Search NASA⌕ Search

SEARCH · Search NASA

Results for “RADIOACTIVE WASTE FACILITIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

WIPP Safety Significant Confinement Ventilation System (SSCVS) Quality Assurance Program - 20237

Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous HEPA filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The SSCVS project has proceeded with the awarding of CD-3A for Long Lead Procurements followed by CD-2/3 approval for the construction of the facilities. The SSCVS project team made the decision to increase the quality oversight throughout the complete project per the Project Quality Assurance Plan (PQAP) such that it can ensure the final products meet applicable NQA-1 requirements and general quality requirements, and that the project will proceed to operations without significant delays due to post installation quality concerns. The PQAP was established prior to approval of the project at the CD-2/3 milestone. The SSCVS project has 2 major long lead procurements which commenced with the awarding of CD-3A. These procurements include the HEPA filter housing assemblies and the Exhaust Fans. There are 22 HEPA filter assemblies for the SSCVS, which are designated Safety Significant for pressure boundary confinement, per the approved PDSA. The exhaust fans also have Safety Significant components to maintain the pressure confinement boundary. NWP made the decision to install resident Quality Inspectors at the fabrication facilities to ensure the documentation for each fabricated unit meets all the QA requirements as defined in the respective contract documents. For the construction of the SSCVS Salt Reduction Building (SRB) and New Filter Building (NFB), dedicated, on-site quality inspectors have been utilized to ensure that all work being performed will comply with quality requirements and the Special Inspections as defined in IBC-2015. At each stage of inspection, hold points are placed into the work packages to ensure NWP QA personnel are present to inspect and verify the installations are in accordance with the design specifications, codes and standards. With this level of oversight, NWP anticipates that the level of quality related issues, as seen on multiple other DOE complex site projects, will be avoided and that the commissioning, start-up and hot operations will progress in a timely fashion, as all documentation will be in place and approved prior to initiation of these activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementing Mixed Reality Tools to Support Mission Delivery at Hanford - 20520

Mission Support Alliance's (MSA) Public Works and Information Systems organizations have been working with Microsoft Corporation to develop and implement mixed reality operational solutions using their HoloLens technology. This collaborative effort is intended to drive innovative solutions and significantly improve MSA's efficiency in performing work at the Hanford Site. HoloLens, a mixed reality tool, is a commercial off-the-shelf technology that combines a head-mounted viewing screen with applications to help people and organizations learn, communicate, and collaborate more effectively through the use of mixed reality. https://microsoft.com/en-us/hololens MSA's initial pilot successfully demonstrated its ability to use mixed reality utilizing HoloLens' advanced features in a variety of ways, illustrating the potential efficiency gains previously stated as goals of this pilot. These achievements include the development of proprietary technology that allows synchronization between a HoloLens device and a mobile device or alternate global positioning system (GPS) device. This synchronization enables the HoloLens device to access real time GPS location data anywhere on the Hanford Site. This real time location data, combined with MSA's improved Hanford Geographical Information System (GIS) data, enables the mixed reality pilot application to identify underground utility systems as well as related utility attributes. This ability will aid utility workers in several areas, including excavation activities, the placement of large cranes, identifying interactions and conflicts with future underground utility placements and, eventually, recognizing and de-conflicting tank waste transfer system valve alignments. The HoloLens mixed reality application is also able to provide full or small scale holographic images of a facility's digital twin. This feature will allow MSA's Water and Sewer Utilities team to train and validate procedures associated with the new water treatment facility virtually, before it is constructed. This reduces the amount of time it takes to complete the training and procedure validation, and accelerates the overall construction schedule. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System Health and Status Reporting is Used to Improve Infrastructure Systems at the Hanford Site - 20449

