A Black Hawk, has been selected as the baseline vehicle for the RASCAL. The research programs that influence the design of the RASCAL are summarized, and the resultant requirements for the RASCAL research system are described. These research programs include investigations of advanced, integrated control concepts for achieving high levels of agility and maneuverability, and guidance technologies, employing computer/sensor-aiding, designed to assist the pilot during low-altitude flight in conditions of limited visibility. The approach to the development of the new facility is presented and selected plans for the preliminary design of the RASCAL are described.

Eshow, Michelle M.↗

Autonomous Command Operations of the WIRE Spacecraft

This paper presents operational innovations which will be introduced on NASA's Wide Field Infrared Explorer (WIRE) mission. These innovations include an end-to-end design architecture for an autonomous commanding capability for the uplink of command loads during unattended station contacts. The WIRE mission is the fifth and final mission of NASA's Goddard Space Flight Center Small Explorer (SMEX) series to be launched in March of 1999. Its primary mission is the targeting of deep space fields using an ultra-cooled infrared telescope. Due to its mission design WIRE command loads are large (approximately 40 Kbytes per 24 hours) and must be performed daily. To reduce the cost of mission operations support that would be required in order to uplink command loads, the WIRE Flight Operations Team has implemented all autonomous command loading capability. This capability allows completely unattended operations over a typical two-day weekend period. The key factors driving design and implementation of this capability were: 1) integration with already existing ground system autonomous capabilities and systems, 2) the desire to evolve autonomous operations capabilities based upon previous SMEX operations experience - specifically the TRACE mission, 3) integration with ground station operations - both autonomous and man-tended, 4) low cost and quick implementation, and 5) end-to-end system robustness. A trade-off study was performed to examine these factors in light of the low-cost, higher-risk SMEX mission philosophy. The study concluded that a STOL (Spacecraft Test and Operations Language) based script, highly integrated with other scripts used to perform autonomous operations, was best suited given the budget and goals of the mission. Each of these factors is discussed in addition to use of the TRACE mission as a testbed for autonomous commanding prior to implementation on WIRE. The capabilities implemented on the WIRE mission are an example of a low-cost, robust, and efficient method for autonomous command loading when implemented with other autonomous features of the ground system. They call be used as a design and implementation template by other missions interested in evolving toward autonomous and lower cost operations. Additionally, the WIRE spacecraft will be used as an operational testbed upon completion of its nominal mission later in 1999. One idea being studied is advanced on-board modeling. Advanced on-board modeling techniques will be used to more efficiently display the spacecraft state. This health and safety information could be used by engineers on the ground or could be used by tile spacecraft for its own assessments. Additionally, this same state information could also be input into the event-driven scheduling system, as the scheduling system will need to assess the spacecraft state before undertaking a new activity. Advanced modeling techniques are being evaluated for a number of NASA missions including The Next Generation Space Telescope (NGST), which is scheduled to launch in 2007.

Walyus, Keith↗

Women's Health Issues in the Space Environment

Women have been an integral part of US space crews since Sally Ride's mission in 1983, and a total of 40 women have been selected as US astronauts. The first Russian female cosmonaut flew in 1963. This presentation examines the health care and reproductive aspects of flying women in space. In addition, the reproductive implications of delaying one's childbearing for an astronaut career and the impact of new technology such as assisted reproductive techniques are examined. The reproductive outcomes of the US female astronauts who have become pregnant following space flight exposure are also presented. Since women have gained considerable operational experience on the Shuttle, Mir and during EVA, the unique operational considerations for preflight certification, menstruation control and hygiene, contraception, and urination are discussed. Medical and surgical implications for women on long-duration missions to remote locations are still evolving, and enabling technologies for health care delivery are being developed. There has been considerable progress in the development of microgravity surgical techniques, including laparoscopy, thoracoscopy, and laparotomy. The concepts of prevention of illness, conversion of surgical conditions to medically treatable conditions and surgical intervention for women on long duration space flights are considered.

Jennings, Richard T.↗

New challenges for Life Sciences flight project management

Scientists have conducted studies involving human spaceflight crews for over three decades. These studies have progressed from simple observations before and after each flight to sophisticated experiments during flights of several weeks up to several months. The findings from these experiments are available in the scientific literature. Management of these flight experiments has grown into a system fashioned from the Apollo Program style, focusing on budgeting, scheduling and allocation of human and material resources. While these areas remain important to the future, the International Space Station (ISS) requires that the Life Sciences spaceflight experiments expand the existing project management methodology. The use of telescience with state-the-art information technology and the multi-national crews and investigators challenges the former management processes. Actually conducting experiments on board the ISS will be an enormous undertaking and International Agreements and Working Groups will be essential in giving guidance to the flight project management Teams forged in this matrix environment must be competent to make decisions and qualified to work with the array of engineers, scientists, and the spaceflight crews. In order to undertake this complex task, data systems not previously used for these purposes must be adapted so that the investigators and the project management personnel can all share in important information as soon as it is available. The utilization of telescience and distributed experiment operations will allow the investigator to remain involved in their experiment as well as to understand the numerous issues faced by other elements of the program The complexity in formation and management of project teams will be a new kind of challenge for international science programs. Meeting that challenge is essential to assure success of the International Space Station as a laboratory in space.

