Search NASA⌕ Search

SEARCH · Search NASA

Results for “S-BAND”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Experimental test of general relativity using time-delay data from Mariner 6 and Mariner 7

Range and Doppler data from Mariner 6 and Mariner 7 have been analyzed for purposes of measuring the effect of the sun's gravity field on S-band radio transmissions to the spacecraft. The prediction of general relativity, that the round-trip time delays between the station and the spacecraft will be increased by about 200 microsec near superior conjunction, has been verified with an uncertainty of 3 per cent or less. The dominant error source on the experiment is the stochastic nongravitational forces which act on the spacecraft and which limit the accuracy of the determination of the Mariner orbits. Effects of free coronal electrons on the round-trip propagation also make the measurement difficult, but the coronal contribution to the error is only about 1 per cent. Separate analyses of data from Mariner 6 and Mariner 7 yield two values near unity for the parameter gamma* which differ by about 0.3 per cent from each other. This and other considerations suggest that the error in the experiment is perhaps less than 3 per cent.

Anderson, J. D.↗

All-weather ice information system

Heart of system consists of two major components: side-looking airborne radar system for detecting ice cover and type, and modified short pulse S-band radar system for simultaneously determining ice cover regardless of cloud cover.

Schertler, R. J.↗

A shuttle radar microwave subsystem for earth resources applications

Microwave subsystem considerations are discussed as a design example for a radar for earth resources applications to be used in conjunction with the shuttle spacelab. This system with a multiplicity of frequencies and polarizations - L-band (25-cm wavelength), S-band (10-cm wavelength), and X-band (3.2-cm wavelength) at two orthogonal linear polarizations - was tentatively selected. The space shuttle vehicle constrains the antenna to approximately 8 m in length and 3 m in width. The frequencies and antenna size comprise the major constraints on the system described, and determine the sensor altitude, coverage, and major hardware parameters.

Source record↗

Scintillation estimates for a Jupiter entry probe: Phase 1

A model of the electron density irregularities in the Jovian ionosphere is constructed based on a preliminary interpretation of the Pioneer 10 Jovian ionospheric scintillations. The ionospheric irregularities exist over an altitude range of 3000 km. The structure constant c sub n of refractive index fluctuations is constant throughout this altitude range. The spatial wavenumber spectrum of the electron density irregularities follows the Kolmogorov spectrum and the outer scale size is greater than 6 km. Estimates of scintillation for a Jovian entry probe based on this model indicate that it is small at S-band but could be substantial at 4000 MHz. The temporal frequency spectrum of the log-amplitude fluctuation is less than 1 Hz and is consequently rather narrow.

Woo, R.↗

Apollo scientific experiments data handbook

A brief description of each of the Apollo scientific experiments was described, together with its operational history, the data content and formats, and the availability of the data. The lunar surface experiments described are the passive seismic, active seismic, lunar surface magnetometer, solar wind spectrometer, suprathermal ion detector, heat flow, charged particle, cold cathode gage, lunar geology, laser ranging retroreflector, cosmic ray detector, lunar portable magnetometer, traverse gravimeter, soil mechanics, far UV camera (lunar surface), lunar ejecta and meteorites, surface electrical properties, lunar atmospheric composition, lunar surface gravimeter, lunar seismic profiling, neutron flux, and dust detector. The orbital experiments described are the gamma-ray spectrometer, X-ray fluorescence, alpha-particle spectrometer, S-band transponder, mass spectrometer, far UV spectrometer, bistatic radar, IR scanning radiometer, particle shadows, magnetometer, lunar sounder, and laser altimeter. A brief listing of the mapping products available and information on the sample program were also included.

Eichelman, W. F.↗

Landsat-1 and Landsat-2 evaluation report, 23 January 1975 to 23 April 1975

A description of the work accomplished with the Landsat-1 and Landsat-2 satellites during the period 23 Jan. - 23 Apr. 1975 was presented. The following information was given for each satellite: operational summary, orbital parameters, power subsystem, attitude control subsystem, command/clock subsystem, telemetry subsystem, orbit adjust subsystem, magnetic moment compensating assembly, unified S-band/premodulation processor, electrical interface subsystem, thermal subsystem, narrowband tape recorders, wideband telemetry subsystem, attitude measurement sensor, wideband video tape recorders, return beam vidicon, multispectral scanner subsystem, and data collection subsystem.

Source record↗

Landsat-1 and Landsat-2 flight evaluation

The flight performance of Landsat 1 and Landsat 2 is analyzed. Flight operations of the satellites are briefly summarized. Other topics discussed include: orbital parameters; power subsystem; attitude control subsystem; command/clock subsystem; telemetry subsystem; orbit adjust subsystem; magnetic moment compensating assembly; unified s-band/premodulation processor; electrical interface subsystem; thermal subsystem; narrowband tape recorders; wideband telemetry subsystem; attitude measurement sensor; wideband video tape recorders; return beam vidicon; multispectral scanner subsystem; and data collection subsystem.

