Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

A New Method for Evaluating Elastomeric Materials for Use in High Pressure Oxygen

The seal configuration tester (SCT) developed at the Stennis Space Center (SSC) was designed to replicate the intended application of different seat and seal materials in a high pressure oxygen system and assess the wearibility of those materials. Statistical models were used to test the reliability of the SCT in its intended application, and the tests showed very consistent measurements over time, indicating that the device was working as intended. Other statistical designs were used to test different O-ring materials in a high-pressure oxygen system. Those tests indicated that the SCT could be used to rank the performance of O-ring materials in certain environments. The results indicated that some cheaper materials performed as well as, if not better than, other more expensive materials. Different lubrications were integrated in the testing as well and had a significant impact on the performance of the materials. Testing of seat materials is the next stage of this project. An augmentation grant (JAG) was obtained to further this experimental testing at the Stennis Space Center. This part of the project is ongoing at this time and therefore there are no significant accomplishments with respect to seat materials as of yet.

Jordan, Scott M.↗

United States manned spacecraft reliability experience

Attention is given to the reliability controls in manned spacecraft programs, taking into account the project Mercury, the Gemini program, the Apollo program, the Skylab program, and the Apollo-Soyuz test project. Reliability controls used in these programs are related to reliability management, parts and materials control, failure mode and effects analysis, reliability quantitative analysis, problem reporting and corrective action control, test control, limited-life control, and milestone reviews. A summary is presented of the major reliability tasks and innovations being used on the Space Shuttle program. Examples of these innovations include improved management techniques and an early identification of specific certification tests.

Kleinknecht, K. S.↗

Demonstrating the Safety and Reliability of a New System or Spacecraft: Incorporating Analyses and Reviews of the Design and Processing in Determining the Number of Tests to be Conducted

Design Safety/Reliability is associated with the probability of no failure-causing faults existing in a design. Confidence in the non-existence of failure-causing faults is increased by performing tests with no failure. Reliability-Growth testing requirements are based on initial assurance and fault detection probability. Using binomial tables generally gives too many required tests compared to reliability-growth requirements. Reliability-Growth testing requirements are based on reliability principles and factors and should be used.

Vesely, William E.↗

Static Torsion Testing and Modeling of a Variable Thickness Hybrid Composite Bull Gear

Torsional strength of a variable thickness hybrid gear web was measured by performing static testing on the part in a large torsion test frame. The outer rim of the hybrid gear web was fixed to the bottom of the test frame and loading was applied to the web through a shaft. The test setup included the installation of digital image correlation (DIC) systems to obtain deformation and strain measurements from the surfaces of the hybrid gear web and the mechanical test equipment to ensure reliability of the test. The results indicated that the variable thickness hybrid gear web achieved approximately twice the torsional strength compared to that of previous hybrid gear designs. The DIC analysis showed significantly more straining of the loading shaft than the actual test article. Additionally, the results demonstrated the importance and affect that the metallic, lobed interlock features had on the principal strain and out-of-plane displacement fields. The analysis revealed that the fixed outer rim was in fact rotating and a rigid body motion compensation (RBMC) function was computed to determine the actual rotation of the hub and composite web relative to the outer rim. Modeling simulations were performed for the variable thickness hybrid gear web and correlated well with the RBMC rotational deformation seen in the DIC analysis. In addition to benchmarking the load capacity of the hybrid gear web, measuring its strength is useful information to define the parameters needed for dynamic, endurance, and other testing of the part.

Johnston, Joel P.↗

Designing of a Fleet-Leader Program for Carbon Composite Overwrapped Pressure Vessels

Composite Overwrapped Pressure Vessels (COPVs) are often used for storing pressurant gases on board spacecraft when mass saving is a prime requirement. Substantial weight savings can be achieved compared to all metallic pressure vessels. For example, on the space shuttle, replacement of all metallic pressure vessels with Kevlar COPVs resulted in a weight savings of about 30 percent. Mass critical space applications such as the Ares and Orion vehicles are currently being planned to use as many COPVs as possible in place of all-metallic pressure vessels to minimize the overall mass of the vehicle. Due to the fact that overwraps are subjected to sustained loads during long periods of a mission, stress rupture failure is a major concern. It is, therefore, important to ascertain the reliability of these vessels by analysis, since it is practically impossible to show by experimental testing the reliability of flight quality vessels. Also, it is a common practice to set aside flight quality vessels as "fleet leaders" in a test program where these vessels are subjected to slightly accelerated operating conditions so that they lead the actual flight vessels both in time and load. The intention of fleet leaders is to provide advanced warning if there is a serious design flaw in the vessels so that a major disaster in the flight vessels can be averted with advance warning. On the other hand, the accelerating conditions must be not so severe as to be prone to false alarms. The primary focus of the present paper is to provide an analytical basis for designing a viable fleet leader program for carbon COPVs. The analysis is based on a stress rupture behavior model incorporating Weibull statistics and power-law sensitivity of life to fiber stress level.

