Search NASA⌕ Search

SEARCH · Search NASA

Results for “RISK ASSESSMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Approaches to advancing quantitative human health risk assessment of environmental chemicals in the post-genomic era

The contribution of genomics and associated technologies to human health risk assessment for environmental chemicals has focused largely on elucidating mechanisms of toxicity, as discussed in other articles in this issue. However, there is interest in moving beyond hazard characterization to making more direct impacts on quantitative risk assessment (QRA) — i.e., the determination of toxicity values for setting exposure standards and cleanup values. We propose that the evolution of QRA of environmental chemicals in the post-genomic era will involve three, somewhat overlapping phases in which different types of approaches begin to mature. The initial focus (in Phase I) has been and continues to be on “augmentation” of weight of evidence — using genomic and related technologies qualitatively to increase the confidence in and scientific basis of the results of QRA. Efforts aimed towards “integration” of these data with traditional animal-based approaches, in particular quantitative predictors, or surrogates, for the in vivo toxicity data to which they have been anchored are just beginning to be explored now (in Phase II). In parallel, there is a recognized need for “expansion” of the use of established biomarkers of susceptibility or risk of human diseases and disorders for QRA, particularly for addressing the issues of cumulative assessment and population risk. Ultimately (in Phase III), substantial further advances could be realized by the development of novel molecular and pathway-based biomarkers and statistical and in silico models that build on anticipated progress in understanding the pathways of human diseases and disorders. Such efforts would facilitate a gradual “reorientation” of QRA towards approaches that more directly link environmental exposures to human outcomes.

60 APPLIED LIFE SCIENCES↗

HyRAM (Hydrogen Risk Assessment Models) v. 1.0

HyRAM is a software toolkit for conducting quantitative risk assessment (QRA) and consequence modeling for hydrogen infrastructure and transportation systems. HyRAM contains validated, simplified hydrogen behavior models, a standardized QRA approach, and engineering models and generic data relevant to hydrogen installations. HyRAM 1.0 was developed by Sandia National Laboratories for the U. S. Department of Energy to increase access to technical data about hydrogen and to enable the use of that data to support development and revision of national and international codes and standards with risk assessment and consequence modeling. The HyRAM toolkit integrates analytical and probabilistic models for quantifying accident scenarios, predicting physical effects, and characterizing the impact of hydrogen hazards (including thermal effects from jet fires and overpressure effects from deflagrations in confined areas) on people and structures. HyRAM incorporates generic probabilities for equipment failures for nine types of components, and probabilistic models for the impact of heat flux on humans and structures, with computationally and experimentally validated analytical first order models of hydrogen release and flame physics. Version 1 can be used to quantify the risk and consequences associated with gaseous hydrogen releases from user-defined hydrogen installations.

Groth, Katrina M.↗

Using Probabilistic Methods in Water Scarcity Assessments: A First Step Towards a Water Scarcity Risk Assessment Framework

Water scarcity -driven by climate change, climate variability, and socioeconomic developments- is recognized as one of the most important global risks, both in terms of likelihood and impact. Whilst a wide range of studies have assessed the role of long term climate change and socioeconomic trends on global water scarcity, the impact of variability is less well understood. Moreover, the interactions between different forcing mechanisms, and their combined effect on changes in water scarcity conditions, are often neglected. Therefore, we provide a first step towards a framework for global water scarcity risk assessments, applying probabilistic methods to estimate water scarcity risks for different return periods under current and future conditions while using multiple climate and socioeconomic scenarios.

water scarcity↗

Using Risk Assessment Methodologies to Meet Management Objectives

Corporate and program objectives focus on desired performance and results. Management decisions that affect how to meet these objectives now involve a complex mix of: technology, safety issues, operations, process considerations, employee considerations, regulatory requirements, financial concerns and legal issues. Risk Assessments are a tool for decision makers to understand potential consequences and be in a position to reduce, mitigate or eliminate costly mistakes or catastrophic failures. Using a risk assessment methodology is only a starting point. A risk assessment program provides management with important input in the decision making process. A pro-active organization looks to the future to avoid problems, a reactive organization can be blindsided by risks that could have been avoided. You get out what you put in, how useful your program is will be up to the individual organization.

