Search NASA⌕ Search

SEARCH · Search NASA

Results for “POWER LINES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Design and Evaluation of a Clock Multiplexing Circuit for the SSRL Booster Accelerator Timing System - Oral Presentation [Slides]

SPEAR3 is a 234 m circular storage ring at SLAC’s synchrotron radiation facility (SSRL) in which a 3 GeV electron beam is stored for user access. Typically the electron beam decays with a time constant of approximately 10hr due to electron lose. In order to replenish the lost electrons, a booster synchrotron is used to accelerate fresh electrons up to 3GeV for injection into SPEAR3. In order to maintain a constant electron beam current of 500mA, the injection process occurs at 5 minute intervals. At these times the booster synchrotron accelerates electrons for injection at a 10Hz rate. A 10Hz 'injection ready' clock pulse train is generated when the booster synchrotron is operating. Between injection intervals-where the booster is not running and hence the 10 Hz ‘injection ready’ signal is not present-a 10Hz clock is derived from the power line supplied by Pacific Gas and Electric (PG&E) to keep track of the injection timing. For this project I constructed a multiplexing circuit to 'switch' between the booster synchrotron 'injection ready' clock signal and PG&E based clock signal. The circuit uses digital IC components and is capable of making glitch-free transitions between the two clocks. This report details construction of a prototype multiplexing circuit including test results and suggests improvement opportunities for the final design.

43 PARTICLE ACCELERATORS↗

Materials and Additive Manufacturing for Energy Efficiency in Wind Turbine and Aircraft Industries

The purpose of this project was to develop surface treatments which will inhibit the formation of ice on turbine blades and propellers. ORNL worked with Piedmont Propulsion Systems, LLC and First Aviation Services Inc. to demonstrate a new surface treatment for two primary markets, aviation and wind turbines, as well as secondary markets such as power lines, bridges, boats, roofs and antennas among others. Exploring alternative surface treatments for wind turbines will provide anti-icing properties and erosion/abrasion prevention properties similar to those for aviation applications. A series of superhydrophobic coating materials was synthesized and successfully applied on anti-ice tape materials that could be used in a wide range of wind turbine and aviation applications to prevent ice accumulation. The coatings developed in this project were based on superhydrophobic particles of different geometries and sizes that were homogeneously dispersed in polymeric binders. The superhydrophobic features of the coatings are volumetric and their abrasion resistance was evaluated. Future research will involve the demonstration of anti-icing properties of the surface treatment developed in this project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Invasive Plant Management Plan for the Oak Ridge Reservation

Invasive non-native plant species have become one of the greatest ecological threats across the country and around the world. Actively managing incursions of invasive plants is crucial to maintaining ecosystems, protecting natural resources, and ensuring proper function of facilities and their support infrastructures, power lines and other utility rights-of-way (ROWs), communications structures, roadways, and waterways. Invasive plants can threaten cultural resources, public and private properties, forests, wetlands, and other natural areas through increased risks of fire and storm damage, as well as decrease native plant diversity, particularly disrupting vital habitats of threatened and endangered species, both plant and animal. In 2000, the Federal Plant Protection Act came into effect. Under this Act, federal agencies are required to develop and coordinate an undesirable plants management program for control of invasive plants on federal lands under each agency’s respective jurisdiction. The agency must adequately fund the undesirable plants management program using an Integrated Pest Management Plan. Additionally, each agency is required to implement cooperative agreements with local and state agencies, as well as other federal agencies, to manage undesirable plants on federal lands under the agency’s jurisdiction. The US Department of Energy (DOE) takes its responsibility for addressing invasive and undesirable plant issues very seriously. Many DOE sites have programs to control invasive pest plant species. DOE has taken a proactive stance toward invasive plant control, and the Invasive Plant Management Plan— created to meet regulatory requirements of federal laws, executive orders, presidential memos, contracts, and agreements on DOE’s Oak Ridge Reservation (ORR)—has been in effect since 2004. This document represents the second revision of this plan.

