Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduler”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Waste Attributes of SMRs Scheduled for Near Term Deployment

This is a short presentation as part of a "roundtable" panel on Back-end Fuel Cycle Implications of Advanced Reactor Fuel Cycles. It covers an evaluation of waste generation rates projected for small modular reactors expected to be constructed this decade which are compared to a reference gigawatt-scale light water reactor like those in the current commercial fleet. For ease of comparison, results are normalized per unit of electricity generated.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Delivery-Risk-Aware Flexibility Scheduling and Dispatch for Aggregated Flexible Loads

Flexible loads like smart thermostats and water heaters can shift energy consumption and provide flexibility to the grid. However, this flexibility is dependent on occupant behavior and can lead to delivery risk, which causes utilities and grid operations to consider them as unreliable for purposes of grid operation. To date, they have not been well integrated into wholesale electricity markets or ancillary service offerings. With proper consideration of uncertainty and risk, these resources can be one of the most cost-effective sources of flexibility. This work uses stochastic optimization to quantify and bid flexibility from a fleet of flexible resources while considering their delivery risk.

DER↗

Arbitrage and Capacity Firming in Coordination with Day-Ahead Bidding of a Hybrid PV Plant

A hybrid PV plant (HPP) combines a photovoltaic (PV) plant with a battery energy storage system (BESS), which is considered a promising step towards the future of renewable power plants by the U.S. Department of Energy. When the renewable penetration reaches a significant level, a hybrid PV plant can bid in as a controllable thermal plant in the future electricity market. In this study, a bidding and BESS scheduling model is proposed for the HPP. The robust optimization (RO) technique has been utilized to identify the worst-case scenario of uncertainties during the bidding process. To address the overly conservative issue of the single-stage RO, we have decoupled the BESS schedule for arbitrage and PV capacity firming by a two-stage RO formulation. By comparing the output of single-stage RO and two-stage RO, the two-stage RO bids and schedules in a more aggressive manner, which increases the income of HPP. Also, the penalty of under-generation is considered in our model so that the day-ahead bidding decision and arbitrage schedules can be adjusted based on the potential UNDER-GENERATION penalty. Because the proposed model is non-convex and contains multi-stages, the Column-and-Constraint Generation (C&CG) algorithm is applied to the model as the solution. The proposed model has shown better economic performance compared to a state-of-art single-stage bidding method in case studies.

BESS scheduling↗

Developing a Reduced 240-Bus WECC Dynamic Model for Frequency Response Study of High Renewable Integration

The ongoing changes in the generation resource mix, driven by the rapid adoption of inverter-based resources (IBR) as well as the early retirement of synchronous generators, are bringing new challenges to the planning and operation of bulk electric power systems. Consequently, there is an increasing need to understand, design, and quantify the reliability service provision from IBRs by performing integrated scheduling and dynamic simulations. However, test systems that have consistent scheduling and dynamic models rarely exist largely because of the decoupled nature of the two simulations on a synchronous generator-dominated system. This paper develops the dynamic model of a reduced Western Electricity Coordinating Council (WECC) system. In conjunction with the existing scheduling model, it is suitable for integrating scheduling and dynamic simulations. The reduced 240-bus WECC model reflects the generation resource mix of the Western Interconnection as of 2018. Moreover, the developed dynamic model is validated against field frequency events measured by FNET/GridEye and preserves the dominant inter-area oscillation mode in WECC.

dynamic simulation↗

Tools and Methods for Optimization of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plants (NPP) operating cycle. Refueling outages are extremely costly for a NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities in a duration of around 30 days on average. Outage staff begin working on the schedule more than a year ahead of the outage start and make every effort to build a robust schedule. Despite the robust and detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjusting. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. The Optimization of Outage Activities project under the Risk-Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program focuses on developing tools and methods to support nuclear power plants with optimization of outage schedules. The goal of the outage optimization is the completion of all planned and emergent outage activities as fast as possible while maintaining highest level of safety. This report describes the initial development of tools to support outage management that leverage computational and machine learning methods developed in other RISA and LWRS projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Methods and Tools To Assess Robustness of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plant (NPP) operating cycle. Refueling outages are extremely costly for an NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities within 30 days on average. Despite detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjustment. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but are often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. This paper focuses on developing tools and methods to support NPPs with outage schedule optimization and it describes the initial development of tools to support outage management that leverage computational and machine learning methods.