Reliable physical infrastructure systems are vital to completing the clean-up mission and the start-up and commissioning of new nuclear waste processing facilities at the Hanford Site. Key infrastructure systems at Hanford include water, sewer, and electrical utilities, roads, telecommunications/network systems, and fire systems. All of the infrastructure systems are non-nuclear, General Service systems that are being maintained under formal engineering configuration control and none are specifically credited in any documented safety analysis (DSA). Starting in calendar year 2017, the Hanford Site's infrastructure and services contractor started producing system health and status reports for a total of 15 critical infrastructure systems as means to get a better understanding of each system's health and how it could be improved to ensure better and more reliable service delivery. As the reporting, tracking, and use of the metrics has matured, the number of systems for which reports are being developed has been expanded to a total of 23. Each of the critical infrastructure systems are assigned primary and alternate design authorities that complete qualifications on each assigned system. The design authorities actively manage and maintain configuration control on each of their systems and track metrics associated with availability, maintenance (corrective and preventive), and configuration of the technical baseline. The metrics are based on the principles established in Chapter V of DOE O 420.1C, Facility Safety, [1] and have been tailored as appropriate to each of the key infrastructure systems. An overall assessment of system health is performed and documented on a routine basis (e.g., quarterly). Included in this documentation is a quantitative score for each of the metrics (i.e., availability, maintenance, configuration management) along with results of system walk-downs, description of any permanent design modifications, identification of new or emerging issues and vulnerabilities affecting the system, and an assessment by the design authority of actions necessary to improve the system health score. The overall status scores are calculated using a formula and based on a pre-determined grading scale, a color is assigned for simple presentation. The information gained from developing the reports is being used to (1) assist with making timely and better informed decisions through the use of solid technical bases that are increasing the overall reliability and capabilities of the Site's infrastructure systems as new expense and capital projects in the Reliability Projects Investment Portfolio (RPIP) are prioritized and executed; (2) feed the risk management program, and (3) integrate the technical content of Master Plans that describe the Site's needs for the system and the system's capabilities to meet those future needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive waste immobilization of Hanford sludge in magnesium potassium phosphate ceramic forms

Here, this paper evaluates immobilization of Hanford K-Basin tank sludge in magnesium potassium phosphate ceramic forms. The waste forms were produced using two simulated non-radioactive sludge streams, each with distinct characteristics and composition. Ceramicrete with wollastonite as filler was used as the matrix for this purpose. The resulting waste forms were tested for their mechanical properties, radiation stability, and leaching resistance. In another series of tests, the samples were vitrified in borosilicate glass and glass waste forms were produced. The Product Consistency Test, the American Nuclear Society's ANS 16.1 test, and the Toxicity Characteristic Leaching Procedure, which are used to develop waste acceptance criteria in the United States for permanent storage of treated waste, were used for evaluation of the leaching resistance of all waste forms.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 90: US DOE Mixed Waste: Proposals for Dealing with Problematic Waste Streams and Policy Changes

This panel focused on generation and management of low level and mixed low-level radioactive wastes, challenges for disposition, innovative solutions applied at DOE sites, and collaboration among sites to ensure that waste disposition pathways are understood. In addition, potential policy initiatives were discussed including depleted uranium, elemental mercury, and treatment of legacy mixed waste components. As part of the introduction, Theresa Kliczewski provided an overview of why this panel is relevant: problematic mixed waste streams still exist across the DOE cleanup complex. Theresa noted that the DOE EM Headquarters Office of Waste and Materials Management (EM-4.2), for which she is employed with, continues to work with the DOE cleanup sites on a path forward for these problematic mixed waste streams. As part of this effort, EM-4.2 requested that the Energy Facility Contractors Group (EFCOG) perform a review of all the DOE sites problematic mixed waste streams. Panelists with presentations: Challenging Waste Streams: Disposition of Depleted Uranium Oxide Conversion Product (Douglas Tonkay); EFCOG WMWG Challenging Waste Subgroup (Tammy Monday); Mercury Waste Challenges (John Wrapp); Legacy Large Mixed Waste Components (Kalli Shupe)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Middlesex South FUSRAP Site: Collaboration Towards Beneficial Reuse - 20338

