Management systems planning on new flight programs.
Management systems planning for control and information systems for Voyager project, with attention to work breakdown and scheduling
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Management systems planning for control and information systems for Voyager project, with attention to work breakdown and scheduling
The cost estimates, schedule data, and funding distributions generated in the Manned Orbital Systems Concepts (MOSC) study are presented. The overall objectives were to examine the requirements for, and to describe, a cost-effective concept for an orbital facility capable of supporting manned operations in earth orbit beyond the 7-to-30-day mission duration provided by the Shuttle/Spacelab system. The cost, schedule, and other programmatic data were developed to provide information useful for their long-range planning activities. The major portion of the data documented and discussed consists of project- and system-level schedule and funding information and also project-, system-, and subsystem-level cost summaries.
Accurate cost estimates help managers understand critical cost-risk information, which improves their perception of the impact project changes have on the budget and schedule. This research project examined buffer reserves, a key aspect of cost estimation. The main focus of this project was to utilize historical data to calculate the extent to which NASA programs typically exceed their original buffers.
With NASA suffering severe funding cutbacks, engineers at NASA are required to produce state-of-the-art hardware with limited personnel and financial resources. In light of these constraints, the new NASA mandate is to build better, faster and cheaper. In April of 1998, Stennis Space Center's Commercial Remote Sensing Program contracted to the Systems Engineering Division at NASA Ames Research Center to develop a device known as a Field Goniometer. A Field Goniometer is a device that measures bi-directional reflectance of a target, such as vegetation, relative to the sun and an imaging system in an aircraft or spacecraft. The device is able to provide a spectral fingerprint of the surface it is measuring in wavelengths from 350nm-2500nm using a hyperspectral imager. To accomplish this project, several obstacles had to be overcome. First, the design had to be completed in less than four months. Second, due to the complexity of the design, the use of solid modeling was highly desirable but most of the group's solid modelers were assigned to other jobs. Third, the amount of funding available from the customer was one half to one third the funding typically expended for a job of this nature. Our choices for this project were to design with standard 2-D CAD systems currently used in-house or train additional engineers on our existing solids package or purchase a new solid model package. The use of a 2D CAD system was very undesirable due to the complexity of the design. Using our existing solids modeler would have required a learning curve for our engineers that would be incompatible with our schedule. Prior to this project, a member of our design group researched the solid modeling industry and decided to purchase SolidWorks. After examining the product for ease of use, modeling capability, training time required and cost, we decided our highest probability of success would be to design with Solidworks. During the design phase, our fabrication group was able to provide input at the very early stages, which added significant benefit to the final product. Fabrication cost and schedule savings have been realized by having complex part geometries translated directly from the SolidWorks design models to Surfcam and other computer-aided manufacturing (CAM) software. This direct model translation capability optimized the fabrication processes. The end result was that we were able to successfully complete the project on time and on budget. Other advantages of using SolidWorks, as cited by the design team, include a rapid negotiation of the initial learning curve, the ability to develop solid model hardware prototypes (used to communicate the design intent to both the customer and the fabricator), and the ability to work as a team collaborating on a large, complex model. These types of tools and efforts represent our response to NASA's challenge to produce higher quality products within shorter design and fabrication times.
The NASA Vision for Space Exploration begins with a more reliable flight capability to the International Space Station and ends with sending humans to Mars. An important stepping stone on the path to Mars encompasses human missions to the Moon. There is little doubt throughout the stakeholder community that new technologies will be required to enable this Vision. However, there are many factors that influence the ability to successfully infuse any technology including the technical risk, requirement and development schedule maturity, and, funds available. This paper focuses on effective infusion processes that have been used recently for the technologies in development for the lunar exploration flight program, Constellation. Recent successes with Constellation customers are highlighted for the Exploration Technology Development Program (ETDP) Projects managed by NASA Glenn Research Center (GRC). Following an overview of the technical context of both the flight program and the technology capability mapping, the process is described for how to effectively build an integrated technology infusion plan. The process starts with a sound risk development plan and is completed with an integrated project plan, including content, schedule and cost. In reality, the available resources for this development are going to change over time, necessitating some level of iteration in the planning. However, the driving process is based on the initial risk assessment, which changes only when the overall architecture changes, enabling some level of stability in the process.
