Search NASA⌕ Search

SEARCH · Search NASA

Results for “Planning Scheduling Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Geomagnetic Sq variation at satellite altitudes - Is Sq correction important in Magsat data analysis

By a spherical harmonic expansion of the magnetic potential the geomagnetic Sq variation is shown to have peak-to-peak amplitudes of a few tens of nanotesla at 400 km altitude. It is shown, in particular, that for harmonics of degree n up to about 4, with which Sq can be well represented, the vertical component of the magnetic field at altitudes to about 400 km is virtually the same as on the ground. Even though the NASA's Magnetic Field Satellite (Magsat), scheduled for launch in September 1979, is planned to be placed in a twilight sun-synchronous orbit, Sq over certain areas of the earth can be of comparable magnitude as magnetic anomalies of geological origin sought in the data. Due consideration should be given to Sq as well as to the effects from magnetospheric sources in analyzing the Magsat data. The Sq effect is expected to be large during the period of Magsat operation which is near the predicted solar maximum.

Sugiura, M.↗

ATD-1 Avionics Phase 2: Post-Flight Data Analysis Report

This report aims to satisfy Air Traffic Management Technology Demonstration - 1 (ATD-1) Statement of Work (SOW) 3.6.19 and serves as the delivery mechanism for the analysis described in Annex C of the Flight Test Plan. The report describes the data collected and derived as well as the analysis methodology and associated results extracted from the data set collected during the ATD-1 Flight Test. All analyses described in the SOW were performed and are covered in this report except for the analysis of Final Approach Speed and its effect on performance. This analysis was de-prioritized and, at the time of this report, is not considered feasible in the schedule and costs remaining.

Scharl, Julien↗

Skylab rescue capability.

Skylab is an experimental manned space station scheduled to be placed into orbit in 1973. The Skylab system is to provide support for occupancy by a three-man crew for a total of up to five months. After an extensive study of various means by which rescue capability could be provided for Skylab, a plan was devised that provides coverage for those situations which are the most likely to arise. Rescue mission requirements are discussed together with a response-time analysis and the rescue vehicle configuration. The time-to-rescue will vary from 48 to 10 days, depending on the launch-readiness state at the time of a mission emergency.

Kleinknecht, K. S.↗

Comet Halley ephemeris uncertainties in 1985-1986

For the planned flyby missions to Comet Halley in March 1986, the comet's ephemeris uncertainties completely dominate the spacecraft-comet miss distance. In an effort to determine realistic Comet Halley ephemeris uncertainties, a statistical covariance analysis was conducted using the actual data in 1909-1910-1911 and simulated data in 1984-1985-1986. In 1985-1986, Comet Halley's ephemeris uncertainties are very sensitive to the comet's orbital position, the optical data noise, data schedule, and whether or not the old data is included in the orbital solutions. The comet's ephemeris uncertainties in March 1986 are relatively insensitive to reasonable center of light/center of mass offsets and also to possible radar data taken in late November 1985. Accurate Space Telescope observations made in early March 1986 might significantly improve upon the comet's position uncertainties for the various intercepting spacecraft.

Yeomans, D. K.↗

Monitoring the Variable Absorption in the Seyfert 1 Galaxy NGC 3783 with FUSE, HST, and Chandra Observations

The analysis of FUSE observations funded by this grant aims to understand the nature and origin of the absorbing gas in NGC 3783. We have used the simultaneous FUSE, HST, and Chandra data to determine the radial location, density, and ionization state of the absorbing gas and measure its evolution in ionization, column density, velocity, and coverage of the active nucleus. As part of this program, Dr. Gerard Kriss supplied advice and assistance in planning and scheduling the FUSE observations of NGC 3783 coordinated with the HST/STIS observations, and co-authored the publications listed in the bibliography and summarized below.

