Search NASA⌕ Search

SEARCH · Search NASA

Results for “ROOF”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Practical Application of Hygrothermal Modeling of West Coast Wood Deck Systems

Roofing systems—particularly in the western part of the United States—are often installed directly to a wood deck, with the building’s insulation below the deck. This construction assembly has a long track record of performance and generally has been used without consequence with traditional built-up roof systems. In recent years, there has been an increase in “conversation” in the roofing industry about anecdotal instances of wood deck deterioration being discovered a relatively short period of time after a roofing system has been installed. Investigations into these occurrences have generally concluded that interior moisture is condensing on the wood deck and causing rot. Hygrothermal modeling of specific roofing systems has confirmed these conclusions. These failures are not being caused by roofing system leaks but by the movement of moisture through the insulation and into the deck and roofing assembly. Unfortunately, these types of failures are becoming more common as the roofing industry (driven by a variety of influences, including regulatory mandate) moves from traditional built-up roofing systems in these markets to reflective membranes—either white or highly reflective “cool”-colored single-ply membranes or white reflective cap sheets. The application of reflective coating can also result in this type of failure....Based on the need for some practical guidelines, a research project was initiated with Oak Ridge National Laboratory’s (ORNL) Building Envelope Group to model the potential for wood deck deterioration under a variety of conditions and to provide guidelines for the amount of insulation that should be installed over a wood deck to reduce this risk.

42 ENGINEERING↗

Cost-Benefit Analysis For Indonesia Building Sector: Whole-Building Cooling Solutions

The Net Zero World (NZW) Initiative Collaborative Work Program with the Government of Indonesia (GoI) includes technical assistance and investment mobilization facilitation to accelerate deployment of energy efficiency technologies and solutions for the building sector. A February 2023 U.S.–Indonesia Joint Workshop on Decarbonizing the Building Sector yielded a NZW Indonesia Building Decarbonization Working Group (NZW IBDWG) with four sub-working groups (SWG): SWG-A National Center, SWG-B Capacity Building, SWG-C Investment and Financing, and SWG-D Pilot Projects. Technical analysis of whole-building cooling solutions for tropical climates of Indonesia was conducted by SWG-A to quantify energy savings, carbon dioxide reductions, and comfort improvements offered by 12 passive or low-energy cooling strategies: ceiling fans with and without thermostat setbacks; cool roofs; cool walls; exterior awnings; exterior shades; interior shades; insulated roofs; insulated walls; low-e windows; solar window films; and natural ventilation. Leveraging the results from SWG-A, cost-benefit analysis (CBA) was conducted by SWG-C to assess the consumer and national costs and impacts associated with these 12 cooling solutions. The evaluation involved estimating life-cycle costs (LCC), payback period (PBP), net present values (NPV), annual electricity burden change for low-income households, and reduced national annual power-sector generation demand by 2030, 2040, 2050, and 2060. This evaluation can help guide Indonesia’s Just Energy Transition Partnership (JETP) investments in policies and programs to advance research, development, deployment, and commercial adoption (RDDCA) of efficient residential building sector cooling technologies and solutions in Indonesia. Four key energy conservation measures (ECM) have been identified to reduce air-conditioning (AC) energy demand in single-family housing in Indonesia: ceiling fan with temperature setback (to 28.1 °Celcius from 25 °C); insulated walls; insulated roof; and cool roof. This study found that low-income households with AC installations in Indonesia currently face a high energy cost burden of approximately 10%. However, by implementing a ceiling fan with temperature setback, this burden could decrease to 2.5% today and further reduce to 1.3% by the year 2060. The PBP for a ceiling fan with temperature setback is one year, indicating one of the lowest LCC and best NPV. In the planned upcoming phase of CBA, a series of building cooling improvement scenarios can be further defined, incorporating more than one ECM in combination with socio-economic factors evaluated in the initial CBA phase. Additionally, the analysis of ECM effects in multifamily housing can be expanded. This broader national analysis aims to encompass a holistic and comprehensive system-level perspective, including factors such as avoided power sector infrastructure investments, domestic job creation, domestic manufacturing job creation, and gross domestic product (GDP) growth.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Vehicle Assembly Building Fire Mishap Investigation Report. Volume I of V

