Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Resilient remediation: Addressing extreme weather and climate change, creating community value

Devastating hurricanes experienced in recent years demonstrated that extreme weather and climate change can jeopardize contaminated land remediation and harm public health and the environment. Since early 2016, the Sustainable Remediation Forum (SURF) has led research and organized knowledge exchanges to examine (1) the impacts of climate change and extreme weather events on hazardous waste sites, and (2) how we can mitigate these impacts and create value for communities. The SURF team found that climate change and extreme weather events can undermine the effectiveness of the approved site remediation, and can also affect contaminant toxicity, exposure, organism sensitivity, fate and transport, long-term operations, management, and stewardship of remediation sites. Further, failure to consider social vulnerability to climate change could compromise remediation and adaptation strategies. SURF's recommendations for resilient remediation build on resources and drivers from state, national, and international sources, and marry the practices of sustainable remediation and climate change adaptation. They outline both general principles and site-specific protocols and provide global examples of mitigation and adaptation strategies. Opportunities for synergy include vulnerability assessments that benefit and build on established hazardous waste management law, policy, and practices. SURF's recommendations can guide owners and project managers in developing a site resiliency strategy. Resilient remediation can help expedite cleanup and redevelopment, decrease public health risks, and create jobs, parks, wetlands, and resilient energy sources. Resilient remediation and redevelopment can also positively contribute to achieving international goals for sustainable land management, climate action, clean energy, and sustainable cities.

54 ENVIRONMENTAL SCIENCES↗

Design, Fabrication and Testing of a Superconducting Fault Current Limiter (SFCL)

The purpose of this project was to conduct R&D on specified components and provide technical design support to a SuperPower team developing a high temperature superconducting Fault Current Limiter (SFCL). ORNL teamed with SuperPower, Inc. on a Superconductivity Partnerships with Industry (SPI) proposal for the SFCL that was submitted to DOE and approved in FY 2003. A contract between DOE and SuperPower, Inc. was signed on July 14, 2003 to design, fabricate and test the SFCL. This device employs high temperature superconducting (HTS) elements and SuperPower's proprietary technology. The program goal was to demonstrate a device that will address a broad range of the utility applications and meet utility industry requirements. This DOE-sponsored Superconductivity Partnership with Industry project would positively impact electric power transmission reliability and security by introducing a new element in the grid that can significantly mitigate fault currents and provide lower cost solutions for grid protection. The project will conduct R&D on specified components and provide technical design support to a SuperPower-led team developing a SFCL as detailed in tasks 1-5 below. Note the SuperPower scope over the broad SPI project is much larger than that shown below which indicates only the SuperPower tasks that are complementary to the ORNL tasks. SuperPower is the Project Manager for the SFCL program, and is responsible for completion of the project on schedule and budget. The scope of work for ORNL is to provide R&D support for the SFCL in the following four broad areas: (1) Assist with high voltage subsystem R&D, design, fabrication and testing including characterization of the general dielectric performance of LN2 and component materials; (2) Consult on cryogenic subsystem R&D, design, fabrication and testing; (3) Participate in project conceptual and detailed design reviews; and (4) Guide commercialization by participation on the Technical Advisory Board (TAB). SuperPower's in-kind work for the SFCL will be provided in the following areas: (1) Work with ORNL to develop suitable test platforms for the evaluation of subsystems and components; (2) Provide cryogenic and high voltage subsystem designs for evaluation; (3) Lead the development of the test plans associated with the subsystem and components and participate in test programs at ORNL; and (4) Based on the test results, finalize the subsystem and component designs and incorporate into the respective SFCL prototypes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Thermal Hydraulic Computational Fluid Dynamics Simulations and Experimental Investigation of Deformed Fuel Assemblies

The project, Toward a Longer Life Core: Thermal Hydraulic CFD Simulations and Experimental Investigation of Deformed Fuel Assemblies, DOE Project code DE-NE0008321, was a verification and validation project for flow and heat transfer through wire wrapped simulated liquid metal fuel assemblies that included both experiments and computational fluid dynamics simulations of those experiments. This project was a two year collaboration between AREVA, TerraPower, Argonne National Laboratory and Texas A&M University. Experiments were performed by AREVA and Texas A&M University. Numerical simulations of these experiments were performed by TerraPower and Argonne National Lab. Project management was performed by AREVA Federal Services. The first of a kind project resulted in the production of both local point temperature measurements and local flow mixing experiment data paired with numerical simulation benchmarking of the experiments. The project experiments included the largest wire-wrapped pin assembly Mass Index of Refraction (MIR) experiment in the world, the first known wire-wrapped assembly experiment with deformed duct geometries and the largest numerical simulations ever produced for wire-wrapped bundles.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Y-12 Lean Six Sigma Marketing Plan 2018