DeMott, D. L.↗

Simulation-Based Recovery Action Analysis Using the EMRALD Dynamic Risk Assessment Tool

Recovery human action is defined as the action that prevents deviant conditions from producing unwanted effects. Analyzing recovery actions has been a critical part in human reliability analysis (HRA). However, there are a couple of limitations to treating recovery actions using only the current HRA methods available. Representatively, the existing recovery analysis does not specifically consider recovery actions as they have occurred in actual nuclear power plants (NPPs). To handle the challenges in the existing recovery analyses, this study suggests a way to analyze recovery actions under a dynamic HRA method, the Procedure-based Risk Investigation MEthod-Human Reliability Analysis (PRIME-HRA) method. The PRIME-HRA method suggests a way on how to develop dynamic simulation models using dynamic risk assessment tools such as the Event Modeling Risk Assessment Using Linked Diagram (EMRALD) [1] and the Human Unimodel for Nuclear Technology to Enhance Reliability (HUNTER) [2]. EMRALD and HUNTER are the dynamic probabilistic risk assessment and HRA tools developed at Idaho National Laboratory. In this paper, differences on analyzing recovery actions in the Technique for Human Error-Rate Prediction (THERP), the Cause-Based Decision Tree (CBDT) and the Korean Standard HRA (K-HRA) and challenges of these approaches are introduced. How we have developed the PRIME-HRA is also introduced in this paper. Then, the proposed approach to analyzing recovery human actions in dynamic context is partially discussed with an example.

99 GENERAL AND MISCELLANEOUS↗

Integration of an Evidence Base into a Probabilistic Risk Assessment Model. The Integrated Medical Model Database: An Organized Evidence Base for Assessing In-Flight Crew Health Risk and System Design

This slide presentation reviews the Integrated Medical Model (IMM) database, which is an organized evidence base for assessing in-flight crew health risk. The database is a relational database accessible to many people. The database quantifies the model inputs by a ranking based on the highest value of the data as Level of Evidence (LOE) and the quality of evidence (QOE) score that provides an assessment of the evidence base for each medical condition. The IMM evidence base has already been able to provide invaluable information for designers, and for other uses.

Saile, Lynn↗

Space Shuttle Main Engine Quantitative Risk Assessment: Illustrating Modeling of a Complex System with a New QRA Software Package

During 1997, a team from Hernandez Engineering, MSFC, Rocketdyne, Thiokol, Pratt & Whitney, and USBI completed the first phase of a two year Quantitative Risk Assessment (QRA) of the Space Shuttle. The models for the Shuttle systems were entered and analyzed by a new QRA software package. This system, termed the Quantitative Risk Assessment System(QRAS), was designed by NASA and programmed by the University of Maryland. The software is a groundbreaking PC-based risk assessment package that allows the user to model complex systems in a hierarchical fashion. Features of the software include the ability to easily select quantifications of failure modes, draw Event Sequence Diagrams(ESDs) interactively, perform uncertainty and sensitivity analysis, and document the modeling. This paper illustrates both the approach used in modeling and the particular features of the software package. The software is general and can be used in a QRA of any complex engineered system. The author is the project lead for the modeling of the Space Shuttle Main Engines (SSMEs), and this paper focuses on the modeling completed for the SSMEs during 1997. In particular, the groundrules for the study, the databases used, the way in which ESDs were used to model catastrophic failure of the SSMES, the methods used to quantify the failure rates, and how QRAS was used in the modeling effort are discussed. Groundrules were necessary to limit the scope of such a complex study, especially with regard to a liquid rocket engine such as the SSME, which can be shut down after ignition either on the pad or in flight. The SSME was divided into its constituent components and subsystems. These were ranked on the basis of the possibility of being upgraded and risk of catastrophic failure. Once this was done the Shuttle program Hazard Analysis and Failure Modes and Effects Analysis (FMEA) were used to create a list of potential failure modes to be modeled. The groundrules and other criteria were used to screen out the many failure modes that did not contribute significantly to the catastrophic risk. The Hazard Analysis and FMEA for the SSME were also used to build ESDs that show the chain of events leading from the failure mode occurence to one of the following end states: catastrophic failure, engine shutdown, or siccessful operation( successful with respect to the failure mode under consideration).

