Autonomous Microgrids: Resilience-Oriented Microgrid Planning and Operations
This presentation talks about the autonomous microgrid work developed under REORG project.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This presentation talks about the autonomous microgrid work developed under REORG project.
Materials scientists want to study the irradiated graphite target from the Neutrino at the Main Injector (NuMI) beam line. In order to gather these irradiated graphite fins from the target canister, it will have to be done remotely. Therefore, a removal assembly will need to be created in order to do this efficiently and well. This project aims to make progressive steps towards deploying the final target removal assembly. Furthermore, calculations related to the removal assembly design were done, and tests were planned to discover further information about the feasibility of this design. The main result from this project is the deflection of the cantilever arm, which is 0.354 inches due to the weight of the beam and cutting tool. Additionally, more results of this project are the testing assembly CAD model and the feasibility of design. This project concludes that there is still more work that needs to be done for the removal assembly to be deployed, but there were foundational steps that were made in the implementation of this design. Finally, there should be further steps and tests to determine the feasibility of this removal assembly.
Materials scientists want to study the irradiated graphite target from the Neutrino at the Main Injector (NuMI) beam line. In order to gather these irradiated graphite fins from the target canister, it will have to be done remotely. Therefore, a removal assembly will need to be created in order to do this efficiently and well. This project aims to make progressive steps towards deploying the final target removal assembly. Furthermore, calculations related to the removal assembly design were done, and tests were planned to discover further information about the feasibility of this design. The main result from this project is the deflection of the cantilever arm, which is 0.354 inches due to the weight of the beam and cutting tool. Additionally, more results of this project are the testing assembly CAD model and the feasibility of design. This project concludes that there is still more work that needs to be done for the removal assembly to be deployed, but there were foundational steps that were made in the implementation of this design. Finally, there should be further steps and tests to determine the feasibility of this removal assembly.
A new baseline (NB) has been proposed by the ITER Project to ensure a robust achievement of the Projects’ goals, in view of past challenges including delays incurred due to the Covid-19 pandemic, technical challenges in completing first-of-a-kind components and in nuclear licensing. The NB includes modifications to the configuration of the ITER device and its ancillaries (e.g. change from beryllium to tungsten as first wall material, modification of the heating and current drive mix, etc.) as well as additional testing of components (e.g. toroidal field coils) or phased installation (start with inertially cooled first wall before later installation of the final actively water-cooled components) to minimise operational risks. In the NB, the ITER research plan (IRP) will be divided into three main phases: (a) start of research operation, with 40 MW of ECH and 10 MW of ICH, which will focus on the demonstration of 15 MA operation in L-mode, commissioning of all required systems, including disruption mitigation, and the demonstration of H-mode plasma operation in deuterium; (b) DT-1, with 60–67 MW of ECH, 33 MW of neutral beam injection (NBI) and 10–20 MW of ICH, which will demonstrate robust operation in high confinement H-mode plasmas in DT up to Q ⩾ 10 and for burn durations of 300–500 s within an accumulated neutron fluence of ∼1% of the ITER machine’s lifetime total, and; (c) DT-2, with up to 67 MW of ECH, up to 49.5 MW of NBI and up to 20 MW of ICH, with the ITER tokamak and ancillaries in their final configuration to demonstrate routine operation in DT plasmas at high Q and the Q ⩾ 5 long-pulse and steady-state scenarios to the final neutron fluence and to perform R&D on nuclear fusion reactor issues. The logic, physics basis, modelling and experimental evaluations carried out to support the NB and the associated IRP are described. These include the impact of the tungsten wall on plasma scenarios and associated risk mitigation measures, as well as the optimisation of the tokamak components and ancillaries to minimise Project risks. Open R&D issues related to these evaluations and mitigation measures are also described together with experimental, modelling and validation activities required to address them.
