Search NASA⌕ Search

SEARCH · Search NASA

Results for “PROGRESS REPORT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Foothill Transit Battery Electric Bus Progress Report (Jul-Dec 2019)

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy’s National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through June 2019. This report extends the data analysis through December 2019. The data period focus of this report is July 2019–December 2019. NREL plans to publish progress reports on the Foothill Transit fleet every 6 months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Foothill Transit Agency Battery Electric Bus Progress Report. Data Period Focus: Jan. 2020 through June 2020

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through December 2019. This report extends the data analysis through June 2020. The data period focus of this report is January 2020-June 2020. NREL plans to publish progress reports on the Foothill Transit fleet every 6 months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Foothill Transit Agency Battery Electric Bus Progress Report, Data Period Focus: Jan. 2017 through Dec. 2017

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through December 2016. This report extends the data analysis through December 2017. NREL plans to publish progress reports on the Foothill Transit fleet every six months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Environmental ISR (Quarterly Progress Report Q3 FY19 April-June 2019)

Progress have been good on both projects. On the subsurface radionuclide project, graduate student, Emily Tran, submitted our first joint manuscript resulting from this collaboration to Water Resources. The manuscript covers batch and flow through experiments using radionuclides with and without bentonite colloids through a naturally fractured chalk rock. Solutions used were collected from a field site in Israel with high ionic strength and filtered prior to using in the experiment. Results show that the bentonite colloids are unstable under these high ionic strengths in carbonate rock in Israel. The U is not significantly eluted with or without bentonite colloids and cerium precipitates as a mobile colloid in the absence of colloids.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Nimbus - A progress report.

Flight accomplishments of Nimbus satellites and progress in meteorological spacecraft observatory systems since program initiation

Huston, W. B.↗

Quarterly Technical Progress Report Piperazine Advanced Stripper (PZAS™) Front End Engineering Design

EXECUTIVE SUMMARY This document summarizes the status of Cooperative Agreement DE-FE0031844, “Piperazine Advanced Stripper (PZAS™) Front-End Engineering Design,” during the reporting period of January 1 through March 31, 2020. The objective of this project is to develop accurate installed costs by conducting a Front-End Engineering Design (FEED) of PZAS™ at Golden Spread Electric Cooperative’s (GSEC) Mustang Station located in Denver City, TX. Complementary benefits include positioning the technology for a commercial project with the 45Q tax credits, qualifying PZAS™ for use on a Natural Gas Combined Cycle (NGCC) Cogen facility, and to provide cost detail to optimize PZAS™ and help guide R&D of second-generation solvent CO2 capture technologies. Results from the FEED will be used to evaluate the economic feasibility of the process at Mustang Station. This project is funded by the U.S. DOE National Energy Technology Laboratory under the aforementioned Cooperative Agreement. Exxon, Total, Chevron, UOP-Honeywell, and the University of Texas (UT) are project co-funders. AECOM and Trimeric are project team members; UT is the prime contractor. Summary of Progress Cooperative Agreement DE-FE0031844 was established in October 2019. The current reporting period, January 1 through March 31, 2020, is the second technical progress reporting period for the project. Several milestones were accomplished during this reporting period, including: • Kickoff Meeting with DOE on February 3, 2020. • Kickoff Meeting with GSEC on March 30, 2020. (Note: Due to Covid-19 travel restrictions and shelter-in-place guidelines, the kickoff meeting was conducted remotely via videoconferencing. See attached notes from that telecon.) • Updated Project Management Plan March 2020, submitted with this quarterly report Other activities during the quarter included progress on contracting and other legal agreements (e.g., non-disclosure agreements), internal kickoff meetings at both AECOM and Trimeric, and development of a Technical Implementation Plan (TIP). The TIP will help the team to make critical, early process decisions and, ultimately, to develop a project and process design basis. Note that all agreements between project team participants are complete as of this submittal, except the vendor agreement with Kiewit (steam cycle modeling). Plans for Next Reporting Period Activities during the next reporting period (April 1, 2020 through June 30, 2020) include: the completion of the Project Design Basis and progress towards the Process Design Basis/Process Design Package (PDP). The Project Design Basis is due as a deliverable and milestone during the next reporting period.

Rochelle, Gary T.↗

A progress report - Induction plasma simulation of the GCNR.

Significant progress has been made in the design, construction and operation of induction coupled devices which simulate the open cycle Gas Core Nuclear Rocket. These devices incorporate solid feed of the plasma forming material (uranium and uranium simulating materials), permeable walls, seeding of the propellant, and transpiration cooled, choked flow nozzles. Operating parameters and performance data of devices employing these design features are discussed. A uranium plasma experiment is included. In addition, operating data of several devices which compare theoretical and actual performance at a variety of powers, pressures, frequencies, and sizes are discussed.