The Lean Six Sigma (LSS) organization at Y-12 sponsors the deployment of Performance Enterprise System (PES) and provides continuous improvement facilitation and training for the Y-12 site. The Lean Six Sigma organization is comprised of Subject Matter Experts (SME) who are passionate about continuous improvement and helping organizations improve their processes. The LSS group includes Support Leads, who perform various PES deployment activities, and Black Belts who use Lean, Six Sigma, and other leadership and project management tools to scope, analyze, and expertly facilitate teams on multifaceted improvement projects to meet safety, security, quality, timeliness, and/or cost savings goals. LSS is a group of change agents who help initiate continuous improvement throughout the Y-12 site. The ultimate goal of this marketing plan is to build a consistent, positive, and influential brand throughout Y-12. This brand will provide employees with information about the Lean Six Sigma organization, generate desire for employees to take the Performance Enterprise System training course, and to improve continuously.

99 GENERAL AND MISCELLANEOUS↗

Reducing Subjectivity in Geothermal Exploration Decision Making (Presentation); NREL(National Renewable Energy Laboratory)

Geothermal exploration projects have a significant amount of risk associated with uncertainties encountered in the discovery of the geothermal resource. Two of the largest challenges for increased geothermal deployment are 1) understanding when and how to proceed in an exploration program, and 2) when to walk away from a site. Current methodologies for exploration decision-making are formulatedby subjective expert opinion which can be incorrectly biased by expertise (e.g. geochemistry, geophysics), geographic location of focus, and the assumed conceptual model. The aim of this project is to develop a methodology for more objective geothermal exploration decision making at a given location, including go/no-go decision points to help developers and investors decide when to give up on alocation. In this scope, two different approaches are investigated: 1) value of information analysis (VOIA) which is used for evaluating and quantifying the value of a data before they are purchased, and 2) enthalpy-based exploration targeting based on reservoir size, temperature gradient estimates, and internal rate of return (IRR). The first approach, VOIA, aims to identify the value of aparticular data when making decisions with an uncertain outcome. This approach targets the pre-drilling phase of exploration. These estimated VOIs are highly affected by the size of the project and still have a high degree of subjectivity in assignment of probabilities. The second approach, exploration targeting, is focused on decision making during the drilling phase. It starts with a basicgeothermal project definition that includes target and minimum required production capacity and initial budgeting for exploration phases. Then, it uses average temperature gradient, reservoir temperature estimates, and production capacity to define targets and go/no-go limits. The decision analysis in this approach is based on achieving a minimum IRR at each phase of the project. This secondapproach was determined to be less subjective, since numerical inputs come from the collected data. And it helps to facilitate communication between project managers and exploration geologists in making objective go/no-go decisions throughout the different project phases.

15 GEOTHERMAL ENERGY↗

Grays River Watershed Restoration Status Report 2007, May 1, 2007 - October 30, 2008.

The Bonneville Power Administration (BPA) Project 2003-013-00, 'Grays River Watershed Restoration', began in FY04 and continues into FY09. This status report is intended to summarize accomplishments during the period 1 May 2007 through 30 October 2008. Accomplishments are summarized by Work Elements, as detailed in the Statement of Work (see BPA's project management database PISCES). The Pacific Northwest National Laboratory (PNNL) is collaborating with the Columbia River Estuary Task Force (CREST) on implementation of the Grays River Restoration Project. The Grays River is vitally important to the recovery of Lower Columbia River (LCR) chum salmon because it currently has the most viable population remaining in the LCR region. The Grays River watershed is also important to the recovery of salmon and steelhead in the LCR ecosystem. Today, numbers of naturally spawning salmon and steelhead have declined to levels far below historical numbers because of habitat limiting factors that include but are not limited to the lack of habitat connectivity, diversity, channel stability, riparian function and altered stream flow conditions. The objective of this project is to restore habitat-forming processes to enhance salmon and steelhead populations in the Grays River, following recommendations developed during the FY04-06 BPA-sponsored Grays River Watershed Assessment (BPA Project No. 2003-013-00). Specifically, this project will be the first step in restoring channel structure and function that will increase instream habitat diversity, channel stability, and riparian integrity in the critical response reach upstream and adjacent to critical salmon spawning areas of the Grays River. The major component of this strategy is the planning, design, installation, and monitoring of engineered logjams (ELJ) that will rejuvenate historic channel and floodplain processes. Additional restoration measures include reforesting the riparian corridor to enhance future large woody debris recruitment and investigation of conservation activities within ecologically critical areas. These activities include land acquisition and levee removal to protect critical areas and reconnect floodplain areas. Finally, monitoring integrated with restoration activities is proposed to evaluate restoration effectiveness and allow for adaptive management of future restoration treatments in the project area as well as other degraded watersheds in the Lower Columbia River.

