Search NASA⌕ Search

SEARCH · Search NASA

Results for “Science Team”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Testing the Exploration ConOps (ExCon) Mockup Suit in Lunar Analog Environments in 2022

Understanding how to effectively train for Extravehicular Activities (EVAs) for Artemis missions is critical. Developing high-fidelity simulation environments is important for Artemis mission preparation. Because the actual Lunar exploration environment cannot be fully replicated on Earth, it is paramount to determine where and how to properly train the Artemis team. The overall focus for this test series was developing the capability to perform Artemis simulated EVAs in high-fidelity, full-scale environments. This test series was broken into three distinct tests titled after the EVA & Human Surface Mobility (HSM) Program (EHP) integrated test team: Joint EVA & HSM Test Team (JETT). The test locations are planned to serve as Artemis training sites and were selected because of their relevance to the expected Artemis Lunar terrain. JETT1 was conducted near Kilbourne Hole by El Paso, Texas and focused on hardware development and checkout. JETT2 was conducted in the Icelandic Highlands and began the transition towards EVA concept of operations (con-ops), risks and technology. JETT3 was conducted near SP Crater by Flagstaff, Arizona and focused on simulating the Artemis III mission including a Houston based Flight Control Team (FCT) and a Science Mission Directorate (SMD) science team. All three JETT tests utilized the Exploration Concept of Operations (ExCon) mockup space suit. The ExCon mockup suit is a lightweight, unpressurized Exploration Extravehicular Mobility Unit (xEMU) simulator. While it cannot replicate the feel of working within a pressurized suit, it does introduce similar volume constraints and some of the mobility programing to simulate the user experience in the xEMU. Overall, the JETT testing was able to create a simulated Lunar EVA and have two subjects perform full scale operations in line with Artemis III mission expectations. Future work is planned to continue to improve the simulation quality of Lunar EVA simulations.

spacesuit↗

Initial Look at the Results From the Prelaunch Characterization Campaign of OCI on the Pace Mission

Scheduled for launch in January 2024, the Phytoplankton, Aerosol, Cloud, and ocean Ecosystem (PACE) mission represents NASA’s next investment in ocean biology, clouds, and aerosol data records [1]. A key feature of PACE is the inclusion of an advanced satellite radiometer known as the Ocean Color Instrument (OCI), a global mapping radiometer that combines multispectral and hyperspectral remote sensing. This paper describes the results of the prelaunch test campaign of the OCI Flight Unit. The measured OCI flight unit performance exceeded requirement thresholds in all critical areas. Overall, the performance of the OCI is excellent, and will allow the PACE science team to meet its science objectives.

Calibration↗

Testing the Exploration Conops (Excon) Mockup Suit in Lunar Analog Environments in 2022

Understanding how to effectively train for Extravehicular Activities (EVAs) for Artemis missions is critical. Developing high-fidelity simulation environments is important for Artemis mission preparation. Because the actual Lunar exploration environment cannot be fully replicated on Earth, it is paramount to determine where and how to properly train the Artemis team. The overall focus for this test series was developing the capability to perform Artemis simulated EVAs in high-fidelity, full-scale environments. This test series was broken into three distinct tests titled after the EVA & Human Surface Mobility (HSM) Program (EHP) integrated test team: Joint EVA & HSM Test Team (JETT). The test locations are planned to serve as Artemis training sites and were selected because of their relevance to the expected Artemis Lunar terrain. JETT1 was conducted near Kilbourne Hole by El Paso, Texas and focused on hardware development and checkout. JETT2 was conducted in the Icelandic Highlands and began the transition towards EVA concept of operations (con-ops), risks and technology. JETT3 was conducted near SP Crater by Flagstaff, Arizona and focused on simulating the Artemis III mission including a Houston based Flight Control Team (FCT) and a Science Mission Directorate (SMD) science team. All three JETT tests utilized the Exploration Concept of Operations (ExCon) mockup space suit. The ExCon mockup suit is a lightweight, unpressurized Exploration Extravehicular Mobility Unit (xEMU) simulator. While it cannot replicate the feel of working within a pressurized suit, it does introduce similar volume constraints and some of the mobility programing to simulate the user experience in the xEMU. Overall, the JETT testing was able to create a simulated Lunar EVA and have two subjects perform full scale operations in line with Artemis III mission expectations. Future work is planned to continue to improve the simulation quality of Lunar EVA simulations.