On January 13, 2005, at approximately 1355, smoke was noticed on the 4th floor of D Tower in the Vehicle Assembly Building (VAB). Subsequently, a 911 call was made, a fire alarm pull station was activated, and the VAB was evacuated. The source of the smoke was determined to be a fire on the Low Bay M/N section roof near the Launch Control Center (LCC) Crossover. Due to the high visibility of the mishap, the KSC Center Director appointed a Mishap Investigation Board. Damage to government property was limited to the roof and a small number of ceiling tiles that were damaged by the fire fighters during the response. At the time of the mishap, there were hazardous commodities in the VAB including Solid Rocket Motors (SRMs) with open grain due to Solid Rocket Booster (SRB) igniter inspections. The Board agrees with the SGS Fire Services' theory that large amounts of smoke concentrated in the VAB D Tower and moved downward into the cable tunnel. The Board determined the proximate cause of this incident to be torching. HRI was installing a torch applied roof membrane which resulted in the ignition of combustible materials under the membrane near a wooden roof expansion joint. The torch applied roofing method is a universally accepted safe industry practice when applied to non-combustible surfaces. The combination of an open flame torch and combustible materiaLs presents an increased level of risk even with skilled applicators. The addition of high winds to this combination results in a risk the Board thinks can not be adequately mitigated. An appropriate risk assessment and analysis must be performed on the proposed roofing method to be used on high visibility facilities which represent unique national assets even when using common industry practices for repair and modification. The Board identified three root causes which contributed to or created the proximate cause and, if eliminated or modified, would have prevented the mishap: 1. Combustible materials in existing roof system 2. Wind speed and direction 3. Inadequate fire watch technique. Two contributing factors were identified which may have contributed to the occurrence but, if eliminated or modified, would not have prevented the occurrence: 1. HRI rushed to dry in and seal the roof on January 13 because heavy rain was predicted for the next day 2. No guidance on torching in windy conditions A total of 17 significant observations were noted during this investigation, which could lead to another mishap, or increase the severity of a mishap, but were not contributing factors in this mishap.

Kight, Ira↗

Use of Unmanned Aerial Systems for Post-closure Waste Site Maintenance and Surveillance - 20143

The P- and R-Area Reactor buildings, located at SRS near Aiken, SC, were in-situ decommissioned by grouting below-grade portions of the buildings and demolishing some above-grade structures to grade level. Other reactor building structures were left above-grade and sealed to prevent human or animal access. Because the above grade-structures are expected to continue in their present state for hundreds of years, the condition of the building roofs is critical to mitigate rainwater intrusion. For this reason, building roof areas were strengthened with high strength concrete to ensure the long-term integrity of the roof structure. Periodic inspections of the roof structures are required to ensure that the roofs are functioning properly and to identify damage areas. The traditional method of inspecting closed reactor buildings requires the use of a helicopter and photographer to generate photographs and videos for review. This method proved sufficient but lacked the resolution and clarity that is required for a thorough inspection of the building structure. Fortunately, the Savannah River National Laboratory (SRNL) has established a Small Unmanned Aircraft System (sUAS) program using commercially available and custom-built remote-controlled aircraft. EC and ACP contacted the SRNL program to evaluate whether the sUAS technology could be employed for periodic reactor building inspections. The sUAS can fly within a few meters of the reactor buildings and hover, allowing for a more thorough aerial inspection. The initial sUAS inspection of the P-Area Reactor building was completed in February 2018 and at the R-Area Reactor building in August 2018 and were successful in providing higher resolution photos and videos. The sUAS inspections also revealed that vegetation had begun to grow on the roofs that could potentially damage the structure integrity. SRNL partnered with Virginia Polytechnic Institute and State University to build a custom heavy lift sUAS that could be equipped with herbicides to remotely treat the vegetative growth. Herbicides were successfully applied to the R-Area Reactor building roof using the custom sUAS in September 2018. The use of unmanned aircraft systems at SRS to perform aerial inspections and herbicide treatment in otherwise inaccessible areas has proven to be an efficient and cost-effective technology that provides high value, increases knowledge of facility conditions, and provides for early detection of damage. Periodic inspections of the reactor building roofs using sUAS technology are performed safely, efficiently, and at a significant cost and schedule savings while reducing emissions, noise, and fossil fuel use. The use of sUAS equipment for building inspections and herbicide application at SRS is unique within the DOE complex. The goal of SRS is to apply this remote technology to other waste unit operations and maintenance activities in the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Global Cooling: Increasing World-Wide Urban Albedos to Offset CO2

Modification of urban albedos reduces summertime urban temperatures, resulting in a better urban air quality and building air-conditioning savings. Furthermore, increasing urban albedos has the added benefit of reflecting some of the incoming global solar radiation and countering to some extent the effects of global warming. In many urban areas, pavements and roofs constitute over 60% of urban surfaces (roof 20-25%, pavements about 40%). Using reflective materials, both roof and the pavement albedos can be increased by about 0.25 and 0.10, respectively, resulting in a net albedo increase for urban areas of about 0.1. Many studies have demonstrated building cooling-energy savings in excess of 20% upon raising roof reflectivity from an existing 10-20% to about 60% (a U.S. potential savings in excess of $1 billion (B) per year in net annual energy bills). On a global basis, our preliminary estimate is that increasing the world-wide albedos of urban roofs and paved surfaces will induce a negative radiative forcing on the earth equivalent to removing {approx} 22-40 Gt of CO{sub 2} from the atmosphere. Since, 55% of the emitted CO{sub 2} remains in the atmosphere, removal of 22-40 Gt of CO{sub 2} from the atmosphere is equivalent to reducing global CO{sub 2} emissions by 40-73 Gt. At {approx} $25/tonne of CO{sub 2}, a 40-73 Gt CO{sub 2} emission reduction from changing the albedo of roofs and paved surfaces is worth about $1,000B to 1800B. These estimated savings are dependent on assumptions used in this study, but nevertheless demonstrate considerable benefits that may be obtained from cooler roofs and pavements.

