Search NASA⌕ Search

SEARCH · Search NASA

Results for “SPACE TRAJECTORY PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Pluto/Kuiper Missions with Advanced Electric Propulsion and Power

In response to a request by NASA Code SD Deep Space Exploration Technology Program, NASA Glenn Research center performed a study to identify advanced technology options to perform a Pluto/Kuiper mission without depending on a 2004 Jupiter Gravity Assist, but still arriving before 2020. A concept using a direct trajectory with small, sub-kilowatt ion thrusters and Stirling radioisotope power system was shown to allow the same or smaller launch vehicle class (EELV) as the chemical 2004 baseline and allow launch in any year and arrival in the 2014 to 2020 timeframe. With the nearly constant power available from the radioisotope power source such small ion propelled spacecraft could explore many of the outer planetary targets. Such studies are already underway. Additional information is contained in the original extended abstract.

Oleson, S. R.↗

Outer Planet Exploration with Advanced Radioisotope Electric Propulsion

In response to a request by the NASA Deep Space Exploration Technology Program, NASA Glenn Research Center conducted a study to identify advanced technology options to perform a Pluto/Kuiper mission without depending on a 2004 Jupiter Gravity Assist, but still arriving before 2020. A concept using a direct trajectory with small, sub-kilowatt ion thrusters and Stirling radioisotope power systems was shown to allow the same or smaller launch vehicle class as the chemical 2004 baseline and allow a launch slip and still flyby in the 2014 to 2020 timeframe. With this promising result the study was expanded to use a radioisotope power source for small electrically propelled orbiter spacecraft for outer planet targets such as Uranus, Neptune, and Pluto.

Oleson, Steven↗

Pair-Wise Trajectory Management-Oceanic (PTM-O)

This document describes the Pair-wise Trajectory Management-Oceanic (PTM-O) Concept of Operations (ConOps). Pair-wise Trajectory Management (PTM) is a concept that includes airborne and ground-based capabilities designed to enable and to benefit from, airborne pair-wise distance-monitoring capability. PTM includes the capabilities needed for the controller to issue a PTM clearance that resolves a conflict for a specific pair of aircraft. PTM avionics include the capabilities needed for the flight crew to manage their trajectory relative to specific designated aircraft. Pair-wise Trajectory Management PTM-Oceanic (PTM-O) is a regional specific application of the PTM concept. PTM is sponsored by the National Aeronautics and Space Administration (NASA) Concept and Technology Development Project (part of NASA's Airspace Systems Program). The goal of PTM is to use enhanced and distributed communications and surveillance along with airborne tools to permit reduced separation standards for given aircraft pairs, thereby increasing the capacity and efficiency of aircraft operations at a given altitude or volume of airspace.

Jones, Kenneth M.↗

Artemis Lunar Mission Availability & Design

The National Aeronautics and Space Administration’s (NASA) Artemis Program is leading international spaceexploration in a return to human lunar missions. The mission design underpinning this program is a critical aspect inthe integration of the multiple vehicles, processes, and capabilities to execute the most demanding human spaceflightmissions to date. Frequently mission design is characterized solely by its trajectory and the associated delta-velocityto achieve the end-to-end mission on a single day of flight. However, in practical terms for spaceflight missions,actual performance must characterize the translation delta-velocity demand, integrated power and thermal, crew dayoperations, commodities limitations, launch vehicle opportunities, and numerous additional factors across numerouslaunch day dependent variables. These factors together provide a unified set of mission design constraints that mustall be met in order to execute a fully integrated mission. The frequency of achieving all of the mission designconstraints is thus characterized as mission availability. The mission availability reflects the number of opportunitiesin any given period (month, year, etc.) for which an end-to-end mission could be launched. Ensuring adequatemission availability for the Artemis Program is necessary to support long term viability and sustainability of humanlunar exploration. This paper will characterize the driving factors in the Artemis mission availability includingvehicle specific effects from the Space Launch System (SLS), Orion Multi-Purpose Crew Vehicle, Gateway, HumanLanding System (HLS) and other contributing projects. This analysis will also summarize the relevant factors thatfuture vehicles and projects should consider for the integration and expansion of exploration capabilities with theArtemis Program.