spacesuit↗

Genesis Solar Wind – Capture, Return, Curate and Analyze: Looking Backward and Creating a Timeline

Introduction: In 1997 NASA’S Discovery Program selected the Genesis mission proposal to return solar wind samples to Earth for laboratory analyses. Principal Investigator Donald S. Burnett and the science team defined the purity of collector materials and ability to analyze solar wind composition to the precision required for planetary science. As a small mission, focused on a well-defined science goal, yet needing careful attention to engineering details, the communication among scientists and engineers, nurtured by Don Burnett, was exceptional. Genesis Mission and Curation Legacy: Genesis, as the first U. S. spacecraft to return astromaterial samples since Apollo, not only integrated the mission planning and flight teams, but also the science and sample curation teams during the mission development period. Since Genesis is a sample return mission, the Science Team was essential in certifying the collectors (sample containers for solar atoms). From inception, Genesis established mission funding for returned sample curation. JSC was lead in contamination control during mission preparation, including establishment of an ISO 4 cleanroom facility and use of ultrapure water (UPW) for cleaning flight hardware (and, as it turned out, for cleaning collectors after the mishap). Reliable, fast communication among scientists, engineers and curators at the hands-on level established deep respect among team members and efficient decision-making. JSC’s 50-years of astromaterial sample curation provided experienced sample processors onsite during recovery in Utah (a deep bench for emergency response). Post-recovery curation included iterative collaboration with science sample users to clean or verify cleanliness of samples. The science legacy from Genesis is addressed by Burnett and Jurewicz, this volume. In The Beginning: After Apollo sample return, Burnett and Marcia Neugebauer at JPL began discussing a solar wind sample return, with Neugebauer arguing that separate collection of solar wind regimes was essential science. By 1992 a solar wind sample return mission was presented at a workshop, and by 1994 a mission was proposed named Suess-Urey. The mission was re-proposed under a new name GENESIS and selected in 1997. Susan Niebur captured the Genesis mission history and stories, from high level management documents and from many interviews with participants [2]. Her account lets readers glimpse personality of participants in quotations from interviews. Need and Scope for Detailed Technical Timeline: A timeline constructed from lower level task documents has been initiated to document the resources and skills actually used, as well as task sequence or concurrency. Timelines for high level mission events are captured in two documents [1] [2] and for detailed re-entry events in [3]. A detailed technical timeline for Genesis mission and curation activities will provide data points for lower level tasks, such as ISO 4 curation facility construction time, preparation for nominal sample field recovery, mishap recovery, and UPW expansion. Changes in technology context 1990-2024: Semiconductor technologies were easily accessible in the U.S.A. (1990-1999), and the Genesis team used those resources for cleanroom design and UPW system expansion. Image documentation was changing from film to digital during cleanroom construction and payload cleaning (1997-2001). Engineering design was done using computer aided design proprietary software, making more difficult the archiving of payload configuration and materials. Email of documents, tracked delivery service and virtual meeting capability greatly improved communication efficiency. Information sources – Pre-launch mission preparation: Examples of mission science, engineering and contamination control are collector purity testing, payload design/fabrication and ISO 4 cleanroom construction. Information on timing of these activities comes from facility readiness reviews, management reviews, shipping documents, procurement documents, test reports, travel documents, laboratory logs, Quality Assurance documents, dates on images, participant notebooks and emails. Information sources – Sample return re-entry and field recovery activities: Information comes from event timelines produced by Mid-Air Recovery team, Lockheed team lead notes and from chase video, JPL Quality Assurance. Information also comes from images and logbooks from UTTR cleanroom operations and from curatorial documents. Information sources – Resulting science and sample cleaning processes: Agendas from the annual gatherings of the science team initially trace testing for collector purity/cleanliness, and after sample recovery, include collector cleaning and cleanliness assessment. Post-recovery documents include curatorial orders and procedures, sample allocation documents and LPSC abstracts. Timeline Objectives: A simple spreadsheet timeline with headers DATE, EVENT, PEOPLE, COMMENT, INFORMATION SOURCE has been initiated and currently has over 90 entries. While this is not definitive historical research, it is a quick look at the evolution of Genesis curation with pointers to documents or people with information. Engineers for future missions may find useful points of comparison for development of facilities. References:[1] Genesis Mission Reference Document, (2011) JPL D-62382.[2] Niebur S. M., edited by Brown D. W. (2023) NASA’s Discovery Program: The First 20 Years of Competitive Planetary Exploration, NASA-SP-2023-4238.[3] Genesis Mishap Investigation Board Report, Vol. 1 (July 2005).

