Search NASASearch

SEARCH · Search NASA

Results for “Project Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

An endorsement-based approach to student modeling for planner-controlled intelligent tutoring systems

An approach is described to student modeling for intelligent tutoring systems based on an explicit representation of the tutor's beliefs about the student and the arguments for and against those beliefs (called endorsements). A lexicographic comparison of arguments, sorted according to evidence reliability, provides a principled means of determining those beliefs that are considered true, false, or uncertain. Each of these beliefs is ultimately justified by underlying assessment data. The endorsement-based approach to student modeling is particularly appropriate for tutors controlled by instructional planners. These tutors place greater demands on a student model than opportunistic tutors. Numerical calculi approaches are less well-suited because it is difficult to correctly assign numbers for evidence reliability and rule plausibility. It may also be difficult to interpret final results and provide suitable combining functions. When numeric measures of uncertainty are used, arbitrary numeric thresholds are often required for planning decisions. Such an approach is inappropriate when robust context-sensitive planning decisions must be made. A TMS-based implementation of the endorsement-based approach to student modeling is presented, this approach is compared to alternatives, and a project history is provided describing the evolution of this approach.

Murray, William R.

The development of a Flight Test Engineer's Workstation for the Automated Flight Test Management System

The Automated Flight Test Management System (ATMS) is being developed as part of the NASA Aircraft Automation Program. This program focuses on the application of interdisciplinary state-of-the-art technology in artificial intelligence, control theory, and systems methodology to problems of operating and flight testing high-performance aircraft. The development of a Flight Test Engineer's Workstation (FTEWS) is presented, with a detailed description of the system, technical details, and future planned developments. The goal of the FTEWS is to provide flight test engineers and project officers with an automated computer environment for planning, scheduling, and performing flight test programs. The FTEWS system is an outgrowth of the development of ATMS and is an implementation of a component of ATMS on SUN workstations.

Tartt, David M.

A systems approach to computer-based training

This paper describes the hardware and software systems approach used in the Automated Recertification Training System (ARTS), a Phase 2 Small Business Innovation Research (SBIR) project for NASA Kennedy Space Center (KSC). The goal of this project is to optimize recertification training of technicians who process the Space Shuttle before launch by providing computer-based training courseware. The objectives of ARTS are to implement more effective CBT applications identified through a need assessment process and to provide an ehanced courseware production system. The system's capabilities are demonstrated by using five different pilot applications to convert existing classroom courses into interactive courseware. When the system is fully implemented at NASA/KSC, trainee job performance will improve and the cost of courseware development will be lower. Commercialization of the technology developed as part of this SBIR project is planned for Phase 3. Anticipated spin-off products include custom courseware for technical skills training and courseware production software for use by corporate training organizations of aerospace and other industrial companies.

Drape, Gaylen W.

Process Improvement in a Radically Changing Organization

This presentation describes how the NASA Glenn Research Center planned and implemented a process improvement effort in response to a radically changing environment. As a result of a presidential decision to redefine the Agency's mission, many ongoing projects were canceled and future workload would be awarded based on relevance to the Exploration Initiative. NASA imposed a new Procedural Requirements standard on all future software development, and the Center needed to redesign its processes from CMM Level 2 objectives to meet the new standard and position itself for CMMI. The intended audience for this presentation is systems/software developers and managers in a large, research-oriented organization that may need to respond to imposed standards while also pursuing CMMI Maturity Level goals. A set of internally developed tools will be presented, including an overall Process Improvement Action Item database, a formal inspection/peer review tool, metrics collection spreadsheet, and other related technologies. The Center also found a need to charter Technical Working Groups (TWGs) to address particular Process Areas. In addition, a Marketing TWG was needed to communicate the process changes to the development community, including an innovative web site portal.

Varga, Denise M.

Transiting Exoplanet Survey Satellite (TESS) Flight Dynamics Commissioning Results and Experiences

The Transiting Exoplanet Survey Satellite (TESS) will perform the first-ever spaceborne all-sky exoplanet transit survey and is the first primary-mission application of a lunar-resonant orbit. Launched on April 18, 2018, TESS completed a two-month commissioning phase consisting of three phasing loops followed by a lunar flyby and a final maneuver to achieve resonance. During the mission orbit, no further station-keeping maneuvers are planned or required. NASA Goddard Space Flight Center is performing flight dynamics operations for the mission. This paper covers the design, implementation, and results from TESS commissioning, including the projected performance of the final mission orbit.

Satellite

Transiting Exoplanet Survey Satellite (TESS) Flight Dynamics Commissioning Results and Experiences

The Transiting Exoplanet Survey Satellite (TESS) will perform the first-ever spaceborne all-sky exoplanet transit survey and is the first primary-mission application of a lunar-resonant orbit. Launched on April 18, 2018, TESS completed a two-month commissioning phase consisting of three phasing loops followed by a lunar flyby and a final maneuver to achieve resonance. During the mission orbit, no further station-keeping maneuvers are planned or required. NASA Goddard Space Flight Center is performing flight dynamics operations for the mission. This paper covers the design, implementation, and results from TESS commissioning, including the projected performance of the final mission orbit.