The US Department of Energy (DOE) Office of Legacy Management (LM) manages DoE's post-closure responsibilities and ensures the future protection of human health and the environment with respect to sites that have no continuing DOE mission after undergoing remediation. LM's beneficial reuse program promotes the LM strategic goal to sustainably manage and optimize use of public lands. The beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. Benefits from the reuse of a site may increase the local tax base, facilitate job growth, utilize existing infrastructure, and enhance or protect natural resources. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment, as well as by retaining good stewardship of natural resources. LM actively participates in promoting the economic development vision of the surrounding communities by collaborating with local communities to promote regional or municipal initiatives. The Borough of Middlesex, New Jersey, has prepared the Lincoln Boulevard Redevelopment Plan, which will reinvent a once-viable downtown and enhance the quality of life for the community. The Middlesex South, New Jersey, Formerly Utilized Sites Remedial Action Program (FUSRAP) site lies within the boundaries of this redevelopment area. In support of this development plan, the Borough is interested in acquiring the site for its Department of Public Works and to increase street access in the future commercial district to be built near adjacent properties. The opportunity to put the FUSRAP site into productive use aligns with LM's mission and strategic goals. In support of beneficial reuse activities, DOE can dispose of excess real property using several mechanisms. The two disposal options applicable to the Middlesex south site include (1) utilizing the US General Services Administration (GSA) or (2) using the Title 10 Code of Federal Regulations Section 770, 'Transfer of Real Property at Defense Nuclear Facilities for Economic Development' (known as a '770 transfer') process. Using the 770 transfer requires economic development as the primary driver, and a specific redevelopment proposal must be submitted. If there is no interest in specific economic development, the GSA option becomes the default mechanism for disposal of the property. In the case of the Middlesex south site, the 770 transfer process is being utilized and the Borough has submitted its economic development proposal to LM. Although LM is encouraged by the opportunity to put the site into productive use, the Middlesex south site is currently on the US Environmental Protection Agency (EPA) National Priorities List and remediation is being performed by the US Army Corp of Engineers (USACE) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consequently, any property transfer must meet the requirements under CERCLA Section 120(h), 'Property Transferred by Federal Agencies.' As the groundwater remedy will not be in place for several years, approval would be required from the US EPA administrator and the governor of the state of New Jersey to perform an early transfer of the site (before all response actions have been completed). The time frame for these approvals to occur under the normal process conflicts with the proposed redevelopment schedule; therefore, various options for expedited sale, transfer, or lease of portions of the site to the Borough were evaluated. The subsequent decision on a mutually beneficial path forward was the result of a collaborative effort between LM, USACE, the Borough and its redevelopment team, EPA, and the New Jersey Department of Environmental Protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhanced Sustainability in Treatment of Contaminated Metals for Clearance and Recycling - 20290

Cyclife Sweden AB has, for more than 30 years, provided metal treatment services to the domestic and international nuclear industry with the aim of creating value through metal clearance and recycling. These operations are to a large extent based on the concept that the materials, after pre-treatment, including decontamination, will be melted for clearance. During the melting process, some nuclides separate from the metal while the remaining radioactivity becomes fully homogenized in the metal bath and the resulting ingots, along with the samples taken before casting At a time when activities to fight Climate Challenge are in focus, any savings in energy consumption, in addition to the positive environmental effect of recycling metals back to industry, is more than welcome. If the clearance of certain metallic items can be achieved safely, without using melting, it is the environmentally preferred option provided it carries a reasonable cost. It is even better if an object can go through a decontamination and clearance process prior to re-use inside or outside the nuclear sector. Cyclife Sweden is currently investing in a direct clearance process, to be operated in parallel with the melting process. This new process is expected to be fully operational in the late summer of 2020 and includes pre-treatment, decontamination and heavily shielded clearance measurement installations. The treatment will also allow clearance measurements of larger objects without the need for segmentation, along with allowing objects composed of different materials, like electric motors can be accepted for treatment. This paper gives an overview of the circular economy aspects in a nuclear back-end context, the Cyclife approach to further implement a circular economy approach in the processes, Material Acceptance Criteria for treatment, the facility set-up for the new process and how the melting route and the direct route can be combined in an efficient industrial scale process. To put the new capabilities into perspective, the two different treatment and clearance approaches, i.e. direct clearance and melting, are to be compared. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Immobilized Low-Activity Waste Transportation System Testing Results - 20043