54 ENVIRONMENTAL SCIENCES↗

Issaquah Highlands Zero Energy Affordable Housing (WA) - YWCA

The YWCA Family Village at Issaquah, Net Zero Energy Approach Project provides a compelling model for how the nation can seriously respond to the critical need for affordable housing while advancing environmental standards and reducing economic inequities. Affordable housing developments for vulnerable members of the community and in today's workforce cannot overlook issues, such as climate impact, energy security and water conservation. This project's advanced building design was based on the goal of creating a 100 year building that could achieve net zero energy usage if funding had been available to support the final pieces of energy generation. The team worked closely with community stakeholders to ensure the baseline components of high quality and efficient building envelopes along with efficient systems were in place to set the stage for future incorporation of energy generating systems such as solar panels. As built, these 146 homes, large child care center and community services areas are proving the value of investing upfront for the benefit of future generations by reducing ongoing utility and maintenance costs with an eye toward environmental stewardship and community/resident education. The DOE award helped fund two critical energy conservation features for the YWCA Family Village at Issaquah campus: 1) super-insulated roof assembly with a continuous air barrier and 2) domestic hot water preheat system. The roof system at the YWCA Family Village at Issaquah project was built to include 6" of Polyiso rigid insulation (R-38) on top of the roof sheathing to provide a super-insulated roof in line with the other green features of the project. Placing the rigid insulation on top of the roof sheathing allows the building to have a continuous layer of insulation and provides a continuous air barrier. The domestic hot water preheat system includes flat panel arrays on roofs of the buildings that heat the water using solar power, which reduces the amount of heating needed from the gas-fired boilers. The flat-plate panels on the roof of the building heats the water using solar power. A heat exchanger transfers heat from water warmed by the panels to potable water for the units. The warmed potable water mixes with the tap water supply to create hot water for the buildings. This boost of water warmed by the solar panels reduces the heating costs for eh project by reducing the need to heat the water via gas-fired boilers. Both of these energy upgrades were chosen because they significantly improve the energy efficiency for the life of the building and are reducing monthly utility costs for both the residents and the owners. Since the owner is a not-for-profit dedicated to long-term ownership and serving households with very-low and low-incomes, the costs savings will ultimately benefit current and future residents as the dollars saved will either be realized directly by the resident or be invested in the project. Technically, the design of these systems is easily understood and the principles could be applied to other projects. The incremental costs depend largely on the existing market rate of the components-none of which are considered "cutting edge" so a market does currently exist.

14 SOLAR ENERGY↗

Web Growth Used to Confine Screw Dislocations to Predetermined Lateral Positions in 4H-SiC Epilayers

Silicon-carbide- (SiC-) based power devices could enable substantial aerospace electronics benefits over today's silicon-based electronics. However, present-day SiC wafers contain electrically harmful dislocations (including micropipes) that are unpredictably distributed in high densities across all commercial 4H- and 6H-SiC wafers. The NASA Glenn Research Center recently demonstrated a crystal growth process that moves SiC wafer dislocations to predetermined lateral positions in epitaxial layers so that they can be reproducibly avoided during subsequent SiC electronic device fabrication. The process starts by reactive ion etching mesa patterns with enclosed trench regions into commercial on-axis (0001) 4H- or 6H-SiC substrates. An example of a pregrowth mesa geometry with six enclosed triangular-shaped trench regions is shown. After the etch mask is stripped, homoepitaxial growth is carried out in pure stepflow conditions that enable thin cantilevers to grow laterally from the tops of mesas whose pregrowth top surfaces are not threaded by substrate screw dislocations. The image in the bottom figure shows the postgrowth structure that forms after the lateral cantilevers expand to coalesce and completely roof over each of the six triangular trench regions. Atomic force microscope (AFM) measurements of the roof revealed that three elementary screw dislocation growth spirals, each shown in the AFM insets of the bottom image on the previous page, formed in the film roof at three respective points of cantilever film coalescence. The image above shows the structure following an etch in molten potassium hydroxide (KOH) that produced surface etch pits at the dislocation defects. The larger KOH etch pits--S1, S2, and S3--shown in this image correspond to screw dislocations relocated to the final points of cantilever coalescence. The smaller KOH etch pits are consistent with epilayer threading edge dislocations from the pregrowth substrate mesa (P1, P3, and P4) and a final cantilever coalescence point (P2). No defects (i.e., no etch pits) are observed in other cantilevered portions of the film surface. On the basis of the principle of dislocation Burgers vector conservation, we hypothesize that all vertically propagating substrate dislocations in an enclosed trench region become combined into a single dislocation in the webbed film roof at the point of final roof coalescence. The point of final roof coalescence, and therefore the lateral location of a webbed roof dislocation, can be designed into the pregrowth mesa pattern. Screw dislocations with predetermined lateral positions can then be used to provide the new growth steps necessary for growing a 4H/6H-SiC epilayer with a lower dislocation density than the substrate. Devices fabricated on top of such films can be positioned to avoid the preplaced dislocations.