Deployment of battery energy storage (BESS) systems, both standalone and as part of hybrid systems paired with generation, has rapidly increased in the United States in recent years as utilities and communities have deployed storage to improve electric grid reliability and act as a cost-effective alternative to larger grid infrastructure. The modular nature of BESS technologies means systems may be built near other existing land uses, creating the potential for conflicts with neighboring landowners that can be managed and mitigated through zoning and permitting requirements established by local jurisdictions. While many cities and counties have adopted ordinances specific to BESS into their local zoning codes, these ordinances vary significantly in their requirements and level of detail. Meanwhile, many other jurisdictions, including those home to proposed or existing BESS projects, lack any specific language related to BESS in their zoning codes. Local planning and zoning officials have limited capacity and may lack the familiarity with BESS technologies needed to develop ordinances or otherwise make reasonable zoning decisions that balance safety, community impacts, and other goals. The resulting uncertainty at the local zoning level has led developers to withdraw projects in some areas and has spurred moratoria or bans on energy storage projects in others. This report intends to provide practical resources for practitioners interested in reasonable and effective local regulation of battery energy storage. It does not present a model zoning ordinance, but rather is intended to complement model ordinances developed by others by providing additional context and analysis regarding the structure of energy storage zoning ordinances and the decision points for local officials. Zoning ordinances at the city, town, and county level across the U.S. were surveyed alongside two template model ordinances to identify common elements and options for regulating the zoning and siting of BESS. Common elements identified and analyzed include definitions and general requirements, including cutoffs or tiers used to apply regulations to different system sizes and the permitted zones where jurisdictions allow BESS to be sited; visual, noise, and aesthetic requirements, including property line setbacks, fencing and visual screening, noise, and lighting requirements; and safety and planning requirements, such as site plans, decommissioning plans or funds, and requirements for access by emergency services. The report also summarizes some of the more unique regulations, including those that place additional restrictions on BESS at the local level.
ABSTRACT We apply a novel model based on convolutional neural networks (CNN) to identify gravitationally lensed galaxies in multiband imaging of the Hyper Suprime-Cam Subaru Strategic Program (HSC-SSP) Survey. The trained model is applied to a parent sample of 2350 061 galaxies selected from the $\sim$ 800 deg$^2$ Wide area of the HSC-SSP Public Data Release 2. The galaxies in HSC Wide are selected based on stringent pre-selection criteria, such as multiband magnitudes, stellar mass, star formation rate, extendedness limit, photometric redshift range, etc. The trained CNN assigns a score from 0 to 1, with 1 representing lenses and 0 representing non-lenses. Initially, the CNN selects a total of 20 241 cutouts with a score greater than 0.9, but this number is subsequently reduced to 1522 cutouts after removing definite non-lenses for further visual inspection. We discover 43 grade A (definite) and 269 grade B (probable) strong lens candidates, of which 97 are completely new. In addition, we also discover 880 grade C (possible) lens candidates, 289 of which are known systems in the literature. We identify 143 candidates from the known systems of grade C that had higher confidence in previous searches. Our model can also recover 285 candidate galaxy-scale lenses from the Survey of Gravitationally lensed Objects in HSC Imaging (SuGOHI), where a single foreground galaxy acts as the deflector. Even though group-scale and cluster-scale lens systems are not included in the training, a sample of 32 SuGOHI-c (i.e. group/cluster-scale systems) lens candidates is retrieved. Our discoveries will be useful for ongoing and planned spectroscopic surveys, such as the Subaru Prime Focus Spectrograph project, to measure lens and source redshifts in order to enable detailed lens modelling.
The Fermilab Main Injector accelerating cavities have sparking issues when they are run at voltages higher than those required by the PIP-II project. This is a problem Fermilab is working on as planning begins for the next upgrade to the accelerator complex. One of the methods being used to address the issue is the development of a CST Microwave Studio simulation to accurately model the PIP-II dual power amplifier cavities and identify which part(s) of the cavity is causing sparking to develop. The model will also be used to determine if changes to the cavity geometry may allow the cavity to be used at higher voltages before sparking occurs.
The objective of this project was for the facility to conduct a techno-economic assessment of the Maximal Asymmetric Drag Wave Energy Converter (MADWEC), developed by the University of Massachusetts Dartmouth (UMass Dartmouth), used for powering remote monitoring and AUV charging systems compared to other existing power supply options. The assessment estimates capital expenditures (CapEx), operational expenditures (OpEx), and power performance for 18 scenarios with the purpose of identifying key cost drivers, comparing total system cost, and comparing the power performance of the power supply options in terms of required installed capacity and estimated theoretical annual energy performance. The scenarios include two end-uses: (1) AUV charging and (2) offshore remote monitoring); three power sources: (1) MADWEC), (2) photovoltaic (PV) solar buoy, (3) and traditional battery swapping); and three locations; (1) nearshore, (2) far-offshore, and (3) high-latitude). In addition, other project goals included developing high level installation, operation, and maintenance plans for each scenario.