solar wind↗

Remote Sensing Product Verification and Validation at the NASA Stennis Space Center

Remote sensing data product verification and validation (V&V) is critical to successful science research and applications development. People who use remote sensing products to make policy, economic, or scientific decisions require confidence in and an understanding of the products' characteristics to make informed decisions about the products' use. NASA data products of coarse to moderate spatial resolution are validated by NASA science teams. NASA's Stennis Space Center (SSC) serves as the science validation team lead for validating commercial data products of moderate to high spatial resolution. At SSC, the Applications Research Toolbox simulates sensors and targets, and the Instrument Validation Laboratory validates critical sensors. The SSC V&V Site consists of radiometric tarps, a network of ground control points, a water surface temperature sensor, an atmospheric measurement system, painted concrete radial target and edge targets, and other instrumentation. NASA's Applied Sciences Directorate participates in the Joint Agency Commercial Imagery Evaluation (JACIE) team formed by NASA, the U.S. Geological Survey, and the National Geospatial-Intelligence Agency to characterize commercial systems and imagery.

Stanley, Thomas M.↗

SERVIR Science Applications for Capacity Building

SERVIR is a regional visualization and monitoring system using Earth observations to support environmental management, climate adaptation, and disaster response in developing countries. SERVIR is jointly sponsored by NASA and the U.S. Agency for International Development (USAID). SERVIR has been instrumental in development of science applications to support the decision-making and capacity building in the developing countries with the help of SERVIR Hubs. In 2011, NASA Research Opportunities in Space and Earth Sciences (ROSES) included a call for proposals to form SERVIR Applied Sciences Team (SERVIR AST) under Applied Sciences Capacity Building Program. Eleven proposals were selected, the Principal Investigators of which comprise the core of the SERVIR AST. The expertise on the Team span several societal benefit areas including agriculture, disasters, public health and air quality, water, climate and terrestrial carbon assessments. This presentation will cover the existing SERVIR science applications, capacity building components, overview of SERVIR AST projects, and anticipated impacts.

Limaye, Ashutosh↗

Virtualization - A Key Cost Saver in NASA Multi-Mission Ground System Architecture

With science team budgets being slashed, and a lack of adequate facilities for science payload teams to operate their instruments, there is a strong need for innovative new ground systems that are able to provide necessary levels of capability processing power, system availability and redundancy while maintaining a small footprint in terms of physical space, power utilization and cooling.The ground system architecture being presented is based off of heritage from several other projects currently in development or operations at Goddard, but was designed and built specifically to meet the needs of the Science and Planetary Operations Control Center (SPOCC) as a low-cost payload command, control, planning and analysis operations center. However, this SPOCC architecture was designed to be generic enough to be re-used partially or in whole by other labs and missions (since its inception that has already happened in several cases!)The SPOCC architecture leverages a highly available VMware-based virtualization cluster with shared SAS Direct-Attached Storage (DAS) to provide an extremely high-performing, low-power-utilization and small-footprint compute environment that provides Virtual Machine resources shared among the various tenant missions in the SPOCC. The storage is also expandable, allowing future missions to chain up to 7 additional 2U chassis of storage at an extremely competitive cost if they require additional archive or virtual machine storage space.The software architecture provides a fully-redundant GMSEC-based message bus architecture based on the ActiveMQ middleware to track all health and safety status within the SPOCC ground system. All virtual machines utilize the GMSEC system agents to report system host health over the GMSEC bus, and spacecraft payload health is monitored using the Hammers Integrated Test and Operations System (ITOS) Galaxy Telemetry and Command (TC) system, which performs near-real-time limit checking and data processing on the downlinked data stream and injects messages into the GMSEC bus that are monitored to automatically page the on-call operator or Systems Administrator (SA) when an off-nominal condition is detected. This architecture, like the LTSP thin clients, are shared across all tenant missions.Other required IT security controls are implemented at the ground system level, including physical access controls, logical system-level authentication authorization management, auditing and reporting, network management and a NIST 800-53 FISMA-Moderate IT Security plan Risk Assessment Contingency Plan, helping multiple missions share the cost of compliance with agency-mandated directives.The SPOCC architecture provides science payload control centers and backup mission operations centers with a cost-effective, standardized approach to virtualizing and monitoring resources that were traditionally multiple racks full of physical machines. The increased agility in deploying new virtual systems and thin client workstations can provide significant savings in personnel costs for maintaining the ground system. The cost savings in procurement, power, rack footprint and cooling as well as the shared multi-mission design greatly reduces upfront cost for missions moving into the facility. Overall, the authors hope that this architecture will become a model for how future NASA operations centers are constructed!