Powell, J. Anthony↗

Strength and Cost Analysis of New Steel Sets as Roadway Support Project in Coal Mines

Roadway support in swelling soft rocks in coal mines has become a critical challenge in recent years. For deformation control in swelling soft rocks, high strength sets are preferred in sites. But high strength always means high costs. Therefore, higher strength sets with not too much cost will be more welcomed in situ. Based on this, three new sets, including a floor beam set, a roof + floor beams set, and a roof + floor beams + braces set, have been developed in the present research. Strength comparisons and costs comparisons have been conducted in this research. Results illustrate that compared with the original set, in the floor beam set, the relative strength of bottom corners reaches 2.964, while the relative cost reaches 1.294; compared with the original set, in the roof + floor beams set, the relative strength of the top arch reaches 2.345, while the relative strength of bottom corners reaches 2.964, and the relative cost reaches 1.568; and compared with the original set, in the roof + floor beams + braces set, the relative strength of the top arch reaches 2.635, and the relative strength of bottom corners reaches 5.905, but the relative cost reaches 1.930. Floor beam set and roof + floor beams set illustrate higher strength and not too higher costs than the original set. Although the roof + floor beams + braces set exhibit much higher strength, they also demonstrate much higher costs than the original set. These new sets can be chosen according to different geological conditions in situ.

Li, Qinghai (ORCID:0000000264575001)↗

Housing-Performance Atlas of Baltimore Row Homes: Archetype-Based Multi-Hazard Baseline of Energy, Heat, Survivability, and Durability

Baltimore’s historic row-home neighborhoods face escalating risks to energy, heat, and durability under intensifying climate stress. This study develops a Housing-Performance Atlas that quantifies multi-hazard performance for eight representative archetypes using DesignBuilder/EnergyPlus Version 7.3.1.003, under Baltimore TMY3 boundary conditions. Performance is evaluated across the following four adaptation domains: energy use intensity, passive survivability during 72 h outage events, roof overheating exposure (>150 °F exceedance hours), and material service life derived from ISO 15686 and synthesized into Lean and Full Deficit Indices for comparative resilience ranking. Results show that EUI ranged from 46.7 to 67.6 kBtu ft −2 ·yr −1 , survivability from 0 to 23 h, and roof temperatures exceeded 150 °F for 150–210 h, shortening roof service life by up to 10 years. Composite Lean and Full Deficit Indices ranged 7.8–92.4, ranking Model 5 (end-unit, flat roof, two-story with basement) as the most resilient configuration and Model 8 (end-unit, pitched roof, three-story above-grade) as the least resilient due to compounded overheating and energy losses. Heat-related domains accounted for nearly 70% of overall resilience deficits, confirming thermal safety and roof reflectivity as retrofit priorities. The Housing-Performance Atlas establishes a reproducible diagnostic framework linking simulation, service life, and resilience metrics to guide cost-effective, climate-responsive retrofits in Baltimore’s aging urban housing stock.

Housing-Performance atlas↗

A Hygrothermal Risk Analysis Applied to Residential Unvented Attics

Aresidential building, constructed with an unvented attic, is acommonroof assembly in the United States.The expected hygrothermal performance and service life of the roof are difficult to estimate due to a number of varying parameters.Typical parameters expected to vary are the climate, direction, and slope of the roof as well as the radiation properties of the surface material. Furthermore, influential parameters are indoor moisture excess, air leakages through the attic floor, and leakages from air-handling unit and ventilation ducts. In addition, the type of building materials such as the insulation material and closed or open cell spray polyurethane foam will influence the future performance of the roof. A development of a simulation model of the roof assembly will enable a risk and sensitivity analysis, in which the most important varying parameters on the hygrothermal performance can be determined. The model is designed to perform probabilistic simulations using mathematical and hygrothermal calculation tools. The varying input parameters can be chosen from existing measurements, simulations, or standards. An analysis is applied to determine the risk of consequences, such as mold growth, rot, or energy demand of the HVAC unit. Furthermore, the future performance of the roof can be simulated in different climates to facilitate the design of an efficient and reliable roof construction with the most suitable technical solution and to determine the most appropriate building materials for a given climate

Pallin, Simon B↗

Next Generation Integrated PV Products Cost and Workflow Analysis (Final Report)