Kriss, Gerard A.↗

NASA RECON: Course development, administration, and evaluation. A research and development proposal

This proposal addresses the development, administration, and evaluation of a set of transportable, college-level courses to educate science and engineering students in the effective use of automated scientific and technical information storage and retrieval systems, and, in particular, in the use of the NASA RECON system. Chapter 1 presents a brief introduction. Chapter 2 identifies general and specific objectives, i.e., needs analysis, course development, course administration, and course evaluation. Chapter 3 proposes the methodology to be used in successfully accomplishing these objectives. Chapter 4 highlights expected results and product deliverables, and Chapter 5 presents the project evaluation plan to be followed. Chapter 6 is a brief overview of the institutional resources available at the proposing institutions, i.e., at the University of Southwestern Louisiana and at Southern University to support the project. Chapter 7 proposes a budget, time schedule, and management plan. Chapter 8 is a summary of the foregoing.

Dominick, Wayne D.↗

Grid resolution and solution convergence for Mars Pathfinder forebody

As part of the Discovery Program, NASA Plans to launch a series of probes to Mars. The Mars Pathfinder project is the first of this series with a scheduled Mars arrival in July 1997. The entry vehicle will perform a direct entry into the atmosphere and deliver a lander to the surface. Predicting the entry vehicle's flight performance and designing the forebody heatshield requires knowledge of the expected aerothermodynamic environment. Much of this knowledge can be obtained through computational fluid dynamic (CFD) analysis.

Nettelhorst, Heather L.↗

A Photo Album of Earth Scheduling Landsat 7 Mission Daily Activities

Landsat7 is a member of a new generation of Earth observation satellites. Landsat7 will carry on the mission of the aging Landsat 5 spacecraft by acquiring high resolution, multi-spectral images of the Earth surface for strategic, environmental, commercial, agricultural and civil analysis and research. One of the primary mission goals of Landsat7 is to accumulate and seasonally refresh an archive of global images with full coverage of Earth's landmass, less the central portion of Antarctica. This archive will enable further research into seasonal, annual and long-range trending analysis in such diverse research areas as crop yields, deforestation, population growth, and pollution control, to name just a few. A secondary goal of Landsat7 is to fulfill imaging requests from our international partners in the mission. Landsat7 will transmit raw image data from the spacecraft to 25 ground stations in 20 subscribing countries. Whereas earlier Landsat missions were scheduled manually (as are the majority of current low-orbit satellite missions), the task of manually planning and scheduling Landsat7 mission activities would be overwhelmingly complex when considering the large volume of image requests, the limited resources available, spacecraft instrument limitations, and the limited ground image processing capacity, not to mention avoidance of foul weather systems. The Landsat7 Mission Operation Center (MOC) includes an image scheduler subsystem that is designed to automate the majority of mission planning and scheduling, including selection of the images to be acquired, managing the recording and playback of the images by the spacecraft, scheduling ground station contacts for downlink of images, and generating the spacecraft commands for controlling the imager, recorder, transmitters and antennas. The image scheduler subsystem autonomously generates 90% of the spacecraft commanding with minimal manual intervention. The image scheduler produces a conflict-free schedule for acquiring images of the "best" 250 scenes daily for refreshing the global archive. It then equitably distributes the remaining resources for acquiring up to 430 scenes to satisfy requests by international subscribers. The image scheduler selects candidate scenes based on priority and age of the requests, and predicted cloud cover and sun angle at each scene. It also selects these scenes to avoid instrument constraint violations and maximizes efficiency of resource usage by encouraging acquisition of scenes in clusters. Of particular interest to the mission planners, it produces the resulting schedule in a reasonable time, typically within 15 minutes.