59 BASIC BIOLOGICAL SCIENCES↗

Requirements for Robust DERMS Control and Cyber Attack Scenarios

A Distribution Management System (DMS) is responsible for monitoring and maintaining the health of a distribution grid. Common DMS applications include fault location isolation and service restoration, on-line power flow (OLPF), volt/VAR optimization (VVO), and switch order management. These systems were developed primarily in the area of top-down, unidirectional power flow, with large centralized generating plants moving electricity through the transmission grid and into the distribution grid from and thence to consumers. The recent and ongoing addition of distributed energy resources (DER) to the grid, including rooftop and community solar and wind, means that power is now flowing into the distribution grid from the edge, which complicates the functioning of the DMS. To ameliorate this problem, DMS use distributed energy resource management systems (DERMS) to control DER such as solar inverters. DERMS comprise software management tools that allow management and near real-time control of an array of DER. DERMS control devices and grid services including smart inverters, capacitor banks, on-load tap changes, voltage regulators, and customer loads.

14 SOLAR ENERGY↗

Natural Resources Assessment for the SNS Second Target Station, Oak Ridge, Tennessee

The US Department of Energy’s Oak Ridge National Laboratory (ORNL) is a leading institution in advanced materials, supercomputing, neutrons, and nuclear science. As a research laboratory managed by UT-Battelle, LLC for DOE, ORNL has national priorities in energy, security, and scientific discovery that necessitate facility improvements and expansions. DOE is also committed to environmental stewardship. The laboratory is located on the ~32,000-acre Oak Ridge Reservation (ORR), much of which is categorized as a National Environmental Research Park and a state Wildlife Management Area. DOE works with the Tennessee Wildlife Resources Agency (TWRA), Tennessee Department of Environment and Conservation (TDEC), US Fish and Wildlife Service (USFWS), US Department of Agriculture, and other agencies to serve as an effective steward of the ORR. Accordingly, project managers must conform to environmental regulations, agreements, and policies at the federal, state, and institutional levels. Per 40 CFR (Code of Federal Regulations) 1508.14, potential effects on research and science education on the National Environmental Research Park represent potential impacts of federal actions. Moreover, federal actions that affect the quantity and quality of hunting opportunities and deer reduction harvest on the Oak Ridge Wildlife Management Area must be considered whenever other aspects of the human environment (as defined by NEPA) are affected. The Spallation Neutron Source (SNS) is a premiere facility at ORNL that provides advanced capabilities in neutron scattering to promote new discoveries and research opportunities in material sciences, physics, chemistry, biological sciences, and others. A conceptual design for a Second Target Station (STS) has been in consideration for several years. The STS is intended to complement and enhance existing ORNL capabilities, notably research and exploration of complex materials. The proposed STS will involve development of existing natural areas on the ORR, which might contain sensitive resources that require mitigation or avoidance in accordance with existing policies and regulation. This report summarizes current knowledge of natural and cultural resources within the STS project area. At the time of this report, the proposed STS project consisted of an operations area comprising 55.4 acres (22.4 ha) and a total review area for potential construction comprising ~224 acres (90.6 ha). The review area is located primarily within forested natural areas of the ORR with minor development in the form of power-line rights-of-way and secondary/graveled roads (Figure 1). The primary goal was to evaluate potential effects on sensitive resources that might result from development of the STS. In addition to onthe-ground surveys during summer 2009 and fall 2019 to summer 2020 by ORNL Natural Resources Management Program and Aquatic Ecology Group staff, this report makes use of historical (pre-1995) and contemporary (1995 to present) data from additional confirmed sources (e.g., TDEC). Likewise, forest conditions were compiled primarily from a 2013 forest inventory effort for Forest Management Compartment 17 and supplemented with limited ground observations in 2019. The individuals who obtained and compiled the data that are presented here are familiar with and routinely assess sensitive resources on the ORR.