97 - MATHEMATICS AND COMPUTING↗

Investigation of pre-cooling as a recommended measure to improve residential buildings’ thermal resilience during heat waves

More intense heat waves are expected to occur more frequently in the twenty-first century. During severe heat waves, cooling capacity shortfall and overheating are likely to occur in residential buildings, and this will adversely affect occupant's thermal comfort and productivity. We propose a strategy of pre-cooling the house during off-peak hours to mitigate overheating during heat waves. Additionally, simulation results of a prototype single-family house show that adopting the rule-based control (RBC) of pre-cooling thermostat setpoint schedule is effective in reducing thermal discomfort, and that the efficacy of pre-cooling depends upon several building characteristics. An optimized control (OC) of the thermostat setpoint schedule was developed based on the simulation of a prototype building. A simplified yet improved RBC (IRBC) pre-cooling schedule was then extracted from the OC schedule for practical implementation at a larger scale. The effects of the RBC schedule and IRBC schedule were evaluated in the King District of Fresno, which contains 814 residential buildings. Results show that both thermostat setpoint schedules can reduce overheating effectively and that IRBC is slightly better than RBC for most buildings. The findings support the California government's recommendation on pre-cooling to mitigate overheating, which can be further improved with an optimized thermostat setpoint schedule broadcast to residents through early alert messages before a heat wave.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Typical occupancy profiles and behaviors in residential buildings in the United States

The energy performance of a residential building is highly dependent on occupant's presence or non-presence in a building and their interactions with energy-consuming appliances. Typical occupancy schedules for residential buildings must be defined for applications such as building energy modeling as well as for assessing energy savings associated with the use of occupancy sensing technologies and occupancy-dependent controls. Currently, commonly used simulation programs assume a typical occupancy schedule, however, there is significant opportunity for improvement to these schedules as this is generally based on engineering judgement. This research uses 12 years of the American Time Use Survey (ATUS) data to develop typical occupancy schedules for a range of household types and occupant age ranges. This is compared to currently utilized residential occupancy schedules. In many cases the developed schedules exhibit similar patterns, however, differences are also found to be as high as 41% for certain periods of time. For occupancy sensing applications, the spatial-temporal distribution of occupants in residential buildings is also evaluated. These locations vary based on temporal factors as well as demographic factors such as age and number of occupants. Finally, the results of this research work towards improved occupancy schedule development can benefit both industry professionals and researchers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modeling distributed energy resource aggregations in security constrained unit commitment and economic dispatch

The Federal Energy Regulatory Commission (FERC) recently issued Order 2222, which requires all wholesale electricity markets in the US to allow distributed energy resources (DERs) to participate in the market as aggregated resources. These DER aggregations may be composed of many individual resources that are offered and dispatched by the market as a single entity. We present here a model of a distributed energy resource aggregator (DERA) that is scheduled by a market operator’s security constrained unit commitment (SCUC) and security constrained economic dispatch (SCED). The DERA model includes constraints for battery energy storage systems (BESSs), demand response resources (DRRs), and a simple distributed energy resource (DER). This paper describes a model for each resource type and presents two methods for the DERA to generate market offer curves: a profit-maximizing optimization to compute cost curves and a direct cost algorithm to determine dispatch costs for each resource and combine into cost curves. Once all participating DERAs are scheduled in SCUC/SCED, the model is then modified to dispatch individual DERs to maximize profit or minimize schedule deviation of the DERAs. A simulation of a representative day illustrates the DERA offers, the scheduled generation, and the DERA dispatch. Findings show the potential for unavoidable schedule deviations due to internal DER constraints and due to economic incentives to deviate from the SCUC/SCED schedules. This highlights the importance of DERA offer construction on market efficiency and system reliability. Novel aspects of our approach include: (1) We consider the asymmetry of price incentives impacting DERAs from the wholesale market compared to those impacting consumers from the retail market, as imposed by current regulations and laws. (2) We model aggregate consumer response through statistically parameterizable utility functions rather than a potentially impractical approach of modeling each individual consumer. (3) We show how to use the DERA operational dispatch model to create offers into the wholesale electricity market. (4) We show how DERAs may fail to meet their scheduled dispatch because the market offer format may not permit them to fully express their operational features such as intertemporal costs and constraints to the market.

aggregations↗

SMART-COM – Scalable Multi-Agent Adaptive Resolution Tools for Collaborative Outage Management

The purpose of this grant was to conduct scientific research and prototype applications to support NPP outage staff in their adaptive decision-making in efficient scheduling and resource allocation while preventing violation of safety technical specifications. The project contributed to scientific knowledge and engineering methods in (1) user interface design, (2) scheduling optimization and risk estimation, and (2) natural language processing that would benefit the nuclear power plants in minimizing schedule overruns and even unexpected shutdowns. The research team conducted site visits at a test reactor facility and an operating nuclear power plant to gather necessary information and inputs for research and development of a software application to support NPP staff in executing their outages. The final software application consisted of three modules. First, the natural language processing module supports interactive processing of technical documentation to build a database for outage staff to query non-permissible actions on system components. This module can alleviate outage staff from reviewing extensive documentation and minimize violation of technical specifications, especially in time-sensitive situations. Second, the schedule optimization module schedules outage activities and compute risk indices that outperform existing software and current practice. This module can reduce completion time of an outage that typically have too many activities for human to optimize based on current practice that does not apply the latest operations research. Finally, the visualization module presents progress and risk information of the overall outage and individual activities, as well as enabling access to the natural language processing and schedule optimization modules. This module can provide outage staff with situation awareness that are necessary to make risk-informed decisions in response to unexpected events during the execution of an outage.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