Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Grid Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Cybersecurity Awareness in the Power Grid

We report on a series of interviews and observations conducted with control room dispatchers in a bulk electrical system. These dispatchers must react quickly to incidents as they happen in order to ensure the reliability and safe operation of the power grid. They do not have the time to evaluate incidents for signs of cyber-attack as part of their initial response. Cyber-attack detection involves multiple personnel from a variety of roles at both local and regional levels. Smart grid technology will improve detection and defense capabilities of the future grid, however, the current infrastructure remains a mixture of old and new equipment which will continue to operate for some time. Thus, research still needs to focus on strategies for the detection of malicious activity on current infrastructure as well as protection and remediation.

Scholtz, Jean↗

A Bilevel Voltage Regulation Operation for Distribution Systems With Self-Operated Microgrids

The emerging of microgrids in distribution systems has significantly enhanced the resilience of power grids. However, the operators of a distribution system and microgrids therein can be different and have accessibility to different devices. To model the operation of such a grid, this work proposes a bilevel formulation and probes into the voltage regulation operation, considering the interaction between different systems. The proposed bilevel formulation considers the cooperation of active energy resources (AER), transformer tap-changers, and capacitor banks that are controlled by different operators. To facilitate the solution time of the target bilevel optimization, the lower-level problems with different objectives are modeled using deep neural networks (DNNs) which are then converted into a set of constraints. Hence, the bilevel problem can be reformed to a single-level problem. Lastly, the proposed solution procedures are validated using a customized joint system constructed by the IEEE 123-bus system and a real distribution system in Iowa. According to the numerical validation results, the solution time of the proposed nonlinear activation function based DNN model is 69 times faster than other methods in solving voltage regulation with a bilevel structure.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Synchronized Phasor Data for Analyzing Wind Power Plant Dynamic Behavior and Model Validation

The U.S. power industry is undertaking several initiatives that will improve the operations of the power grid. One of those is the implementation of 'wide area measurements' using phasor measurement units (PMUs) to dynamically monitor the operations and the status of the network and provide advanced situational awareness and stability assessment. This project seeks to obtain PMU data from wind power plants and grid reference points and develop software tools to analyze and visualize synchrophasor data for the purpose of better understanding wind power plant dynamic behaviors under normal and contingency conditions.

17 WIND ENERGY↗

Enhanced INL Power Grid Test Bed Infrastructure – Phase I

Idaho National Laboratory (INL), a Department of Energy (DOE) laboratory, owns, operates, and maintains transmission and distribution power grid infrastructure to support the INL multi program mission. Sections of this power infrastructure, known as the INL Power Grid Test Bed, have been and are being used by government and industry to develop, demonstrate, and validate technologies for the modern grid, including smart grid, on a full scale utility test bed. INL’s power grid includes 61 miles of 140 MW, 138 kV rated electrical power transmission supplying seven main substations, each feeding a separate facility complex (or ‘city’) within the INL’s 890 square mile Site. This power grid is fed by three commercial utilities into the INL’s main control substation, but is operated independently from the commercial utility through its primary substation and command and control center. Within the INL complex, one of the seven complexes, the Critical Infrastructure Test Range Complex (CITRC), has been designated as the INL complex for supporting critical infrastructure research and testing. This complex includes its own substation and 13.8kV distribution network, all configurable and controlled by the INL research and development programs. Through investment partnership with the DOE Office of Electricity Delivery and Energy Reliability (DOE OE), INL is enhancing its existing distribution infrastructure to expand the types of testing that can be conducted and increase flexibility for testing configurations. The enhancement of the INL Power Grid Test Bed will enable development and full scale testing of smart-grid-related technologies and smart devices including testing interoperability, operational performance, reliability, and resiliency contribution at multiple distribution voltage classes, specifically 15kV, 25kV, and 35kV. The expected time frame for completion of the Phase I portion of the enhancement would be 4th quarter fiscal year (FY) 2015.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Validation of Interconnection and Interoperability of Grid-Forming Inverters Sourced by Hydrogen Technologies in View of 100% Renewable Microgrids