54 ENVIRONMENTAL SCIENCES↗

Geothermal Resource Potential Assessment White Pine County, Nevada, NBMG Report 55

Geothermal resources can potentially contribute toward the renewable energy portfolio of White Pine County (WPC) in two ways: first through the direct conversion of heat energy into electricity, and the second by way of direct-use applications in which thermal energy is used as a source of heat for buildings, greenhouses, and related structures. Several known geothermal areas within WPC lie proximal to the Southwest Intertie power line currently under construction. A potential source of electricity could come from conventional geothermal systems associated with young faults and regions of active crustal deformation. These systems have a total installed capacity in the Great Basin region of nearly 1,000 MWe. White Pine County hosts several geothermal systems of this type, but none are currently producing electricity. White Pine County has relatively low rates of crustal deformation relative to western NV or the Wasatch region of Utah (e.g., faulting accommodating crustal extension). However, based on a review of the geology in the region, we conclude that sustained and reasonable exploration efforts could result in the discovery and development of one or more electricity-grade geothermal systems, with potential generation capacity at each system in the range of 1–20 MWe. In addition, a new and unproven type of potential geothermal resource termed “deep stratigraphic reservoirs” or “hot sedimentary aquifers” has recently been proposed in the western United States. White Pine County, and in particular, the northern Steptoe Valley, has some of the most promising potential for electricity generation from this type of reservoir in the United States. Preliminary calculations suggest that as much as 500 MWe of baseload electricity in the northern Steptoe Valley could be produced from this type of reservoir using wells reaching depths of 2 to 4 km. The economic feasibility remains unproven, but initial estimates are encouraging. Based on observed surface temperatures and flow rates of springs, several geothermal systems in WPC also have the potential for direct use, including the heating of buildings and greenhouses. Such uses could reduce the consumption of electricity generated from fossil fuels and could lead to economic expansion by extending the growing season for certain agricultural products and reducing utility costs.

15 GEOTHERMAL ENERGY↗

Olympus System Backplane Definition

The purpose of this document is to define the backplane of the Olympus firing system, a modular system based on SpaceWire communication between modules. The backplane provides the connection between the modules, controller (embedded in the front module), the SpaceWire router, and an alternative switch. Those connections include SpaceWire links, interlocks, a key, a dead-man switch (DMS)/charge, timing lines, power distribution, geographical addresses, and communication to the human-machine interface (HMI). This backplane is based on the VMEBus International Trade Association (VITA) 46 Specification (VPX) and OpenVPX standards for a 3U backplane. Unless otherwise specified, those standards apply for signal definitions and mechanical specifications.

42 ENGINEERING↗

Evaluation of Clamshell Current Coupler for Online Frequency Domain and Spread Spectrum Time Domain Reflectometry to Detect Anomalies in Energized Cables

This document describes adaptation and evaluation of a clamshell inductive current coupler for online reflectometry testing (both frequency domain reflectometry and spread spectrum time domain reflectometry) to evaluate cable insulation degradation and anomalies. Safety-critical nuclear power plant cables were initially qualified for 40 years. However, as plants extend their operating licenses to 60 and 80 years, justification for continued safe operation includes test and monitoring programs. These will become more important as the industry moves to condition based qualification programs. Cable test programs traditionally involve manual interventions to disconnect cables, perform one or several tests, then reconnect the systems, usually during refueling outages occurring only every 18 to 24 months. This poses an operational burden that can be minimized by online testing or periodic connection to a coupler that may remain on the cable of interest or be clamped onto the cable without de-termination. This work investigates the adaptation of a clamshell inductive current coupler for either frequency domain reflectometry or spread-spectrum time domain reflectometry. The reflectometry test instrument injects a broad-band chirp or pseudo-noise signal onto a cable conductor and monitors for a reflected signal indicative of an impedance change caused by a damage condition. The instrument maximum input signal levels are typically 10 to 30 volts or less and the instruments will be damaged if subjected to 60 Hz power line voltages of 110, 220, or 480 VAC. One commercial spread-spectrum time domain reflectometry system has circuitry suitable for voltages up to 1 kV, but typical reflectometry tests are performed on de-energized cables. The clamshell inductive coupler provides >60 dB of 60 Hz attenuation with less than 10 dB loss in the 1-500 MHz test bandwidth of interest. An energized cable was successfully tested up to 6.7 kVp-p and frequency response plots imply that the tests could be extended to 10 kV or higher energized levels.