Potter, William↗

Estimation of Cometary Rotation Parameters Based on Camera Images

The purpose of the Rosetta mission is the in situ analysis of a cometary nucleus using both remote sensing equipment and scientific instruments delivered to the comet surface by a lander and transmitting measurement data to the comet-orbiting probe. Following a tour of planets including one Mars swing-by and three Earth swing-bys, the Rosetta probe is scheduled to rendezvous with comet 67P/Churyumov-Gerasimenko in May 2014. The mission poses various flight dynamics challenges, both in terms of parameter estimation and maneuver planning. Along with spacecraft parameters, the comet's position, velocity, attitude, angular velocity, inertia tensor and gravitatonal field need to be estimated. The measurements on which the estimation process is based are ground-based measurements (range and Doppler) yielding information on the heliocentric spacecraft state and images taken by an on-board camera yielding informaton on the comet state relative to the spacecraft. The image-based navigation depends on te identification of cometary landmarks (whose body coordinates also need to be estimated in the process). The paper will describe the estimation process involved, focusing on the phase when, after orbit insertion, the task arises to estimate the cometary rotational motion from camera images on which individual landmarks begin to become identifiable.

Spindler, Karlheinz↗

Aerospace Safety Advisory Panel Annual Report for 1999

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for the calendar year 1999.This was a year of notable achievements and significant frustrations. Both the Space Shuttle and International Space Station (ISS) programs were delayed.The Space Shuttle prudently postponed launches after the occurrence of a wiring short during ascent of the STS-93 mission. The ISS construction schedule slipped as a result of the Space Shuttle delays and problems the Russians experienced in readying the Service Module and its launch vehicle. Each of these setbacks was dealt with in a constructive way. The STS-93 short circuit led to detailed wiring inspections and repairs on all four orbiters as well as analysis of other key subsystems for similar types of hidden damage. The ISS launch delays afforded time for further testing, training, development, and contingency planning. The safety consciousness of the NASA and contractor workforces, from hands-on labor to top management, continues high. Nevertheless, workforce issues remain among the most serious safety concerns of the Panel. Cutbacks and reorganizations over the past several years have resulted in problems related to workforce size, critical skills, and the extent of on-the-job experience. These problems have the potential to impact safety as the Space Shuttle launch rate increases to meet the demands of the ISS and its other customers. As with last year's report, these work- force-related issues were considered of sufficient import to place them first in the material that follows. Some of the same issues of concern for the Space Shuttle and ISS arose in a review of the launch vehicle for the Terra mission that the Panel was asked by NASA to undertake. Other areas the Panel was requested to assess included the readiness of the Inertial Upper Stage for the deployment of the Chandra X-ray Observatory and the possible safety impact of electromagnetic effects on the Space Shuttle. The findings and recommendations in this report do not highlight any major, immediate issues that might compromise the safe pursuit of the various NASA programs. They do, however, cover concerns that the Panel believes should be addressed in the interest of maintaining NASA's excellent safety record.The Panel is pleased to note that remedial efforts for some of the findings raised are underway. Given appropriate funding and cooperative efforts among the Administration, the Congress and the various contractors, the Panel is convinced that safety problems can be avoided or solved resulting in lower risk for NASA's human space and aeronautics programs. Section II of this report contains specific findings and recommendations generated by Panel activities during the calendar year 1999. Section III presents more detailed information in support of these findings and recommendations. A current roster of Panel members, consultants, and staff is included as Appendix A. Appendix B contains NASA's response to the findings and recommendations from the 1998 annual report. It has been augmented this year to include brief explanations of why the Panel classified the NASA response as " open,""continuing," or "closed." Appendix C lists the fact-finding activities of the Panel in 1999.

