Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic risk assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Performance Risk Model (PRisM) Proof-of-Concept: An Operational Decision Support Tool to Predict Crew Performance in Space from Available Performance Tests

The Crew Health and Performance-Probabilistic Risk Assessment (CHP-PRA) team at NASA Glenn Research Center has developed a range of tools to evaluate astronaut health during spaceflight and to optimize the medical set required for missions. Among these, the Performance Risk Model (PRisM) represents a novel advancement, extending CHP-PRA’s focus beyond medical systems into the domain of human performance. Such tool could be pivotal in optimizing astronaut capabilities during space travel, thereby enhancing overall mission success. PRisM leverages data from well-established performance assessments conducted during previous crewed space missions and Earth analogs to strategically predict outcomes for planned tasks, even when direct performance testing has not been conducted for those specific tasks. To evaluate performance, PRisM references the various metrics outlined in NASA-STD-3001 and employs a methodology to integrate different performance scales. This framework analyzes the contribution of various human system task categories (HSTCs) to task execution and compares these contributions to the HSTCs’ involvement in other known tests. The model further employs a Monte Carlo simulation to sample performance scores from their distribution in operationally relevant tests such as those in Mulavara et al. (2018) and, by leveraging similarities in HSTC involvement, transfers this knowledge to actual mission tasks, such as those outlined in the "Human Exploration of Mars: Preliminary List of Crew Tasks”. The current PRisM proof-of-concept includes analyses of the impact of exercise and specific medications on astronauts’ performance, with provisions to incorporate additional countermeasures as data becomes available. Furthermore, the tool is customizable to include any system necessary to fully encompass the domain of human systems and can be adapted to evaluate performance for any spaceflight activities as requested by operational stakeholders. PRisM has the potential to assist the Human Research Program in exploring the capabilities trade space for optimized crew performance.

performance modeling↗

Performance Risk Model Validation with Operationally Relevant Tasks

Human Research Program aims to develop methods to support astronauts’ health and productivity during spaceflight. The Crew Health and Performance Probabilistic Risk Assessment (CHP-PRA) team uses powerful computational methods to predict mission risk in both domains: medical and performance. Here, we show how CHP-PRA uses the Performance Risk Model (PRisM) to quantify the performance risk and show an application of the model on operationally relevant tasks. There are various metrics adopted across performance researchers that PRisM can accommodate. For data analysis, interpretation, and integration, we use a method of unifying data from multiple sources by converting each to a single metric. We consult subject matter experts prior to integrating the converted data into PRisM. The method we use is inspired by the Cooper-Harper rating scale [1]. Using this unified metric, we can easily combine data from various tests and lab groups. We explain our conversion method in detail and show how it pertains to the process of testing and validation of PRisM on operational tasks. We conducted an initial validation in collaboration with the Behavioral Health and Performance (BHP) lab. We test PRisM using data on their operationally relevant task ROBoT-r, a track-and-capture task for grappling incoming resupply vehicles [2]. Several other labs at NASA Johnson Space Center worked together to design 7 Functional Task Tests (FTTs) in pursuit of simulating the tasks required after landing on a planetary surface and after return to Earth [3]. Here we use the results from both ROBoT-r and the 7 FTTs and compare their experiment data to PRisM’s computational output to demonstrate how PRisM can support operations by predicting crew performance on future missions.

performance modeling↗

Application of Probabilistic Methods to Assess Risk Due to Resonance in the Design of J-2X Rocket Engine Turbine Blades

The LOX-Hydrogen J-2X Rocket Engine, which is proposed for use as an upper-stage engine for numerous earth-to-orbit and heavy lift launch vehicle architectures, is presently in the design phase and will move shortly to the initial development test phase. Analysis of the design has revealed numerous potential resonance issues with hardware in the turbomachinery turbine-side flow-path. The analysis of the fuel pump turbine blades requires particular care because resonant failure of the blades, which are rotating in excess of 30,000 revolutions/minutes (RPM), could be catastrophic for the engine and the entire launch vehicle. This paper describes a series of probabilistic analyses performed to assess the risk of failure of the turbine blades due to resonant vibration during past and present test series. Some significant results are that the probability of failure during a single complete engine hot-fire test is low (~1%) because of the small likelihood of resonance, but that the probability increases to around 30% for a more focused turbomachinery-only test because all speeds will be ramped through and there is a greater likelihood of dwelling at more speeds. These risk calculations have been invaluable for use by program management in deciding if risk-reduction methods such as dampers are necessary immediately or if the test can be performed before the risk-reduction hardware is ready.

