Signal Detection Theory Applied to Helicopter Transmission Diagnostic Thresholds

Helicopter Health Usage Monitoring Systems (HUMS) have potential for providing data to support increasing the service life of a dynamic mechanical component in the transmission of a helicopter. Data collected can demonstrate the HUMS condition indicator responds to a specific component fault with appropriate alert limits and minimal false alarms. Defining thresholds for specific faults requires a tradeoff between the sensitivity of the condition indicator (CI) limit to indicate damage and the number of false alarms. A method using Receiver Operating Characteristic (ROC) curves to assess CI performance was demonstrated using CI data collected from accelerometers installed on several UH60 Black Hawk and AH64 Apache helicopters and an AH64 helicopter component test stand. Results of the analysis indicate ROC curves can be used to reliably assess the performance of commercial HUMS condition indicators to detect damaged gears and bearings in a helicopter transmission.

Dempsey, Paula J.↗

Signal Detection Theory Applied to Helicopter Transmission Diagnostic Thresholds

Helicopter Health Usage Monitoring Systems (HUMS) have potential for providing data to support increasing the service life of a dynamic mechanical component in the transmission of a helicopter. Data collected can demonstrate the HUMS condition indicator responds to a specific component fault with appropriate alert limits and minimal false alarms. Defining thresholds for specific faults requires a tradeoff between the sensitivity of the condition indicator (CI) limit to indicate damage and the number of false alarms. A method using Receiver Operating Characteristic (ROC) curves to assess CI performance was demonstrated using CI data collected from accelerometers installed on several UH60 Black Hawk and AH64 Apache helicopters and an AH64 helicopter component test stand. Results of the analysis indicate ROC curves can be used to reliably assess the performance of commercial HUMS condition indicators to detect damaged gears and bearings in a helicopter transmission.

Dempsey, Paula J.↗

Reliability of Ceramic Column Grid Array Interconnect Packages Under Extreme Temperatures

A paper describes advanced ceramic column grid array (CCGA) packaging interconnects technology test objects that were subjected to extreme temperature thermal cycles. CCGA interconnect electronic package printed wiring boards (PWBs) of polyimide were assembled, inspected nondestructively, and, subsequently, subjected to ex - treme-temperature thermal cycling to assess reliability for future deep-space, short- and long-term, extreme-temperature missions. The test hardware consisted of two CCGA717 packages with each package divided into four daisy-chained sections, for a total of eight daisy chains to be monitored. The package is 33 33 mm with a 27 27 array of 80%/20% Pb/Sn columns on a 1.27-mm pitch. The change in resistance of the daisy-chained CCGA interconnects was measured as a function of the increasing number of thermal cycles. Several catastrophic failures were observed after 137 extreme-temperature thermal cycles, as per electrical resistance measurements, and then the tests were continued through 1,058 thermal cycles to corroborate and understand the test results. X-ray and optical inspection have been made after thermal cycling. Optical inspections were also conducted on the CCGA vs. thermal cycles. The optical inspections were conclusive; the x-ray images were not. Process qualification and assembly is required to optimize the CCGA assembly, which is very clear from the x-rays. Six daisy chains were open out of seven daisy chains, as per experimental test data reported. The daisy chains are open during the cold cycle, and then recover during the hot cycle, though some of them also opened during the hot thermal cycle..

Ramesham, Rajeshuni↗

Recent advances in computational structural reliability analysis methods

The goal of structural reliability analysis is to determine the probability that the structure will adequately perform its intended function when operating under the given environmental conditions. Thus, the notion of reliability admits the possibility of failure. Given the fact that many different modes of failure are usually possible, achievement of this goal is a formidable task, especially for large, complex structural systems. The traditional (deterministic) design methodology attempts to assure reliability by the application of safety factors and conservative assumptions. However, the safety factor approach lacks a quantitative basis in that the level of reliability is never known and usually results in overly conservative designs because of compounding conservatisms. Furthermore, problem parameters that control the reliability are not identified, nor their importance evaluated. A summary of recent advances in computational structural reliability assessment is presented. A significant level of activity in the research and development community was seen recently, much of which was directed towards the prediction of failure probabilities for single mode failures. The focus is to present some early results and demonstrations of advanced reliability methods applied to structural system problems. This includes structures that can fail as a result of multiple component failures (e.g., a redundant truss), or structural components that may fail due to multiple interacting failure modes (e.g., excessive deflection, resonate vibration, or creep rupture). From these results, some observations and recommendations are made with regard to future research needs.