36 MATERIALS SCIENCE↗

Regulatory and Technical Challenges and Barriers to Adoption of Distributed Wind Energy in Agricultural Settings

Distributed wind (DW) energy development can benefit agricultural landowners through the possibility of improved resilience of electrical service from onsite generation and associated economic benefits. DW development currently faces technical and regulatory challenges related to interconnection of projects with distribution or transmission equipment on the main electrical grid. A review was conducted of barriers to adoption for agricultural DW projects and potential roles of various stakeholders in addressing them. One major barrier is that the unique characteristics of wind energy generation such as its variability and intermittency, may require upgrades for the whole power line, which can lead to prohibitive cost burdens on individual interconnection customers. Another barrier is compliance with federal, state, or utility-level regulations that require technology-agnostic, industry-standard equipment that is often not technically realistic for DW projects. DW developers, grid infrastructure owner-operators, regulators, and standards publishers can work together to address these challenges and facilitate DW development.

17 WIND ENERGY↗

Report on Non-Contact DC Electric Field Sensors

This document reports on methods used to measure DC electrostatic fields in the range of 100 to 4000 V/m using a non-contact method. The project for which this report is written requires this capability. Non-contact measurements of DC fields is complicated by the effect of the accumulation of random space-charges near the sensors which interfere with the measurement of the field-of-interest and consequently, many forms of field measurements are either limited to AC measurements or use oscillating devices to create pseudo-AC fields. The intent of this document is to report on methods discussed in the literature for non-contact measurement of DC fields. Electric field meters report either the electric field expressed in volts per distance or the voltage measured with respect to a ground reference. Common commercial applications for measuring static (DC) electric fields include measurement of surface charge on materials near electronic equipment to prevent arcing which can destroy sensitive electronic components, measurement of the potential for lightning to strike buildings or other exposed assets, measurement of the electric fields under power lines to investigate potential health risks from exposure to EM fields and measurement of fields emanating from the brain for brain diagnostic purposes. Companies that make electric field sensors include Trek (Medina, NY), MKS Instruments, Boltek, Campbell Systems, Mission Instruments, Monroe Electronics, AlphaLab, Inc. and others. In addition to commercial vendors, there are research activities continuing in the MEMS and optical arenas to make compact devices using the principles applied to the larger commercial sensors.

42 ENGINEERING↗

Wetland and Sensitive Species Survey Report for Y-12: Proposed Uranium Processing Facility (UPF)

This report summarizes the results of an environmental survey conducted at sites associated with the proposed Uranium Processing Facility (UPF) at the Y-12 National Security Complex in September-October 2009. The survey was conducted in order to evaluate potential impacts of the overall project. This project includes the construction of a haul road, concrete batch plant, wet soil storage area and dry soil storage area. The environmental surveys were conducted by natural resource experts at ORNL who routinely assess the significance of various project activities on the Oak Ridge Reservation (ORR). Natural resource staff assistance on this project included the collection of environmental information that can aid in project location decisions that minimize impacts to sensitive resource such as significant wildlife populations, rare plants and wetlands. Natural resources work was conducted in various habitats, corresponding to the proposed areas of impact. Thc credentials/qualifications of the researchers are contained in Appendix A. The proposed haul road traverses a number of different habitats including a power-line right-of-way. wetlands, streams, forest and mowed areas. It extends from what is known as the New Salvage Yard on the west to the Polaris Parking Lot on the east. This haul road is meant to connect the proposed concrete batch plant to the UPF building site. The proposed site of the concrete batch plant itself is a highly disturbed fenced area. This area of the project is shown in Fig. 1. The proposed Wet Soils Disposal Area is located on the north side of Bear Creek Road at the former Control Burn Study Area. This is a second growth arce containing thick vegetation, and extensive dead and down woody material. This area of the project is shown in Fig. 2. Thc dry soils storage area is proposed for what is currently known as the West Borrow Area. This site is located on the west side of Reeves Road south of Bear Creek Road. The site is an early successional field. This area of the project is shown in Fig. 2.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Cultural Resource Investigations for a Multipurpose Haul Road on the Idaho National Laboratory