Murthy, Pappu L.N.↗

Optimum structural design based on reliability and proof-load testing

Proof-load test eliminates structures with strength less than the proof load and improves the reliability value in analysis. It truncates the distribution function of strength at the proof load, thereby alleviating verification of a fitted distribution function at the lower tail portion where data are usually nonexistent.

Shinozuka, M.↗

A differential approach to microcomputer test battery development and implementation

The present microcomputer-based performance test battery emphasizes psychometric theory and utility for repeated-measures applications during extended exposure to various environmental stressors. In the menu that has been defined at the current state of this system's development, there are more than 30 'qualified' mental tests which stabilize in less than 10 min and possess test-retest reliabilities greater than 0.7 for a three-minute test/work period. The battery encompasses tests of cognition, information processing, psychomotor skill, memory, mood, etc. Several of the tests have demonstrated sensitivity to chemoradiotherapy, sleep loss, hypoxia, amphetamines, thermal stress, sensory deprivation, altitude, fatigue, and alcohol use. Recommendations are presented for 6-, 12-, and 22-min batteries.

Kennedy, R. S.↗

Evaluation of 1/100-Scale Mooring Systems for Wave Energy Converters

This study evaluates the feasibility, accuracy, and limitations of using 1/100th scale physical mooring systems to represent full-scale mooring behavior for wave energy converters (WECs) during small-scale tank testing. The work focuses on an RM3-style point absorber deployed in conditions representative of the PacWave South test site and examines whether small-scale physical testing can reliably inform numerical modeling, design decisions, and future prototype development. Overall, this study concludes that small-scale (1/100th) physical mooring models can provide valuable qualitative insights, including relative comparisons between mooring types and trends in device behavior, but cannot reliably replicate full-scale mooring loads or dynamic response without significant scaling distortion. Physical tests at this scale are most appropriate for motion characterization and model validation within known limitations, not for deriving absolute mooring loads or final engineering design values. Key lessons learned emphasize the importance of improved instrumentation strategies, iterative wave tank tuning, more precisely manufactured scaled mooring components, and enhanced anchoring systems to reduce experimental uncertainty.

16 TIDAL AND WAVE POWER↗

NASA'S reliability requirements.

NASA reliability program provisions for space system contractors, detailing program management, reliability engineering, testing and evaluation

PROGRAM MANAGEMENT↗

Reliability Assessment of Cooling Fans for PV Inverters: Testing, Modeling, and Case Studies

The reliability of photovoltaic (PV) inverters is critical for long-term solar system performance, with cooling fan failures frequently leading to costly downtime. While much research exists on general cooling fan reliability, little attention has been given to fans operating within PV inverters and their unique environmental challenges. Here, this article proposes a comprehensive methodology to address this gap. First, a failure mode and effects analysis is performed on fans to identify the key failure mechanisms in PV applications, their corresponding stressors, and the models necessary for lifetime prediction. Second, an accelerated life test is designed and conducted to collect valuable experimental data for PV inverter fans in a reasonable amount of time. Third, a mathematical conversion of dynamic mission profiles into effective constant stress levels is derived. Fourth, case studies are given, showcasing lifetime estimates that account for geographic variations in mission profile data. The results demonstrate that this integrated approach leads to an accurate reliability assessment for PV inverter cooling fans.

accelerated life testing (ALT)↗

Failure analysis of electronic parts: Laboratory methods

Failure analysis test methods are presented for use in analyzing candidate electronic parts and in improving future design reliability. Each test is classified as nondestructive, semidestructive, or destructive. The effects upon applicable part types (i.e. integrated circuit, transitor) are discussed. Methodology is given for performing the following: immersion tests, radio graphic tests, dewpoint tests, gas ambient analysis, cross sectioning, and ultraviolet examination.