Thacker, Ben H.↗

Multi-Hazard Advanced Seismic Probabilistic Risk Assessment Tools and Applications

Design of nuclear power plant (NPP) facilities to resist natural hazards has been a part of the regulatory process from the beginning of the NPP industry in the United States (US), but has evolved substantially over time. The original set of approaches and methods was entirely deterministic in nature and focused on a traditional engineering margins-based approach. However, over time probabilistic and risk-informed approaches were also developed and implemented in US Nuclear Regulatory Commission (NRC) guidance and regulation. A defense-in-depth framework has also been incorporated into US regulatory guidance over time. As a result, today, the US regulatory framework incorporates deterministic and probabilistic approaches for a range of different applications and for a range of natural hazard considerations. This framework will continue to evolve as a result of improved knowledge and newly identified regulatory needs and objectives, most notably in response to the NRC activities developed in response to the 2011 Fukushima accident in Japan. Although the US regulatory framework has continued to evolve over time, the tools, methods and data available to the US nuclear industry to meet the changing requirements have not kept pace. Notably, there is significant room for improvement in the tools and methods available for external event probabilistic risk assessment (PRA), which is the principal assessment approach used in risk-informed regulations and risk-informed decision-making applied to natural hazard assessment and design. This is particularly true if PRA is applied to natural hazards other than seismic loading. Development of a new set of tools and methods that incorporate current knowledge, modern best practice, and state-of-the-art computational resources would lead to more reliable assessment of facility risk and risk insights (e.g., the SSCs and accident sequences that are most risk-significant), with less uncertainty and reduced conservatisms.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Power Cycle Testing of Power Switches: A Literature Survey

Reliability of power converters and lifetime prediction has been a major topic of research in the last few decades, especially for traction applications. The main failures in high power semiconductors are caused by thermomechanical fatigue. Power cycling and temperature cycling are the two most common thermal acceleration tests used in assessing reliability. The objective of this paper is to study the various power cycling tests found in the literature and to develop generalized steps in planning application specific power cycling tests. A comparison of different tests based on the failures, duration, test circuits, and monitored electrical parameters is presented.

42 ENGINEERING↗

Probabilistic Risk Assessment Procedures Guide for NASA Managers and Practitioners (Second Edition)

Probabilistic Risk Assessment (PRA) is a comprehensive, structured, and logical analysis method aimed at identifying and assessing risks in complex technological systems for the purpose of cost-effectively improving their safety and performance. NASA's objective is to better understand and effectively manage risk, and thus more effectively ensure mission and programmatic success, and to achieve and maintain high safety standards at NASA. NASA intends to use risk assessment in its programs and projects to support optimal management decision making for the improvement of safety and program performance. In addition to using quantitative/probabilistic risk assessment to improve safety and enhance the safety decision process, NASA has incorporated quantitative risk assessment into its system safety assessment process, which until now has relied primarily on a qualitative representation of risk. Also, NASA has recently adopted the Risk-Informed Decision Making (RIDM) process [1-1] as a valuable addition to supplement existing deterministic and experience-based engineering methods and tools. Over the years, NASA has been a leader in most of the technologies it has employed in its programs. One would think that PRA should be no exception. In fact, it would be natural for NASA to be a leader in PRA because, as a technology pioneer, NASA uses risk assessment and management implicitly or explicitly on a daily basis. NASA has probabilistic safety requirements (thresholds and goals) for crew transportation system missions to the International Space Station (ISS) [1-2]. NASA intends to have probabilistic requirements for any new human spaceflight transportation system acquisition. Methods to perform risk and reliability assessment in the early 1960s originated in U.S. aerospace and missile programs. Fault tree analysis (FTA) is an example. It would have been a reasonable extrapolation to expect that NASA would also become the world leader in the application of PRA. That was, however, not to happen. Early in the Apollo program, estimates of the probability for a successful roundtrip human mission to the moon yielded disappointingly low (and suspect) values and NASA became discouraged from further performing quantitative risk analyses until some two decades later when the methods were more refined, rigorous, and repeatable. Instead, NASA decided to rely primarily on the Hazard Analysis (HA) and Failure Modes and Effects Analysis (FMEA) methods for system safety assessment.