Residential photovoltaic (PV) costs have fallen consistently for over a decade (Ardani et al. 2018). DOE has subsequently developed a new residential PV cost target for 2030 of $0.05/kilowatt hour (SETO 2023). Ardani et al. (2018) conclude that integrated roofing and PV (RIPV) products may be key to achieving the residential target for both new construction and retrofit residential PV. In RIPV, the PV product is incorporated into or replaces the roofing material. RIPV systems can use conventional crystalline or thin-film technologies, may be aesthetically attractive alternatives to traditional racked and mounted PV systems, and may increase building property values (Cook et al. 2023). These products also have the potential to provide customer acquisition, labor, and equipment cost savings over traditional, racked and mounted residential rooftop PV and several companies have recently introduced integrated roofing and PV (RIPV) products (Cook et al. 2023). In 2022, Tesla was the market leader, representing 94% of RIPV capacity installed in 2022 through its Solar Roof offering, while GAF Energy and its Timberline Solar product was second capturing 3% (Feldman et al. 2023). In this project, NREL analyzed three research questions: (1) How do current RIPV products compare to racked and mounted PV in terms of costs, install times and processes? (2) How are RIPV products installed and are there opportunities for cost savings? (3) What are the key barriers to expanding market opportunities for integrating solar and roofing products? In this project, we explored residential RIPV cost reduction opportunities by analyzing installation processes. Our study documented residential RIPV installations at two reroofing sites (20.52 kilowatts) and the equivalent of nine new construction sites (71.75 kW) in California through a methodology known as time and motion study. We also conducted 15 interviews with subject-matter experts to identify barriers and solutions to maximize these products' market penetration.

14 SOLAR ENERGY↗

Building a 40% Energy Saving House in the Mixed-Humid Climate

This report describes a home that uses 40% less energy than the energy-efficient Building America standard - a giant step in the pursuit of affordable near-zero-energy housing through the evolution of five near-zero-energy research houses. This four-bedroom, two-bath, 1232-ft2 house has a Home Energy Rating System (HERS) index of 35 (a HERS rating of 0 is a zero-energy house, a conventional new house would have a HERS rating of 100), which qualifies it for federal energy efficiency and solar incentives. The house is leading to the planned construction of a similar home in Greensburg, Kansas, and 21 staff houses in the Walden Reserve, a 7000-unit "deep green" community in Cookville, Tennessee. Discussions are underway for construction of similar houses in Charleston, South Carolina, Seattle, Washington, Knoxville and Oak Ridge, Tennessee, and upstate New York. This house should lead to a 40% and 50% Gate-3, Mixed-Humid-Climate Joule for the DOE Building America Program. The house is constructed with structurally-insulated-panel walls and roof, raised metal-seam roof with infrared reflective coating, airtight envelope (1.65 air changes per hour at 50 Pascal), supply mechanical ventilation, ducts inside the conditioned space, extensive moisture control package, foundation geothermal space heating and cooling system, ZEHcor wall, solar water heater, and a 2.2 kWp grid-connected photovoltaic (PV) system. The detailed specifications for the envelope and the equipment used in ZEH5 compared to all the houses in this series are shown in Tables 1 and 2. Based on a validated computer simulation of ZEH5 with typical occupancy patterns and energy services for four occupants, energy for this all-electric house is predicted to cost only $0.66/day ($0.86/day counting the hookup charges). By contrast, the benchmark house would require $3.56/day, including hookup charges (these costs are based on a 2006 residential rates of $0.07/kWh and solar buyback at $0.15/kWh). The solar fraction for this home located in Lenoir City, Tennessee, is predicted to be as high as 41%(accounting for both solar PV and the solar water heater). This all-electric home is predicted to use 25 kWh/day based on the one year of measured data used to calibrate a whole-building simulation model. Based on two years of measured data, the roof-mounted 2.2 kWp PV system is predicted to generate 7.5 kWh/day. The 2005 cost to commercially construct ZEH5, including builder profit and overhead, is estimated at about $150,000. This cost - for ZEH5's panelized construction, premanufactured utility wall (ZEHcor), foundation geothermal system, and the addition of the walkout lower level, and considering the falling cost for PV - suggests that the construction cost per ft2 for a ZEH5 two-story will be even more cost-competitive. The 2005 construction cost estimate for a finished-out ZEH5 with 2632 ft2 is $222,000 or $85/ft2. The intention of this report is to help builders and homeowners make the decision to build zero-energy-ready homes. Detailed drawings, specifications, and lessons learned in the construction and analysis of data from about 100 sensors monitoring thermal performance for a one-year period are presented. This information should be specifically useful to those considering structural insulated panel walls and roof, foundation geothermal space heating and cooling, solar water heater and roof-mounted, photovoltaic, grid-tied systems.

14 SOLAR ENERGY↗

Development of an Accelerated Microbial Procedure (Final Report)

Cool-roof coating technologies make buildings more energy efficient, reducing energy consumption as well as air pollution in temperate and hot climates. The performance of a cool roof can diminish significantly when exposed to adverse environmental agents such as dust, soot, and pollens as well as microorganisms. There is currently no equivalent method to accelerate testing of cool roof erformance. We developed an experimental procedure to test cool roof samples using a defined mixture of both photoautotrophic and heterotrophic microorganisms that would produce an equivalent, faster test for biodeterioration. The mixture consists of 6 bacterial, 3 algal, and 4 fungal species suspended in rich media. Microbial biofilms developed rapidly on the coating surface. Any cool-roof technology could be tested using this microbial aging procedure. If the surface of a material is accessible to the microbial mixture, the growth of a microbial biofilm could reduce the solar reflectance to less than 50% of its initial value within 2 months. Thus, it completes the test cycle required by the ENERGY STAR ® program in only 2 months instead of 3 years by the biofilm alone.