Anstead, R. J.↗

NASA-DoD Lead-Free Electronics Project: Vibration Test

Vibration testing was conducted by Boeing Research and Technology (Seattle) for the NASA-DoD Lead-Free Electronics Solder Project. This project is a follow-on to the Joint Council on Aging Aircraft/Joint Group on Pollution Prevention (JCAA/JG-PP) Lead-Free Solder Project which was the first group to test the reliability of lead-free solder joints against the requirements of the aerospace/miLItary community. Twenty seven test vehicles were subjected to the vibration test conditions (in two batches). The random vibration Power Spectral Density (PSD) input was increased during the test every 60 minutes in an effort to fail as many components as possible within the time allotted for the test. The solder joints on the components were electrically monitored using event detectors and any solder joint failures were recorded on a Labview-based data collection system. The number of test minutes required to fail a given component attached with SnPb solder was then compared to the number of test minutes required to fail the same component attached with lead-free solder. A complete modal analysis was conducted on one test vehicle using a laser vibrometer system which measured velocities, accelerations, and displacements at one . hundred points. The laser vibrometer data was used to determine the frequencies of the major modes of the test vehicle and the shapes of the modes. In addition, laser vibrometer data collected during the vibration test was used to calculate the strains generated by the first mode (using custom software). After completion of the testing, all of the test vehicles were visually inspected and cross sections were made. Broken component leads and other unwanted failure modes were documented.

Woodrow, Thomas A.↗

Reliability of Upright and Supine Power Measurements Using an Inertial Load Cycle Ergometer

Practical, reliable, and time efficient methods of measuring muscular power are desirable for both research and applied testing situations. The inertial-load cycling method (ILC; Power/Cycle, Austin, TX) requires subjects to pedal as fast as possible against the inertial load of a flywheel for only 3-5 seconds, which could help reduce the time and effort required for maximal power testing. PURPOSE: 1) To test the intramachine reliability of ILC over 3 separate sessions, 2) to compare postural stance (upright vs. supine) during testing, and 3) to compare the maximal power (Pmax) output measured using ILC to that obtained from traditional isokinetic and leg press testing. METHODS: Subjects (n = 12) were tested on 4 non-consecutive days. The following tests were done on the first day of testing: isometric knee extension, isokinetic knee extension at several speeds, isokinetic power/endurance at 180/sec (Biodex System 4), leg press maximal isometric force, and leg press power/endurance. The other 3 days consisted exclusively of ILC testing. Subjects performed 6 ILC tests in an upright position and 6 ILC tests in a supine position on each day. The starting position was counterbalanced. Mixed-effects linear modeling was used to determine if any differences existed between testing days and between upright and supine for Pmax and revolutions per minute at Pmax (RPMpk). Mixed-modeling was also used to calculate intraclass correlation coefficients (ICC) to determine the reliability of the ILC on each testing day for Pmax and RPMpk (ICCs were calculated separately for upright and supine). gKendall fs Tau a h was used to determine the association between ILC Pmax and isokinetic and leg press data. RESULTS: For Pmax, significant differences were found between days 1 and 2 (upright: p = 0.018; supine: p = 0.014) and between days 1 and 3 (upright: p = 0.001; supine: p = 0.002), but not between days 2 and 3 (upright: p = 0.422; supine: p = 0.501). Pmax ICC values were greater than or equal to 0.97 for all days in both positions. Also, no significant differences between upright and supine postures were found for Pmax. No significant differences between days were found for RPMpk; however, there was a significant posture effect (upright greater than supine). Moderate correlations were observed between ILC Pmax and isokinetic and leg press tests (upright: 0.64-0.79, supine: 0.52-0.82). CONCLUSIONS: Overall, ILC is a very reliable test. Since a significant difference was found between day 1 and the other ILC testing days, it is suggested that day 1 of ILC testing should be used as a familiarization session to allow for subject learning. No significant difference in Pmax was seen from test 3 to test 6. However, an increase of 1.3% was observed from test 4 to test 6. Therefore, although 4 tests may be sufficient for most subjects to produce Pmax, in some cases 6 tests may be required. PRACTICAL APPLICATIONS: No differences were seen in Pmax between upright and supine positions despite differing RPMpk. This suggests that ILC testing can be used to provide reliable testing both in an upright position (appropriate for athletes) and in research (e.g., bed rest) or rehabilitation settings where supine testing is necessary. Future research should evaluate whether peak power measurements obtained with the ILC are sensitive to changes such as that observed with training and de-training.