Stamatelatos,Michael↗

Building Energy Model Development for Retrofit Homes

Based on previous research conducted by Pacific Northwest National Laboratory and Florida Solar Energy Center providing technical assistance to implement 23 deep energy retrofits across the nation, six homes were selected in Florida and Texas for detailed post-retrofit energy modeling to assess realized energy savings (Chandra et al, 2012). Of these homes, three homes in San Antonio were selected for detailed analysis of post-retrofit energy use and realized energy savings. The actual savings achieved in these homes post-retrofit, as determined by a utility bill comparison, is presented. For the three metered homes in Florida, no pre-retrofit utility bills are available, so a utility bill comparison to determine realized savings is not possible. Assessing realized savings can be difficult for some homes where pre-retrofit occupancy and energy performance are unknown. Initially, savings had been estimated using a HERS Index comparison for these homes. However, this does not account for confounding factors such as occupancy and weather. This research also addresses a method to more reliably assess energy savings achieved in deep energy retrofits for which pre-retrofit utility bills or occupancy information is not available.

energy efficiency↗

Advanced probabilistic method of development

Advanced structural reliability methods are utilized on the Probabilistic Structural Analysis Methods (PSAM) project to provide a tool for analysis and design of space propulsion system hardware. The role of the effort at the University of Arizona is to provide reliability technology support to this project. PSAM computer programs will provide a design tool for analyzing uncertainty associated with thermal and mechanical loading, material behavior, geometry, and the analysis methods used. Specifically, reliability methods are employed to perform sensitivity analyses, to establish the distribution of a critical response variable (e.g., stress, deflection), to perform reliability assessment, and ultimately to produce a design which will minimize cost and/or weight. Uncertainties in the design factors of space propulsion hardware are described by probability models constructed using statistical analysis of data. Statistical methods are employed to produce a probability model, i.e., a statistical synthesis or summary of each design variable in a format suitable for reliability analysis and ultimately, design decisions.

Wirsching, P. H.↗

A functional global sensitivity measure and efficient reliability sensitivity analysis with respect to statistical parameters

Sensitivity analysis and reliability assessment are two important aspects of structural and system safety. Epistemic uncertainty with respect to probabilistic model of input parameters due to lack of knowledge is present in many scarce-data applications and complicates the characterization of uncertainty in model response. In this article, we present two importance measures to evaluate the impact of distribution parameters on the probability distribution function (PDF) of the output and the failure probability. The epistemic uncertainty associated with the distribution parameters is modeled as random variables. Additionally, a modified extended polynomial chaos expansion (MEPCE) approach is introduced in which aleatory and epistemic random variables are modeled and propagated simultaneously while allowing the separate assessment for any single epistemic variable. A MEPCE-based kernel density estimation (KDE) construction provides a composite map from each epistemic variable to the response PDF. The functional global sensitivity index of the PDF with respect to the distribution parameters is thus derived, as a function of output, which is both more informative and more efficient than standard scalar sensitivity measures. Reliability sensitivity indices can be readily evaluated by integrating the global sensitivity index function over the failure zone. Three illustrative examples are used to demonstrate the proposed methodology.

42 ENGINEERING↗

Explained: Maintaining a Reliable Future Grid with More Wind and Solar

Since the early 2000s, maintaining grid reliability has become more complex due to a variety of factors, including the changing generation mix, the creation of wholesale energy markets, and a growing number of extreme weather events. Parts of the U.S. grid are already operating with significant amounts of wind and solar generation - with 2022 annual wind and solar generation in the range of 25% to 40%. Even without considering the effects of extreme weather, maintaining reliability will require new capacity to address both growth in electric demand and retiring capacity. Based on the 2022 North American Electric Reliability Corporation (NERC) Long-Term Reliability Assessment, the combination of both growth in peak demand and retirements suggests a need for more than 100 gigawatts (GW) of new capacity by 2032. In general, there are a five categories of resources that are expected to be deployed and used to meet the challenge of maintaining an adequate source of supply in the coming decades: new wind and solar resources (accounting for their reliability contributions), energy storage, demand response resources, expanded transmission, and continued use of thermal generators.

power grid↗

Reduction Of Sizes Of Semi-Markov Reliability Models

Trimming technique reduces computational effort by order of magnitude while introducing negligible error. Error bound depends on only three parameters from semi-Markov model: maximum sum of rates for failure transitions leaving any state, maximum average holding time for recovery-mode state, and operating time for system. Error bound computed before any model generated, enabling modeler to decide immediately whether or not model can be trimmed. Trimming procedure specified by precise and easy description, making it easy to include trimming procedure in program generating mathematical models for use in assessing reliability. Typical application of technique in design of digital control systems required to be extremely reliable. In addition to aerospace applications, fault-tolerant design has growing importance in wide range of industrial applications.