14 SOLAR ENERGY↗

Planning large-scale excavation and construction activities within an aerially constrained site for construction of a repository for low and short-lived intermediate level radioactive waste at the Bulgarian national disposal facility - 15372

The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is planning the construction of a near-surface repository for low and short-lived intermediate level radioactive waste, the National Disposal Facility (NDF), at the Radiana Site adjacent to the Kozloduy Nuclear Power Plant (KNPP). The Site, a rectangular area approximately 1.2 km east-west by 0.4 north-south, is located on a slopping area between the second and sixth loess terraces above the River Danube with elevations ranging from approximately +40 m to elevation +95 m. Construction of the NDF will be divided into three phases separated by approximately 20 years each. The first phase will see the construction of the primary support facilities, referred to as the Auxiliary Buildings and including the Waste Reception and Buffer Storage (WRBS) Building, and the first set of 22 reinforced concrete disposal cells and supporting infrastructure, including a network of subsurface observation galleries, the Infiltration Network Control (ICN) Galleries. Each disposal cell will be 20.15 m long by 17.05 m wide by 9.45 m in height. The disposal cells will be arranged in two parallel rows. Disposal activities will be conducted using overhead cranes installed inside of track mounted mobile roofs. Each row of disposal cells will be serviced by one mobile roof. The mobile roofs will be supported by massive concrete foundations. Construction at the site will present several logistical challenges that will need to be overcome to fully realize the NDF. First in order to begin construction of these facilities nearly 1 million 3 of soil will require excavation and handling. Consistent with requirements to minimize potential environmental impacts identified in the site Environmental Safety Assessment (EIA) excavated soil will, to the extent possible, remain onsite. Approximately three quarters of the soil can be accommodated within the site boundaries. Another challenge results from requirements imposed by the ground conditions. The sub-grade at the site, which consists primarily of loess, will require considerable improvement. To this end a 5 m thick loess-cement cushion will be constructed across much of the site. Specifically, the cushion will be required beneath the disposal cells and the WRBS Building. Construction of the loess-cement cushion in the disposal area will require detailed planning and coordination, particularly as the cushion beneath the disposal cells also contains embedded structures, including the ICN Galleries as well as massive concrete foundation beams required for the two mobile roofs. Construction of these structures will require planned interruptions in the construction of the loess-cement cushion. Specific cement types and strict quality requirements will be required for completion of the loess-cement cushion as well as for completion of the ICN Galleries. The construction planning will need to account for the large volumes of soil to be excavated as well as ensuring sufficient material supplies in terms of both quality as well as quantity. Large quantities of materials including both dry cement for mixing with the loess, and wet concrete for pouring of the mobile roof foundations are accounted for by the plan. However, even after completion of these activities additional challenges are addressed by the plan related to the contemporaneous construction management of the auxiliary buildings and the disposal cells. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On the relationship factor between the PV module temperature and the solar radiation on it for various BIPV configurations

Temperatures of c-Si, pc-Si and a-Si PV modules making part of a roof in a building or hanging outside windows with various inclinations were measured with respect to the Intensity of the solar radiation on them under various environmental conditions. A relationship coefficient f was provided whose values are compared to those from a PV array operating in a free standing mode on a terrace. A theoretical model to predict f was elaborated. According to the analysis, the coefficient f takes higher values for PV modules embedded on a roof compared to the free standing PV array. The wind effect is much stronger for the free standing PV than for any BIPV configuration, either the PV is part of the roof, or placed upon the roof, or is placed outside a window like a shadow hanger. The f coefficient depends on various parameters such as angle of inclination, wind speed and direction, as well as solar radiation. For very low wind speeds the effect of the angle of inclination, β, of the PV module with respect to the horizontal on PV temperature is clear. As the wind speed increases, the heat transfer from the PV module shifts from natural flow to forced flow and this effect vanishes. The coefficient f values range from almost 0.01 m{sup 2°}C/W for free standing PV arrays at strong wind speeds, v{sub W}>7m/s, up to around 0.05 m{sup 2°}C/W for the case of flexible PV modules which make part of the roof in a BIPV system.