Blomberg, Richard D.↗

Used Nuclear Fuel Management Using the Next Generation System Analysis Model

The U.S. Department of Energy (DOE) is leading the National effort to manage the back end of the nuclear fuel cycle, encompassing the safe transportation, storage/staging, and/or eventual disposal of used nuclear fuel (UNF) and high-level radioactive waste. The Next Generation System Analysis Model (NGSAM) is DOE’s discrete-event, agent-based simulation tool designed to model the full life cycle of UNF from reactor discharge to final disposal. NGSAM supports the DOE Office of Spent Fuel and High-Level Waste Disposition by enabling a detailed, scenario-based analysis of logistics, infrastructure, and shipping strategies. NGSAM replaces legacy models with a modern, flexible platform built on Repast Simphony and enhanced by the Process Analysis Tool. NGSAM simulates the movement and interaction of individual fuel assemblies with system components such as canisters, casks, railcars, and facilities. The model integrates with the Java Transportation Operations Model to plan and execute transportation scenarios, supporting both constrained and unconstrained resource allocation. Key features include customizable allocation and acceptance algorithms, detailed facility-level operations, and a Quick Edit tool for rapid scenario adjustments. NGSAM supports multimodal transportation modeling (e.g. rail, road, barge) and provides comprehensive cost, schedule, and infrastructure data. NGSAM utilizes data from sources such as DOE’s STANDARDS UNF database and DOE’s Stakeholder Tool for Assessing Radioactive Transportation, while also allowing user-defined inputs for scenario customization. NGSAM enables stakeholders to evaluate complex UNF management strategies, assess system performance under varying assumptions, and inform decision making for future infrastructure investments. Its modular architecture and integration with other Integrated Waste Management System tools make it a critical asset for planning the safe and efficient disposition of the Nation’s growing UNF inventory.

Craig, Brian [Argonne National Laboratory (ANL)]↗

Artificial Intelligence Research Branch future plans

This report contains information on the activities of the Artificial Intelligence Research Branch (FIA) at NASA Ames Research Center (ARC) in 1992, as well as planned work in 1993. These activities span a range from basic scientific research through engineering development to fielded NASA applications, particularly those applications that are enabled by basic research carried out in FIA. Work is conducted in-house and through collaborative partners in academia and industry. All of our work has research themes with a dual commitment to technical excellence and applicability to NASA short, medium, and long-term problems. FIA acts as the Agency's lead organization for research aspects of artificial intelligence, working closely with a second research laboratory at the Jet Propulsion Laboratory (JPL) and AI applications groups throughout all NASA centers. This report is organized along three major research themes: (1) Planning and Scheduling: deciding on a sequence of actions to achieve a set of complex goals and determining when to execute those actions and how to allocate resources to carry them out; (2) Machine Learning: techniques for forming theories about natural and man-made phenomena; and for improving the problem-solving performance of computational systems over time; and (3) Research on the acquisition, representation, and utilization of knowledge in support of diagnosis design of engineered systems and analysis of actual systems.

Stewart, Helen↗

Engineering America's Future in Space: Systems Engineering Innovations for Sustainable Exploration

The National Aeronautics and Space Administration (NASA) delivers space transportation solutions for America's complex missions, ranging from scientific payloads that expand knowledge, such as the Hubble Space Telescope, to astronauts and lunar rovers destined for voyages to the Moon. Currently, the venerable Space Shuttle, which has been in service since 1981, provides U.S. capability for both crew and cargo to low-Earth orbit to construct the International Space Station, before the Shuttle is retired in 2010, as outlined in the 2006 NASA Strategic Plan. I In the next decade, NASA will replace this system with a duo of launch vehicles: the Ares I Crew Launch Vehicle/Orion Crew Exploration Vehicle and the Ares V Cargo Launch Vehicle/Altair Lunar Lander. The goals for this new system include increased safety and reliability, coupled with lower operations costs that promote sustainable space exploration over a multi-decade schedule. This paper will provide details of the in-house systems engineering and vehicle integration work now being performed for the Ares I and planned for the Ares V. It will give an overview of the Ares I system-level test activities, such as the ground vibration testing that will be conducted in the Marshall Center's Dynamic Test Stand to verify the integrated vehicle stack's structural integrity against predictions made by modern modeling and simulation analysis. It also will give information about the work in progress for the Ares I-X developmental test flight planned in 2009 to provide key data before the Ares I Critical Design Review. Activities such as these will help prove and refine mission concepts of operation, while supporting the spectrum of design and development tasks being performed by Marshall's Engineering Directorate, ranging from launch vehicles and lunar rovers to scientific spacecraft and associated experiments. Ultimately, the work performed will lead to the fielding of a robust space transportation solution that will carry international explorers and essential payloads for sustainable scientific discovery beyond planet Earth.

