At least 271 records · Page 15

How the U.S. Power Grid Kept the Lights on in Summer 2024

Maintaining the reliability of the bulk power system, which supplies and transmits electricity, is a critical priority of electric grid planners, operators, and regulators. As demand for electricity increases and the U.S. resource mix changes, how grid operators meet peak demand is changing. In summer 2024, grid operators in all regions maintained enough capacity to keep the lights and air conditioners on during periods of peak demand, even as older generators have been retired. And, an increasing number of regions used more solar and storage to meet peak demand. In this publication, we describe grid operations on the highest demand day in ERCOT and a few other regions and how solar and storage in particular worked together to help meet peak demand.

14 SOLAR ENERGY↗

Impact of Nuclear Power Plant Energy Storage on Grid Reliability and Generation Costs with Variable Power Generation

This report examines the impact of combining integrated energy systems (IES), specifically hydrogen-based energy-storage systems, with nuclear power plants (NPPs) on grid reliability and generation flexibility in scenarios with substantial variable-power generation from solar energy. The analysis focuses on the challenges and solutions associated with high-levels of solar energy penetration, highlighting the role of advanced energy-storage solutions and flexible-generation technologies in enhancing grid stability and reliability.

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Limiter-aware adaptive excitation control for hydropower generators with legacy voltage regulation systems

Hydropower units often rely on legacy excitation systems with fixed automatic voltage regulator (AVR) settings, but parameter drift, changing operating conditions, and evolving grid-service demands can degrade terminal-voltage regulation over time. This problem should be addressed because poor voltage regulation affects reactive-power support, system stability, and reliable plant operation, and replacing installed AVR and limiter logic is costly and disruptive in practice. To address this issue, this paper proposes a retrofit-friendly enhancement for hydropower generator excitation systems that combines adaptive tuning of the AVR middle lead–lag branch with a small proportional-integral correction for removing steady bias and slow drift. The adaptive laws are normalized, projection-bounded, and equipped with leakage, while adaptation is enabled only in the middle branch. Thus, the intent of the underexcitation and overexcitation limiters, as well as legacy current and rate limits, remains unchanged. Stability is analyzed under incremental performance assumptions, yielding boundedness and asymptotic tracking in the absence of saturation. The method is evaluated using real operational data from a utility-scale hydropower unit at Rocky Reach Dam, Unit C-8. Compared with the fixed AVR baseline, the proposed method reduces terminal-voltage mean squared error by about 70%, removes long periods of steady-state bias, and improves transient tracking while coexisting with limiter actions. These results show that substantial voltage-control improvement can be achieved on existing hydropower units with minimal integration effort and without replacing the installed AVR structure.

ESST5B model↗

Power beaming research at NASA

NASA's current research activities to evaluate laser power beaming systems are summarized with regard to their applications of greatest interest. Key technical certainties and uncertainties pertaining to laser power beaming systems appropriate for space applications are quantified. A path of development is presented that includes maturation of key technology components for reliable laser and millimeter wave power beaming systems during the 1990s.

Rather, John D. G.↗

Design of a Glenn Research Center Solar Field Grid-Tied Photovoltaic Power System

The NASA Glenn Research Center (GRC) designed, developed, and installed, a 37.5 kW DC photovoltaic (PV) Solar Field in the GRC West Area in the 1970s for the purpose of testing PV panels for various space and terrestrial applications. The PV panels are arranged to provide a nominal 120 VDC. The GRC Solar Field has been extremely successful in meeting its mission. The PV panels and the supporting electrical systems are all near their end of life. GRC has designed a 72 kW DC grid-tied PV power system to replace the existing GRC West Area Solar Field. The 72 kW DC grid-tied PV power system will provide DC solar power for GRC PV testing applications, and provide AC facility power for all times that research power is not required. A grid-tied system is connected directly to the utility distribution grid. Facility power can be obtained from the utility system as normal. The PV system is synchronized with the utility system to provide power for the facility, and excess power is provided to the utility for use by all. The project transfers space technology to terrestrial use via nontraditional partners. GRC personnel glean valuable experience with PV power systems that are directly applicable to various space power systems, and provide valuable space program test data. PV power systems help to reduce harmful emissions and reduce the Nation s dependence on fossil fuels. Power generated by the PV system reduces the GRC utility demand, and the surplus power aids the community. Present global energy concerns reinforce the need for the development of alternative energy systems. Modern PV panels are readily available, reliable, efficient, and economical with a life expectancy of at least 25 years. Modern electronics has been the enabling technology behind grid-tied power systems, making them safe, reliable, efficient, and economical with a life expectancy of at least 25 years. The report concludes that the GRC West Area grid-tied PV power system design is viable for a reliable, maintenance free, long life power system that is of significant value to NASA and the community.

Eichenberg, Dennis J.↗

Enabling The Next Generation of Smart Sensors in Coal Fired Power Plants using Cellular 5G Technology

Ohio University (OHIO), West Virginia University (WVU), and American Electric Power (AEP) proposed to study and report on the benefits of 5G wireless cellular technologies for coal-fired power plants. The significant advantages, cost savings, and potential of 5G wireless data communications based sensors promised to usher in a new era of reliable, inexpensive, and powerful embedded systems that had not previously been available for coal-fired power plants. The team built upon existing experience with cellular-based systems, power plant water quality sensing, and high temperature sensors developed during past projects. Principal Investigator Wilhelm had been developing cellular-based sensor data systems with a commercial partner for 10 years, pioneering innovative solar-powered devices that began with 2G technology. The lessons and knowledge gained served as a foundation to demonstrate innovations and potential impacts specific to coal fired power plants enabled by 5G technology, along with integration with existing sensors and systems.