The immobilized low-activity waste (ILAW) transportation system is a first-of-a-kind system that is being designed and tested to transport ILAW glass-filled containers from Hanford's Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility to the Integrated Disposal Facility (IDF) burial trench for permanent disposal. A prototype design and fabrication of one transport trailer and four engineered ILAW pallets was completed in mid-2018. Prototype qualification testing to verify adequacy of the design was completed in 2019 by Washington River Protection Solutions (WRPS) and affiliate ATKINS SNC-Lavalin Group. Prototype testing was completed to advance design maturation across all operational and facility interfaces, and under adverse environmental and operating conditions, including thermal assessment of the system at peak projected temperatures. Test design, observation, and feedback was well represented and supported by all ILAW Transportation System interfacing organizations: WTP constructor Bechtel National, Inc.; IDF operator CH2M (CHPRC); transportation contractor Mission Support Alliance (MSA); the U. S. Department of Energy Richland Operations Office (DOE/RL) and Office of River Protection (DOE/ORP); and Washington State Department of Ecology. This paper presents the results of prototype qualification testing and opportunities for design improvements based on testing. Changes to the final design as a result of prototype testing include improvements in safety, ergonomics, operational flexibility, and As-Low-As-Reasonably-Achievable (ALARA) applications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Marshall Islands Dose Assessment and Radioecology Program: Report on the (i) 2018 Visual Study of Exterior Concrete of the Cactus Crater Containment Structure (ii) Periodic Monitoring of Groundwater on Runit Island and (iii) Initial Health Risk Assessment from Contaminants in the Cactus Crater Containment Structure

In 2012, Congress passed P.L. 112-149, Insular Areas Act of 2011, which amended the Compact of Free Association Amendments Act of 2003 by assigning Cactus Crater containment monitoring and reporting requirements to the Secretary of Energy (Secretary). Effective January 1, 2012, the Secretary was required to “periodically (but not less frequently than every 4 years) conduct -- (I) a visual study of the concrete exterior of the Cactus Crater Containment Structure on Runit Island; and (II) a radiochemical analysis of the groundwater surrounding and in the Cactus Crater Containment Structure on Runit Island.” 48 U.S.C. 1921b(f)(1)(B)(i). The Secretary was also directed to submit to Congress a report describing the results of each visual survey and the radiochemical analysis and “a determination on whether the surveys and analyses indicate any significant change in the health risks to the people of Enewetak from the contaminants within the Cactus Crater Containment Structure.” 48 U.S.C. 1921b(f)(1)(B)(ii)(II).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 26: Risk-Based Approaches to Environmental Remediation and Adaptive Site Management

This panel discussed the needs and importance of developing risk-based approaches to environmental remediation that will enable complex sites to be adaptively managed by applying cost-effective remedies that are protective of human health and the environment. The discussion emphasized risk-based approaches within decision processes and subsequent incorporation into regulatory decision documents. Remedy approaches, remediation exit strategies, and long-term monitoring plans that support risk-based end-states for difficult-to-remediate sites were discussed Panelists with presentations: Risk-Informed Approaches to Environmental Remediation and Adaptive Site Management (Vicky Freedman); ITRC Adaptive Site Management Perspective (Michael Truex); Optimization During Operations and Maintenance Phase at the Hanford Site 200-ZP-1 Groundwater Operable Unit (Emerald Laija, Kate Amrhein, Michael Truex); Adaptive Management: EPA Overview (Benjamin Simes); Decommissioning and Environmental Remediation Section Division of Nuclear Fuel Cycle and Waste Technology (Horst Monken Fernandes)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ten-Year Review of US/German Collaboration in Salt Repository Research - 20069