NASA Discipline General Space Life Sciences↗

The High Definition Earth Viewing (HDEV) Payload

The High Definition Earth Viewing (HDEV) payload enables long-term experimentation of four, commercial-of-the-shelf (COTS) high definition video, cameras mounted on the exterior of the International Space Station. The payload enables testing of cameras in the space environment. The HDEV cameras transmit imagery continuously to an encoder that then sends the video signal via Ethernet through the space station for downlink. The encoder, cameras, and other electronics are enclosed in a box pressurized to approximately one atmosphere, containing dry nitrogen, to provide a level of protection to the electronics from the space environment. The encoded video format supports streaming live video of Earth for viewing online. Camera sensor types include charge-coupled device and complementary metal-oxide semiconductor. Received imagery data is analyzed on the ground to evaluate camera sensor performance. Since payload deployment, minimal degradation to imagery quality has been observed. The HDEV payload continues to operate by live streaming and analyzing imagery. Results from the experiment reduce risk in the selection of cameras that could be considered for future use on the International Space Station and other spacecraft. This paper discusses the payload development, end-to- end architecture, experiment operation, resulting image analysis, and future work.

Muri, Paul↗

Celescope catalog of ultraviolet stellar observations: 5068 objects measured by Orbiting Astronomical Observatory (OAO-2)

During the 16 months that the Celescope Experiment operated, it took 8000 frames of data. This report describes the experiment, the data it gathered, the format of the magnetic tape containing the data, and a number of programs that were written to read and manipulate the tape. The tape version of the catalog contains Data on 5068 stars and is available from the National Space Sciences Data Center.

Davis, R. J.↗

Effects of Shuttle environment on instrument performance

Examination of the OSTA-1 payload instruments carried in the shuttle bay during the 54.25 hour mission of STS-2 indicates that the shuttle environment has no measurable effect on the Earth-viewing experiments. Operation of the payload shows that flight simulations are essential and experiment replanning practice is needed. Ground control of experiments is desirable since malfunctions of totally automated experiments cannot be fixed in flight. Alarm limits for experiments must be realistic since the crew loses interest after a few alarms. The quality and number of hours of data obtained for each experiment are listed.

Potter, A. E.↗

Orbital transfer vehicle launch operations study. Volume 1: Executive summary

The purpose was to use the operational experience at the launch site to identify, describe and quantify the operational impacts of the various configurations on the Kennedy Space Center (KSC) and/or space station launch sites. Orbital Transfer Vehicle (OTV) configurations are being developed/defined by contractor teams. Lacking an approved configuration, the KSC Study Team defined a Reference Configuration to be used for this study. This configuration then become the baseline for the identification of the facilities, personnel and crew skills required for processing the OTV in a realistic manner that would help NASA achieve the lowest possible OTV life cycle costs. As the study progressed, researchers' initial apraisal that the vehicle, when delivered, would be a sophisticated, state-of-the-art vehicle was reinforced. It would be recovered and reused many times so the primary savings to be gained would be in the recurring-cycle of the vehicle operations--even to the point where it would be beneficial to break from tradition and make a significant expenditure in the development of processing facilities at the beginning of the program.

Source record↗

The Dust Management Project: Final Report

A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

Hyatt, Mark J.↗

Historical data retrieval study - Results for the first five years of KSC STS payload processing

This paper identifies general and specific quantitative and qualitative results from a study of actual operational experiences while processing 185 science, applications, and commercial payloads for the first five years of STS operations at NASA's Kennedy Space Center (KSC). All the non-DOD payloads from STS-2 through STS-33 were part of the study. The emphasis was placed on various program planning and events that affected KSC processing, payload experiences and improvements, payload hardware condition after arrival, services to customers, and the impact of STS operations and delays. From these initial considerations, operational drivers were identified, data for selected processing measurements collected and analyzed, processing criteria and options determined, and STS payload results and conclusions reached. The study showed a significant reduction in time and effort needed by STS customers and KSC to process a wide variety of payload configurations, although even the simplest payloads required more processing resources and time than were initially assumed.

