Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Telemetry”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Design and Testing of a Breadboard Electrical Power Control Unit for the Fluid Combustion Facility Experiment

The Fluid Combustion Facility (FCF) Project and the Power Technology Division at the NASA Glenn Research Center (GRC) at Lewis Field in Cleveland, OH along with the Sundstrand Corporation in Rockford, IL are jointly developing an Electrical Power Converter Unit (EPCU) for the Fluid Combustion Facility to be flown on the International Space Station (ISS). The FCF facility experiment contains three racks: A core rack, a combustion rack, and a fluids rack. The EPCU will be used as the power interface to the ISS 120V(sub dc) power distribution system by each FCF experiment rack which requires 28V(sub dc). The EPCU is a modular design which contains three 120V(sub dc)-to-28V(sub dc) full-bridge, power converters rated at 1 kW(sub e) each bus transferring input relays and solid-state, current-limiting input switches, 48 current-limiting, solid-state, output switches; and control and telemetry hardware. The EPCU has all controls required to autonomously share load demand between the power feeds and--if absolutely necessary--shed loads. The EPCU, which maximizes the usage of allocated ISS power and minimizes loss of power to loads, can be paralleled with other EPCUs. This paper overviews the electrical design and operating characteristics of the EPCU and presents test data from the breadboard design.

Kimnach, Greg L.↗

Apollo 13 LiOH canister breakthrough test

The Apollo 13 lithium hydroxide canister test was conducted to evaluate emergency measures designed to enable the Apollo 13 crew to use command module lithium hydroxide canisters in the lunar module. The test verified the effectiveness of the emergency system and established that the canisters in the command module would provide ample carbon dioxide removal for the return of the Apollo 13 crew. The time interval between canister changes on the flight was also determined in the test. This reduced power demand on the lunar module by eliminating the need for telemetry in determining canister replacement times. Details of the canister modifications were relayed to the flight crew and a replica of the test system was assembled in the flight vehicle. Graphs of the parameters which were measured during the simulation are presented.

Leblanc, J. C.↗

ERTS-1, the spacecraft and its sensors

The basic objectives of the ERTS-1 mission are defined as follows: (1) to determine what data can be acquired from an orbiting satellite on the natural and cultural resources and on the environment; and (2) to develop and demonstrate the combination of data-acquisition procedures and interpretative techniques which can make this new knowledge available for use in the many facets of man's life. A general description of the satellite's observatory system and its sensors is given, including the thermal control subsystem, the power subsystem, the attitude control subsystem, the orbit adjust subsystem, the telemetry and tracking systems, the communications and data handling subsystem, the return beam vidicon subsystem, the multispectral scanner subsystem, the two wideband video tape recorders, and the data collection subsystem.

Weiland, S.↗

A proof-of-principle getaway special free-flying satellite demonstration

An air traffic control radar calibration satellite is described that will be used by the U.S. Federal Aviation Administration, U.S. military agencies and cooperating governments around the world to measure antenna patterns associated with the existing international air traffic control network. The satellite will employ three L-band receivers, a UHF command receiver, a VHF telemetry transmitter, associated antennas, a microprocessor, fixed solar arrays, and a power supply to acquire, store and forward signal strength data from some of the tracking radars. A second satellite is planned for launch in 1986 into a high altitude polar orbit with a lifetime of several years in order to provide a long-lived calibration service to the entire international air traffic control system. The initial satellite and associated ground station are being designed and built by a volunteer consortium of three educational institutions and more than a dozen aerospace companies. Following this initial demonstration of a free-flying Getaway Special satellite, a substantial number of organizations are contemplating commercial uses of the concept. Discussions are being held with NASA concerning the establishing of an appropriate fee for this new class of service.

Moore, R. G.↗

AMO EXPRESS: A Command and Control Experiment for Crew Autonomy Onboard the International Space Station

