Search NASA⌕ Search

SEARCH · Search NASA

Results for “Prelaunch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Skylab Saturn 1B flight manual

A Saturn 1B Flight Manual provides launch vehicle systems descriptions and predicted performance data for the Skylab missions. Vehicle SL-2 (SA-206) is the baseline for this manual; but, as a result of the great similarity, the material is representative of SL-3 and SL-4 launch vehicles, also. The Flight Manual is not a control document but is intended primarily as an aid to astronauts who are training for Skylab missions. In order to provide a comprehensive reference for that purpose, the manual also contains descriptions of the ground support interfaces, prelaunch operations, and emergency procedures. Mission variables and constraints are summarized, and mission control monitoring and data flow during launch preparation and flight are discussed.

Source record↗

MSFC Skylab attitude and pointing control system mission evaluation

The results of detailed performance analyses of the attitude and pointing control system in-orbit hardware and software on Skylab are reported. Performance is compared with requirements, test results, and prelaunch predictions. A brief history of the altitude and pointing control system evolution leading to the launch configuration is presented. The report states that the attitude and pointing system satisfied all requirements.

Chubb, W. B.↗

ERTS-1 system performance overview

The ERTS-1 spacecraft had a life of one year as a design goal. At the end of one year, the spacecraft was still providing about 130 scenes per day in multispectral images having resolution and radiometric accuracy better than prelaunch predictions.

Boeckel, J. H.↗

MSFC Skylab Apollo Telescope Mount

A technical history and management critique of the Skylab Apollo Telescope Mount (ATM) from initial conception through the design, manufacturing, testing and prelaunch phases is presented. A mission performance summary provides a general overview of the ATM's achievements in relationship to its design goals. Recommendations and conclusions applicable to hardware design, test program philosophy and performance, and program management techniques for the ATM with potential application to future programs are also discussed.

Morse, A. R.↗

Development of the Viking Mars lander thermal control subsystem design

Two Viking spacecraft, each consisting of a lander capsule coupled to an orbiter, will be launched toward Mars during the summer of 1975. About a year later, the orbiters will go into orbit around Mars and the landers will descend to the surface for 90-day landed missions. The lander must withstand a wide variety of environmental and operational conditions during all phases of the mission, including prelaunch sterilization. On the surface of Mars, the lander internal temperatures must be controlled under widely varying thermal environments and atmospheric conditions. The lander thermal design is based on the maximum use of passive techniques and is integrated into the overall vehicle design and operation. The solutions to the unusual combinations of design problems and a summary of the results of full scale model testing under simulated mission conditions are presented.

Morey, T. F.↗

Cluster systems integration

The cluster systems integration program of Skylab is reviewed with attention to its hardware, management interfaces, mission requirements control, and baseline planning documentation. The responsibilities of the interdiscipline and intercenter technical working groups and panels participating in the program are discussed. The five phases of the program are identified as Wet and Dry Workshop studies and Skylab Program Specification; requirements synthesis and the start of formal configuration management; compatibility assessment and control; design verification; and prelaunch and mission support operations. It is indicated that the cluster systems integration is a vital key element in the development and implementation of the Skylab space station.

Hagood, C. C.↗

ATM test and integration

The test and checkout philosophy of the test program for the Skylab ATM module and the overall test flow including in-process, post-manufacturing, vibration, thermal vacuum, and prelaunch checkout activities are described. Capabilities and limitations of the test complex and its use of automation are discussed. Experiences with the organizational principle of using a dedicated test team for all checkout activities are reported. Material on the development of the ATM subsystems, the experimental program and the requirements of the scientific community, and the integration and verification of the complex systems/subsystems of the ATM are presented. The performance of the ATM test program in such areas as alignment, systems and subsystems, contamination control, and experiment operation is evaluated. The conclusions and recommendations resulting from the ATM test program are enumerated.

Moore, J. W.↗

The 1974 NASA-ASEE summer faculty fellowship aeronautics and space research program

Research activities by participants in the fellowship program are documented, and include such topics as: (1) multispectral imagery for detecting southern pine beetle infestations; (2) trajectory optimization techniques for low thrust vehicles; (3) concentration characteristics of a fresnel solar strip reflection concentrator; (4) calaboration and reduction of video camera data; (5) fracture mechanics of Cer-Vit glass-ceramic; (6) space shuttle external propellant tank prelaunch heat transfer; (7) holographic interferometric fringes; and (8) atmospheric wind and stress profiles in a two-dimensional internal boundary layer.