Vogel, C. E.↗

Use of graphics in decision aids for telerobotic control: (Parts 5-8 of an 8-part MIT progress report)

Four separate projects recently completed or in progress at the MIT Man-Machine Systems Laboratory are summarized. They are: a decision aid for retrieving a tumbling satellite in space; kinematic control and graphic display of redundant teleoperators; real time terrain/object generation: a quad-tree approach; and two dimensional control for three dimensional obstacle avoidance.

Sheridan, Thomas B.↗

The 1990 progress report and future plans

This document describes the progress and plans of the Artificial Intelligence Research Branch (RIA) at ARC in 1990. Activities span a range from basic scientific research to engineering development and to fielded NASA applications, particularly those applications that are enabled by basic research carried out at RIA. Work is conducted in-house and through collaborative partners in academia and industry. Our major focus is on a limited number of research themes with a dual commitment to technical excellence and proven applicability to NASA short, medium, and long-term problems. RIA acts as the Agency's lead organization for research aspects of artificial intelligence, working closely with a second research laboratory at JPL and AI applications groups at all NASA centers.

Friedland, Peter↗

A progress report on grazing incidence optics fabrication and evaluation

The progress being made on a mirror array telescope for high energies (MARTHE) project is reported. As a first step, small mirror flats and full-size Wolter I mirrors are produced that are lacquer coated (mandrels) and then coated with gold or palladium. The up-to-date results of fabricating and testing these mirrors are presented. Currently, results can be provided on the micro-roughness, marco-figure, X-ray scattering, and reflectivity up to 8 keV from flats and Wolter I mirrors as well as optical measurements of the flats.

Teague, Peter F.↗

Memorandum of Understanding for Hydropower: Two-Year Progress Report

On March 24, 2010, the Department of the Army (DOA) through the U.S. Army Corps of Engineers (USACE or Corps), the Department of Energy, and the Department of the Interior signed the Memorandum of Understanding (MOU) for Hydropower. The purpose of the MOU is to “help meet the nation’s needs for reliable, affordable, and environmentally sustainable hydropower by building a long-term working relationship, prioritizing similar goals, and aligning ongoing and future renewable energy development efforts.” This report documents efforts so far.

13 HYDRO ENERGY↗

Lake Roosevelt White Sturgeon Recovery Project : Annual Progress Report, January 2003 – March 2004.

This report summarizes catch data collected from white sturgeon Acipenser transmontanus in Lake Roosevelt during limited setlining and gill netting activities in the fall of 2003, and documents progress toward development of a U.S. white sturgeon conservation aquaculture program for Lake Roosevelt. From 27-30 October, 42 overnight small mesh gill net sets were made between Marcus and Northport, WA for a total catch of 15 juvenile white sturgeon (275-488 mm FL). All sturgeon captured were of Canadian hatchery origin. These fish had been previously released as sub-yearlings into the Canadian portion (Keenleyside Reach) of the Transboundary Reach of the Columbia River during 2002 and 2003. Most sturgeon (n=14) were caught in the most upstream area sampled (Northport) in low velocity eddy areas. Five fish exhibited pectoral fin deformities (curled or stunted). Growth rates were less than for juvenile sturgeon captured in the Keenleyside Reach but condition factor was similar. Condition factor was also similar to that observed in juvenile sturgeon (ages 1-8) captured in the unimpounded Columbia River below Bonneville Dam between 1987-92. From 10-14 November, 28 overnight setline sets were made in the Roosevelt Reach between the confluence of the Spokane River and Marcus Island for a total catch of 17 white sturgeon (94-213 cm FL). Catch was greatest in the most upstream areas sampled, a distribution similar to that observed during a WDFW setline survey in Lake Roosevelt in 1998. The mean W{sub r} index of 110% for fish captured this year was higher than the mean W{sub r} of 91% for fish captured in 1998. Excellent fish condition hindered surgical examination of gonads as lipid deposits made the ventral body wall very thick and difficult to penetrate with available otoscope specula. Acoustic tags (Vemco model V16 coded pingers, 69 kHz, 48-month life expectancy) were internally applied to 15 fish for subsequent telemetry investigations of seasonal and reproductively motivated movements. In August 2003, three Vemco VR2 fixed station acoustic receivers, supplied by the UCWSRI Transboundary Telemetry Project, were deployed in the vicinities of Kettle Falls Bridge, Marcus Island, and Northport, WA. Data downloaded from these receivers through December 2003 confirmed the findings of a previous telemetry study that the Marcus area is an important overwintering habitat for white sturgeon. On 18 February 2004, juvenile white sturgeon (n=2,000) were transported from Kootenay Sturgeon Hatchery in British Columbia to WDFW Columbia Basin Hatchery (CBH) in Moses Lake, WA. Fish were reared at CBH to approximately 30 g and individually outfitted with PIT tags and scute marked. On 11 May 2004, fish were released into Lake Roosevelt in the vicinities of Kettle Falls Bridge, North Gorge, and Northport.

13 HYDRO ENERGY↗