Smart, Christian↗

System-level risk assessment of carbon sequestration into a naturally fractured aquifer at Kevin Dome, Montana

As actual CO2 injection is unlikely to take place at Kevin Dome, Montana, the Big Sky Carbon Sequestration Partnership has turned to maximizing the value of existing data acquired at the site. We present the risk assessment work done using the National Risk Assessment Partnership (NRAP) to Kevin Dome, Montana. Geologic CO2 sequestration in saline aquifers poses certain risks including CO2/brine leakage through wells or non-sealing faults into ground water or land surface. These risks are difficult to quantify due to data availability and uncertainty. One solution is running large numbers of numerical simulations on the primary CO2 injection reservoir, shallow reservoirs/aquifers, faults, and wells to assess leakage risks and uncertainties. However, a full-physics simulation is usually too computationally expensive. NRAP integrated assessment model (NRAP-IAM) uses reduced order models (ROMs) developed from numerical reservoir simulations of a primary CO2 injection reservoir to address this issue. A powerful stochastic framework allows NRAP-IAM to explore complex interactions among many uncertain variables and evaluate the likely performance of potential sequestration sites. In this study, we investigate the sensitivity of a variety of uncertain parameters to CO2/brine leakage through (1) legacy wellbore and (2) fault pathways. We found major uncertain parameters to which the potential CO2 leakage through legacy wellbore is sensitive including values of fracture permeability, end-point CO2 relative permeability, capillary pressure, and permeability of confining rocks. CO2 and brine leakage through fault pathways is sensitive to fracture permeability, length of the faults, and fault displacement.

Nguyen, Minh↗

Qualitative Risk Assessment of Legacy Wells within the Estimated Prairie State Generating Company Area of Review

This report details the digitization of a legacy wellbore database, including data processing assumptions, parameter estimation, and risk assessment methodology. The database, comprising 6,454 documents, was provided by ISGS. It includes valuable data from the Prairie State Generating Company (PSGC) and One Earth Energy (OEE) sites of the CarbonSAFE Phase III – Illinois Storage Corridor project. The report focuses on wells within a 15-mile radius from the Lively Grove #1 (LG#1) well at PSGC site, evaluating subsurface conditions and potential risks. A total of 4,386 wellbores within 15 miles of the LG#1 well were filtered based on depth and formation codes. LG#1 is the stratigraphic well at the PSGC site drilled in 2021. Ninety-four (94) wells penetrating the Maquoketa Shale Group (the primary confining unit) within the estimated area-of-review (AoR) for the PSGC site were evaluated using a qualitative risk assessment (QRA) methodology. The QRA developed by Arbad et al. 2022 focuses on legacy wells within the AoR and categorizes them based on well construction details. The QRA identifies wells that need immediate attention by categorizing them based on penetration depth and protection. Wells within the AoR were categorized into nine groups based on penetrations and protections. These categories range from Type 1 wells, with no documentation, to Type 9 wells, which do not penetrate the primary confining unit or storage reservoir (unit). Well accessibility within the AoR varies based on well status, including Dry & Abandoned (DA), Plugged & Abandoned (PA), Injection (INJ), Oil/Gas Producing (PROD), and Observation (Obs) wells. Accessibility levels were determined by well construction, with DA wells being the least accessible and Observation wells the most accessible, impacting gas leakage detection possibilities. Remedial action priority of wells decreases from Type 1 to Type 9 wells. Type 1 to Type 6 wells with status DA and PA require immediate attention, while Type 7 and Type 8 wells are low priority. A risk matrix used to prioritize corrective actions for legacy wells is proposed to categorize wells within an AoR based on penetrations, protections, and accessibility. The methodology involves data acquisition, well categorization into nine types, and determining CO 2 leakage pathways using well schematics and geospatial mapping. This approach is particularly useful for managing the integrity of legacy wells throughout the lifecycle of a Carbon Capture and Storage (CCS) project. A qualitative risk assessment of 94 wells within the AoR of the PSGC site identified 54 wells with high priority for corrective action due to penetration of the primary containment seal. The assessment utilizes color-coded maps to categorize well types and prioritize corrective actions, providing a comprehensive analysis. Schematics of wells penetrating the primary confining unit were drawn, and leakage pathways were identified. Details of all wells penetrating the confining zone are provided in the appendix, including information on well types, plugging, and casing status.