Nujoud Fahoum Merancy↗

HP-9825A HFRMP trajectory processor (#TRAJ), detailed description

The computer code for the trajectory processor (#TRAJ) of the high fidelity relative motion program is described. The #TRAJ processor is a 12-degrees-of-freedom trajectory integrator (6 degrees of freedom for each of two vehicles) which can be used to generate digital and graphical data describing the relative motion of the Space Shuttle Orbiter and a free-flying cylindrical payload. A listing of the code, coding standards and conventions, detailed flow charts, and discussions of the computational logic are included.

Kindall, S. M.↗

Trajectory Design Considerations for Low Lunar Orbit to Near Rectilinear Halo Orbit Transfers

NASA’s Artemis program plans to use a Near-Rectilinear Halo Orbit (NRHO) to stage assets for a lunar exploration campaign. While the proximity operations in the NRHO are simple and very similar to flat-space dynamics, the far-field ren-dezvous has considerations that are non-intuitive, especially to those that may be steeped in the dynamics of rendezvous in Keplerian orbits. This paper will discuss some key drivers to the delta-V performance of far-field rendezvous from Low Lunar Orbit to the Gateway space station in its 9:2 resonant south-ward NRHO.

NRHO↗

Capabilities, Design, Construction and Commissioning of New Vibration, Acoustic, and Electromagnetic Capabilities Added to the World's Largest Thermal Vacuum Chamber at NASA's Space Power Facility

NASA s human space exploration plans developed under the Exploration System Architecture Studies in 2005 included a Crew Exploration Vehicle launched on an Ares I launch vehicle. The mass of the Crew Exploration Vehicle and trajectory of the Ares I coupled with the need to be able to abort across a large percentage of the trajectory generated unprecedented testing requirements. A future lunar lander added to projected test requirements. In 2006, the basic test plan for Orion was developed. It included several types of environment tests typical of spacecraft development programs. These included thermal-vacuum, electromagnetic interference, mechanical vibration, and acoustic tests. Because of the size of the vehicle and unprecedented acoustics, NASA conducted an extensive assessment of options for testing, and as result, chose to augment the Space Power Facility at NASA Plum Brook Station, of the John H. Glenn Research Center to provide the needed test capabilities. The augmentation included designing and building the World s highest mass capable vibration table, the highest power large acoustic chamber, and adaptation of the existing World s largest thermal vacuum chamber as a reverberant electromagnetic interference test chamber. These augmentations were accomplished from 2007 through early 2011. Acceptance testing began in Spring 2011 and will be completed in the Fall of 2011. This paper provides an overview of the capabilities, design, construction and acceptance of this extraordinary facility.

Motil, Susan M.↗

MONTE Python for Deep Space Navigation

The Mission Analysis, Operations, and Navigation Toolkit Environment (MONTE) is the Jet Propulsion Laboratory’s (JPL) signature astrodynamic computing platform. It was built to support JPL’s deep space exploration program, and has been used to fly robotic spacecraft to Mars, Jupiter, Saturn, Ceres, and many solar system small bodies. At its core, MONTE consists of low-level astrodynamic libraries that are written in C++ and presented to the end user as an importable Python language module. These libraries form the basis on which Python-language applications are built for specific astrodynamic applications, such as trajectory design and optimization, orbit determination, flight path control, and more. The first half of this paper gives context to the MONTE project by outlining its history, the field of deep space navigation and where MONTE fits into the current Python landscape. The second half gives an overview of the main MONTE libraries and provides a narrative example of how it can be used for astrodynamic analysis.

aerospace↗

Space Shuttle Plume and Plume Impingement Study

The extent of the influence of the propulsion system exhaust plumes on the vehicle performance and control characteristics is a complex function of vehicle geometry, propulsion system geometry, engine operating conditions and vehicle flight trajectory were investigated. Analytical support of the plume technology test program was directed at the two latter problem areas: (1) definition of the full-scale exhaust plume characteristics, (2) application of appropriate similarity parameters; and (3) analysis of wind tunnel test data. Verification of the two-phase plume and plume impingement models was directed toward the definition of the full-scale exhaust plume characteristics and the separation motor impingement problem.