Ragusa, J. M.↗

STS-79 Space Shuttle Mission Report

STS-79 was the fourth of nine planned missions to the Russian Mir Space Station. This report summarizes the activities such as rendezvous and docking and spaceborne experiment operations. The report also discusses the Orbiter, External Tank (ET), Solid Rocket Boosters (SRB), Reusable Solid Rocket Motor (RSRM) and the space shuttle main engine (SSME) systems performance during the flight. The primary objectives of this flight were to rendezvous and dock with the Mir Space Station and exchange a Mir Astronaut. A double Spacehab module carried science experiments and hardware, risk mitigation experiments (RME's) and Russian logistics in support of program requirements. Additionally, phase 1 program science experiments were carried in the middeck. Spacehab-05 operations were performed. The secondary objectives of the flight were to perform the operations necessary for the Shuttle Amateur Radio Experiment-2 (SAREX-2). Also, as a payload of opportunity, the requirements of Midcourse Space Experiment (MSX) were completed.

Fricke, Robert W., Jr.↗

Solid oxide electrolysis cell and stack testing best practices

Solid oxide electrolyzer (SOE) technology is an emerging method for hydrogen production, noted for its superior electrical efficiency. Despite the significant progress made in recent years, the broad development of SOE technology is often constrained by the necessary and extensive "skill of the craft" required to successfully test simple single cell test articles. This may be linked to the dearth of practical and pragmatic guidance within the literature for safe, reliable, and performant test equipment and test procedures. Researchers at the Idaho National Laboratory (INL) have been actively testing SOEs ranging from button cells to stacks up to 500 kW, in collaboration with industry and other national laboratories. Based on operational experience, INL has developed system design procedures that ensure safe and reliable operation of SOE systems with the level of support required for each test. This paper presents key aspects of SOE stack and system testing, including safe design procedures, balance of plant components design, and specific implementations at INL. Practical design details of reactants, heat, and power management are presented along with lessons learned from the SOE test facility operations at INL.

08 HYDROGEN↗

Rotorcraft In-Flight Simulation Research at NASA Ames Research Center: A Review of the 1980's and plans for the 1990's

A new flight research vehicle, the Rotorcraft-Aircrew System Concepts Airborne Laboratory (RASCAL), is being developed by the U.S. Army and NASA at ARC. The requirements for this new facility stem from a perception of rotorcraft system technology requirements for the next decade together with operational experience with the Boeing Vertol CH-47B research helicopter that was operated as an in-flight simulator at ARC during the past 10 years. Accordingly, both the principal design features of the CH-47B variable-stability system and the flight-control and cockpit-display programs that were conducted using this aircraft at ARC are reviewed. Another U.S Army helicopter, a Sikorsky UH-60A Black Hawk, was selected as the baseline vehicle for the RASCAL. The research programs that influence the design of the RASCAL are summarized, and the resultant requirements for the RASCAL research system are described. These research programs include investigations of advanced, integrated control concepts for achieving high levels of agility and maneuverability, and guidance technologies, employing computer/sensor-aiding, designed to assist the pilot during low-altitude flight in conditions of limited visibility. The approach to the development of the new facility is presented and selected plans for the preliminary design of the RASCAL are described.

Aiken, Edwin W.↗

Geostationary Operational Environmental Satellite (GOES)-8 mission flight experience

The Geostationary Operational Environmental Satellite (GOES)-8 spacecraft was launched on April 13, 1994, at 06:04:02 coordinated universal time (UTC), with separation from the Atlas-Centaur launch vehicle occurring at 06:33:05 UTC. The launch was followed by a series of complex, intense operations to maneuver the spacecraft into its geosynchronous mission orbit. The Flight Dynamics Facility (FDF) of the Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) was responsible for GOES-8 attitude, orbit maneuver, orbit determination, and station acquisition support during the ascent phase. This paper summarizes the efforts of the FDF support teams and highlights some of the unique challenges the launch team faced during critical GOES-8 mission support. FDF operations experience discussed includes: (1) The abort of apogee maneuver firing-1 (AMF-1), cancellation of AMF-3, and the subsequent replans of the maneuver profile; (2) The unexpectedly large temperature dependence of the digital integrating rate assembly (DIRA) and its effect on GOES-8 attitude targeting in support of perigee raising maneuvers; (3) The significant effect of attitude control thrusting on GOES-8 orbit determination solutions; (4) Adjustment of the trim tab to minimize torque due to solar radiation pressure; and (5) Postlaunch analysis performed to estimate the GOES-8 separation attitude. The paper also discusses some key FDF GOES-8 lessons learned to be considered for the GOES-J launch which is currently scheduled for May 19, 1995.