Obrien, J. F., Jr.↗

Preliminary nondestructive evaluation manual for the space shuttle

Nondestructive evaluation (NDE) requirements are presented for some 134 potential fracture-critical structural areas identified, for the entire space shuttle vehicle system, as those possibly needing inspection during refurbishment/turnaround and prelaunch operations. The requirements include critical area and defect descriptions, access factors, recommended NDE techniques, and descriptive artwork. Requirements discussed include: Orbiter structure, external tank, solid rocket booster, and thermal protection system (development area).

Pless, W. M.↗

Apollo Program Summary Report: Synopsis of the Apollo Program Activities and Technology for Lunar Exploration

Overall program activities and the technology developed to accomplish lunar exploration are discussed. A summary of the flights conducted over an 11-year period is presented along with specific aspects of the overall program, including lunar science, vehicle development and performance, lunar module development program, spacecraft development testing, flight crew summary, mission operations, biomedical data, spacecraft manufacturing and testing, launch site facilities, equipment, and prelaunch operations, and the lunar receiving laboratory. Appendixes provide data on each of the Apollo missions, mission type designations, spacecraft weights, records achieved by Apollo crewmen, vehicle histories, and a listing of anomalous hardware conditions noted during each flight beginning with Apollo 4.

Source record↗

LANDSAT-2 launch and flight activation. Launch through orbit 50 and orbit adjust operation

The results of the analysis conducted on the telemetry data from the prelaunch, launch, and flight activation phases of LANDSAT-2 spacecraft are presented according to subsystems and interrelationships that exist between subsystems. Subsystem characteristics are included along with the flight evaluation results. Flight data are compared to baseline data established at the 20 C plateau during thermal vacuum testing of the spacecraft. Evaluation guidelines are derived from the specifications developed from the LANDSAT program objectives: (1) acquisition of multispectral images of the surface of the earth; and (2) use of the LANDSAT-2 receiving, frequency translating, and transmitting equipment as a relay system to gather data from fixed earth-based sensor platforms which are operated by individual investigators. Data are presented on the first 50 orbits of the spacecraft.

Source record↗

Flight performance of Skylab attitude and pointing control system

The Skylab attitude and pointing control system (APCS) requirements are briefly reviewed and the way in which they became altered during the prelaunch phase of development is noted. The actual flight mission (including mission alterations during flight) is described. The serious hardware failures that occurred, beginning during ascent through the atmosphere, also are described. The APCS's ability to overcome these failures and meet mission changes are presented. The large around-the-clock support effort on the ground is discussed. Salient design points and software flexibility that should afford pertinent experience for future spacecraft attitude and pointing control system designs are included.

Chubb, W. B.↗

Apollo experience report: Engineering and analysis mission support

The tasks performed by the team of specialists that evaluated hardware performance during prelaunch checkout and in-flight operation are discussed. The organizational structure, operational procedures, and interfaces as well as the facilities and software required to perform these tasks are discussed. The scope of the service performed by the team and the evaluation philosophy are described. Summaries of problems and their resolution are included as appendixes.

Fricke, R. W., Jr.↗

Natural environment support guidelines for Space Shuttle tests and operations

The present work outlines the general concept as to how natural environment guidelines will be developed for Space Shuttle activities. The following six categories that might need natural environment support are single out: development tests; preliminary operations and prelaunch; launch to orbit; orbital mission and operations; deorbit, entry, and landing; ferry flights. An example of detailed event requirements for decisions to launch is given. Some artist's conceptions of proposed launch complexes at Kennedy Space Center and Vandenberg AFB are shown.

Carter, E. A.↗

In orbit sun calibration performance of Landsat-2

Sun calibration data from Landsat-2 are presented and compared with those from Landsat-1 (ERTS-1). The data support the hypothesis that organic contamination caused the poor performance of the Landsat-1 sun calibration mirror, since extra cleanliness precautions were taken with the Landsat-2 mirror. These precautions are described; of particular importance was the aluminum foil covering kept close to the reflective surfaces of the second mirror during the prelaunch period.

Horan, J. J.↗

An aneroid pressure sensor for constant-level balloons

The pressure sensor for the Tropical Wind Energy conversion and Reference Level Experiment (TWERLE) is described. Key design features of the sensor are: capacitive coupling, reference at midrange, up-down counting, passive oven, storage at flight pressure and prelaunch calibration. Sensor specifications are given which are based on the production results of 440 units. Drift, as estimated from simulated life tests, is 1 mb per 6 months. The overall weight of the sensor, including thermal package, is 180 g.

Levanon, N.↗

Tracking operations during Viking 1 launch phase

The prelaunch planning and subsequent analysis of tracking operations during the Viking 1 launch phase were described. The launch phase tracking procedures were intensively considered and conservatively designed to accommodate even the most unfavorable of launch possibilities. These procedures were successfully implemented and strongly contributed to the highly successful launch of Viking 1.

Berman, A. L.↗