Grid-forming assets are required in microgrids to act as voltage-frequency masters. These grid-forming assets can operate in two modes of operation: grid-following mode and grid-forming mode. In grid-following mode of operation, these assets will follow real power and reactive power setpoints and in grid-forming mode of operation these assets will follow voltage and frequency setpoints. Traditionally, diesel generators or natural gas-based generators are widely used to act as a voltage-frequency master. However, many utilities are aiming to replace generators with grid forming-inverters supplied by solar photovoltaics (PV), batteries or fuel cells. Since grid-forming assets need a long-term reliable energy source, fuel cells are a reasonable and viable choice to supply the grid-forming inverters, but some of the challenges facing the wide deployment of grid-forming fuel cell inverters need to be addressed. Specifically, in our proposed work, we aim to focus on the interconnection and interoperability requirements of grid-forming fuel cell inverters. Currently, state-of-the-art fuel cell inverters follow the general interconnection requirements of distributed energy resources (DERs) and general interoperability requirements of DERs, but these requirements were built with PV and battery systems in mind. Fuel cells have different operational requirements, and therefore these requirements need to be appropriately modified for the grid operators to use. These additional steps add to the investment and operational cost to the grid operators. Through the ARIES platform, this proposed project aims to bridge this gap and use power hardware-in-the-loop (PHIL) and controller hardware-in-the-loop (CHIL) experiments to inform the creation of open-source interconnection and interoperability information that can aid in faster and cheaper installation and operation of grid-forming fuel cell inverters.

grid-forming↗

Intergovernmental Advanced Stationary PEM Fuel Cell System Demonstration (Final Report)

A program to complete the design, construction and demonstration of a PEMFC system fuelled by Ethanol, LPG or NG for telecom applications was initiated in October 2007. Early in the program the economics for Ethanol were shown to be unfeasible and permission was given by DOE to focus on LPG only. The design and construction of a prototype unit was completed in Jun 2009 using commercially available PEM FC stack from Ballard Power Systems. During the course of testing, the high pressure drop of the stack was shown to be problematic in terms of control and stability of the reformer. Also, due to the power requirements for air compression the overall efficiency of the system was shown to be lower than a similar system using internally developed low pressure drop FC stack. In Q3 2009, the decision was made to change to the Plug power stack and a second prototype was built and tested. Overall net efficiency was shown to be 31.5% at 3 kW output. Total output of the system is 6 kW. Using the new stack hardware, material cost reduction of 63% was achieved over the previous Alpha design. During a November 2009 review meeting Plug Power proposed and was granted permission, to demonstrate the new, commercial version of Plug Power's telecom system at CERL. As this product was also being tested as part of a DOE Topic 7A program, this part of the program was transferred to the Topic 7A program. In Q32008, the scope of work of this program was expanded to include a National Grid demonstration project of a micro-CHP system using hightemperature PEM technology. The Gensys Blue system was cleared for unattended operation, grid connection, and power generation in Aug 2009 at Union College in NY state. The system continues to operate providing power and heat to Beuth House. The system is being continually evaluated and improvements to hardware and controls will be implemented as more is learned about the system's operation. The program is instrumental in improving the efficiency and reducing costs of PEMFC based power systems using LPG fuel and continues to makes steps towards meeting DOE's targets. Plug Power would like to thank DOE for their support of this program.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fast Dynamic Simulation-Based Small Signal Stability Assessment and Control

Power grid planning and operation decisions are made based on simulation of the dynamic behavior of the system. Enabling substantial energy savings while increasing the reliability of the aging North American power grid through improved utilization of existing transmission assets hinges on the adoption of wide-area measurement systems (WAMS) for power system stabilization. However, adoption of WAMS alone will not suffice if the power system is to reach its full entitlement in stability and reliability. It is necessary to enhance predictability with "faster than real-time" dynamic simulations that will enable the dynamic stability margins, proactive real-time control, and improve grid resiliency to fast time-scale phenomena such as cascading network failures. Present-day dynamic simulations are performed only during offline planning studies, considering only worst case conditions such as summer peak, winter peak days, etc. With widespread deployment of renewable generation, controllable loads, energy storage devices and plug-in hybrid electric vehicles expected in the near future and greater integration of cyber infrastructure (communications, computation and control), monitoring and controlling the dynamic performance of the grid in real-time would become increasingly important. The state-of-the-art dynamic simulation tools have limited computational speed and are not suitable for real-time applications, given the large set of contingency conditions to be evaluated. These tools are optimized for best performance of single-processor computers, but the simulation is still several times slower than real-time due to its computational complexity. With recent significant advances in numerical methods and computational hardware, the expectations have been rising towards more efficient and faster techniques to be implemented in power system simulators. This is a natural expectation, given that the core solution algorithms of most commercial simulators were developed decades ago, when High Performance Computing (HPC) resources were not commonly available.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Vulnerability Studies Under EMP: Impedance and PCI Testing of the Grid Control Devices

Control devices such as inverters and generator controllers are critical for the stable operation of the power grid, especially for power stability control and power dispatch. However, the Electromagnetic Pulse (EMP) is a potential threat to electronic devices in modern power grids, therefore decreasing the power grid resilience and bringing unrecoverable damages to the devices. To reveal the impact mechanism of the EMP, impedance and Pulse Current Injection (PCI) testing is established to study the vulnerability of the grid control devices. The impedance of the grid control devices is accurately measured using impedance analyzers with different frequency ranges. Then the voltage and current responses are tested based on the PCI testing. The vulnerability experiments based on two grid control devices are carried out. And the comparison results reveal that most ports would be damaged under EC8, and some ports can survive under EC5 according to the calculated PCI response and cumulative energy. The results can provide a reference for the future design of control devices and the strategic resilience of power grids.