Parker, Joel J. K.

Transiting Exoplanet Survey Satellite (TESS) Flight Dynamics Commissioning Results and Experiences

The Transiting Exoplanet Survey Satellite (TESS) will perform the first-ever spaceborne all-sky exoplanet transit survey and is the first primary-mission application of a lunar-resonant orbit. Launched on April 18, 2018, TESS completed a two-month commissioning phase consisting of three phasing loops followed by a lunar flyby and a final maneuver to achieve resonance. During the mission orbit, no further station-keeping maneuvers are planned or required. NASA Goddard Space Flight Center is performing flight dynamics operations for the mission. This paper covers the design, implementation, and results from TESS commissioning, including the projected performance of the final mission orbit.

Parker, Joel J. K.

Tunisia Renewable Energy Project systems description report

In 1979, the Agency for International Development (AID) initiated a renewable energy project with the Government of Tunisia to develop an institutional capability to plan and institute renewable energy technologies in a rural area. The specific objective of the district energy applications subproject was to demonstrate solar and wind energy systems in a rural village setting. The NASA Lewis Research Center was asked by the AID Near East Bureau to manage and implement this subproject. This report describes the project and gives detailed desciptions of the various systems.

Scudder, L. R.

Late-Stage Research Development and Demonstration Sub-activities Updates – FY24 Q3

Oak Ridge National Laboratory (ORNL), in collaboration with the Pacific Northwest National Laboratory (PNNL), the National Renewable Energy Laboratory (NREL), the Lawrence Berkeley National Laboratory (LBNL), and the Hummingbird Firm (a specialized consulting firm focused on promoting diversity, equity, and inclusion considerations), has initiated a national initiative known as the Heat Pump (HP) and Heat Pump Water Heater (HPWH) Field Validation Partnership. This effort involves active participation from numerous critical entities involved in research and market transformation within the field. The ORNL team is responsible for leading Late-Stage Research Development and Demonstration (LSRDD) among the four different topics. The overall outcomes of this project will be: (1) A structured Field Validation Partnership between DOE, the national labs, research, implementation, and market transformation organizations. This will result in unique way to coordinate field validation plans and collect relevant data from around the country into the HP and HPWH Field Validation Database. (2) The Field Validation Partnership will result in a continuous stream of information between DOE and the major industry players in the space of HPs and HPWHs. If desired, DOE could use this information to inform roadmaps related to HP and HPWH market adoption and research going forward. (3) The structure of this Partnership provides a mechanism for sharing lessons learned directly between Late-Stage RD&D, Building Integration Barriers, Regional Market and Policy and Workforce Development efforts. The result will be training content that is well-reviewed by the Partnership which will lead to a workforce that meets the industry’s quality and workforce supply demands. (4) The structure of this Partnership also provides an opportunity for regions to share lessons learned on policy and market transformation with each other through the Market and Policy core Committee. This report includes an update in Late-Stage Research Development and Demonstration.

99 GENERAL AND MISCELLANEOUS

Annual Report on NCSP Technical Support task in BNL during FY24

This work reports on the investigations done during FY 24 in collaboration with two 2024 Summer undergraduate interns through the DOE SULI and BNL SURP programs. These efforts were partially funded by the Nuclear Criticality Safety Program through the Technical Support Succession Plan task. The first project, developed by Ian Snider, focused on testing the impact of uncertainties in thermal cross sections for multiple materials in nuclear reactor simulations. The second project aimed implement concurrent into BNL’s machine-learning code to correct spin mis-assignments in neutron resonances, the Bayesian Resonance Reclassifier (BRR).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS

2024 Geothermal Rising Conference Poster

As part of a U.S. DOE Geothermal Technologies Office funding opportunity, Geysers Power Company, LLC, an indirect subsidiary of Calpine Corporation, partnered with Sandia National Labs, EGI at the University of Utah, and Texas A&M University to demonstrate increased drilling performance at The Geysers Geothermal Field. The performance target in the drilling demonstrations is at least a 25% improvement in rates of penetration with increased time on bottom for each bit. The planned drilling demonstrations are being conducted as part of an existing drilling campaign intended to enhance reservoir utilization. A major goal of the project is to assess the effectiveness of implementing mechanical specific energy (MSE) and drilling dysfunction diagnosis and remediation in these challenging environments, as well as alternate bit technologies. The first demonstration well has been completed, with a total of 15 PDC bit runs in the 17.5”, 12.25” and 8.5” sections. Initial analysis shows ROP gains in all three hole sections, especially in the 17.5” and 12.25” sections, compared with conventional roller cone bit runs in the demonstration well and offset wells. However in the 8.5” hole, wear and damage to the PDC bits resulted in relatively short bit runs. Analysis is underway to take advantage of the positive results and remediate the challenges.