Dumbacher, Daniel L.↗

Landsat 9: Status and Plans

The Landsat 9 mission, currently under development and proceeding towards a targeted launch in late 2020, will be very similar to the Landsat 8 mission, launched in 2013. Like Landsat 8, Landsat 9 is a joint effort between NASA and USGS with two sensors, the Operational Land Imager 2 (OLI-2), essentially a copy of the OLI on Landsat 8 and the Thermal Infrared Sensor 2 (TIRS-2), very similar to the TIRS on Landsat 8. The OLI-2, like OLI, provides 14-bit image data, though for Landsat 9, all 14 bits will be retained and transmitted to the ground. The focal plane modules to be used for OLI-2 were flight spares for OLI and are currently being retested by Ball Aerospace. Results indicate radiometric performance comparable to OLI. The TIRS was a class C instrument, with a 3-year design lifetime, and therefore had limited redundancy. TIRS-2 will be a class B instrument, with a 5-year design lifetime, like OLI (and OLI-2), necessitating design changes to increase redundancy. The stray light and Scene Select Mechanism (SSM) encoder problems observed on orbit with TIRS have also instigated a few design changes to TIRS-2. Stray light analysis and testing have indicated that additional baffles in the TIRS-2 optical system will suppress the out-of-field response. The SSM encoder problems have not been definitively traced to a route cause, though conductive anodic filament growth in the circuit boards is suspected. Improved designs for the encoder are being considered for TIRS-2. The spare Focal Plane Array (FPA) from TIRS is planned for use in TIRS-2; FPA spectral and radiometric performance testing is scheduled for September of this year at NASA's Goddard Space Flight Center.

Landsat↗

Assessing Relay Communications for Mars Sample Return Surface Mission Concepts

The Mars Sample Return (MSR) Campaign would be a 3-mission campaign concept supported by NASA and ESA to return samples from the Mars surface. MSR would, for the first time ever, present a need to communicate with multiple surface assets that are co-located on Mars in a coordinated effort to accomplish the unified objective of fetching, transporting, and returning samples from Mars. Currently, Mars surface assets relay data to and from Earth using a number of orbiters in what’s known as the Mars Relay Network (MRN). This network is characterized by a small number of surface assets distributed across the Martian globe and a larger number of orbiters to provide relay services. As of June 2020, there are two surface assets for which five orbiters are providing relay. During the MSR Campaign, there would be two rovers and a lander that all would require relay communication from a small number of Mars orbiters to meet the aggressive MSR timeline. The inversion of the current MRN paradigm, a system of many surface assets requiring relay and few orbiters to provide relay, necessitates the unique challenge of optimally allocating relay passes to maximize the operational capability of all assets. The allocation must consider a large number of trade variables including Mars asset operational requirements and Earth ground system constraints, including staffing schedules, operations planning across time zones, and more. To address these telecommunication challenges, the Mars Asset Relay Mission Link Allocation Design Environment (MARMLADE) tool was developed. It is a MATLAB-based tool to assign orbiter passes or Direct-From-Earth (DFE) links to each of the three surface assets and quantify the operational efficiency of each surface asset.MARMLADE uses a data set of simulated Mars relay orbiter geometry and telecommunication capabilities provided by JPL’s Telecom Orbit Analysis and Simulation Tool (TOAST) software to compute which asset should get each pass based on a series of heuristics and predictions of all assets’ states. Within MARMLADE, the user can provide inputs including the option for time-based pass splitting, fixed FWD data rate capabilities, DFE communication capabilities, and link parameters allowing for the assessment of complex operations and hardware trades using surface mission operational efficiency as a primary figure of merit. As the MSR mission concepts continue to mature, MARMLADE is being used to assess ability of all MSR elements to meet the surface mission timeline requirements and to provide relay link allocations to each of the MSR surface assets.This paper will describe the motivation and design of the MARMLADE tool and how it is being used to perform campaign and mission level trades, generate requirements, and support development of the MSR surface mission scenarios.