Qiu, Wei↗

Optimization strategies for the vulnerability analysis of the electric power grid.

Identifying small groups of lines, whose removal would cause a severe blackout, is critical for the secure operation of the electric power grid. We show how power grid vulnerability analysis can be studied as a mixed integer nonlinear programming (minlp) problem. Our analysis reveals a special structure in the formulation that can be exploited to avoid nonlinearity and approximate the original problem as a pure combinatorial problem. The key new observation behind our analysis is the correspondence between the Jacobian matrix (a representation of the feasibility boundary of the equations that describe the flow of power in the network) and the Laplacian matrix in spectral graph theory (a representation of the graph of the power grid). The reduced combinatorial problem is known as the network inhibition problem, for which we present a mixed integer linear programming formulation. Our experiments on benchmark power grids show that the reduced combinatorial model provides an accurate approximation, to enable vulnerability analyses of real-sized problems with more than 10,000 power lines.

99 GENERAL AND MISCELLANEOUS↗

Real-Time Optimization of Distribution-level Energy Resources [SWR-18-27]

Researchers at NREL have developed a novel real-time control architecture to optimize the operation of DERs at residential, commercial, and industrial levels. The real-time system enables (portions of) feeders to emulate virtual power plants providing services to the rest of the grid, while ensuring satisfaction of electrical limits and maximizing customers’ benefits. This system can be integrated with legacy hardware and/or new advanced systems to optimally manage both individually-controlled DERs and aggregations of DERs. By virtue of the proposed engineering approach, the DERs collectively regulate the powers at an electrical point to respond to grid dispatch signals such as an automatic generation control, a ramping signal, or a 5-minute dispatch. Overall, this architecture allows end customers to minimize their payments and partake in grid operations while guaranteeing power quality in the distribution network.

Dall-Anese, Emiliano↗

Use of Hardware-in-the-Loop to De-Risk Field Deployment of Hydrogen Assets

Grid-forming assets are required in microgrids to act as voltage-frequency masters. These grid-forming assets can operate in two modes of operation: grid-following mode and grid-forming mode. In grid-following mode of operation, these assets will follow real power and reactive power setpoints and in grid-forming mode of operation these assets will follow voltage and frequency setpoints. Traditionally, diesel generators or natural gas-based generators are widely used to act as a voltage-frequency master. However, many utilities are aiming to replace generators with grid forming-inverters supplied by solar photovoltaics (PV), batteries or fuel cells. Since grid-forming assets need a long-term reliable energy source, fuel cells are a reasonable and viable choice to supply the grid-forming inverters, but some of the challenges facing the wide deployment of grid-forming fuel cell inverters need to be addressed. Specifically, in our proposed work, we aim to focus on the interconnection and interoperability requirements of grid-forming fuel cell inverters. Currently, state-of-the-art fuel cell inverters follow the general interconnection requirements of distributed energy resources (DERs) and general interoperability requirements of DERs, but these requirements were built with PV and battery systems in mind. Fuel cells have different operational requirements, and therefore these requirements need to be appropriately modified for the grid operators to use. These additional steps add to the investment and operational cost to the grid operators. Through the ARIES platform, this proposed project aims to bridge this gap and use power hardware-in-the-loop (PHIL) and controller hardware-in-the-loop (CHIL) experiments to inform the creation of open-source interconnection and interoperability information that can aid in faster and cheaper installation and operation of grid-forming fuel cell inverters.

08 HYDROGEN↗

Validation of Interconnection and Interoperability of Grid-Forming Inverters Sourced by Hydrogen Technologies in View of 100% Renewable Microgrids

Grid-forming assets are required in microgrids to act as voltage-frequency masters. These grid-forming assets can operate in two modes of operation: grid-following mode and grid-forming mode. In grid-following mode of operation, these assets will follow real power and reactive power setpoints and in grid-forming mode of operation these assets will follow voltage and frequency setpoints. Traditionally, diesel generators or natural gas-based generators are widely used to act as a voltage-frequency master. However, many utilities are aiming to replace generators with grid forming-inverters supplied by solar photovoltaics (PV), batteries or fuel cells. Since grid-forming assets need a long-term reliable energy source, fuel cells are a reasonable and viable choice to supply the grid-forming inverters, but some of the challenges facing the wide deployment of grid-forming fuel cell inverters need to be addressed. Specifically, in our proposed work, we aim to focus on the interconnection and interoperability requirements of grid-forming fuel cell inverters. Currently, state-of-the-art fuel cell inverters follow the general interconnection requirements of distributed energy resources (DERs) and general interoperability requirements of DERs, but these requirements were built with PV and battery systems in mind. Fuel cells have different operational requirements, and therefore these requirements need to be appropriately modified for the grid operators to use. These additional steps add to the investment and operational cost to the grid operators. Through the ARIES platform, this proposed project aims to bridge this gap and use power hardware-in-the-loop (PHIL) and controller hardware-in-the-loop (CHIL) experiments to inform the creation of open-source interconnection and interoperability information that can aid in faster and cheaper installation and operation of grid-forming fuel cell inverters.