White, Allan L.↗

Analytical Assessment of the Reciprocating Feed System

A preliminary analysis tool has been created in Microsoft Excel to determine deliverable payload mass, total system mass, and performance of spacecraft systems using various types of propellant feed systems. These mass estimates are conducted by inserting into the user interface the basic mission parameters (e.g., thrust, burn time, specific impulse, mixture ratio, etc.), system architecture (e.g., propulsion system type and characteristics, propellants, pressurization system type, etc.), and design properties (e.g., material properties, safety factors, etc.). Different propellant feed and pressurization systems are available for comparison in the program. This gives the user the ability to compare conventional pressure fed, reciprocating feed system (RFS), autogenous pressurization thrust augmentation (APTA RFS), and turbopump systems with the deliverable payload, inert mass, and total system mass being the primary comparison metrics. Analyses of several types of missions and spacecraft were conducted and it was found that the RFS offers a performance improvement, especially in terms of delivered payload, over conventional pressure fed systems. Furthermore, it is competitive with a turbopump system at low to moderate chamber pressures, up to approximately 1,500 psi. Various example cases estimating the system mass and deliverable payload of several types of spacecraft are presented that illustrate the potential system performance advantages of the RFS. In addition, a reliability assessment of the RFS was conducted, comparing it to simplified conventional pressure fed and turbopump systems, based on MIL-STD 756B; these results showed that the RFS offers higher reliability, and thus substantially longer periods between system refurbishment, than turbopump systems, and is competitive with conventional pressure fed systems. This is primarily the result of the intrinsic RFS fail-operational capability with three run tanks, since the system can operate with just two run tanks.

Eddleman, David E.↗

Final Report to the National Energy Technology Laboratory on FY14- FY15 Cooperative Research with the Consortium for Electric Reliability Technology Solutions

The Power System Engineering Research Center (PSERC) engages in technological, market, and policy research for an efficient, secure, resilient, adaptable, and economic U.S. electric power system. PSERC, as a founding partner of the Consortium for Electric Reliability Technology Solutions (CERTS), conducted a multi-year program of research for U.S. Department of Energy (DOE) Office of Electricity Delivery and Energy Reliability (OE) to develop new methods, tools, and technologies to protect and enhance the reliability and efficiency of the U.S. electric power system as competitive electricity market structures evolve, and as the grid moves toward wide-scale use of decentralized generation (such as renewable energy sources) and demand-response programs. Phase I of OE’s funding for PSERC, under cooperative agreement DE-FC26-09NT43321, started in fiscal year (FY) 2009 and ended in FY2013. It was administered by DOE’s National Energy Technology Laboratory (NETL) through a cooperative agreement with Arizona State University (ASU). ASU provided sub-awards to the participating PSERC universities. This document is PSERC’s final report to NETL on the activities for OE, conducted through CERTS, from September 2015 through September 2017 utilizing FY 2014 to FY 2015 funding under cooperative agreement DE-OE0000670. PSERC is a thirteen-university consortium with over 30 industry members. Since 1996, PSERC has been engaged in research and education efforts with the mission of “empowering minds to engineer the future electric energy system.” Its work is focused on achieving: • An efficient, secure, resilient, adaptable, and economic electric power infrastructure serving society • A new generation of educated technical professionals in electric power • Knowledgeable decision-makers on critical energy policy issues • Sustained, quality university programs in electric power engineering. PSERC core research is funded by industry, with a budget supporting approximately 30 principal investigators and some 70 graduate students and other researchers. Its researchers are multi-disciplinary, conducting research in three principal areas: power systems, power markets and policy, and transmission and distribution technologies. The research is collaborative; each project involves researchers typically at two universities working with industry advisors who have expressed interest in the project. Examples of topics for recent PSERC research projects include grid integration of renewables and energy storage, new tools for taking advantage of increased penetration of real-time system measurements, advanced system protection methods to maintain grid reliability, and risk and reliability assessment of increasingly complex cyber-enabled power systems. A PSERC’s objective is to proactively address the technical and policy challenges of U.S. electric power systems. To achieve this objective, PSERC works with CERTS to conduct technical research on advanced applications and investigate the design of fair and transparent electricity markets; these research topics align with CERTS research areas 1 and 2: Real-time Grid Reliability Management (Area 1), and Reliability and Markets (Area 2). The CERTS research areas overlap with the PSERC research stems: Power Systems, Power Markets, and Transmission and Distribution Technologies, as described on the PSERC website (see http://www.pserc.org/research/research_program.aspx). The performers were with Arizona State University (ASU), Cornell University (CU), University of California at Berkeley (UCB), and University of Illinois at Urbana-Champaign (UIUC). PSERC research activities in the area of reliability and markets focused on electric market and power policy analyses. The resulting studies suggest ways to frame best practices using organized markets for managing U.S. grid assets reliably and to identify highest priority areas for improvement. PSERC research activities in the area of advanced applications focused on mid- to long-term software research and development, with anticipated outcomes that move innovative ideas toward real-world application. Under the CERTS research area of Real-time Grid Reliability Management, PSERC has been focused on Advanced Applications Research and Development (AARD), a subgroup of activities that works to develop advanced applications and tools to more effectively operate the electricity delivery system, by enabling advanced analysis, visualization, monitoring and alarming, and decision support capabilities for grid operators.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Failure Mode and Effects Analysis for a Photovoltaic Inverter