Tevepaugh, J. A.↗

4D Dynamic RNP Annual Interim Report-Year 1

This Annual Interim Report summarizes the activities led by Raytheon, in collaboration with GE Aviation and SAIC, and presents the results obtained during the first year of this research effort to expand the RNP concept to 4 dimensions relative to a dynamic frame of reference. Joint Program Development Office (JPDO)Concepts of Operations for the Next Generation Air Transportation System (NextGen) considers 4 Dimension Trajectory (4DT) procedures a key enabler to Trajectory Based Operations (TBO). The JPDO defines 4DT as a precise description of an aircraft path in space and time . While NextGen assumes that this path is defined within an Earth-reference frame, many 4DT procedure implementations will require an aircraft to precisely navigate relative to a moving reference such as another aircraft to form aggregate flows or a weather cell to allow for flows to shift. Current methods of implementing routes and flight paths rely on aircraft meeting a Required Navigation Performance (RNP) specification and being equipped with a monitoring and alerting capability to annunciate when the aircraft system is unable to meet the performance specification required for the operation. Since all aircraft today operate within the NAS relative to fixed reference points, the current RNP definition is deemed satisfactory. However, it is not well understood how the current RNP construct will support NextGen 4DT procedures where aircraft operate relative to each other or to other dynamic frames of reference. The objective of this research effort is to analyze candidate 4DT procedures from both an Air Navigation Service Provider (ANSP) and aircraft perspective, to identify their specific navigational requirements, assess the shortcomings of the current RNP construct to meet these requirements, to propose an extended 4 Dimensional Dynamic RNP (4D Dynamic RNP) construct that accounts for the dynamic spatial and temporal nature of the selected 4DT procedures, and finally, to design an experiment using the Airspace and Traffic Operations Simulation (ATOS) system to validate the 4D Dynamic RNP construct. This Annual Interim Report summarizes the activities led by Raytheon, in collaboration with GE Aviation and SAIC, and presents the results obtained during the first year of this research effort to expand the RNP concept to 4 dimensions relative to a dynamic frame of reference. A comprehensive assessment of the state-of-the-art international implementation of current RNP was completed and presented in the Contractor Report RNP State-of-the-Art Assessment, Version 4, 17 December 2008 . The team defined in detail two 4DT operations, Airborne Precision Spacing and Self-Separation, that are ideally suited to be supported by 4D Dynamic RNP and developed their respective conceptual frameworks, Required Interval Management Performance (RIMP) Version 1.1, 13 April 2009 and Required Self Separation Performance (RSSP) Version 1.1, 13 April 2009 . Finally, the team started the development of a mathematical model and simulation tool for RIMP and RSSP scheduled to be delivered during the second year of this research effort.

Finkelsztein, Daniel M.↗

Dispersion analysis for baseline reference mission 1

A dispersion analysis considering 3 sigma uncertainties (or perturbations) in platform, vehicle, and environmental parameters was performed for the baseline reference mission (BRM) 1 of the space shuttle orbiter. The dispersion analysis is based on the nominal trajectory for the BRM 1. State vector and performance dispersions (or variations) which result from the indicated 3 sigma uncertainties were studied. The dispersions were determined at major mission events and fixed times from lift-off (time slices) and the results will be used to evaluate the capability of the vehicle to perform the mission within a 3 sigma level of confidence and to determine flight performance reserves. A computer program is given that was used for dynamic flight simulations of the space shuttle orbiter.