Brown, Andrew M.↗

Using Probabilistic Methods in Water Scarcity Assessments: A First Step Towards a Water Scarcity Risk Assessment Framework

Water scarcity -driven by climate change, climate variability, and socioeconomic developments- is recognized as one of the most important global risks, both in terms of likelihood and impact. Whilst a wide range of studies have assessed the role of long term climate change and socioeconomic trends on global water scarcity, the impact of variability is less well understood. Moreover, the interactions between different forcing mechanisms, and their combined effect on changes in water scarcity conditions, are often neglected. Therefore, we provide a first step towards a framework for global water scarcity risk assessments, applying probabilistic methods to estimate water scarcity risks for different return periods under current and future conditions while using multiple climate and socioeconomic scenarios.

water scarcity↗

Statistical aspects of carbon fiber risk assessment modeling

The probabilistic and statistical aspects of the carbon fiber risk assessment modeling of fire accidents involving commercial aircraft are examined. Three major sources of uncertainty in the modeling effort are identified. These are: (1) imprecise knowledge in establishing the model; (2) parameter estimation; and (3)Monte Carlo sampling error. All three sources of uncertainty are treated and statistical procedures are utilized and/or developed to control them wherever possible.

Gross, D.↗

Probabilistic structural analysis algorithm development for computational efficiency

The PSAM (Probabilistic Structural Analysis Methods) program is developing a probabilistic structural risk assessment capability for the SSME components. An advanced probabilistic structural analysis software system, NESSUS (Numerical Evaluation of Stochastic Structures Under Stress), is being developed as part of the PSAM effort to accurately simulate stochastic structures operating under severe random loading conditions. One of the challenges in developing the NESSUS system is the development of the probabilistic algorithms that provide both efficiency and accuracy. The main probability algorithms developed and implemented in the NESSUS system are efficient, but approximate in nature. In the last six years, the algorithms have improved very significantly.

Wu, Y.-T.↗

Reliability Analysis of Complex NASA Systems with Model Based Engineering

The emergence of model-based engineering, with Model- Based Systems Engineering (MBSE) leading the way, is transforming design and analysis methodologies. The recognized benefits to systems development include moving from document-centric information systems and document-centric project communication to a model-centric environment in which control of design changes in the life cycles is facilitated. In addition, a “single source of truth” about the system, that is up-to-date in all respects of the design, becomes the authoritative source of data and information about the system. This promotes consistency and efficiency in regard to integration of the system elements as the design emerges and thereby may further optimize the design. Therefore Reliability Engineers (REs) supporting NASA missions must be integrated into model-based engineering to ensure the outputs of their analyses are relevant and value-needed to the design, development, and operational processes for failure risks assessment and communication.

Reliability prediction↗

Probabilistic Causal Analysis for System Safety Risk Assessments in Commercial Air Transport

Aviation is one of the critical modes of our national transportation system. As such, it is essential that new technologies be continually developed to ensure that a safe mode of transportation becomes even safer in the future. The NASA Aviation Safety Program (AvSP) is managing the development of new technologies and interventions aimed at reducing the fatal aviation accident rate by a factor of 5 by year 2007 and by a factor of 10 by year 2022. A portfolio assessment is currently being conducted to determine the projected impact that the new technologies and/or interventions may have on reducing aviation safety system risk. This paper reports on advanced risk analytics that combine the use of a human error taxonomy, probabilistic Bayesian Belief Networks, and case-based scenarios to assess a relative risk intensity metric. A sample case is used for illustrative purposes.

Luxhoj, James T.↗

Risk Assessment for Asteroid Impact Threat Scenarios

Asteroid impacts can cause a wide range of damage through multiple potential hazards, from localized blast waves or thermal radiation, to tsunami inundation, to global climatic effects. The level of risk posed by these hazards depends not only upon their extent and severity, but also upon the likelihood of the various damage ranges. Some consequences may be more moderate but very likely, while others may be unlikely but catastrophic. Evaluating the risk from these hazards involves substantial uncertainties across all aspects of the problem, including the properties of the asteroid itself, the specifics of its entry, and the complex high-energy damage physics involved. NASA’s Asteroid Threat Assessment Project performs Probabilistic Asteroid Impact Risk (PAIR) assessments that use fast-running entry and hazard models to evaluate millions of impact cases representing the distributions of these many uncertain parameters. This paper presents current probabilistic asteroid impact risk assessment modeling tools and approaches used for evaluating specific asteroid impact threat cases. We give an overview of the current PAIR model used to support impact threat scenarios and discuss some of the key applications of these assessment in supporting response decisions and planetary defense preparedness. We then present the results and key findings from the recent 2023 PDC hypothetical impact exercise as an example of the primary types of risk results and metrics being developed to inform and support those mitigation and response decisions.

SMD↗

Fault Management Algorithm Risk Assessment for the NASA Space Launch System

This presentation describes the false positive (FP) and false negative (FN) risk assessment process currently being conducted for the Space Launch System (SLS) Artemis II Fault Management (FM) detection functions. The analysis scope, general assumptions and guide rules, and key modeling concepts were discussed to establish the basis of the risk assessments conducted. Initial analyses indicated a dominance in the total risk by software and firmware failures. This paper presents efforts applied to refine the software risks and the overall impact of implementing those modifications. Current analyses conducted on the detection functions implemented for the SLS Artemis II mission indicate primary risk drivers for the individual FM detection functions are flight software failures, firmware design failures, and hardware Common Cause Failures (CCFs). There still remains issues of how to account for time and redundancy in the software risk estimations.

probability risk analysis↗