01 COAL, LIGNITE, AND PEAT↗

The additive to background assumption in cancer risk assessment: A reappraisal

The assumption that chemical and radiation induced cancers act in a manner that is additive to background was proposed in the mid-1970s. It was adopted by the U.S. Environmental Protection Agency (EPA) in 1986 and then subsequently by other regulatory agencies worldwide for cancer risk assessment. It ensured that cancer risks at low doses act in a linear fashion. The additive to background process assumes that the mechanism(s) resulting in induced (i.e., treatment related) and spontaneous (i.e., control group) cancers are identical. This assumption could not be properly evaluated due to inadequate mechanistic data when it was proposed in the 1970s. Using the findings of modern molecular toxicology, including oncogene activation/mutation, gene regulation, and molecular pathway analyses, the additive to background assumption was evaluated in the present paper. Based on published studies with 45 carcinogens over 13 diverse mammalian models and for a broad range of tumor types compelling evidence indicates that carcinogen-induced tumors are mediated in general via mechanisms that are not identical to those affecting the occurrence of the same type of spontaneous tumors in appropriate control groups. These findings, which challenge a fundamental assumption of the additive to background concept, have significant implications for cancer risk assessment policy, regulatory agency practices, as well as fundamental concepts of cancer biology.

54 ENVIRONMENTAL SCIENCES↗

Soil Sample Report in Support of the Site 300 EWTF Ecological Risk Assessment and Permit Renewal-September 2012

LLNL Site 300 has applied to renew the permits for its Explosives Waste Treatment Facility (EWTF), Explosives Waste Storage Facility (EWSF) and Building 883 Storage Facility. As a part of the permit renewal process, the Department of Toxic Substances Control (DTSC) requested LLNL to obtain soil samples in order to conduct a scoping-level ecological risk assessment pursuant to the Department of Toxic Substances Control, Guidance for Ecological Risk Assessment at Hazardous Waste Sites and Permitted Facilities, Part A: Overview, July 4, 1996. As stated in the guidance document, the scoping-level ecological risk assessment provides a framework to determine the potential interaction ecological receptors and chemicals of concern from hazardous waste treatment operations in the area of EWTF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GSFC Risk Assessment Process for Inherited Items

The NASA Goddard Space Flight Center Safety and Mission Assurance Directorate is implementing an alternate process for approval of Spacecraft Inherited Items in accordance with Goddard Procedural Requirements 8730.5. A Commodity Risk Assessment Engineer is performing an Inherited Item Risk Assessment (I2RA) for the use of Spacecraft Standard Components (items generally necessary to control the spacecraft, e.g. reaction wheel assemblies) and payload flight spares or Built-to-Print items. The I2RA may take into account prior space flight performance, criticality of the component, qualification records, quality and reliability records, storage conditions, manufacturer assessments, and mission specific parameters like mission environment and duration. The I2RA provides a means to accept for the entire item materials, parts or workmanship non-conformances, that do not significantly increase risk.