The U. S. Department of Energy, Idaho Operations Office is considering options for construction of a multipurpose haul road to transport materials and wastes between the Materials and Fuels Complex (MFC) and other Idaho National Laboratory (INL) Site facilities. The proposed road will be closed to the public and designed for limited year-round use. Two primary options are under consideration: a new route south of the existing T-25 power line road and an upgrade to road T-24. In the Spring of 2010, archaeological field surveys and initial coordination and field reconnaissance with representatives from the Shoshone-Bannock Tribes were completed to identify any resources that may be adversely affected by the proposed road construction and to develop recommendations to protect any listed or eligible for listing on the National Register of Historic Places. The investigations showed that 24 archaeological resources and one historic marker are located in the area of potential effects for road construction and operation south of the T-25 powerline road and 27archaeological resources are located in the area of potential effects for road construction and operation along road T-24. Generalized tribal concerns regarding protection of natural resources were also documented in both road corridors. This report outlines recommendations for additional investigations and protective measures that can be implemented to minimize adverse impacts to the identified resources.

54 ENVIRONMENTAL SCIENCES↗

Microgrid Assisted Design for Remote Areas

In this work, we present a three-stage multiobjective mixed-integer linear programming (MILP) for the optimal expansion planning and operation of isolated multienergy microgrids in remote areas. By selecting the optimal distributed generators (DGs) and energy storage systems (ESSs) mix selection, siting, sizing, and scheduling in the remote microgrid, the proposed model is targeted to minimize the annualized total cost of microgrids while enhancing the performance of the system, i.e., minimizing the voltage deviations and line power loss. To represent the electricity and heat flow between generation resources and various electrical, heating, and cooling loads in the isolated microgrid, linearized power flow, and heat flow constraints are employed in the proposed optimization model. The available capacity of DGs and ESSs are modeled as discrete constants instead of continuous variables for practical purpose. Numerical simulation results on a remote microgrid consisting of DGs, ESSs, and various loads validate the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

3D Printing of Cement-Based Materials Using Seawater for Simulated Marine Environments

Global demand for adaptable and rapidly deployable construction solutions in offshore, coastal, and fluvial environments continues to rise, driven by pressing needs to develop energy platforms, improve coastal resilience, and support emergency response in the face of natural disasters. Increased investment in human-made coastal infrastructure, such as piers, support structures for power lines, offshore wind farms, and seawall protection systems, further underscores this trend. This study investigates the development of printable concrete mixtures for underwater environments using seawater as a replacement for freshwater, using a 3D printing syringe-based extrusion system. The effect of seawater addition and the printing medium (in air vs. underwater) was assessed via rheological and mechanical performance characterization. The results indicate rheological properties are favorable for seawater adoption by producing mixtures with higher yield stress and viscosity with the same levels of admixtures used for freshwater. Seawater-based mixtures demonstrated superior dimensional stability compared to freshwater counterparts, maintaining cross-sectional geometry, while compressive strength results showed no statistical differences between in-air and underwater samples. However, flexural strength was significantly influenced by geometry and printing medium. These findings establish critical rheological parameters for printable underwater mixtures and highlight the need for optimized curing strategies and layer bonding techniques to improve interfacial strength in underwater 3D printing applications.

36 MATERIALS SCIENCE↗

Probes for measuring noise current in an electronic cable

Electromagnetic interference in deep-space network receiver is often caused by stray coupling from power lines. These stray signals create potential differences between ground terminals, which leads to excessive noise in receiver circuits. Pair of probes detect and measure noise currents in conductors.

Lundy, C. C.↗