13 HYDRO ENERGY↗

Energy Savings from GSA's National Deep Retrofit Program

Under its National Deep Energy Retrofit (NDER) program, the U.S. General Services Administration (GSA) awarded 10 ESPC projects with the objectives of using innovative technologies and renewable energy technologies, and moving buildings toward net zero energy consumption. This report analyzes data on energy savings from the 10 NDER projects, and compares them with the savings of a sample of other recently awarded Federal ESPC projects. It is shown that by emphasizing the need for deeper energy savings, and by the establishment of a central Project Management Office (PMO) to provide authoritative contracting, technical and pricing assistance, the NDER projects achieved an average level of savings more than twice that of the other Federal ESPC projects. The level of savings achieved in each project seems to be dependent more on the availability of ECMs at the site than on energy price, energy cost per square foot, pre-retrofit EUI or the length of the contract term. This suggests that GSA can achieve similar results in a wide variety of building

ESPC↗

MANAGING HANFORD'S LEGACY NO-PATH-FORWARD WASTES TO DISPOSITION

The U.S. Department of Energy (DOE) Richland Operations Office (RL) has adopted the 2015 Vision for Cleanup of the Hanford Site. This vision will protect the Columbia River, reduce the Site footprint, and reduce Site mortgage costs. The CH2M HILL Plateau Remediation Company's (CHPRC) Waste and Fuels Management Project (W&FMP) and their partners support this mission by providing centralized waste management services for the Hanford Site waste generating organizations. At the time of the CHPRC contract award (August 2008) slightly more than 9,000 m{sup 3} of waste was defined as 'no-path-forward waste.' The majority of these wastes are suspect transuranic mixed (TRUM) wastes which are currently stored in the low-level Burial Grounds (LLBG), or stored above ground in the Central Waste Complex (CWC). A portion of the waste will be generated during ongoing and future site cleanup activities. The DOE-RL and CHPRC have collaborated to identify and deliver safe, cost-effective disposition paths for 90% ({approx}8,000 m{sup 3}) of these problematic wastes. These paths include accelerated disposition through expanded use of offsite treatment capabilities. Disposal paths were selected that minimize the need to develop new technologies, minimize the need for new, on-site capabilities, and accelerate shipments of transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

THE SUCCESSFUL UTILIZATION OF COMMERCIAL TREATMENT CAPABILITIES TO DISPOSITION HANFORD NO-PATH-FORWARD SUSPECT TRANSURANIC WASTES

The U.S. Department of Energy (DOE) Richland Operations Office (RL) has adopted the 2015 Vision for Cleanup of the Hanford Site. The CH2M HILL Plateau Remediation Company's (CHPRC) Waste and Fuels Management Project (W&FMP) and their partners support this mission by providing centralized waste management services for the Hanford Site waste generating organizations. At the time of the CHPRC contract award (August 2008) slightly more than 9,000 cubic meters (m{sup 3}) of legacy waste was defined as ''no-path-forward waste.'' A significant portion of this waste (7,650 m{sup 3}) comprised wastes with up to 50 grams of special nuclear materials (SNM) in oversized packages recovered during retrieval operations and large glove boxes removed from Hanford's Plutonium Finishing Plant (PFP). Through a collaborative effort between the DOE, CHPRC, and Perma-Fix Environmental Services, Inc. (PESI), pathways for these problematic wastes were developed and are currently being implemented.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adaptive management: a paradigm for remediation of public facilities