The Fermilab Main Injector accelerating cavities have sparking issues when they are run at voltages higher than those required by the PIP-II project. This is a problem Fermilab is working on as planning begins for the next upgrade to the accelerator complex. One of the methods being used to address the issue is the development of a CST Microwave Studio simulation to accurately model the PIP-II dual power amplifier cavities and identify which part(s) of the cavity is causing sparking to develop. The model will also be used to determine if changes to the cavity geometry may allow the cavity to be used at higher voltages before sparking occurs
The GRACE project (Grid that is Risk-Aware for Clean Electricity) was a five-year research initiative funded by the U.S. Department of Energy's Advanced Research Projects Agency- Energy (ARPA-E) under the PERFORM program. Led by Duke University's Nicholas School of the Environment, with contributions from The Ohio State University, North Carolina State University, Dartmouth College, and Pacific Northwest National Laboratory, the project addressed a fundamental challenge in grid management: conventional software plans for a single most-likely outcome and relies on reserves as a buffer, leaving utilities poorly equipped for the growing variability introduced by renewable energy. GRACE demonstrated a better approach: explicitly representing thousands of plausible future scenarios and choosing operating schedules that perform well across all of them.
The Energy Technology Innovation Partnership Project (ETIPP) worked with the Makah Tribe on strategic energy planning, including scoping future energy needs of relocated facilities, understanding the potential for new energy generation options to support current and future energy demand, and supporting communication and capacity-building goals.
The Integrated Urban Services (IUS) program, launched in 2021 and funded by the U.S. State Department under the United States-Association of Southeast Asian Nations (US-ASEAN) Smart Cities Partnership, aimed to bolster resilience in ASEAN cities by addressing challenges across food, energy, and water systems. Led by the National Renewable Energy Lab (NREL) with support from Regenerative Impact Ventures, the program focused on demonstrating the socio-economic benefits of integrated urban planning, educating stakeholders on circular economy principles, providing technical assistance to two ASEAN cities, and attracting private sector involvement. The program facilitated peer learning events, engaging public and private sector participants and leveraging knowledge from a group of global experts to inform approaches and best practices. Technical assistance was provided to two pilot cities, Iskandar Malaysia and Cagayan de Oro, Philippines, resulting in the development of market-driven business plans for resilient, circular, and regenerative energy-water-food system projects. The Iskandar Malaysia pilot focused on development of a state-of-the-art AgriTech Innovation Hub and Modern Farming Complex to enhance agricultural productivity and produce enough renewable energy to power the facilities. The Cagayan de Oro project aimed to enhance urban agricultural productivity and waste management through development of an Urban Precision Agricultural Complex featuring aeroponics, hydroponics, aquaponics, agrivoltaics, and a Black Solider Fly Facility for converting municipal solid waste into commodities. The success of the IUS program sets a precedent for replicating integrated urban service models globally, offering valuable insights for cities aiming to enhance their resilience and sustainability.
This case study report documents the City's project evolution and the entrepreneurial ways through which the City approached the questions of how solar and storage could support their resilience efforts and how to value and pay for solar-plus-storage systems. This report documents how and why the City of Reno came to the specific conclusion to integrate solar and storage into their Public Safety Center retrofit project and apply for Federal Emergency Management Agency (FEMA) Building Resilient Infrastructure and Communities (BRIC) funding. (The City of Reno applied for and was awarded FEMA BRIC funding in January 2021; leveraging work that was underway in this project.) This report provides an overview for other local governments to draw inspiration from when considering how to prioritize community values and pursue multi-stakeholder dialogue around resilient energy solutions. The City of Reno's experience can serve as a starting point for other communities interested in valuing the resilience benefits of solar and storage.
Residential and commercial buildings accounted for 40% of U.S. energy consumption in 2022 and represent a significant opportunity for decarbonization through energy efficiency and electrification, and for grid planning. Building stock energy modeling is a powerful tool that can evaluate what-if scenarios as utilities, municipalities, policymakers, building owners and others work towards equitable building decarbonization and climate goals. This presentation will highlight several high-impact use cases of the National Renewable Energy Laboratory (NREL)'s highly granular, bottom-up building stock energy modeling tools, ResStock and ComStock. These use cases cover a wide range of project scale, from neighborhood electrification analysis and municipality long-term energy planning, to state energy code development and national policy evaluation. This presentation will showcase specific real-world applications for which ResStock and ComStock have been utilized across the country, including California codes and standards cost-effectiveness analysis, New York City affordable housing electrification cost gap analysis, and California targeted electrification and gas decommissioning analysis. For each use case, this presentation will illustrate how ResStock and ComStock played a crucial role in accurately characterizing regional building stocks, providing discrete and aggregated end-use load shapes, and calculating lifecycle consumption, emissions, and costs for a variety of building electrification strategies and scenarios. Finally, this presentation will demonstrate how the data provided by ResStock and ComStock can help unlock significant outcomes for these use cases, including but not limited to, customer bill impact, incentive and program design, and energy equity analyses.