The objective of this joint NASA Ames/JPL/SRI project was to develop mixed-initiative planning and scheduling technology that would enable more effective and efficient planning of science missions. The original intent behind the project was to have all three organizations work closely on the overall research and technology development objectives. Shortly after the project began, however, the Ames and JPL project members made a commitment to develop and field an operational mixed-initiative planning and scheduling tool called MAPGEN for the 2003 Mars Exploration Rover (MER) mission [Ai-Chang et al. 2003]. Because of the tremendous amounts of time and effort that went into making that tool a success, the Ames and JPL personnel were mostly unavailable for collaboration on the joint objectives of the original proposal. Until November of 2002, SRI postponed work on the project in the hope that the Ames and JPL personnel would be able to find time for the planned collaborative research. During discussions between Dr. Karen Myers (the SRI institutional PI) and Dr. John Bresina (the project PI) during November of 2002, it was mutually agreed that SRI should work independently to achieve some of the research objectives for the project. In particular, Dr. Bresina identified explanation of plans and planner behavior as a critical area for research, based on feedback from demonstrating an initial prototype of MAPGEN to the operational community. For that reason, our focus from November of 2002 through the end of the project was on designing explanation methods to address this need.
The Traffic Management Advisor (TMA) is an air traffic control automation system currently in use in seven Air Route Traffic Control Centers (ARTCCs) to enable time based metering to busy airports within their airspace. However, this system is limited to operation within a single ARTCC, within about a 200 nautical mile radius of the airport, and on relatively simple streams of traffic. The need for coordinated metering within a greater (300+ nautical mile) radius of an airport, on streams of traffic with significant branching, and across ARTCC boundaries, has been identified. Early tests revealed that TMA could not simply be scaled up to handle such a problem. Instead, a loosely coupled hierarchy of schedules, in which constraints from downstream schedules are passed upstream, is required. Such an architecture reduces the reliance on distant projections of arrival times, making schedules robust to changes in sequence and to additions of aircraft (such as aircraft departing inside the system s scheduling horizon). This architecture is also scaleable, easily reconfigurable, and can be networked together. As such, it can be adapted for use in any size or configuration of airspace and with any number of airports delivering restrictions. An implementation of this distributed scheduling architecture is currently undergoing testing in the TMA-Multi Center system. This paper describes the architecture and its motivation.
The Applied Meteorology Unit (AMU) provides technology transition and technique development to improve operational weather support to the Space Shuttle and the entire American space program. The AMU is funded and managed by NASA and operated by a contractor that provides five meteorologists with a diverse mix of advanced degrees, operational experience, and associated skills including data processing, statistics, and the development of graphical user interfaces. The AMU's primary customers are the U.S. Air Force 45th Weather Squadron at Patrick Air Force Base, the National Weather Service Spaceflight Meteorology Group at NASA Johnson Space Center, and the National Weather Service Melbourne FL Forecast Office. The AMU has transitioned research into operations for nineteen years and worked on a wide range of topics, including new forecasting techniques for lightning probability, synoptic peak winds,.convective winds, and summer severe weather; satellite tools to predict anvil cloud trajectories and evaluate camera line of sight for Space Shuttle launch; optimized radar scan strategies; evaluated and implemented local numerical models; evaluated weather sensors; and many more. The AMU has completed 113 projects with 5 more scheduled to be completed by the end of 2010. During this rich history, the AMU and its customers have learned many lessons on how to effectively transition research into operations. Some of these lessons learned include collocating with the operational customer and periodically visiting geographically separated customers, operator submitted projects, consensus tasking process, use of operator primary advocates for each project, customer AMU liaisons with experience in both operations and research, flexibility in adapting the project plan based on lessons learned during the project, and incorporating training and other transition assistance into the project plans. Operator involvement has been critical to the AMU's remarkable success and many awards from NASA, the National Weather Association, and two citations from the Navy's Center of Excellence for Best Manufacturing Practices. This paper will present the AMU's proven methods and explain how they may be applied by other organizations to effectively transition research into operations.
An analysis of orbit propagation models was performed by the Mission Operations element of the Sea-viewing Wide Field-of-View Sensor (SeaWiFS) Project, which has overall responsibility for the instrument scheduling. The orbit propagators selected for this analysis are widely available general perturbations models. The analysis includes both absolute accuracy determination and comparisons of different versions of the models. The results show that all of the models tested meet accuracy requirements for scheduling and data acquisition purposes. For internal Project use the SGP4 propagator, developed by the North American Air Defense (NORAD) Command, has been selected. This model includes atmospheric drag effects and, therefore, provides better accuracy. For High Resolution Picture Transmission (HRPT) ground stations, which have less stringent accuracy requirements, the publicly available Brouwer-Lyddane models are recommended. The SeaWiFS Project will make available portable source code for a version of this model developed by the Data Capture Facility (DCF).
The purpose of this guide is intended to be a quick reference for a Project-Control Account Manager (P CAM) or technical manager empowered with a project’s cost, schedule, and technical responsibilities of a control account(s) when Earned Value Management (EVM) is required. The overall objective is to support the P CAM in performing their responsibilities as they relate to EVM. In addition, the reference guide describes at a summary level how the scope, schedule, and budget of a project integrate for optimal planning and control of prime contracts and in-house projects.