A multinational collaboration on salt repository research, design and operation has enjoyed remarkable success since reinvigorating efforts in 2010. Nations now engaged in the shared salt repository research agenda include Germany, the United States, the United Kingdom, the Netherlands, and Poland. The scientific basis for safe and permanent disposal of nuclear waste in salt formations has been strengthened by annual workshops that recognize and address contemporary research, including breakout sessions to stimulate open discussion and focus planning for ongoing investigations. Collaboration not only identifies pertinent technical issues, but facilitates timely, expert, and cost-effective consideration. Contemporary workshops have been held annually since 2010 and are documented in yearly state-of-the-art Proceedings, which summarize content and conclusions. The Proceedings help preserve scientific understanding and provide timely source references. These workshops often produce valuable joint publications coordinated with the Nuclear Energy Agency and other suitable external forums for dissemination. Nuclear waste management programs face growing challenges, while permanent disposal in salt formations provides a robust, safe option for several nations. Workshop format and publications provide a cost-effective insurance against loss of scientific expertise and institutional memory. This paper summarizes ten US/German workshops since formal reinitiation, reexamines key technical issues, discusses the evolving research agenda, and highlights successes and challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 69: Ensuring Strong Return on Investment for DOE EM Technology Development: Global Views

This panel focused on DOE and Non-US Technology Development Projects discussing how they approach tech development to maximize return on investment (ROI). Successful examples were discussed. After the individual panelist's presentations, the three panelists were joined by Kurt Gerdes in discussing the genesis of this panel and why it is important. Panelists with presentations: Ensuring a Strong Return on Investment for DOE EM Technology Development (Anthony Banford) DOE Technology Development Projects that Provided a Strong Return on Investment (ROI (Mark Lesinski) Australian Nuclear Science and Technology Organisation (Gerry Triani) Decommissioning Situation of Nuclear Power Plant in Japan (Teruyuki Hirai)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feedback from International Decommissioning Planning Projects - 20269

Decommissioning of Nuclear Power Plants is an increasing reality in many countries with nuclear power. Already many years before final shutdown, planning of the decommissioning work is usually started in order to understand for example the costs, waste volume capacity and licensing work needed. In many countries it is required to have a final decommissioning plan before any decommissioning work is allowed to start. Westinghouse has been involved in international decommissioning planning for more than 30 years, where the first 20 years was mostly funding and preliminary plans due to that decommissioning was many years away. However, as many more plants are now moving into decommissioning, the focus has shifted to final decommissioning plans with budgets instead of funding plans, strategic decisions instead of choices, waste volume specifications instead of estimates and a defined approach instead of what ifs. Westinghouse has developed a methodology based on the planning and execution of many decommissioning projects in Europe, America and Asia. That international experience and understanding helps the customers to adopt a systematic planning process where strategy development is done with the end state in mind, where the goals are clearly outlined and the starting point described. The process and steps to reach the desired end state need to be clearly defined and all options/alternatives evaluated from a cost/benefit point of view. This is followed by a thorough and quantitative risk analysis in order to give solid recommendations and credible conclusions. One important feedback has been that real decommissioning experience from reference projects is invaluable for an efficient and timely progress in order not to spend unnecessary time and effort on understanding the barriers and links between different activities in decommissioning. Skilled project managers or engineers can drive the project forward, but without decommissioning experience previously gained, valuable lessons learned are not used and the same mistakes can be made again. Many utilities have invested in knowledge transfer from other decommissioning projects through site visits, exchange programs and supplier meetings, which is a valuable asset and way of implementing lessons learned from performed decommissioning projects into the planning process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tool for Developing Integrated Strategies for Decontamination and Waste Management - 20291