NASA is investigating a range of future human spaceflight missions, including both Mars-distance and Near Earth Object (NEO) targets. Of significant importance for these missions is the balance between crew autonomy and vehicle automation. As distance from Earth results in increasing communication delays, future crews need both the capability and authority to independently make decisions. However, small crews cannot take on all functions performed by ground today, and so vehicles must be more automated to reduce the crew workload for such missions. NASA's Advanced Exploration Systems Program funded Autonomous Mission Operations (AMO) project conducted an autonomous command and control experiment on-board the International Space Station that demonstrated single action intelligent procedures for crew command and control. The target problem was to enable crew initialization of a facility class rack with power and thermal interfaces, and involving core and payload command and telemetry processing, without support from ground controllers. This autonomous operations capability is enabling in scenarios such as initialization of a medical facility to respond to a crew medical emergency, and representative of other spacecraft autonomy challenges. The experiment was conducted using the Expedite the Processing of Experiments for Space Station (EXPRESS) rack 7, which was located in the Port 2 location within the U.S Laboratory onboard the International Space Station (ISS). Activation and deactivation of this facility is time consuming and operationally intensive, requiring coordination of three flight control positions, 47 nominal steps, 57 commands, 276 telemetry checks, and coordination of multiple ISS systems (both core and payload). Utilization of Draper Laboratory's Timeliner software, deployed on-board the ISS within the Command and Control (C&C) computers and the Payload computers, allowed development of the automated procedures specific to ISS without having to certify and employ novel software for procedure development and execution. The procedures contained the ground procedure logic and actions as possible to include fault detection and recovery capabilities.

Stetson, Howard K.↗

AMO EXPRESS: A Command and Control Experiment for Crew Autonomy Onboard the International Space Station

NASA is investigating a range of future human spaceflight missions, including both Mars-distance and Near Earth Object (NEO) targets. Of significant importance for these missions is the balance between crew autonomy and vehicle automation. As distance from Earth results in increasing communication delays, future crews need both the capability and authority to independently make decisions. However, small crews cannot take on all functions performed by ground today, and so vehicles must be more automated to reduce the crew workload for such missions. NASA's Advanced Exploration Systems Program funded Autonomous Mission Operations (AMO) project conducted an autonomous command and control experiment on-board the International Space Station that demonstrated single action intelligent procedures for crew command and control. The target problem was to enable crew initialization of a facility class rack with power and thermal interfaces, and involving core and payload command and telemetry processing, without support from ground controllers. This autonomous operations capability is enabling in scenarios such as initialization of a medical facility to respond to a crew medical emergency, and representative of other spacecraft autonomy challenges. The experiment was conducted using the Expedite the Processing of Experiments for Space Station (EXPRESS) rack 7, which was located in the Port 2 location within the U.S Laboratory onboard the International Space Station (ISS). Activation and deactivation of this facility is time consuming and operationally intensive, requiring coordination of three flight control positions, 47 nominal steps, 57 commands, 276 telemetry checks, and coordination of multiple ISS systems (both core and payload). Utilization of Draper Laboratory's Timeliner software, deployed on-board the ISS within the Command and Control (C&C) computers and the Payload computers, allowed development of the automated procedures specific to ISS without having to certify and employ novel software for procedure development and execution. The procedures contained the ground procedure logic and actions as possible to include fault detection and recovery capabilities. The autonomous operations concept includes a reduction of the amount of data a crew operator is required to verify during activation or de-activation, as well as integration of procedure execution status and relevant data in a single integrated display. During execution, the auto-procedures (via Timerliner) provide a step-by-step messaging paradigm and a high-level status upon termination. This messaging and high-level status is the only data generated for operator display. To enhance situational awareness of the operator, the Web-based Procedure Display (WebPD) provides a novel approach to the issues of procedure display and execution tracking. WebPD is a web based application that serves as the user interface for electronic procedure execution. It incorporates several aspects of the HTML5 standard. Procedures are written in a dialect of XML called Procedure Representation Language (PRL). WebPD tracks execution status in the procedure or procedures being displayed. WebPD aggregates and simplifies the auto-sequence execution status information, and formatted to be easily followed and understood by an operator who is not dedicated to actively monitoring the task. WebPD also provides an integrated data and control interface to pause or halt the execution in order to provide a check point of operation and to examine progress before starting the next sequence of activities. For this demonstration, the procedure was initiated and monitored from the ground. As the Timeliner sequences executed, their high-level execution status was written to PLMDM memory. This memory is read and downlinked via Ku-Band at a 1 Hz rate. The data containing the high-level execution status is de-commutated on the ground, and rebroadcast for WebPD consumption. A future demonstration will be performed onboard, with ISS astronauts initiating the operations instead of ground controllers. The AMO EXPRESS experiment demonstrated activation and de-activation of EXPRESS rack 7, providing the capability of future single button activations and deactivations of facility class racks. The experiment achieved numerous technical and operations 'firsts' for the ISS