The Fermilab Accelerator Complex is the largest national user facility in the Office of High Energy Physics (DOE/HEP) program and the only national user facility operating at Fermilab. Fermilab serves as the host to the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE), the laboratory’s flagship project for neutrino science that is under construction. LBNF/DUNE will be powered by megawatt beams from an upgraded accelerator, the Proton Improvement Plan II (PIP-II) that will replace the laboratory’s aging linear accelerator with a new one based on superconducting radio-frequency cavities. The Accelerator Controls Operations Research Network (ACORN) Project will support LBNF/DUNE and PIP-II by modernizing the accelerator control system. The project is at the conceptual design phase and looking to achieve Critical Decision 1 (CD-1) later this year. The scope and structure of the project will be presented, along with an overview of how that has changed in the past year. Current design and technology choices will be shared. Specific challenges facing the project will be addressed, along with current thinking on solutions.
The U.S. Department of Energy's (DOE) Energy Technology Innovation Partnership Project (ETIPP) helps coastal, remote, and island communities increase the affordability, reliability, and security of their energy systems through energy planning and deep-dive technical assistance.
The U.S. Department of Energy's (DOE) Energy Technology Innovation Partnership Project (ETIPP) helps coastal, remote, and island communities increase the affordability, reliability, and security of their energy systems through energy planning and deep-dive technical assistance. This is a English and Spanish translation.
The Roughrider Carbon Storage Hub was a 2-year project (October 2023 – September 2025) conducted by the Energy & Environmental Research Center (EERC) focused on advancing the feasibility of a commercial-scale carbon dioxide (CO 2 ) geologic storage hub in McKenzie County, North Dakota. The project’s objective was to investigate the potential that stacked storage complexes (multiple deep saline formations) can safely and economically store at least 50 million tonnes of CO 2 within 30 years. The captured CO 2 would be sourced from industrial emitters including project partner ONEOK, Inc.’s gas-processing plants and a planned gas-to-liquids facility. Drilling of the Roughrider 1 stratigraphic test well (14,979-ft total depth) was completed in November 2024. The wellbore intersected four candidate storage formations: Inyan Kara, Broom Creek, Mission Canyon, and Black Island–Deadwood. Operational challenges, including a stuck drill string, were resolved without long-term impact. A comprehensive logging and coring program was conducted, followed by successful well abandonment and site reclamation. Over 660 ft of 4-in. whole core was retrieved. Core plug samples were processed and analyzed for petrophysical and geochemical properties. Results confirmed promising porosity and permeability in the Inyan Kara and Broom Creek Formations and removal of the Mission Canyon and Black Island–Deadwood horizons from further investigation. Data derived from the logging and coring program were used to improve initial geologic models built from legacy data. CO 2 injection simulations showed that the Inyan Kara alone can feasibly store the target mass of CO 2 . Because of subtle differences in geologic structure and porosity trends between the formations, a stacked storage scenario using the Broom Creek and Inyan Kara Formations resulted in a larger overall plume area than using the Inyan Kara alone. Preliminary CO 2 pipeline routes from the industrial sources were mapped utilizing existing rights of way and evaluated for capacity and cost using U.S. Department of Energy Office of Fossil Energy and Carbon Management/National Energy Technology Laboratory models and U.S. Environmental Protection Agency emissions data. Integrating capture, transport, and storage cost estimates with policy incentives (e.g., 45Q credits) provided a total cost-per-ton analysis. Results indicate that the small scale of the volumes to be transported over the cumulative large distances does not support the project’s financial viability. However, the groundwork laid during this project from geological, regulatory, and social perspectives positions the Roughrider hub site as a promising candidate for commercial carbon storage in North Dakota, especially if the economy of scale is introduced for CO 2 transportation to the hub site.