Ground System Architecture↗

Real-Time Science Decisioning During High Tempo-High Intensity Mission Operations and the Role of Analogs

Introduction: NASA’s VIPER mission presents a unique operational paradigm within the history of robotic spaceflight. The proximity of the Moon to the Earth and the terrain elements (surface characteristics, light/shadow dynamics, communication links) of the lunar South Polar landing site create unprecedented operational conditions between these two planetary bodies. Apollo era lunar science and exploration included humans in situ to operate instruments and assimilate observational inputs in real-time. Previous lunar orbital missions have worked to operational timescales, e.g., decisional timelines and communication exchanges, that were weeks in length. Mars rover missions have worked to operational timescales, e.g., decisional timelines and communication exchanges between Mars and Earth, that were hours, days, and weeks in length. In the case of the VIPER mission, our operational decisioning for rover driving and instrument commanding will be compressed to minute-scale timeframes. These operational conditions directly impact the manner and speed with which the VIPER Science Team (VST) is required to synthesize and analyze data and produce timely science-driven decisions throughout surface mission operations. The VST shall provide mission enhancing scientific input to guide rover traverse planning and drill site confirmation and selection throughout surface operations. Further, the VST input will be of vital importance to the mission’s ability to maximize science return and to meet broader NASA objectives for future lunar in-situ resource utilization (ISRU)and exploration activities. The VST co-located in the Mission Science Center (MSC) will be responsive to the tactical operational cadence of the Mission Operations Center (MOC) and will provide further strategic and Long-Term Planning (LTP) guidance to the mission. The VIPER Science Operations & Integration(SO&I)team has developed an architecture that is focused on the infusion of science-decisioning into the operational framework and execution cadence of VIPER. NASA analog research has played a significant role in the construction of the VIPER science operations systems. As an example, the SO&I team has led analog missions that have focused on bringing together expertise in the sciences (natural, applied and social) and in operations in service of learning how to build and hold together interdisciplinary work environments and what tools are needed to support high tempo, high intensity integrated decisioning. These experiences have provided an essential foundation of knowledge to the VIPER team. Those analogs that specifically influenced the VIPER science operations construct were identified through a process of comparative analysis to prioritize those that offered relevance in whole or in part, and those that did not. The analog research output that provided extensibility to the VIPER science operations architecture included remote teams of humans and robots in cooperation (synchronous and asynchronous) with simulated earthbound systems, engineering and science teams, and the integrated assembly of tools that supported scientific analysis and data synthesis and provided infrastructure for the remote testing framework. Analogs which included real-time data monitoring, synthesis, visualization and access in a democratized and operationalized manner were of particular interest to the development of the VIPER MSC toolset both in terms of the technology and the processes used to develop the supporting infrastructure. We anticipate that each subsequent mission to the lunar south pole, whether with robots or humans, will be able to optimize science and exploration return by evolving strategies to infuse real-time collaborative science-decisioning. Furthermore, these efforts will result in a foundation for science operations development in support of human-robotic exploration of deep space and Mars. NASA analogs can continue to provide the opportunity to prepare, test and iterate on the operational concepts and tools that will support these ever-expanding space exploration efforts. Our presentation will include an overview of the VIPER Science Operations & Integration development process and specifics on what aspects of analog research have had a significant impact on our work systems.