15 GEOTHERMAL ENERGY

Advanced Conductor Testing – 1431 kcmil Prysmian ACSS with E3X

Advanced conductors represent a significant evolution in transmission line technology. These conductors utilize innovative materials, such as composite cores, ultra-high-strength steel, and heat-dissipating coatings, to offer improved performance compared to traditional Aluminum Conductor Steel Reinforced (ACSR) designs. However, the deployment of these technologies has so far been limited. As each conductor comes with nuances in test setup and specifications, a standard test is not readily available to apply to all advanced conductors. Idaho National Laboratory’s (INL) Advanced Conductor Testing project, sponsored by the Department of Energy (DOE) Office of Cybersecurity, Energy Security, and Emergency Response (CESER) and Office of Electricity (OE), focuses on developing and implementing testing protocols and plans for advanced conductor technologies to assess and demonstrate physical performance under varying operational conditions, including extreme environmental stressors such as wildfires. This report contains the fire testing results of a 1431 kcmil Prysmian ACSS with E3X conductor.

24 - POWER TRANSMISSION AND DISTRIBUTION

Avionics test bed development plan

The plan is for a facility for the early investigation and evaluation of new concepts for the control of large space structures, orbiter attached flex body experiments, and orbiter enhancements. This plan outlines a distributed data processing facility that will utilize the current JSC laboratory resources for the test bed development. The future studies required for implementation, the management system for project control, and the baseline system configuration are described.

Harris, L. H.

Automating the U.S. Space Station's electrical power system

NASA's Lewis Research Center is developing a highly automated system for the generation, storage and distribution of electrical power aboard the projected Space Station. This autonomous power system will employ conventional algorithms, enhanced by expert systems, to schedule power, allocate energy, diagnose causes of failure, propose goals, prepare plans for their implementation, evaluate their consequences, and select optimum plans for their execution. While crew-interactive expert systems will be ready for the initial Space Station, total system autonomy is expected to require additional development time.

Dolce, James L.

Small planetary mission plan: Report to Congress

This document outlines NASA's small planetary projects plan within the context of overall agency planning. In particular, this plan is consistent with Vision 21: The NASA Strategic Plan, and the Office of Space Science and Applications (OSSA) Strategic Plan. Small planetary projects address focused scientific objectives using a limited number of mature instruments, and are designed to require little or no new technology development. Small missions can be implemented by university and industry partnerships in coordination with a NASA Center to use the unique services the agency provides. The timeframe for small missions is consistent with academic degree programs, which makes them an excellent training ground for graduate students and post-doctoral candidates. Because small missions can be conducted relatively quickly and inexpensively, they provide greater opportunity for increased access to space. In addition, small missions contribute to sustaining a vital scientific community by increasing the available opportunities for direct investigator involvement from just a few projects in a career to many.

Source record

The Console in A Briefcase: An Approach to Remote Space Operations

The CIAB (Console in a Briefcase) is conceived as an ISS (International Space Station) Payload Operations remote console that would run via an Internet connection, consisting of components (primarily a laptop PC) that fit into a briefcase, and intended for use from home in an 'on call' scenario. The primary purpose of the CIAB project is to verify that the technology and tools exist to support remote-access payload operations for the International Space Station (ISS) and to build, test, and demonstrate a prototype system. The project can potentially provide cost savings and increased morale to the space operations community by reducing demands on staff. Also, the CIAB project provides a vehicle for examining innovative concepts pertaining to Mission Planning software tools that have potential benefits beyond just the immediate needs of remote access. To date we have implemented and tested the basic capability. Current research is focused on reducing bandwidth demands via the adoption of innovative software solutions. Research into current Internet connectivity and bandwidth is also being pursued.

Heaton, Andy F.

Implementation Reviews

The point of the implementation review is to prevent problems from occurring later by trying to get our arms around the planning from the start. fmplementation reviews set the tone for management of the project. They establish a teaming relationship (if they are run properly), and they level the playing field instead of setting up turf wars.

Murphy, Gerald

Sharing the NASA Experience

Dr. Obadiah Kegege will share his career experience with the University of Missouri _ Kansas City Students. This experience spans from academia, research and development, working on flight and ground systems for space exploration, to current work in engineering project management. Most of his NASA experience concentrates on supporting the Space Communication and Navigation Program (SCaN) program. SCaN implements, manages, and maintains communications and navigation services to existing and planned space missions. Dr. Kegege's talk will touch on topics like "how do we communicate to space," as well giving an overview of NASA's Near-Earth Network (NEN), Space Network (SN), and the Deep Space Network (DSN). Also, Dr. Kegege will answer a few questions from students, i.e applying for NASA internships, applying for jobs at NASA, etc.

Kegege, Obadiah O.