Public facility restoration planning traditionally focused on response to natural disasters and hazardous materials accidental releases. These plans now need to integrate response to terrorist actions. Therefore, plans must address a wide range of potential vulnerabilities. Similar types of broad remediation planning are needed for restoration of waste and hazardous material handling areas and facilities. There are strong similarities in damage results and remediation activities between unintentional and terrorist actions; however, the uncertainties associated with terrorist actions result in a re-evaluation of approaches to planning. Restoration of public facilities following a release of a hazardous material is inherently far more complex than in confined industrial settings and has many unique technical, economic, social, and political challenges. Therefore, they arguably involve a superset of drivers, concerns and public agencies compared to other restoration efforts. This superset of conditions increases complexity of interactions, reduces our knowledge of the initial conditions, and even condenses the timeline for restoration response. Therefore, evaluations of alternative restoration management approaches developed for responding to terrorist actions provide useful knowledge for large, complex waste management projects. Whereas present planning documents have substantial linearity in their organization, the 'adaptive management' paradigm provides a constructive parallel operations paradigm for restoration of facilities that anticipates and plans for uncertainty, multiple/simUltaneous public agency actions, and stakeholder participation. Adaptive management grew out of the need to manage and restore natural resources in highly complex and changing environments with limited knowledge about causal relationships and responses to restoration actions. Similarities between natural resource management and restoration of a facility and surrounding area(s) after a disruptive event suggest numerous advantages over preset linearly-structured plans by incorporating the flexibility and overlap of processes inherent in effective facility restoration. We discuss three restoration case studies (e.g., the Hart Senate Office Building anthrax restoration, Rocky Flats actinide remediation, and hurricane destruction restoration), that implement aspects of adaptive management but not a formal approach. We propose that more formal adoption of adaptive management principles could be a basis for more flexible standards to improve site-specific remediation plans under conditions of high uncertainty.

99 GENERAL AND MISCELLANEOUS↗

Experience from the US contribution to HL-LHC: Nb3Sn focusing quadrupoles and SRF crab cavities

The Interaction Regions (IR) of many colliders benefit from the application of leading-edge technologies to ensure the highest possible luminosity delivered to the experiments. Leading-edge low-beta focusing magnets and crab cavities to handle individual bunches are critically important to increase the instantaneous and integrated luminosity in future Colliders.The High-Luminosity LHC Upgrade, HL-LHC, with Nb3Sn Magnets (called MQXF) and Superconducting Radio Frequency (SRF) crab cavities (of two types, called DQW and RFD) is a world-wide collaborative project under construction in this decade to utilize the solutions mentioned above as key ingredients to increase tenfold the integrated luminosity delivered to the CMS and ATLAS experiments in the next decade. The HL-LHC AUP is the US effort to contribute approximately 50% of the low-beta focusing magnets and crab cavities for the HL-LHC.In this contribution we present the valuable lessons learned by the US efforts in the procurement, construction, and testing phases of the Nb3Sn focusing magnets and SRF crab cavities. We will report on the experience gathered by HL-LHC AUP in the production of the first half of deliverables (magnets MQXFA03 to MQXFA13). We will also report on the test of the first cryoassemblies and the status of the cavities’ development, production and testing.Both the technical and project management lessons-learned will inform applications of these technologies to future colliders and projects.

43 PARTICLE ACCELERATORS↗

Economic Analysis of Potential for CCUS in the Gulf of Mexico

This study identifies the major capital and operating expenses in eight distinct segments across carbon capture, transportation, and injection operations within the offshore CCUS supply chain to develop a model identifying the financial challenges the market must address. The approach then defined the economic drivers and primary cost elements within the CCUS supply chain to model the total supply chain costs and returns along with plausible scenarios of projects for CCUS. This study was presented as a poster at the 2022 Carbon Management Project Review Meeting held in Pittsburgh, PA (August 15 – 19, 2022).

Grant, Timothy↗

Commercialization of Medium Voltage HTS Triax™ Cable Systems

The original project scope that was established in 2007 aimed to install a 1,700 meter (1.1 mile) medium voltage HTS Triax™ cable system into the utility grid in New Orleans, LA. In 2010, however, the utility partner withdrew from the project, so the 1,700 meter cable installation was cancelled and the scope of work was reduced. The work then concentrated on the specific barriers to commercialization of HTS cable technology. The modified scope included long-length HTS cable design and testing, high voltage factory test development, optimized cooling system development, and HTS cable life-cycle analysis. In 2012, Southwire again analyzed the market for HTS cables and deemed the near term market acceptance to be low. The scope of work was further reduced to the completion of tasks already started and to testing of the existing HTS cable system in Columbus, OH. The work completed under the project included: • Long-length cable modeling and analysis • HTS wire evaluation and testing • Cable testing for AC losses • Optimized cooling system design • Life cycle testing of the HTS cable in Columbus, OH • Project management. The 200 meter long HTS Triax™ cable in Columbus, OH was incorporated into the project under the initial scope changes as a test bed for life cycle testing as well as the site for an optimized HTS cable cooling system. The Columbus cable utilizes the HTS Triax™ design, so it provided an economical tool for these of the project tasks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