Lee, Charles↗

Tropical Rainfall Measuring Mission (TRMM) Precipitation Data and Services for Research and Applications

Precipitation is a critical component of the Earth's hydrological cycle. Launched on 27 November 1997, TRMM is a joint U.S.-Japan satellite mission to provide the first detailed and comprehensive data set of the four-dimensional distribution of rainfall and latent heating over vastly under-sampled tropical and subtropical oceans and continents (40 S - 40 N). Over the past 14 years, TRMM has been a major data source for meteorological, hydrological and other research and application activities around the world. The purpose of this short article is to inform that the NASA Goddard Earth Sciences Data and Information Services Center (GES DISC) provides TRMM archive and near-real-time precipitation data sets and services for research and applications. TRMM data consist of orbital data from TRMM instruments at the sensor s resolution, gridded data at a range of spatial and temporal resolutions, subsets, ground-based instrument data, and ancillary data. Data analysis, display, and delivery are facilitated by the following services: (1) Mirador (data search and access); (2) TOVAS (TRMM Online Visualization and Analysis System); (3) OPeNDAP (Open-source Project for a Network Data Access Protocol); (4) GrADS Data Server (GDS); and (5) Open Geospatial Consortium (OGC) Web Map Service (WMS) for the GIS community. Precipitation data application services are available to support a wide variety of applications around the world. Future plans include enhanced and new services to address data related issues from the user community. Meanwhile, the GES DISC is preparing for the Global Precipitation Measurement (GPM) mission which is scheduled for launch in 2014.

Liu, Zhong↗

NASA Tech Briefs, September 2006

Topics covered include: Improving Thermomechanical Properties of SiC/SiC Composites; Aerogel/Particle Composites for Thermoelectric Devices; Patches for Repairing Ceramics and Ceramic- Matrix Composites; Lower-Conductivity Ceramic Materials for Thermal-Barrier Coatings; An Alternative for Emergency Preemption of Traffic Lights; Vehicle Transponder for Preemption of Traffic Lights; Automated Announcements of Approaching Emergency Vehicles; Intersection Monitor for Traffic-Light-Preemption System; Full-Duplex Digital Communication on a Single Laser Beam; Stabilizing Microwave Frequency of a Photonic Oscillator; Microwave Oscillators Based on Nonlinear WGM Resonators; Pointing Reference Scheme for Free-Space Optical Communications Systems; High-Level Performance Modeling of SAR Systems; Spectral Analysis Tool 6.2 for Windows; Multi-Platform Avionics Simulator; Silicon-Based Optical Modulator with Ferroelectric Layer; Multiplexing Transducers Based on Tunnel-Diode Oscillators; Scheduling with Automated Resolution of Conflicts; Symbolic Constraint Maintenance Grid; Discerning Trends in Performance Across Multiple Events; Magnetic Field Solver; Computing for Aiming a Spaceborne Bistatic- Radar Transmitter; 4-Vinyl-1,3-Dioxolane-2-One as an Additive for Li-Ion Cells; Probabilistic Prediction of Lifetimes of Ceramic Parts; STRANAL-PMC Version 2.0; Micromechanics and Piezo Enhancements of HyperSizer; Single-Phase Rare-Earth Oxide/Aluminum Oxide Glasses; Tilt/Tip/Piston Manipulator with Base-Mounted Actuators; Measurement of Model Noise in a Hard-Wall Wind Tunnel; Loci-STREAM Version 0.9; The Synergistic Engineering Environment; Reconfigurable Software for Controlling Formation Flying; More About the Tetrahedral Unstructured Software System; Computing Flows Using Chimera and Unstructured Grids; Avoiding Obstructions in Aiming a High-Gain Antenna; Analyzing Aeroelastic Stability of a Tilt-Rotor Aircraft; Tracking Positions and Attitudes of Mars Rovers; Stochastic Evolutionary Algorithms for Planning Robot Paths; Compressible Flow Toolbox; Rapid Aeroelastic Analysis of Blade Flutter in Turbomachines; General Flow-Solver Code for Turbomachinery Applications; Code for Multiblock CFD and Heat-Transfer Computations; Rotating-Pump Design Code; Covering a Crucible with Metal Containing Channels; Repairing Fractured Bones by Use of Bioabsorbable Composites; Kalman Filter for Calibrating a Telescope Focal Plane; Electronic Absolute Cartesian Autocollimator; Fiber-Optic Gratings for Lidar Measurements of Water Vapor; Simulating Responses of Gravitational-Wave Instrumentation; SOFTC: A Software Correlator for VLBI; Progress in Computational Simulation of Earthquakes; Database of Properties of Meteors; Computing Spacecraft Solar-Cell Damage by Charged Particles; Thermal Model of a Current-Carrying Wire in a Vacuum; Program for Analyzing Flows in a Complex Network; Program Predicts Performance of Optical Parametric Oscillators; Processing TES Level-1B Data; Automated Camera Calibration; Tracking the Martian CO2 Polar Ice Caps in Infrared Images; Processing TES Level-2 Data; SmaggIce Version 1.8; Solving the Swath Segment Selection Problem; The Spatial Standard Observer; Less-Complex Method of Classifying MPSK; Improvement in Recursive Hierarchical Segmentation of Data; Using Heaps in Recursive Hierarchical Segmentation of Data; Tool for Statistical Analysis and Display of Landing Sites; Automated Assignment of Proposals to Reviewers; Array-Pattern-Match Compiler for Opportunistic Data Analysis; Pre-Processor for Compression of Multispectral Image Data; Compressing Image Data While Limiting the Effects of Data Losses; Flight Operations Analysis Tool; Improvement in Visual Target Tracking for a Mobile Robot; Software for Simulating Air Traffic; Automated Vectorization of Decision-Based Algorithms; Grayscale Optical Correlator Workbench; "One-Stop Shopping" for Ocean Remote-Sensing and Model Data; State Analysis Database Tool; Generating CAHV and CAHVOmages with Shadows in ROAMS; Improving UDP/IP Transmission Without Increasing Congestion; FORTRAN Versions of Reformulated HFGMC Codes; Program for Editing Spacecraft Command Sequences; Flight-Tested Prototype of BEAM Software; Mission Scenario Development Workbench; Marsviewer; Tool for Analysis and Reduction of Scientific Data; ASPEN Version 3.0; Secure Display of Space-Exploration Images; Digital Front End for Wide-Band VLBI Science Receiver; Multifunctional Tanks for Spacecraft; Lightweight, Segmented, Mostly Silicon Telescope Mirror; Assistant for Analyzing Tropical-Rain-Mapping Radar Data; and Anion-Intercalating Cathodes for High-Energy- Density Cells.