While PV panel reliability continues to increase, PV inverters become the limiting factor for PV system reliability. Consequently, it is critical to have a generic tool from a third party for PV inverter reliability assessment to help 1) utilities/PV farm operators schedule maintenance in advance, and 2) inverter developers improve the next-generation design. However, these two things cannot be accomplished without first understanding the reasons behind inverter failure. Following this idea, as the first step, it is essential to identify and investigate the most failure-prone components within a PV inverter system. After all, any system is only as reliable as the components that are contained within it. This motivates the failure mode and effects analysis (FMEA) work presented for this workshop. The FMEA is conducted as follows: first, the overview of the methodology on the development of the FMEA is presented; then, based on a top-down approach starting from the PV inverter system, critical inverter components with high failure rates are identified and summarized; afterward, a thorough FMEA study at a component-level is performed and its results, including failure modes, failure mechanisms, and critical stressors, are tabulated; finally, according to three rankings (chance of occurrence, severity of occurrence, and ease of detection prior to failure) for each failure mechanism provided by the FMEA, risk priority numbers are calculated and the failure mechanisms along with the critical stressors are ranked in terms of their potentially detrimental effect on the PV inverter.

Brown, Buck↗

Object-oriented fault tree evaluation program for quantitative analyses

Object-oriented programming can be combined with fault free techniques to give a significantly improved environment for evaluating the safety and reliability of large complex systems for space missions. Deep knowledge about system components and interactions, available from reliability studies and other sources, can be described using objects that make up a knowledge base. This knowledge base can be interrogated throughout the design process, during system testing, and during operation, and can be easily modified to reflect design changes in order to maintain a consistent information source. An object-oriented environment for reliability assessment has been developed on a Texas Instrument (TI) Explorer LISP workstation. The program, which directly evaluates system fault trees, utilizes the object-oriented extension to LISP called Flavors that is available on the Explorer. The object representation of a fault tree facilitates the storage and retrieval of information associated with each event in the tree, including tree structural information and intermediate results obtained during the tree reduction process. Reliability data associated with each basic event are stored in the fault tree objects. The object-oriented environment on the Explorer also includes a graphical tree editor which was modified to display and edit the fault trees.

Patterson-Hine, F. A.↗

Space Shuttle Rudder Speed Brake Actuator-A Case Study Probabilistic Fatigue Life and Reliability Analysis

The U.S. Space Shuttle fleet was originally intended to have a life of 100 flights for each vehicle, lasting over a 10-year period, with minimal scheduled maintenance or inspection. The first space shuttle flight was that of the Space Shuttle Columbia (OV-102), launched April 12, 1981. The disaster that destroyed Columbia occurred on its 28th flight, February 1, 2003, nearly 22 years after its first launch. In order to minimize risk of losing another Space Shuttle, a probabilistic life and reliability analysis was conducted for the Space Shuttle rudder/speed brake actuators to determine the number of flights the actuators could sustain. A life and reliability assessment of the actuator gears was performed in two stages: a contact stress fatigue model and a gear tooth bending fatigue model. For the contact stress analysis, the Lundberg-Palmgren bearing life theory was expanded to include gear-surface pitting for the actuator as a system. The mission spectrum of the Space Shuttle rudder/speed brake actuator was combined into equivalent effective hinge moment loads including an actuator input preload for the contact stress fatigue and tooth bending fatigue models. Gear system reliabilities are reported for both models and their combination. Reliability of the actuator bearings was analyzed separately, based on data provided by the actuator manufacturer. As a result of the analysis, the reliability of one half of a single actuator was calculated to be 98.6 percent for 12 flights. Accordingly, each actuator was subsequently limited to 12 flights before removal from service in the Space Shuttle.

Rudder↗