Stetson, Howard K.↗

AMO EXPRESS: A Command and Control Experiment for Crew Autonomy

NASA is investigating a range of future human spaceflight missions, including both Mars-distance and Near Earth Object (NEO) targets. Of significant importance for these missions is the balance between crew autonomy and vehicle automation. As distance from Earth results in increasing communication delays, future crews need both the capability and authority to independently make decisions. However, small crews cannot take on all functions performed by ground today, and so vehicles must be more automated to reduce the crew workload for such missions. NASA's Advanced Exploration Systems Program funded Autonomous Mission Operations (AMO) project conducted an autonomous command and control demonstration of intelligent procedures to automatically initialize a rack onboard the International Space Station (ISS) with power and thermal interfaces, and involving core and payload command and telemetry processing, without support from ground controllers. This autonomous operations capability is enabling in scenarios such as a crew medical emergency, and representative of other spacecraft autonomy challenges. The experiment was conducted using the Expedite the Processing of Experiments for Space Station (EXPRESS) rack 7, which was located in the Port 2 location within the U.S Laboratory onboard the International Space Station (ISS). Activation and deactivation of this facility is time consuming and operationally intensive, requiring coordination of three flight control positions, 47 nominal steps, 57 commands, 276 telemetry checks, and coordination of multiple ISS systems (both core and payload). The autonomous operations concept includes a reduction of the amount of data a crew operator is required to verify during activation or de-activation, as well as integration of procedure execution status and relevant data in a single integrated display. During execution, the auto-procedures provide a step-by-step messaging paradigm and a high level status upon termination. This messaging and high level status is the only data generated for operator display. To enhance situational awareness of the operator, the Web-based Procedure Display (WebPD) provides a novel approach to the issues of procedure display and execution tracking. For this demonstration, the procedure was initiated and monitored from the ground. As the Timeliner sequences executed, their high level execution status was transmitted to ground, for WebPD consumption.

Stetson, Howard K.↗

AMO EXPRESS: A Command and Control Experiment for Crew Autonomy Onboard the International Space Station

NASA is investigating a range of future human spaceflight missions, including both Mars-distance and Near Earth Object (NEO) targets. Of significant importance for these missions is the balance between crew autonomy and vehicle automation. As distance from Earth results in increasing communication delays, future crews need both the capability and authority to independently make decisions. However, small crews cannot take on all functions performed by ground today, and so vehicles must be more automated to reduce the crew workload for such missions.NASAs Advanced Exploration Systems Program funded Autonomous Mission Operations (AMO) project conducted an autonomous command and control experiment on-board the International Space Station that demonstrated single action intelligent procedures for crew command and control. The target problem was to enable crew initialization of a facility class rack with power and thermal interfaces, and involving core and payload command and telemetry processing, without support from ground controllers. This autonomous operations capability is enabling in scenarios such as initialization of a medical facility to respond to a crew medical emergency, and representative of other spacecraft autonomy challenges. The experiment was conducted using the Expedite the Processing of Experiments for Space Station (EXPRESS) rack 7, which was located in the Port 2 location within the U.S Laboratory onboard the International Space Station (ISS).

Autonomous Mission Operations↗

The Small Explorer power system

A direct-energy-transfer (DET) power system design with the battery connected directly to the bus was selected as the generic power system to satisfy the various Small Explorer spacecraft missions. The power system electronics (PSE) are designated to handle power levels up to a 250-W load with minimum changes in the electronics. The command and telemetry interface is through an optical MIL-STD-1773 interface that is contained in the PSE. The system provides high performance, low weight, and low EMI (electromagnetic interference) generation. The design and performance of the power system have been verified through analysis and extensive tests on a breadboard.