Management of waste from chemical, biological, and radiological incidents is complicated by the fact that decontamination decisions have a profound impact on the characteristics of resulting waste streams. Wide-area biological and radiological incidents could produce massive quantities of waste that may need to be treated on-site and sent for subsequent disposal as non-contaminated materials, or else be directly disposed of as contaminated materials. The EPA has developed the Waste Estimation Support Tool (WEST) for characterizing and quantifying biological and radiological waste that may be generated from decontamination efforts. This paper focuses on the WEST's uses for radiological incidents. WEST combines Geographic Information System (GIS)-based analysis of externally-supplied plume data, infrastructure databases derived from the Federal Emergency Management Agency's (FEMA's) Hazus tool [1], and satellite imagery surface recognition algorithms to combine the composition and square footage of the buildings in the plume with estimates of the materials between the buildings in the plume. The resulting GIS data files are then imported into a Microsoft Access database application, where they are combined with information about the nature and concentration of contaminants, and then subjected to decontamination strategies for different contaminated surfaces. The tool provides estimates of the type and quantities of potential wastes resulting from simulated decontamination and/or demolition activities and includes estimates of the remaining contamination levels including residual contamination contained within each waste stream. Estimates are presented at several levels of detail, allowing users to obtain needed data at the desired resolution. These include estimates for the total affected area, estimates by contamination zone, estimates by decontamination method(s), and estimates by building type (occupancy classification). EPA is currently developing the next version of WEST which will include several substantial enhancements. The most significant improvement for the next version of WEST will include the ability for users to develop contamination scenarios and waste estimates based on previously developed, readily available, and geographically specific infrastructure data. Instead of using WEST's default infrastructure data based on FEMA's Hazus tool, users will be able to import their own building data specific to the geographically affected area. This capability may substantially decrease uncertainties in the resulting waste estimates because the results will be based on actual building data (numbers of each type, square footage, building height, etc.). Two other significant enhancements will be the ability to generate waste estimates for vehicles and biomass. In addition to building debris and building decontamination waste, vehicles and biomass will likely constitute a significant percentage of the total waste which may result from wide area contamination events. This presentation will present the most recent version of WEST, which includes such considerations as affected biomass (e.g., trees), vehicles, and the ability to replace the default Hazus infrastructure databases with custom infrastructure databases. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Overview of R and D on Retrievability and Retrieval Technology in Germany - 20462

Retrievability is a term that is included in most radioactive waste management programs around the world. Although national definitions vary, the overall understanding of retrievability concerns the ability to recover waste packages from the repository mine after their emplacement. Different countries may implement retrievability in very different ways, ranging from a built-in reversibility into the emplacement process to the stipulation that retrievability may in no way impede passive safety in the post-closure phase. Germany takes a middle course such that retrievability in a HLW repository (repository for high level radioactive waste) may have no significant detrimental effect on passive safety. In Germany, the current siting process considers rock salt, clay rock, and crystalline rock as potential host rocks. Therefore, Research and Development (R and D) has been investigating repository concepts and retrievability in all host rocks. After introduction of retrievability in 2010, existing repository concepts were modified to facilitate retrieval. The changes made comprised, for example, equipping boreholes with steel liners, developing new technologies, and modifying existing emplacement devices. Apart from retrieval of HLW, retrieval of other wastes from underground repositories that were designed and operated without retrievability in mind, poses major technical and scientific challenges. Currently, studies are under way to investigate the feasibility and costs of partial retrieval of waste from an underground repository for hazardous and highly toxic waste in France, Stocamine. With regard to retrieval, the rock-mechanical conditions are deteriorating rapidly, so time is of the essence. In the Asse II mine in Germany, about 126,500 waste casks with low and intermediate level waste await retrieval. The repository mine suffers from difficult rock-mechanical conditions and inflow of brine, locally into emplacement areas. The Federal Company for Radioactive Waste Disposal (BGE) is legally required to retrieve all wastes from the Asse. Due to the specific challenges, R and D is needed to develop technical solutions for the safe retrieval from each of the emplacement chambers. R and D on retrievability and retrieval technology does not only address challenges in radioactive or toxic waste retrieval but may also help to germinate innovation to better master complex underground situations in general, e.g. in deep mining, tunneling, or repository construction. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Laboratory-Scale Melter Systems for Simulated and Real AP-107 Tank Waste - 20483