D S S Lim↗

Cassini Titan Science Integration: Getting a 'Jumpstart' on the Process

The Cassini spacecraft has been in orbit for five years, returning a wealth of scientific data from Titan and the Saturn system. The mission is a cooperative undertaking between NASA, ESA and the Italian Space Agency and the project is currently planning for a second extension of the mission. The Cassini Solstice Mission (CSM) will extend the mission's lifetime until Saturn's northern summer solstice in 2017. The Titan Orbiter Science Team (TOST) has the task of integrating the science observations for all 126 targeted Titan flybys (44 in the Prime Mission, 26 in the first extension (Equinox Mission), and 56 in the second extension (Solstice Mission)) contained in the chosen trajectory. Cassini science instruments are body-fixed with limited ability to articulate; thus, the spacecraft pointing during the flybys must be allocated among the instruments to accomplish the mission's science goals. The science that can be accomplished on each Titan flyby also critically depends on the closest approach altitude, which is in turn determined by the attitude, but changing the altitude impacts the overall trajectory for the Solstice Mission. During the Prime and Extended missions, TOST has learned that the best way to achieve Cassini's Titan science goals is via a 'jumpstart' process prior to final delivery of the trajectory. The jumpstart is driven by the desire to balance Titan science across the entire set of flybys during the CSM, and to influence any changes (tweaks) to the flyby altitudes. By the end of the jumpstart, TOST produces Master Timelines for each flyby, identifying each flyby's prime science observations and allocating control of the spacecraft attitude to specific instrument teams. In addition, developing timelines early, while the science and operations teams are still fully funded, decreases the future workload in integration and implementation.

Steadman, Kimberly B.↗

Venus Aerobot Surface Science Imaging System (VASSIS)

The VASSIS task was to design and develop an imaging system and container for operation above the surface of Venus in preparation for a Discovery-class mission involving a Venus aerobot balloon. The technical goals of the effort were to: a) evaluate the possible nadir-viewed surface image quality as a function of wavelength and altitude in the Venus lower atmosphere, b) design a pressure vessel to contain the imager and supporting electronics that will meet the environmental requirements of the VASSIS mission, c) design and build a prototype imaging system including an Active-Pixel Sensor camera head and VASSIS-like optics that will meet the science requirements. The VASSIS science team developed a set of science requirements for the imaging system upon which the development work of this task was based.

Greeley, Ronald↗

Science Data Processing for the Advanced Microwave Scanning Radiometer: Earth Observing System

The National Aeronautics and Space Administration established the framework for the Science Investigator-led Processing Systems (SIPS) to enable the Earth science data products to be produced by personnel directly associated with the instrument science team and knowledgeable of the science algorithms. One of the first instantiations implemented for NASA was the Advanced Microwave Scanning Radiometer - Earth Observing System (AMSR-E) SIPS. The AMSR-E SIPS is a decentralized, geographically distributed ground data processing system composed of two primary components located in California and Alabama. Initial science data processing is conducted at Remote Sensing Systems (RSS) in Santa Rosa, California. RSS ingests antenna temperature orbit data sets from JAXA and converts them to calibrated, resampled, geolocated brightness temperatures. The brightness temperatures are sent to the Global Hydrology and Climate Center in Huntsville, Alabama, which generates the geophysical science data products (e.g., water vapor, sea surface temperature, sea ice extent, etc.) suitable for climate research and applications usage. These science products are subsequently sent to the National Snow and Ice Data Center Distributed Active Archive Center in Boulder, Colorado for archival and dissemination to the at-large science community. This paper describes the organization, coordination, and production techniques employed by the AMSR-E SIPS in implementing, automating and operating the distributed data processing system.

Goodman, H. Michael↗

A Framework for Orbital Performance Evaluation in Distributed Space Missions for Earth Observation

Distributed Space Missions (DSMs) are gaining momentum in their application to earth science missions owing to their unique ability to increase observation sampling in spatial, spectral and temporal dimensions simultaneously. DSM architectures have a large number of design variables and since they are expected to increase mission flexibility, scalability, evolvability and robustness, their design is a complex problem with many variables and objectives affecting performance. There are very few open-access tools available to explore the tradespace of variables which allow performance assessment and are easy to plug into science goals, and therefore select the most optimal design. This paper presents a software tool developed on the MATLAB engine interfacing with STK, for DSM orbit design and selection. It is capable of generating thousands of homogeneous constellation or formation flight architectures based on pre-defined design variable ranges and sizing those architectures in terms of predefined performance metrics. The metrics can be input into observing system simulation experiments, as available from the science teams, allowing dynamic coupling of science and engineering designs. Design variables include but are not restricted to constellation type, formation flight type, FOV of instrument, altitude and inclination of chief orbits, differential orbital elements, leader satellites, latitudes or regions of interest, planes and satellite numbers. Intermediate performance metrics include angular coverage, number of accesses, revisit coverage, access deterioration over time at every point of the Earth's grid. The orbit design process can be streamlined and variables more bounded along the way, owing to the availability of low fidelity and low complexity models such as corrected HCW equations up to high precision STK models with J2 and drag. The tool can thus help any scientist or program manager select pre-Phase A, Pareto optimal DSM designs for a variety of science goals without having to delve into the details of the engineering design process.