Risk Assessment↗

Automating Risk Assessments of Hazardous Material Shipments for Transportation Routes and Mode Selection

The METEOR project at Idaho National Laboratory (INL) successfully addresses the difficult problem in risk assessment analyses of combining the results from bounding deterministic simulation results with probabilistic (Monte Carlo) risk assessment techniques. This paper describes a software suite designed to perform sensitivity and cost/benefit analyses on selected transportation routes and vehicles to minimize risk associated with the shipment of hazardous materials. METEOR uses Monte Carlo techniques to estimate the probability of an accidental release of a hazardous substance along a proposed transportation route. A METEOR user selects the mode of transportation, origin and destination points, and charts the route using interactive graphics. Inputs to METEOR (many selections built in) include crash rates for the specific aircraft, soil/rock type and population densities over the proposed route, and bounding limits for potential accident types (velocity, temperature, etc.). New vehicle, materials, and location data are added when available. If the risk estimates are unacceptable, the risks associated with alternate transportation modes or routes can be quickly evaluated and compared. Systematic optimizing methods will provide the user with the route and vehicle selection identified with the lowest risk of hazardous material release. The effects of a selected range of potential accidents such as vehicle impact, fire, fuel explosions, excessive containment pressure, flooding, etc. are evaluated primarily using hydrocodes capable of accurately simulating the material response of critical containment components. Bounding conditions that represent credible accidents (i.e; for an impact event, velocity, orientations, and soil conditions) are used as input parameters to the hydrocode models yielding correlation functions relating accident parameters to component damage. The Monte Carlo algorithms use random number generators to make selections at the various decision points such as; crash, location, etc. For each pass through the routines, when a crash is randomly selected, crash parameters are then used to determine if failure has occurred using either external look up tables, correlations functions from deterministic calculations, or built in data libraries. The effectiveness of the software was recently demonstrated in safety analyses of the transportation of radioisotope systems for the US Dept. of Energy. These methods are readily adaptable to estimating risks associated with a variety of hazardous shipments such as spent nuclear fuel, explosives, and chemicals.

42 ENGINEERING↗

Risk assessment of engineering diseases of embankment–bridge transition section for railway in permafrost regions

Abstract The embankment–bridge transition section (EBTS) is one of the zones where railway diseases occur frequently in permafrost regions. Disease risk assessment of EBTSs can provide guidance for maintenance. In this study, considering the engineering geological conditions, climate characteristics, and embankment structure types along the Qinghai–Tibet Railway (QTR) as well as based on the disease inventory of the QTR from 2010 to 2019, the logistic regression (LR), support vector machine (SVM), and combination‐weight‐based gay relation analysis (GRA) were used for disease risk assessment of the EBTSs along the QTR in permafrost regions. The results indicate that the LR and SVM models have a better capability for EBTS disease prediction than the GRA model, and the SVM model can select more disease samples in relatively larger regions than the LR model. Based on the SVM and LR models, the risk level of EBTSs is divided into four classes: low‐ (29.9%), moderate‐ (39.6%), high‐ (22.1%), and very high (8.4%) risk. Finally, we selected 272 EBTSs in high‐ and very‐high‐risk classes for key observation during the maintenance of the QTR in permafrost regions. This study provides a reference for the risk assessment of railways built in permafrost regions using data‐driven methods.

Zhang, Saize↗

Robotic Mars Sample Return: Risk Assessment and Analysis Report

A comparison of the risk associated with two alternative scenarios for a robotic Mars sample return mission was conducted. Two alternative mission scenarios were identified, the Jet Propulsion Lab (JPL) reference Mission and a mission proposed by Johnson Space Center (JSC). The JPL mission was characterized by two landers and an orbiter, and a Mars orbit rendezvous to retrieve the samples. The JSC mission (Direct/SEP) involves a solar electric propulsion (SEP) return to earth followed by a rendezvous with the space shuttle in earth orbit. A qualitative risk assessment to identify and characterize the risks, and a risk analysis to quantify the risks were conducted on these missions. Technical descriptions of the competing scenarios were developed in conjunction with NASA engineers and the sequence of events for each candidate mission was developed. Risk distributions associated with individual and combinations of events were consolidated using event tree analysis in conjunction with Monte Carlo techniques to develop probabilities of mission success for each of the various alternatives. The results were the probability of success of various end states for each candidate scenario. These end states ranged from complete success through various levels of partial success to complete failure. Overall probability of success for the Direct/SEP mission was determined to be 66% for the return of at least one sample and 58% for the JPL mission for the return of at least one sample cache. Values were also determined for intermediate events and end states as well as for the probability of violation of planetary protection. Overall mission planetary protection event probabilities of occurrence were determined to be 0.002% and 1.3% for the Direct/SEP and JPL Reference missions respectively.