Good program management practices, cost analysis, cost estimation, and cost control for aerospace flight systems are interrelated and depend upon each other. The best cost control process cannot overcome poor design or poor systems trades that lead to the wrong approach. The project needs robust Technical, Schedule, Cost, Risk, and Cost Risk practices before it can incorporate adequate Cost Control. Cost analysis both precedes and follows cost estimation -- the two are closely coupled with each other and with Risk analysis. Parametric cost estimating relationships and computerized models are most often used. NASA has learned some valuable lessons in controlling cost problems, and recommends use of a summary Project Manager's checklist as shown here.
In the STBO modeler and tactical surface scheduler for ATD-2 project, taxi speed decision trees are used to calculate the unimpeded taxi times of flights taxiing on the airport surface. The initial taxi speed values in these decision trees did not show good prediction accuracy of taxi times. Using the more recent, reliable surveillance data, new taxi speed values in ramp area and movement area were computed. Before integrating these values into the STBO system, we performed test runs using live data from Charlotte airport, with different taxi speed settings: 1) initial taxi speed values and 2) new ones. Taxi time prediction performance was evaluated by comparing various metrics. The results show that the new taxi speed decision trees can calculate the unimpeded taxi-out times more accurately.
In an ongoing project at Honeywell SRC, we are constructing a prototype scheduling system for a NASA domain using the 'Time Map Manager' (TMM). The TMM representations are flexible enough to permit the representation of precedence constraints, metric constraints between activities, and constraints relative to a variety of references (e.g., Mission Elapsed Time vs. Mission Day). The TMM also supports a simple form of causal reasoning (projection), dynamic database updates, and monitoring specified database properties as changes occur over time. The greatest apparent advantage to using the TMM is the flexibility added to the scheduling process: schedules are constructed by a process of 'iterative refinement,' in which scheduling decisions correspond to constraining an activity either with respect to another activity or with respect to one time line. The schedule becomes more detailed as activities and constraints are added. Undoing a scheduling decision means removing a constraint, not removing an activity from a specified place on the time line. For example, we can move an activity around on the time line by deleting constraints and adding new ones.
The projection is proceeding on schedule. The remaining budget for the year is about ~$\$$30k and that should be sufficient to accomplish tasks scheduled for the remaining quarter. The anticipated remaining deliverable is a report with results for 111 Ag long-lived fission product.
The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 191 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2023, between October 1, 2022 and September 30, 2023, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.
Great River Hydro (GRH) is New England's largest conventional hydropower generator and operates sustainable hydropower systems in Vermont, New Hampshire, and Massachusetts. Several of GRH’s hydropower projects on the Connecticut River are largely constrained to operate as run-of-river; however, though a new FERC license they have opportunity in the form of flex hours where they are allowed to deviate operations to capture favorable market conditions or emergency operations. To maximize value from these new operations, GRH is considering new sources of forecasted inflow. Pacific Northwest National Laboratory (PNNL) is evaluating the quality of two commercial inflow forecasts for GRH under DOE Water Power Technology Office’s Notice of Opportunity for Technical Assistance: Improving Hydropower’s Value through Informed Decision Making. This project will provide an unbiased evaluation of the accuracy of inflow forecasts available through commercial vendors. GRH will use this information to support their decision on which inflow forecast to use under their new FERC license and to assess the overall value of the available inflow forecasting tools and practices. In this talk we will discuss details of the near real-time forecast evaluation process, the metrics involved in the evaluation, and some preliminary results. In addition, we’ll touch on the second phase of the project which involves evaluating scheduling strategies that identify windows of opportunity to change operations in ways that increase profit through participation in day ahead and real time markets.
The schedule for the IMP project for the eighth, ninth, and tenth satellites of the series is presented. A description of the spacecraft and the weekly summaries of the operations performed on the spacecraft are provided. The project planning, project problems, recommendations, and reports of launch operations are described. Drawings of the satellite structures are included.
The shuttle avionics integration laboratory (SAIL) requirements for supporting the Spacelab/orbiter avionics verification process are defined. The principal topics are a Spacelab avionics hardware assessment, test operations center/electronic systems test laboratory (TOC/ESL) data processing requirements definition, SAIL (Building 16) payload accommodations study, and projected funding and test scheduling. Because of the complex nature of the Spacelab/orbiter computer systems, the PCM data link, and the high rate digital data system hardware/software relationships, early avionics interface verification is required. The SAIL is a prime candidate test location to accomplish this early avionics verification.