Dakermanji, George↗

Micro-battery Development for Juvenile Salmon Acoustic Telemetry System Applications

The Juvenile Salmon Acoustic Telemetry System (JSATS) project supported by the U.S. Army Corps of Engineers, Portland District, has yielded the smallest acoustic fish tag transmitter commercially available to date. In order to study even smaller fish populations and make the transmitter injectable by needles, the JSATS acoustic micro transmitter needs to be further downsized. This study focuses on the optimization of microbattery design based on Li/CFx chemistry. Through appropriate modifications, a steady high-rate pulse current with desirable life time has been achieved while the weight and volume of the battery is largely reduced. The impedance variation in as-designed microbatteries is systematically compared with that of currently used watch batteries in JSATS with an attempt to understand the intrinsic factors that control the performances of microbatteries under the real testing environments.

acoustic telemetry↗

Greater Sage-Grouse Habitat Use and Population Demographics at the Simpson Ridge Wind Resource Area, Carbon County, Wyoming

This study was conducted to obtain baseline data on use of the proposed Simpson Ridge Wind Resource Area (SRWRA) in Carbon County, Wyoming by greater sage-grouse. The first two study years were designed to determine pre-construction seasonally selected habitats and population-level vital rates (productivity and survival). The presence of an existing wind energy facility in the project area, the PacifiCorp Seven Mile Hill (SMH) project, allowed us to obtain some information on initial sage-grouse response to wind turbines the first two years following construction. To our knowledge these are the first quantitative data on sage-grouse response to an existing wind energy development. This report presents results of the first two study years (April 1, 2009 through March 30, 2011). This study was selected for continued funding by the National Wind Coordinating Collaborative Sage-Grouse Collaborative (NWCC-SGC) and has been ongoing since March 30, 2011. Future reports summarizing results of this research will be distributed through the NWCC-SGC. To investigate population trends through time, we determined the distribution and numbers of males using leks throughout the study area, which included a 4-mile radius buffer around the SRWRA. Over the 2-year study, 116 female greater sage-grouse were captured by spotlighting and use of hoop nets on roosts surrounding leks during the breeding period. Radio marked birds were located anywhere from twice a week to once a month, depending on season. All radio-locations were classified to season. We developed predictor variables used to predict success of fitness parameters and relative probability of habitat selection within the SRWRA and SMH study areas. Anthropogenic features included paved highways, overhead transmission lines, wind turbines and turbine access roads. Environmental variables included vegetation and topography features. Home ranges were estimated using a kernel density estimator. We developed resource selection functions (RSF) to estimate probability of selection within the SRWRA and SMH. Fourteen active greater sage-grouse leks were documented during lek surveys Mean lek size decreased from 37 in 2008 to 22 in 2010. Four leks located 0.61, 1.3, 1.4 and 2.5 km from the nearest wind turbine remained active throughout the study, but the total number of males counted on these four leks decreased from 162 the first year prior to construction (2008), to 97 in 2010. Similar lek declines were noted in regional leks not associated with wind energy development throughout Carbon County. We obtained 2,659 sage-grouse locations from radio-equipped females, which were used to map use of each project area by season. The sage-grouse populations within both study areas are relatively non-migratory, as radio-marked sage-grouse used similar areas during all annual life cycles. Potential impacts to sage-grouse from wind energy infrastructure are not well understood. The data rom this study provide insight into the early interactions of wind energy infrastructure and sage-grouse. Nest success and brood-rearing success were not statistically different between areas with and without wind energy development in the short-term. Nest success also was not influenced by anthropogenic features such as turbines in the short-term. Additionally, female survival was similar among both study areas, suggesting wind energy infrastructure was not impacting female survival in the short-term; however, further analysis is needed to identify habitats with different levels of risk to better understand the impact of wind energy development on survival. Nest and brood-rearing habitat selection were not influenced by turbines in the short-term; however, summer habitat selection occurred within habitats closer to wind turbines. Major roads were avoided in both study areas and during most of the seasons. The impact of transmission lines varied among study areas, suggesting other landscape features may be influencing selection. The data provided in this report are preliminary and are not meant to provide a basis for forming any conclusions regarding potential impacts of wind energy development on sage-grouse. Although the data collected during the initial phases of this study indicate that greater sage-grouse may continue to use habitats near wind-energy facilities, research conducted on greater sage-grouse response to oil and gas development has found population declines may not occur until 2-10 years after development. Therefore, long-term data from several geographic areas within the range of the sage-grouse will likely be required to adequately assess impacts of wind-energy development on greater sage-grouse.

17 WIND ENERGY↗

Remote control and navigation tests for application to long-range lunar surface exploration.

A vehicle system has been built and tested to investigate some of the unknown factors with regard to the operation of a remotely controlled vehicle on the surface of the moon. A general vehicle system description is presented, giving attention to the wheel drive subsystem, the steering subsystem, the power system, the control console, the command subsystem, the television subsystem, the telemetry subsystem, and the navigation subsystem. The remote control driving station consists of the antenna system, the video display system, the instrument and control panel, the data panel, and the steering and throttle controls. Initial tests with the vehicle and the remote driving station were conducted in March and April 1971.