30 DIRECT ENERGY CONVERSION↗

Bonded Bracket Assmebly for Frameless Solar Panels

In February 2011 the US Department of Energy announced their new Sunshot Initiative. The Sunshot goal is to reduce the total cost of solar energy systems by about 75 percent before the end of the decade. The DOE estimated that a total installed cost of $$1 per watt for photovoltaic systems would be equivalent to 5-6¢/kilowatt hour (kWh) for energy available from the grid. The DOE also estimated that to meet the $1 per watt goal, PV module costs would need to be reduced to $ .50 per watt, balance of systems costs would need to be reduced to $.40 per watt, and power electronic costs would need to reach $.10 per watt. To address the BOS balance of systems cost component of the $1 per watt goal, the DOE announced a funding opportunity called (BOS-X) Extreme Balance of System Hardware Cost Reductions. The DOE identified eight areas within the total BOS costs: 1) installation labor, 2) installation materials, 3) installation overhead and profit, 4) tracker, 5) permitting and commissioning, 6) site preparation, 7) land acquisition, 8) sales tax. The BOS-X funding announcement requested applications in four specific topics;Topic 1: Transformational Building Integrated Photovoltaic (BIPV) Modules; Topic 2: Roof and Ground Mount Innovations; Topic 3: Transformational Photovoltaic System Designs; and Topic 4: Development of New Wind Load Codes for PV Systems.The application submitted by ARaymond Tinnerman reflected the requirements listed in Topic #2, Roof and Ground Mount Innovations. The goal of topic #2 was to develop technologies that would result in the extreme reduction of material and labor costs associated with applications that require physical connections and attachments to roof and ground mount structures. The topics researched in this project included component cost reduction, labor reduction, weight reduction, wiring innovations, and alternative material utilization. The project objectives included; 1) The development of an innovative quick snap bracket assembly that would be bonded to frameless PV modules for commercial rooftop installations; 2) The development of a composite pultruded rail to replace traditional racking materials; 3) In partnership with a roofing company, pilot the certification of a commercial roof to be solar panel compliant, eliminating the need for structural analysis and government oversight resulting in significantly decreased permitting costs; and 4) Reduce the sum of all cost impacts in topic #2 from a baseline total of $2.05/watt to $.34/watt.

14 SOLAR ENERGY↗

The SURE House (Solar Decathlon 2015)

Coastal towns and cities across the Northeastern US, with their high population density, aged utility infrastructure, and unique geography, are increasingly vulnerable to climate change related storm events. In October 2012 superstorm Sandy highlighted the fragility of our current coastal building types and made clear the need for a new model of design and construction which works to understand and mitigate these weaknesses. Dramatic changes in public policy, championed by both The Federal Emergency Management Agency (FEMA) and the National Flood Insurance Program (NFIP) are driving the rebuilding of these shore communities, often resulting in costly renovations, un-sustainable neighborhood configurations and in direct conflict with concurrent government policies such as The American with Disabilities Act (ADA). The SURE HOUSE demonstrates a series of new design solutions to these conflicting public policies and environmental imperatives. At Stevens Institute of Technology, the 2015 Solar Decathlon started with the challenge: Can we design a home for coastal New Jersey that dramatically reduces its energy use while protecting itself from the realities of a changing, more extreme climate? The SURE HOUSE merges the iconic 20th century shore home with 21st century building science. Utilizing innovative renewable energy technologies, a ‘Passive House’ level building envelope, and rugged glass-fiber-composite materials to flood-proof the home, the SURE HOUSE is a high-performance, net-zero-energy home, armored against extreme weather, designed for the contemporary lifestyle of the Jersey Shore and other vulnerable coastal communities. SUSTAINABLE At Stevens, we recognize that energy use in the home and workplace is directly connected to the growing problem of climate change. Reducing our energy consumption by designing higher performing, compact homes that are both functional, comfortable and desirable is the first critical step towards a modern, sustainable architecture for New Jersey and beyond. This is what informed the architectural design of the house. Configured about a compact form, thickly insulated and air-sealed walls eliminate thermal bridging and minimize energy losses while advanced glazing brings in free solar heat during the winter months. As a result of these passive design strategies, the SURE HOUSE has a greatly reduced carbon footprint requiring 91% less energy than a typical New Jersey home. Photovoltaic (PV) arrays on both the rooftop and operable shutters easily provide energy in excess of the home’s modest demands. The Stevens team considers a truly sustainable home in the era of climate change, one that prioritizes low energy use, and integrates right-sized renewable generation to supply the home’s needs. Low consumption, low production. RESILIENT In October of 2012, Hurricane Sandy wreaked havoc along the east coast of the US. In New Jersey alone there was an estimated 29.4 billion dollars in damages, 346,000 homes affected, and almost two and a half million people left without power, in some cases for over 10 days. Recovery from this storm and associated flooding is ongoing to this day, as many New Jersey homeowners grapple with the large costs of rebuilding and struggle to adapt to complicated new home building regulations. Damage from this storm to Hoboken, the home of the Stevens Institute of Technology’s campus, and to the New Jersey shore was extensive and many students on the SURE HOUSE team were directly affected by this historic event. The Stevens design team recognizes that in a world of more frequent and stronger storms, the ability to absorb and adapt to change is more important than ever. Successfully weathering the next storm and its aftermath is one of the primary goals in the design of the SURE HOUSE prototype. The SURE HOUSE introduces unique ‘dry flood-proofing’ methods to residential construction. Innovative wall and floor flood-proofing, utilizing durable composite sheathing materials adapted from the boating industry, were developed by the student team to render the SURE House’s building envelope flood proof up to the FEMA AE 6/7 Zone (+ 6/7 feet of water above sea-level). Designed and fabricated utilizing glass-fiber composite materials, the custom storm shutter system serves to protect the large glazed openings of the home from both air-borne debris impact and water infiltration during a storm event while also providing deterrence from the vandalism that often occurs in the aftermath of a calamitous event. During extended power outages, a ‘resilient’ solar array is capable of supplying critical amounts of energy and hot water to the home, without the use of battery storage or grid infrastructure. PV Description AC GRID-TIED PV SYSTEM The SURE HOUSE solar system consists of two distinct arrays, the grid-tied rooftop array which produces AC Powerand the shutter-mounted array which converts DC power generated by the modules directly into usable heat for the domestic hot water (DHW). The roof-mounted AC grid-tied array is comprised of three strings, two 11 module strings connected to an SMA SB 5000TL-US-223 inverter and a single 10 module string equipped and an SMA SB 3000TL-US-22 central inverter. All modules for the rooftop AC array are LG MonoX 2804 watt solar panels, chosen for their durability and efficiency. Inverter sizing and string size are optimized to the electrical characteristics of the chosen PV modules and the desired energy production, see Appendix 5B. The SURE HOUSE is projected to produce 12,353 kWh per year to meet 6,157 kWh per year of estimated consumption. Solar modules for the two AC grid-tied sub arrays are mounted on the main roof surface of the SURE HOUSE with a 10 degree tilt angle using a partially-ballasted polyethylene roof mounting system made by Renusol, which is particularly suited to the corrosive salt air of a coastal environment. This method was chosen for its installation simplicity and to limit detrimental roof penetrations. The 10 degree tilt optimizes the energy generated per roof area at a lower price, see Appendix 5A, and ensures that there is minimal wind uplift. DC SOLAR ELECTRIC DOMESTIC HOT WATER The SURE HOUSE’s approach to sustainable and resilient domestic hot water (DHW) consists of a unique, custom engineered DC solar electric hot water system. Employing the use of Advanced Energy’s DC electric PV heater (DCPVH)5 to heat domestic water well beyond the draw temperature, the SURE HOUSE is able to obtain a remarkably high solar fraction of 75% or more. The custom modified 80 gallon Vaughn DHW tank acts as a large solar ‘battery’ that stores heat energy in the form of hot water at almost 150 degrees, harvesting energy when the sun is out for use later in the day or overnight. The system, which uses electricity rather than heated fluid, is distinct from traditional ‘solar thermal’ systems by eliminating the dangers and associated maintenance issues of fluid based systems. By forgoing the use of external fluid loops, overheated solar collectors and pipes are not an issue for the SURE HOUSE system which never needs any yearly or seasonal flushing. In weather conditions where the integrated DCPVH unit cannot produce enough hot water via solar energy alone, the Vaughn hot water tank comes factory made with an AC powered 2.6 COP heat pump and a AC heating coil that serve as back-up heating elements. The DCPVH is powered by a DC array consisting of 10 custom-made Solbian by PVilion 180 watt, monocrystalline, flexible solar modules6. The Solbian modules are directly mounted to the top half of the operable storm shutters on the south façade of the SURE HOUSE. The SURE HOUSE team worked closely with PVillion, a PV system designer specializing in flexible architectural photovoltaics, to design an adhesive system that works with the glass-fiber storm shutter surface in a reliable manner over an extended period. Because this system operates in DC-only mode and never connects to the municipal power grid, the system can continue to create hot water safely and effectively even during grid disruption events. This hot water, and the energy stored within it, could be used for a range of activities including washing and cooking to more elaborate hydronic heating systems as desired. See Appendix 6 for system engineering, sizing and modeling.