Lalk, Thomas R.↗

Recent advances in the risk assessment of melamine and cyanuric acid in animal feed

Melamine can be present at low levels in food and feed mostly from its legal use as a food contact material in laminates and plastics, as a trace contaminant in nitrogen supplements used in animal feeds, and as a metabolite of the pesticide cyromazine. The mechanism of toxicity of melamine involves dose-dependent formation of crystals with either endogenous uric acid or a structural analogue of melamine, cyanuric acid, in renal tubules resulting in potential acute kidney failure. Co-exposure to melamine and cyanuric acid in livestock, fish, pets and laboratory animals shows higher toxicity compared with melamine or cyanuric acid alone. Evidence for crystal formation between melamine and other structural analogs i.e. ammelide and ammeline is limited. Illegal pet food adulterations with melamine and cyanuric acid and adulteration of milk with melamine resulted in melamine–cyanuric acid crystals, kidney damage and deaths of cats and dogs and melamine–uric acid stones, hospitalisation and deaths of children in China respectively. Following these incidents, the tolerable daily intake for melamine was re-evaluated by the U.S. Food and Drug Administration, the World Health Organisation, and the Scientific Panel on Contaminants in the Food Chain of the European Food Safety Authority (EFSA). This review provides an overview of toxicology, the adulteration incidents and risk assessments for melamine and its structural analogues. Particular focus is given to the recent EFSA risk assessment addressing impacts on animal and human health of background levels of melamine and structural analogues in animal feed. Recent research and future directions are discussed. - Highlights: ► Melamine in food and feed. ► Forms crystals in kidney with uric acid or cyanuric acid. ► Toxicity higher with cyanuric acid. ► Recent EFSA risk assessment. ► Animal and human health.

60 APPLIED LIFE SCIENCES↗

A Corrosion Risk Assessment Model for Underground Piping

The Pressure Systems Manager at NASA Ames Research Center (ARC) has embarked on a project to collect data and develop risk assessment models to support risk-informed decision making regarding future inspections of underground pipes at ARC. This paper shows progress in one area of this project - a corrosion risk assessment model for the underground high-pressure air distribution piping system at ARC. It consists of a Corrosion Model of pipe-segments, a Pipe Wrap Protection Model; and a Pipe Stress Model for a pipe segment. A Monte Carlo simulation of the combined models provides a distribution of the failure probabilities. Sensitivity study results show that the model uncertainty, or lack of knowledge, is the dominant contributor to the calculated unreliability of the underground piping system. As a result, the Pressure Systems Manager may consider investing resources specifically focused on reducing these uncertainties. Future work includes completing the data collection effort for the existing ground based pressure systems and applying the risk models to risk-based inspection strategies of the underground pipes at ARC.

Datta, Koushik↗

Waterlogging risk assessment based on self-organizing map (SOM) artificial neural networks: A case study of an urban storm in Beijing

Due to rapid urbanization, waterlogging induced by torrential rainfall has become a global concern and a potential risk affecting urban habitant's safety. Widespread waterlogging disasters have occurred almost annually in the urban area of Beijing, the capital of China. Based on a self-organizing map (SOM) artificial neural network (ANN), a graded waterlogging risk assessment was conducted on 56 low-lying points in Beijing, China. Social risk factors, such as Gross domestic product (GDP), population density, and traffic congestion, were utilized as input datasets in this study. The results indicate that SOM-ANN is suitable for automatically and quantitatively assessing risks associated with waterlogging. The greatest advantage of SOM-ANN in the assessment of waterlogging risk is that a priori knowledge about classification categories and assessment indicator weights is not needed. As a result, SOM-ANN can effectively overcome interference from subjective factors, producing classification results that are more objective and accurate. In this paper, the risk level of waterlogging in Beijing was divided into five grades. As a result, the points that were assigned risk grades of IV or V were located mainly in the districts of Chaoyang, Haidian, Xicheng, and Dongcheng.

54 ENVIRONMENTAL SCIENCES↗