Source record↗

Rapid Cost Assessment of Space Mission Concepts Through Application of Complexity-Based Cost Indices

This slide presentation reviews the development of a rapid cost assessment models for evaluation of exploration missions through the application of complexity based cost indices. In Fall of 2004, NASA began developing 13 documents, known as "strategic roadmaps," intended to outline a strategy for space exploration over the next 30 years. The Third Strategic Roadmap, The Strategic Roadmap for Solar System Exploration, focused on strategy for robotic exploration of the Solar System. Development of the Strategic Roadmap for Solar System Exploration led to the investigation of a large variety of missions. However, the necessity of planning around scientific inquiry and budgetary constraints made it necessary for the roadmap development team to evaluate potential missions not only for scientific return but also cost. Performing detailed cost studies for each of the large number of missions was impractical given the time constraints involved and lack of detailed mission studies; so a method of rapid cost assessment was developed by us to allow preliminary analysis. It has been noted that there is a strong correlation between complexity and cost and schedule of planetary missions. While these correlations were made after missions had been built and flown (successfully or otherwise), it seemed likely that a similar approach could provide at least some relative cost ranking. Cost estimation relationships (CERs) have been developed based on subsystem design choices. These CERs required more detailed information than available, forcing the team to adopt a more high level approach. Costing by analogy has been developed for small satellites, however, planetary exploration missions provide such varying spacecraft requirements that there is a lack of adequately comparable missions that can be used for analogy.

cost estimation↗