Kuhn, A. E.↗

NASA's new Mars Exploration Program: the trajectory of knowledge

NASA's newly restructured Mars Exploration Program (MEP) is finally on the way to Mars with the successful April 7 launch of the 2001 Mars Odyssey Orbiter. In addition, the announcement by the Bush Administration that the exploration of Mars will be a priority within NASA's Office of Space Science further cements the first decade of the new millennium as one of the major thrusts to understand the "new" Mars. Over the course of the past year and a half, an integrated team of managers, scientists, and engineers has crafted a revamped MEP to respond to the scientific as well as management and resource challenges associated with deep space exploration of the Red Planet. This article describes the new program from the perspective of its guiding philosophies, major events, and scientific strategy. It is intended to serve as a roadmap to the next 10-15 years of Mars exploration from the NASA viewpoint. [For further details, see the Mars Exploration Program web site (URL): http://mars.jpl.nasa.gov]. The new MEP will certainly evolve in response to discoveries, to successes, and potentially to setbacks as well. However, the design of the restructured strategy is attentive to risks, and a major attempt to instill resiliency in the program has been adopted. Mars beckons, and the next decade of exploration should provide the impetus for a follow-on decade in which multiple sample returns and other major program directions are executed. Ultimately the vision to consider the first human scientific expeditions to the Red Planet will be enabled. By the end of the first decade of this program, we may know where and how to look for the elusive clues associated with a possible martian biological record, if any was every preserved, even if only as "chemical fossils.".

Space Flight↗

Preliminary Design of Low-Thrust Interplanetary Missions

For interplanetary missions, highly efficient electric propulsion systems can be used to increase the mass delivered to the destination and/or reduce the trip time over typical chemical propulsion systems. This technology is being demonstrated on the Deep Space 1 mission - part of NASA's New Millennium Program validating technologies which can lower the cost and risk and enhance the performance of future missions. With the successful demonstration on Deep Space 1, future missions can consider electric propulsion as a viable propulsion option. Electric propulsion systems, while highly efficient, produce only a small amount of thrust. As a result, the engines operate during a significant fraction of the trajectory. This characteristic makes it much more difficult to find optimal trajectories. The methods for optimizing low-thrust trajectories are typically categorized as either indirect, or direct. Indirect methods are based on calculus of variations, resulting in a two-point boundary value problem that is solved by satisfying terminal constraints and targeting conditions. These methods are subject to extreme sensitivity to the initial guess of the variables - some of which are not physically intuitive. Adding a gravity assist to the trajectory compounds the sensitivity. Direct methods parameterize the problem and use nonlinear programming techniques to optimize an objective function by adjusting a set of variables. A variety of methods of this type have been examined with varying results. These methods are subject to the limitations of the nonlinear programming techniques. In this paper we present a direct method intended to be used primarily for preliminary design of low-thrust interplanetary trajectories, including those with multiple gravity assists. Preliminary design implies a willingness to accept limited accuracy to achieve an efficient algorithm that executes quickly.

Sims, Jon A.↗

NASA Electric Propulsion Program

The described NASA program is to provide the technology base to meet the U.S. future needs in the area of low thrust, high specific impulse propulsion. An electric propulsion system will be needed to augment the Shuttle-IUS Space Transportation System for space missions involving the exploration of the solar system. Plans exist in this connection for comet and asteroid rendezvous, a Saturn and a Mercury orbiter, and a Mars surface sample return. An analysis has shown that electric propulsion can be used to obtain larger payloads, shorter trip times, more mission flexibility, and less complicated trajectories. In addition, electric propulsion has also potential uses for earth orbital missions. Attention is given to the auxiliary propulsion technology program which is to develop a one millipound electron bombardment thrust system, a baseline program concerned with a 3 kilowatt thrust system, ion thruster research, magnetoplasmadynamic thruster research and evaluation, and the use of a mass driver as a reaction mass propulsion system.