Noonan, C. H.↗

New Opportunities with the Advanced Communications Technology Satellite (ACTS)

Various issues associated with the Advanced Communications Technology Satellite (ACTS) are presented in viewgraph form. Specific topics include: 1) ACTS program review; 2) Spot beam locations; 3) Key ACTS technologies; 4) ACTS accomplishments; 5) Experiments operations; 6) Inclined orbit opportunity, mission and impact; 7) Modifications summary; 8) Experiment opportunity, categories, processes; and 9) Recent and ongoing activity.

Bauer, Robert↗

Current NASA In-Situ Resource Utilization (ISRU) Strategic Vision

Perform development to TRL 5/6 through ground demonstration in relevant environment. Perform component/subscale subsystem flight demonstrations on small/mid-size landers. Assess and characterize water in volatiles in lunar polar shadowed regions and craters. Reduce risk of ISRU for mission critical consumables through Integrated End-to-End Flight Demonstrations (pilot scale). Establish initial Human Mission Scale production capability to promote sustainable operations and as anchor for commercial involvement. Identify and characterize polar region environment and resources/volatiles for Science and future Exploration/Commercial applications. Provide ground-truth physical, mineral, and water/volatile resource characteristic information at multiple locations to provide geological context for science-focused theories of volatile placement and initial mining assessments.Test technologies and processes to reduce risk of future extraction/mining systems. Quantify concentration and lateral/vertical distribution of resources/volatiles. Utilize ISRU capabilities to Extend and Enhance Human Lunar Exploration Missions. Provide oxygen (and fuel) to enable reusable human lunar lander (10+ MT/yr O2)Process carbon-based crew waste/trash into gases and propellants; can reduce logistics while minimizing public perception issues (alternative is conversion to radiation shielding). Scavenge unused propellants and hardware from spent landers. Metal extraction from regolith as feedstock for in situ and in space manufacturing demonstrations. Civil engineering and construction aimed at future outpost/infrastructure build-up. Develop and Demonstrate ISRU for Human Mars Missions. ISRU for propellant production (10-15 MT/yr); Liquefy, store, transfer, and refuel ascent vehicle. Use Moon for operational experience and mission validation for Mars: Pre-deployment & remote activation and operation without crew. Storing and transferring mission consumables Landing crew with empty tanks with ISRU propellants already made and waiting. Support/Promote Commercialization of Space. Large scale polar ice mining (100+ MT/yr water)O2/H2 propulsion for landers/cis-lunar transportation with surface and in space depots. In situ construction and energy expansion at mining and human outpost site(s). ISRU Ground Development. Develop and advance ISRU technologies to enable acquisition of resources and processing into mission consumables. Utilize Multi-center collaboration with a portfolio that includes internal NASA work, external contracts, and collaborative agreements/partnerships. Where appropriate, develop lunar ISRU components and subsystems with a Mars-forward application. Engage industry through public-private partnerships to lay the foundation for long-term lunar and space economic development. Spin-in/spin-out technologies for terrestrial applications and industry (mining, oil & gas, alternative energy, construction). Flight Demonstration Path to Operational ISRU. Utilize small demonstrations with near off-the-shelf hardware to obtain critical information quickly on lunar resources and operations. Demonstrate critical technologies and processes that interact with lunar materials and environments. Perform 'pilot plant' demonstrations at architecture relevant scales and durations to reduce the risk for ISRU-provided products for critical human mission applications.

In-situ Resource Utilization↗

NASA Engineering and Safety Center Lunar Rover Design Concepts Assessments

Mass is a significant risk to programs and projects as they transition from formulation to implementation, especially in larger human space systems where delivery mass or volume can be a constrained commodity. • Concepts developed without an adequate systems-engineering basis, including design and operations experience, may miss significant functionality and subsequent mass required for integration or operations. • Further uncertainty can be associated with not fully understanding design best practices and standards that drive mass, such as design for minimum risk or fault tolerance.1 • Finally, the appropriate systems engineering mass properties management rigor and technical discipline insight are required to set the mass baseline, including appropriate mass growth allowance (MGA) to ensure program success. Mass is a key quantity that should be constantly monitored by the systems engineer and the program/project management stakeholder to ensure mission compatibility throughout the project life cycle. In addition, mass is a key programmatic performance metric monitored by the NASA Chief Financial Officer for current and future program cost estimating. NASA Exploration Systems sought an assessment of reasonableness with respect to different potential rover concepts that balances mass needs and human-class cargo lander capabilities. Appropriate systems engineering mass properties management rigor and technical discipline insight were used, and are required to set the mass baseline, including appropriate MGA to ensure program success. Two independent Lunar rover concepts were evaluated, with a goal to understand concept credibility and the Lunar rover designs potential extensibility for Mars surface operations. A notional generic rover concept is shown in Figure 1.

Systems Engineering↗