controller hardware-in-the-loop↗

Solar Data Inputs for Integration and Transmission Planning Studies

Renewable energy integration studies are frequently conducted to evaluate the impacts wind and solar power have on grid operations and planning. In the United States, these studies have historically been focused on wind energy integration. However, with the rapid deployment of large-scale and distributed solar power across the United States. and Hawaii, the interest in solar power variability andits impacts on the grid is increasing. To complete detailed integration studies, modeled power production of existing and future solar power deployments is necessary. This paper discusses some of the methods used to generate photovoltaic (PV) and concentrating solar power (CSP) production profiles for studies undertaken in the United States, evaluates the results, and compares the profiles withmeasured solar power production characteristics.

14 SOLAR ENERGY↗

Comprehensive Solutions for Integration of Solar Resources into Grid Operations

The need for proactive closed-loop integration of uncertainty information into system operations and probability-based controls is widely recognized, but rarely implemented in system operations. Proactive integration for this project means that the information concerning expected uncertainty ranges for net load and balancing requirements, including required balancing capacity, ramping and ramp duration characteristics, will be fed back into the generation commitment and dispatch algorithms to modify their performance so that potential shortages of these characteristics can be prevented. This basic, yet important, premise is the motivating factor for this project. The achieved project goal is to demonstrate the benefit of such a system. The project quantifies future uncertainties, predicts additional system balancing needs including the prediction intervals for capacity and ramping requirements of future dispatch intervals, evaluates the impacts of uncertainties on transmission including the risk of overloads and voltage problems, and explores opportunities for intra-hour generation adjustments helping to provide more flexibility for system operators. The resulting benefits culminate in more reliable grid operation in the face of increased system uncertainty and variability caused by solar power. The project identifies that solar power does not require special separate penetration level restrictions or penalization for its intermittency. Ultimately, the collective consideration of all sources of intermittency distributed over a wide area unified with the comprehensive evaluation of various elements of balancing process, i.e. capacity, ramping, and energy requirements, help system operators more robustly and effectively balance generation against load and interchange. This project showed that doing so can facilitate more solar and other renewable resources on the grid without compromising reliability and control performance. Efforts during the project included developing and integrating advanced probabilistic solar forecasts, including distributed PV forecasts, into closed –loop decision making processes. Additionally, new uncertainty quantifications methods and tools for the direct integration of uncertainty and variability information into grid operations at the transmission and distribution levels were developed and tested. During Phase 1, project work focused heavily on the design, development and demonstration of a set of processes and tools that could reliably and efficiently incorporate solar power into California’s grid operations. In Phase 2, connectivity between the ramping analysis tools and market applications software were completed, multiple dispatch scenarios demonstrated a successful reduction of overall uncertainty and an analysis to quantify increases in system operator reliability, and the transmission and distribution system uncertainty prediction tool was introduced to system operation engineers in a live webinar. The project met its goals, the experiments prove the advancements to methods and tools, when working together, are beneficial to not only the California Independent System Operator, but the benefits are transferable to other system operators in the United States.

14 SOLAR ENERGY↗

Distributed Software-Defined Network Architecture for Smart Grid Resilience to Denial-of-Service Attacks

An important challenge for smart grid security is designing a secure and robust smart grid communications architecture to protect against cyber-threats, such as Denial-of-Service (DoS) attacks, that can adversely impact the operation of the power grid. Researchers have proposed using Software Defined Network frameworks to enhance cybersecurity of the smart grid, but there is a lack of benchmarking and comparative analyses among the many techniques. In this work, a distributed three-controller software-defined networking (D3-SDN) architecture, benchmarking, and comparative analysis with other techniques is presented. The selected distributed flat SDN architecture divides the network horizontally into multiple areas or clusters, where each cluster is handled by a single Open Network Operating System (ONOS) controller. A case study using the IEEE 118-bus system is provided to compare the performance of the presented ONOS-managed D3-SDN, against the POX controller. In addition, the proposed architecture outperforms a single SDN controller framework by a tenfold increase in throughput; a reduction in latency of > 20%; and an increase in throughput of approximately 11% during the DoS attack scenarios.

Agnew Jr., Dennis↗