AmeriFlux FLUXNET-1F US-Fmf Flagstaff - Managed Forest

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Fmf Flagstaff - Managed Forest. This is the FLUXNET version of the carbon flux data for the site US-Fmf Flagstaff - Managed Forest produced by applying the standard ONEFlux (1F) software. Site Description - Ponderosa pine forest subject to thinning in September 2006. Project webpage http://nau.edu/CEFNS/Forestry/Research/Carbon-Flux/Sites/

Dore, Sabina↗

A database-informed approach to new plant shielding design

Document available in abstract form only, full text of document follows: To facilitate the definition and description of radiation dose rates in the numerous rooms and areas of a new nuclear power plant, a database approach was developed. This approach offers a number of benefits over more manual methods. A key benefit is that the selection of an appropriate shielding method to use in each area of the plant is greatly facilitated by virtue of the team's improved ability to grasp the significance of each of the individual sources that are candidates for making a significant contribution to the dose rate in each area. By understanding the level of relevant contribution - if any - of each of these candidate sources, an analyst is able to select a method that will define the contribution without becoming enmired in a model representing inappropriately high degrees of accuracy and modeling time. This database method, by allowing for an evolving understanding of dose rates and sources in the neighboring rooms for each portion of the plant, leads to substantial reductions in the effort of characterizing a plant's radiation environment. As an additional benefit, the database serves as a tool for documenting the shielding calculations themselves, automatically generating formatted sections including drawing and source term references, shielding calculation types, key dimensions, and results; these sections can form the starting point of a full calculation package. The approach offers a final project management benefit: estimating, tracking, and predicting the effort associated with the many calculations involved in such a project are greatly systematized, leading to more reliable manpower estimates. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Geological storage of CO2 in sub-seafloor basalt: the CarbonSAFE pre-feasibility study offshore Washington State and British Columbia

The CarbonSAFE Cascadia project is conducting a pre-feasibility study to evaluate technical and nontechnical aspects of collecting and storing 50 MMT of CO2 in a safe, ocean basalt reservoir offshore from Washington State and British Columbia. Sub-seafloor basalts are very common on Earth and enable CO2 mineralization as a long-term storage mechanism, permanently sequestering the carbon in solid rock form. Our project goals include evaluation of this reservoir as an industrial-scale CO2 storage complex, developing potential source/transport scenarios, and conducting laboratory and modeling studies to evaluate the potential capacity of the reservoir, and completing an evaluation of economic, regulatory and project management risks. Potential scenarios include sources and transport options in USA and in Canada. The overall project network consists of a coordination team of researchers from collaborating academic institutions, subcontractors, and external participants. Lessons learned from this study at the Cascadia Basin location may be transferrable elsewhere around the globe.

basalt, carbon storage, Offshore CO2 Injection↗

Quality framework proposal for Component Material Evaluation (CME) projects.

This report proposes the first stage of a Quality Framework approach that can be used to evaluate and document Component Material Evaluation (CME) projects. The first stage of the Quality Framework defines two tools that will be used to evaluate a CME project. The first tool is used to decompose a CME project into its essential elements. These elements can then be evaluated for inherent quality by looking at the subelements that impact their level of quality maturity or rigor. Quality Readiness Levels (QRLs) are used to valuate project elements for inherent quality. The Framework provides guidance for the Principal Investigator (PI) and stakeholders for CME project prerequisites that help to ensure the proper level of confidence in the deliverable given its intended use. The Framework also Provides a roadmap that defined when and how the Framework tools should be applied. Use of these tools allow the Principal Investigator (PI) and stakeholders to understand what elements the project will use to execute the project, the inherent quality of the elements, which of those are critical to the project and why, and the risks associated to the project's elements.

97 MATHEMATICS AND COMPUTING↗

Greenbelt Homes Pilot Program: Summary of Building Envelope Retrofits, Planned HVAC Equipment Upgrades, and Energy Savings

In fall 2010, Greenbelt Homes, Inc. (GHI) a 1,566-home cooperative of circa 1930-1940 homes in Greenbelt, Maryland, undertook a multiyear pilot energy efficiency retrofit project. GHI established this pilot project as a basis for decision making for the rollout of a decade-long community-wide upgrade program that will incorporate energy-efficiency improvements to the building envelopes and mechanical equipment. The community upgrade is fully funded by the cooperative through its membership with no outside subsidies. This project thus presents a unique opportunity to evaluate and prioritize the wide range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, tradeoffs, construction methods, project management implications, realistic upfront costs, financing, and other considerations provides a case study for energy retrofit projects to include high-performance technologies based on the long-term value to the homeowner.

Array↗