Wickwire, P. J.↗

The scaling of model test results to predict intake hot gas reingestion for STOVL aircraft with augmented vectored thrust engines

The difficulties of modeling the complex recirculating flow fields produced by multiple jet STOVL aircraft close to the ground have led to extensive use of experimental model tests to predict intake Hot Gas Reingestion (HGR). Model test results reliability is dependent on a satisfactory set of scaling rules which must be validated by fully comparable full scale tests. Scaling rules devised in the U.K. in the mid 60's gave good model/full scale agreement for the BAe P1127 aircraft. Until recently no opportunity has occurred to check the applicability of the rules to the high energy exhaust of current ASTOVL aircraft projects. Such an opportunity has arisen following tests on a Tethered Harrier. Comparison of this full scale data and results from tests on a model configuration approximating to the full scale aircraft geometry has shown discrepancies between HGR levels. These discrepancies although probably due to geometry and other model/scale differences indicate some reexamination of the scaling rules is needed. Therefore the scaling rules are reviewed, further scaling studies planned are described and potential areas for further work are suggested.

Penrose, C. J.↗

Redundancy: How Many Unreliable Spares are Needed for High Reliability and Confidence on a Time Limited Mission?

This paper investigates the number of redundant units needed to achieve high reliability with high confidence. The approach applies to the case where the unit failure rate is too high for a single unit to provide the required reliability over the mission duration. To achieve high reliability, the design then uses N redundant units, one operating unit and N – 1 spares. If the unit failure rate is f, the mission length is L, and f * L is small (not the case assumed here), the unit failure probability over the mission duration is F1 = f * L << 1. In this case, the probability that all N units will fail is FN = F1N, and the needed N = LN(FN)/LN(F1). For the case of large f * L assumed here, F1 = f * L > 1, and F1 is the expected number of failures during the mission. The needed redundancy, N, to achieve the specified N unit reliability, FN, can be computed using the cumulative Poisson distribution with mean equal to F1. The number of spares, N - 1, is increased until the probability - that the total number of failures will be less than N -1 - achieves the required reliability. The confidence that this reliability can be achieved can be computed using the cumulative Poisson distribution or the chi-square distribution. Since the measured unit failure rate, f, has some uncertainty, the confidence that the rate is not lower than the actual failure rate and the required reliability is not overestimated is about 50%. Adding more redundant units increases the confidence that the required reliability, FN, will be achieved. For a fixed number of redundant units, the expected reliability and confidence can be traded off, since lower reliability goals have higher confidence in being achieved. Both the required reliability and confidence can be specified initially and the needed number of redundant units computed using the measured failure rate. The unit failure rate is determined by initial reliability growth testing to remove design errors and to better estimate the final constant failure rate. Reducing the failure rate and reducing its variance both reduce the number of redundant units needed for the required reliability and confidence. Since the total cost is the sum of the costs of the units and of the testing, there is an optimum test time that produces minimum cost.

Harry W. Jones↗

The detection of tightly closed flaws by nondestructive testing (NDT) methods

Liquid penetrant, ultrasonic, eddy current and X-radiographic techniques were optimized and applied to the evaluation of 2219-T87 aluminum alloy test specimens in integrally stiffened panel, and weld panel configurations. Fatigue cracks in integrally stiffened panels, lack-of-fusion in weld panels, and fatigue cracks in weld panels were the flaw types used for evaluation. A 2319 aluminum alloy weld filler rod was used for all welding to produce the test specimens. Forty seven integrally stiffened panels containing a total of 146 fatigue cracks, ninety three lack-of-penetration (LOP) specimens containing a total of 239 LOP flaws, and one-hundred seventeen welded specimens containing a total of 293 fatigue cracks were evaluated. Nondestructive test detection reliability enhancement was evaluated during separate inspection sequences in the specimens in the 'as-machined or as-welded', post etched and post proof loaded conditions. Results of the nondestructive test evaluations were compared to the actual flaw size obtained by measurement of the fracture specimens after completing all inspection sequences. Inspection data were then analyzed to provide a statistical basis for determining the flaw detection reliability.

Rummel, W. D.↗