14 SOLAR ENERGY↗

Next-Generation Factory-Produced Cool Asphalt Shingles: Phase 1 Final Report

As the least expensive category of high-slope roofing in the U.S., shingles are found on the roofs of about 80% of U.S. homes, and constitute about 80% (by product area) of this market. Shingles are also among the least reflective high-slope roofing products, with few cool options on the market. The widespread use of cool roofs in the two warmest U.S. climate zones could reduce annual residential cooling energy use in these zones by over 7%. This project targets the development of high-performance cool shingles with initial solar reflectance at least 0.40 and a cost premium not exceeding US$0.50/ft². Phase 1 of the current study explored three approaches to increasing shingle reflectance. Method A replaces dark bare granules by white bare granules to enhance the near-infrared reflectance attained with cool pigments. Method B applies a white basecoat and a cool-color topcoat to a shingle surfaced with dark bare granules. Method C applies a visually clear, NIR-reflecting surface treatment to a conventionally colored shingle. Method A was the most successful, but our investigation of Method B identified roller coating as a promising top-coating technique, and our study of Method C developed a novel approach based on a nanowire mesh. Method A yielded red, green, brown, and black faux shingles with solar reflectance up to 0.39 with volumetric coloration. Since the base material is white, these reflectances can readily be increased by using less pigment. The expected cost premium for Method A shingles is less than our target limit of $0.50/ft², and would represent less than a 10% increase in the installed cost of a shingle roof. Using inexpensive but cool (spectrally selective) iron oxide pigments to volumetrically color white limestone synthesized from sequestered carbon and seawater appears to offer high albedo at low cost. In Phase 2, we plan to refine the cool shingle prototypes, manufacture cool granules, and manufacture and market high-performance cool shingles.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