Hudson, W. R.↗

Coronas-F Orbit Monitoring and Re-Entry Prediction

Russian scientific satellite CORONAS-F was launched on July, 31, 2001. The object was inserted in near-circular orbit with the inclination 82.5deg and a mean altitude approx. 520 km. Due to the upper atmosphere drag CORONAS-F was permanently descended and as a result on December, 6, 2005 it has finished the earth-orbital flight, having lifetime in space approx. 4.5 years. The satellite structural features and its flight attitude control led to the significant variations of its ballistic coefficient during the flight. It was a cause of some specific difficulties in the fulfillment of the ballistic and navigation support of this space vehicle flight. Besides the main mission objective CORONAS-F also has been selected by the Inter-Agency Space Debris Coordination Committee (IADC) as a target object for the next regular international re-entry test campaign on a program of surveillance and re-entry prediction for the hazard space objects within their de-orbiting phases. Spacecraft (S/C) CORONAS-F kept its working state right up to the end of the flight - down to the atmosphere entry. This fact enabled to realization of the additional research experiments, concerning with an estimation of the atmospheric density within the low earth orbits (LEO) of the artificial satellites, and made possible to continue track the S/C during final phase of its flight by means of Russian regular command & tracking system, used for it control. Thus there appeared a unique possibility of using for tracking S/C at its de-orbiting phase not only passive radar facilities, belonging to the space surveillance systems and traditionally used for support of the IADC re-entry test campaigns, but also more precise active trajectory radio-tracking facilities from the ground control complex (GCC) applied for this object. Under the corresponding decision of the Russian side such capability of additional high-precise tracking control of the CORONAS-F flight in this period of time has been implemented. The organizing of the CORONAS-F ballistic and navigational support (BNS) and solving its main tasks (such as S/C orbit determination (OD) and its motion prediction and connected with them) both for regular mission stage and for additional flight program were realized by the group of specialists from the Mission Control Center (MCC). MCC was also assigned as a principal organization from the Russian side for participation in the 7th IADC re-entry test campaign on CORONAS-F. The CORONAS-F flight features and space environments circumstances during its flight as well as a methodology and technology of spacecraft ballistic and navigational support are given below. The BNS results for different phases of S/C flight, including the results of its re-entry predictions, obtained during the realization of the 7th IADC test campaign are submitted. The accuracy of space vehicle re-entry prediction and its dependence on various factors are analyzed in more details.

Ivanov, N. M.↗

Four-body trajectory optimization

A comprehensive optimization program has been developed for computing fuel-optimal trajectories between the earth and a point in the sun-earth-moon system. It presents methods for generating fuel optimal two-impulse trajectories which may originate at the earth or a point in space and fuel optimal three-impulse trajectories between two points in space. The extrapolation of the state vector and the computation of the state transition matrix are accomplished by the Stumpff-Weiss method. The cost and constraint gradients are computed analytically in terms of the terminal state and the state transition matrix. The 4-body Lambert problem is solved by using the Newton-Raphson method. An accelerated gradient projection method is used to optimize a 2-impulse trajectory with terminal constraint. The Davidon's Variance Method is used both in the accelerated gradient projection method and the outer loop of a 3-impulse trajectory optimization problem.

Pu, C. L.↗

The 2006 Cape Canaveral Air Force Station Range Reference Atmosphere Model Validation Study and Sensitivity Analysis to the National Aeronautics and Space Administration's Space Shuttle

Atmospheric parameters are essential in assessing the flight performance of aerospace vehicles. The effects of the Earth's atmosphere on aerospace vehicles influence various aspects of the vehicle during ascent ranging from its flight trajectory to the structural dynamics and aerodynamic heatmg on the vehicle. Atmospheric databases charactenzing the wind and thermodynamic environments, known as Range Reference Atmospheres (RRA), have been developed at space launch ranges by a governmental interagency working group for use by aerospace vehicle programs. The National Aeronantics and Space Administration's (NASA) Space Shuttle Program (SSP), which launches from Kennedy Space Center, utilizes atmosphenc statistics derived from the Cape Canaveral Air Force Station Range Reference Atmosphere (CCAFS RRA) database to evaluate environmental constraints on various aspects of the vehlcle during ascent.

Decker, Ryan K.↗

Trajectory Based Operations (TBO)

Today, the FAA is fully engaged in the development and deployment of TBO for the NAS. To realize TBO, the FAA and NAS user community recognize the importance of systems-of-systems thinking and of greater integration across systems, programs, teams, and between research and the field. The ATD-1 Operational Integration Assessment (OIA), helped blaze the trail for this important transition while moving TBFM Terminal Sequencing and Spacing (TSAS) down the path to deployment. Only a few years later, a comprehensive flight test of Flight Deck Interval Management (FIM) capabilities was executed, complementary and interoperable with traffic flow capabilities that were then emerging for TBO. Together, the ATD-1 tech transfers helped pave the way for the highly integrated systems-of-systems development and acquisition being undertaken for TBO. This session will chart that path to where we are today, and where we are going in the future.

ATD-1, TSAS, FIM, trajectory based operations↗