Source record↗

Shuttle orbiter C-band beacon antenna location study

A recommendation for the location of the Space Shuttle C-Band Beacon Antenna(s) to be used during Approach and Landing Tests was made. The study has included an Orbiter-to-ground radar look angle evaluation, a vehicle shadowing evaluation and extensive 1/10-scale antenna pattern measurements. Locations were limited to the cutouts for the S-Band Quads and Hemis to minimize skin perturbation. The results show that a single C-Band Antenna located in the lower Hemi cutout will provide optimum coverage and eliminate the need for switching and the undesirable interferometer effects of two antennas.

Lindsey, J. F.↗

Effective mie-scattering and CO2 absorption in the dust-laden Martian atmosphere and its impact on radiative-convective temperature changes in the lower scale heights

A time dependent computer model of radiative-convective-conductive heat transfer in the Martian ground-atmosphere system was refined by incorporating an intermediate line strength CO2 band absorption which together with the strong-and weak-line approximation closely simulated the radiative transmission through a vertically inhomogeneous stratification. About 33,000 CO2 lines were processed to cover the spectral range of solar and planetary radiation. Absorption by silicate dust particulates, was taken into consideration to study its impact on the ground-atmosphere temperature field as a function of time. This model was subsequently attuned to IRIS, IR-radiometric and S-band occultation data. Satisfactory simulations of the measured IRIS spectra were accomplished for the dust-free condition. In the case of variable dust loads, the simulations were sufficiently fair so that some inferences into the effect of dust on temperature were justified.

Pallmann, A. J.↗

Relativity experiment on Helios - A status report

The relativity experiment on Helios (Experiment 11) uses S-band and Doppler data, and spacecraft-solar-orbital data to measure the effects of general relativity in the solar system and the quadrupole moment in the solar gravitational field. Specifically, Experiment 11 is converned with measuring the following effects: (1) relativistic orbital corrections described by two parameters of the space-time metric which are both equal to unity in Einstein's theory; (2) orbital perturbations caused by a finite quadrupole moment of an oblate sun, described by zonal harmonics in the solar gravitational field.

Anderson, J. D.↗

Synchronous Meteorological Satellite spin testing

The end-to-end spin tests conducted on the Synchronous Meteorological Satellite are described in detail. It is noted that the objective of these tests was to demonstrate that the satellite performed its intended functions under spinning conditions and that all satellite functions were tested except for solar-panel illumination, pyrotechnic-device operation, VISSR infrared operation, and auxiliary propulsion-system operation. Tests discussed include antenna pointing, S-band and UHF equivalent isotropic radiated power, output-power ripple, bit error rate, synchronous electromagnetic interference, earth width measurement, and satellite magnetic-field measurement. The purpose, technique, salient results, and problems of each test are outlined.

Mcbrady, D. J.↗

ATS-6 - Technical aspects of the Health/Education Telecommunications Experiment

An overview is given of the HET experiment on ATS-6. The paper is divided into nine parts, including a technical overview, a preliminary evaluation of the HET demonstration, a review of operations at the Denver uplink terminal, a discussion of remote ground terminals, a review of C-band comprehensive terminals and of S-band comprehensive terminals, and parts devoted to general network operations, technical management and effectiveness of the network, and the site equipment operator.

Boor, J. L.↗

ATS-6 - Satellite-to-satellite tracking and data relay experiments

The paper describes the utilization of ATS-6 to relay tracking and telemetry data from Geos-5 and then from Nimbus-6. The experiment configuration consists of a ground station which receives data from ATS-6 through C-band links; ATS-6, in turn, transmits command data and receives telemetry data from the low-orbit satellites through S-band links. The ground and satellite equipment are described along with results of ground tests.

Schmid, P. E.↗

Great Lakes all-weather ice information system

The all-weather ice information system described uses the X-band side-looking airborne radar to determine the aerial distribution, location, and type of ice cover in the Great Lakes and an airborne S-band short-pulse radar to determine the ice thickness. Results from the 1974-1975 winter season demonstrated the ability of the system to provide all-weather ice information to shippers at the required time.

Schertler, R. J.↗

Tracking and Data Relay Satellite System /TDRSS/ telecommunication services

The TDRSS and tracking services define the telecommunication performance of the TDRSS between the RF interface with user spacecraft and the data interface with NASCOM at the ground terminal. Attention is given to system constraints, forward link services, multiple-access signal design parameters, S-band single access signal design parameters, multiple-access return link services, and single-access return link services.

Deerkoski, L. F.↗

EMI survey for maritime satellite, L-band, shipboard terminal

The paper presents results of an onboard EMI survey of an L-band shipboard terminal for operation with two geostationary maritime satellites. Significant EMC results include: (1) antenna noise temperature measurements indicate a maximum of 70 K steady background component at 1.6 GHz at sea for elevation angles of 5 degrees and higher; (2) field intensity measurements from 1-10 GHz show that a L-band terminal can operate simultaneously with onboard S-band and X-band navigation radar; (3) radar transmitter case emissions, below deck, in-band from 1535-1660 MHz, at 1 m distance from the cabinet, are equivalent, or greater than above-deck emissions in the same frequency range; and (4) conducted-emission tests of a ship's power lines to both radars show both narrow band and broad band emissions are 15 dB to 50 dB higher than equivalent U.S. commercial power lines from 150 kHz to 32 MHz.

Taylor, R. E.↗