20 FOSSIL-FUELED POWER PLANTS↗

Investigating the Performance of SF6 Replacement Gases to Enable the Next Generation of Pulsed Power

High voltage switches are essential components in pulsed power systems, where consistent and reliable performance is crucial—particularly as the field explores alternatives to SF 6 as an insulating gas. This project examines the self-break voltage distributions of various gases, with a focus on the low-voltage discharges observed in the lower tail of these distributions. Experimental results revealed that the specific housing design influenced the self-break behavior. Among the tested gases, air demonstrated a more favorable overall distribution compared to SF 6 , albeit requiring higher operating pressures. However, air also exhibited a greater likelihood of extremely low-voltage dropouts, raising concerns about its suitability as a direct replacement for SF 6 . Notably, all gases tested showed a higher-than-expected probability of low-voltage events when considering the tail of the distribution rather than the bulk behavior.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

ELM 1016706669-AA B581 GDE01 Generator Summary pg 4-5 only

The table below shows the general load breakdown for 581GDE01. Although the total connected load exceeds the generator’s 150kW nameplate capacity, the normal configured load during standby power mode is less, which was measured at 81kW, or 54%, during preventive maintenance activities on 12/12/24. The generator’s available spare capacity must account for dynamically changing loads that can increase the total power demand at any time. If the two online VFD’s are operated at full speed the actual standby mode load is estimated to increase by 38kW, which would bring the total configured load during standby power mode to 119kW, or 79%, still within 581GDE01’s acceptable capacity. Per the LLNL Site 200 Generator Consolidation Final Study 2022, “Standby Emergency Generator nameplate ratings are based upon operation with varying load averaging 70% of the nameplate for 200 hours per year. Continuous loading between 70% and 100% will reduce a generator’s expected lifetime before a major overhaul. This is never a problem with Laboratory machines because of conservative application of generators and the reliability of the normal power system combines to keeps the load and hours down”. To achieve optimal performance and prolong generator life, the recommended generator loading is between 40% and 70%, optimally at 70%, which 581GDE01 appropriately falls within.

42 ENGINEERING↗

System Study: Emergency Power System 1998-2024

This report presents an unreliability evaluation of the emergency power system (EPS) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of EPS system start-only unreliability, but a statistically significant decreasing trend was identified in the industry-wide estimates of EPS system 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: High-Pressure Coolant Injection 1998-2024

This report presents an unreliability evaluation of the high-pressure coolant injection (HPCI) system at 22 U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period and yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCI results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Auxiliary Feedwater 1998-2024

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period and yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of AFW system start-only unreliability, but a statistically significant decreasing trend was identified in the industry-wide estimates of AFW system 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: High-Pressure Core Spray 1998-2024

This report presents an unreliability evaluation of the high-pressure core spray (HPCS) at eight U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period and yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCS results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: High-Pressure Safety Injection 1998-2024

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period and yearly estimates for system unreliability are provided for the entire active period. Statistically significant decreasing trends were identified in both the HPSI system start-only unreliability and 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Photovoltaic power systems.

Solar photovoltaic power systems weight reduction and reliability noting applicability to propulsion, attitude control and stationkeeping missions

Goldsmith, J.↗

Parametric and cycle tests of a 40-A-hr bipolar nickel-hydrogen battery

A series of tests was performed to characterize battery performance relating to certain operating parameters which included charge current, discharge current, temperature and pressure. The parameters were varied to confirm battery design concepts and to determine optimal operating conditions. Spacecraft power requirements are constantly increasing. Special spacecraft such as the Space Station and platforms will require energy storage systems of 130 and 25 kWh, respectively. The complexity of these high power systems will demand high reliability, and reduced mass and volume. A system that uses batteries for storage will require a cell count in excess of 400 units. These cell units must then be assembled into several batteries with over 100 cells in a series connected string. In an attempt to simplify the construction of conventional cells and batteries, the NASA Lewis Research Center battery systems group initiated work on a nickel-hydrogen battery in a bipolar configuration in early 1981. Features of the battery with this bipolar construction show promise in improving both volumetric and gravimetric energy densities as well as thermal management. Bipolar construction allows cooling in closer proximity to the cell components, thus heat removal can be accomplished at a higher rejection temperature than conventional cell designs. Also, higher current densities are achievable because of low cell impedance. Lower cell impedance is achieved via current flow perpendicular to the electrode face, thus reducing voltage drops in the electrode grid and electrode terminals tabs.

Cataldo, R. L.↗

Leo space plasma interactions

Photovoltaic arrays interact with the low earth orbit (LEO) space plasma in two fundamentally different ways. One way is the steady collection of current from the plasma onto exposed conductors and semiconductors. The relative currents collected by different parts of the array will then determine the floating potential of the spacecraft. In addition, these steady state collected currents may lead to sputtering or heating of the array by the ions or electrons collected, respectively. The second kind of interaction is the short time scale arc into the space plasma, which may deplete the array and/or spacecraft of stored charge, damage solar cells, and produce EMI. Such arcs only occur at high negative potentials relative to the space plasma potential, and depend on the steady state ion currents being collected. New high voltage solar arrays being incorporated into advanced spacecraft and space platforms may be endangered by these plasma interactions. Recent advances in laboratory testing and current collection modeling promise the capability of controlling, and perhaps even using, these space plasma interactions to enable design of reliable high voltage space power systems. Some of the new results may have an impact on solar cell spacing and/or coverslide design. Planned space flight experiments are necessary to confirm the models of high voltage solar array plasma interactions. Finally, computerized, integrated plasma interactions design tools are being constructed to place plasma interactions models into the hands of the spacecraft designer.

Ferguson, Dale C.↗