The Hanford Waste Treatment and Immobilization Plant (WTP) will process and stabilize waste that is stored in underground tanks on the Hanford Site. At the WTP, the tank waste will be combined with glass-forming and modifying additives to form an aqueous and solid mixture called melter feed, which will then be vitrified in joule-heated melters. A small-scale melter system, the continuous laboratory-scale melter (CLSM), is designed to operate with a continuous feeding process while periodically pouring glass product and collecting off-gas. Two CLSMs were constructed: one in a non-radioactive environment for processing waste simulants and another in a fume hood capable of handling radioactive material for processing actual Hanford tank waste. The waste sample received for vitrification in the CLSM was from Hanford tank 241-AP-107. Approximately 12 liters of melter-feed slurry was vitrified into 7 kilograms of glass product over the course of 10 hours of charging to the CLSM. The partitioning of technetium-99 in the product streams was used to calculate the technetium-99 recovery and help determine when the vitrification process had reached a steady state. The average single-pass retention of technetium-99 in the glass product was then calculated for the processing of AP-107 waste in the CLSM system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The German Site Selection Process - Implementation and Challenges - 20528

Federal Company for Radioactive Waste Disposal (Bundesgesellschaft fuer Endlagerung mbH; hereinafter referred to as BGE) is a state-owned company established in September 2016 following the 'Act on the Organisational Restructuring in the Field of Radioactive Waste Storage'. 'Repository Site Selection Act' (hereinafter referred to as StandAG) defines the site selection procedure, aiming to ensure the best possible safety for storing high-level radioactive waste in Germany for the duration of one million years. The selection procedure is a participatory, transparent, learning and self-questioning process based on scientific expertise. Possible repository sites are sought all over Germany, without excluding or predetermining any potential site at the beginning. The procedure consists of three phases. After each phase, the legislative decides on the regions for further consideration in the next phase of the site selection procedure. The current first phase (Phase I) is divided into two steps. Objective of Step 1 is to determine subareas of favorable geological conditions based on available data. Step 2 of Phase I will lead to identification of specific regions that are considered for further surface-based geoscientific and geophysical exploration. Potential host rocks are rock salt, clay rock and crystalline rock. As part of the site selection procedure, an overview of the status of the planning and implementation of R and D activities is given. Topics of particular interest are, for example, the adaptation of the maximum temperature of 100 deg. C at the container surface, the impact of long-term climate variations as well as minimally invasive exploration methods. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of FREMES to Characterize and Sort Soil During Site Remediation - 20182

During decommissioning of buildings and the related release of nuclear sites, large amounts of bulk materials such as soil must be measured for clearance. These measurements are required to demonstrate that for example potentially contaminated soil is below the respective radiological limits. Doing so also helps to minimize the amount of bulk material which has to be disposed of as nuclear waste. NUKEM Technologies Engineering Services GmbH (NUKEM) applies their FREMES technology in a project at the former fuel element factory of FBFC International at Dessel, Belgium. The purpose is to measure and check for potential contamination within the excavated soil. The project started in 2017 with design and procurement of the necessary equipment. In October 2017 the FREMES system was installed at the site. After installation and an extensive test program the FREMES facility went fully into operation in July 2018. Original foreseen to measure between 4.000 and 8.000 tons of material, it has currently (mid 2019) measured 23.600 tons. It is expected that another 5.000 tons still have to be measured before the project successfully ends. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