Earth Science↗

NEEMO 20: Science Training, Operations, and Tool Development

The 20th mission of the National Aeronautics and Space Administration (NASA) Extreme Environment Mission Operations (NEEMO) was a highly integrated evaluation of operational protocols and tools designed to enable future exploration beyond low-Earth orbit. NEEMO 20 was conducted from the Aquarius habitat off the coast of Key Largo, FL in July 2015. The habitat and its surroundings provide a convincing analog for space exploration. A crew of six (comprised of astronauts, engineers, and habitat technicians) lived and worked in and around the unique underwater laboratory over a mission duration of 14-days. Incorporated into NEEMO 20 was a diverse Science Team (ST) comprised of geoscientists from the Astromaterials Research and Exploration Science (ARES/XI) Division from the Johnson Space Center (JSC), as well as marine scientists from the Department of Biological Sciences at Florida International University (FIU). This team trained the crew on the science to be conducted, defined sampling techniques and operational procedures, and planned and coordinated the science focused Extra Vehicular Activities (EVAs). The primary science objectives of NEEMO 20 was to study planetary sampling techniques and tools in partial gravity environments under realistic mission communication time delays and operational pressures. To facilitate these objectives two types of science sites were employed 1) geoscience sites with available rocks and regolith for testing sampling procedures and tools and, 2) marine science sites dedicated to specific research focused on assessing the photosynthetic capability of corals and their genetic connectivity between deep and shallow reefs. These marine sites and associated research objectives included deployment of handheld instrumentation, context descriptions, imaging, and sampling; thus acted as a suitable proxy for planetary surface exploration activities. This abstract briefly summarizes the scientific training, scientific operations, and tool development conducted during NEEMO 20 with an emphasis on the primary lessons learned.

Graff, T.↗

Lower Mekong Hydrological Decision Support system

The Lower Mekong Hydrological Decision Support system (LMHDSs) is a environmental data analysis tool developed at the NASA Goddard Space Flight Center with funding from the SERVIR Applied Sciences Team and technical support from SERVIR Science Coordination Office (SCO). The web application allows stakeholders and decision-makers to view and download the inputs and outputs to the Soil and Water Assessment Tool(SWAT) model temporally and spatially. The front end is developed using JavaScript libraries like OpenLayers and Stock charts and the backend uses Django, a Python-based web framework. The web app provides several features, including visualizing map products, time-series plots, land-use/land-cover and associated soil information, and a data cart for downloading data. In addition, LMHDSs incorporates the NASAaccess software package, which provides seamless access to various climate and weather data products from NASA’s Earth observations portfolio. The application is region agnostic (any valid SWAT model can be used), modular (different components of the applications can be customized), and open (anyone can download and run it on their end). The web app is currently in use by the Mekong River Commission (MRC), a treaty-based regional intergovernmental organization that is made up of Mekong countries, as part of its hydrological decision support.

Hydrology↗

Handling Late Changes to Titan Science

The Cassini mission has been in orbit for eight years, returning a wealth of scientific data from Titan and the Saturnian system. The mission, a cooperative undertaking between NASA, ESA and ASI, is currently in its second extension of the prime mission. The Cassini Solstice Mission (CSM) extends the mission's lifetime until Saturn's northern summer solstice in 2017. The Titan Orbital Science Team (TOST) has the task of integrating the science observations for all 56 targeted Titan flybys in the CSM. In order to balance Titan science across the entire set of flybys during the CSM, to optimize and influence the Titan flyby altitudes, and to decrease the future workload, TOST went through a "jumpstart" process before the start of the CSM. The "jumpstart" produced Master Timelines for each flyby, identifying prime science observations and allocating control of the spacecraft attitude to specific instrument teams. Three years after completing this long-range plan, TOST now faces a new challenge: incorporating changes into the Titan Science Plan without undoing the balance achieved during the jumpstart.

Pitesky, Jo Eliza↗