Mastin, W. C.↗

The gamma ray observatory

A large, free-flying space observatory is planned for (1) locating and characterizing gamma ray sources, in particular peculiar objects such as pulsars; (2) studying diffuse gamma ray emission, both from our galaxy and from extragalactic space, (3) investigating other galaxies, especially radio galaxies, Seyfert galaxies and QSOs; and (4) understanding the origin of gamma ray bursts. The spacecraft will weight about 10,000 kg, with about 6,500 kg available for scientific instruments, providing about 400 watts of power to the instruments, and about 12,000 bits per second of telemetry. The spacecraft which will be launched by the space shuttle into a 400 to 500 km circular orbit, inclined at 28.5 deg to the equator, will be three-axis stabilized, with orientation capability of about 20 arc minutes and aspect determination of 2 arc minutes. Absolute timing of 0.1 millisecond will be provided by the spacecraft. The instruments will be co-aligned along one axis of the spacecraft to optimize the spectral coverage of a particular region. A two-year mission is planned with launch in 1984. Possible retrieval by the shuttle at the end of the mission is considered.

Opp, A. G.↗

Software and system level tests of a test flight mercury ion thruster subsystem

A U.S. Air Force technology spacecraft flight is scheduled to carry an Ion Auxiliary Propulsion System (IAPS) as part of its experimental payload. This paper presents the results of the successful flight-software qualification and system-level tests which were performed on IAPS. The software tests were performed with an operating engineering model ion thruster and power processing unit, and failure/off-normal recovery modes, operation with and without temperature telemetry from the thruster vaporizers, and with closed-loop control or fixed setpoint operation of the thruster vaporizers. The system-level tests cover a wide range of thermal and operating conditions with the entire system exposed to a simulated space environment.

Robson, R. R.↗

Advanced Receiver tracking of Voyager 2 near solar conjunction

The Advanced Receiver (ARX) was used to track the Voyager 2 spacecraft at low Sun-Earth-Probe (SEP) angles near solar conjunction in December of 1987. The received carrier signal exhibited strong fluctuations in both phase and amplitude. The ARX used spectral estimation and mathematical modeling of the phase and receiver noise processes to set an optimum carrier tracking bandwidth. This minimized the mean square phase error in tracking carrier phase and thus minimized the loss in the telemetry signal-to-noise ratio due to the carrier loop. Recovered symbol SNRs and errors in decoded engineering data for the ARX are compared with those for the current Block 3 telemetry stream. Optimum bandwidths are plotted against SEP angle. Measurements of the power spectral density of the solar phase and amplitude fluctuations are also given.

Brown, D. H.↗

Deployment of Autonomous GPS Stations in Marie Byrd Land, Antarctica

During the 1998-1999 Antarctic field season, we installed three autonomous GPS stations in Marie Byrd Land, West Antarctica to measure glacio-isostatic rebound and rates of spreading across the West Antarctic Rift System. The systems collect data throughout the entire year and therefore must function during the warm, relatively mild summer, and cold, harsh winters. They are powered by gel cell batteries that are charged by wind and solar power. The system includes dual data logging capability. We log data at 5 minute intervals within the receiver and at 30 second intervals to a serial data logger. We do not require 365 days of continuous data for well determined crustal velocities, but rather long periods (greater than 24 hours) of continuous data distributed throughout the year. Therefore, for simplicity, we designed the system to accept occasional data interruptions. The batteries, in addition to supplying power, act as a thermal capacitive heat storage device to help regulate the temperatures within the system. This storage system absorbs the majority of the 10-15 watts of power from the receiver and 5 watts from the data logger which helps to maintain temperature for long periods of time. Power is switched off when the temperature within the system enclosure reaches 50'C and is reconnected at 20 C. If battery voltage drops too low the batteries will freeze. Therefore, we cut the power off when the batteries drop to a low voltage of 12.45V. Power is restored at 13.2V. The temperature and power hysteresis allows for a minimum of several days of data to be collected before system shutdowns. A check of all three stations in late January 1999 indicated that the thermal and power control systems are performing as expected. We plan to implement satellite telemetry to the systems during the 2000-2001 season following a year of development.

Donnellan, Andrea↗