Search NASA⌕ Search

SEARCH · Search NASA

Results for “September 2012”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

In-flight Operation of the Dawn Ion Propulsion System Through Year One of Cruise to Ceres

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, 4 Vesta, and the dwarf planet 1 Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 rocket that placed the 1218-kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide an additional delta- V of approximately 11 km/s for the heliocentric transfers to each body and for all orbit transfers including orbit capture/escape and transition to the various science orbits. Deterministic thrusting to Vesta began in December 2007 and concluded with orbit capture at Vesta in July 2011. The transfer to Vesta included a Mars gravity assist flyby in February 2009 that provided an additional delta-V of 2.6 km/s and was the only postlaunch mission delta-V not provided by IPS. During the mission at Vesta the IPS was used for all orbit transfers which included six different near-polar science mapping orbits. Thrusting for departure from Vesta and the start of cruise to Ceres began on July 25, 2012 with escape from Vesta occurring on September 5, 2012. To date the IPS has been operated for approximately 31,000 hours, consumed approximately 300 kg of xenon, and provided a delta-V of approximately 8.3 km/s. IPS performance characteristics are very close to the expected performance based on analysis and testing performed prelaunch. Thrusting for cruise to Ceres will continue until the spring of 2015, with a planned arrival date at Ceres in April 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations from Vesta departure through the first year of cruise to Ceres.

Hayabusa spacecraft↗

A pilot study on the feasibility of European harmonized human biomonitoring: Strategies towards a common approach, challenges and opportunities

In 2004 the European Commission and Member States initiated activities towards a harmonized approach for Human Biomonitoring surveys throughout Europe. The main objective was to sustain environmental health policy by building a coherent and sustainable framework and by increasing the comparability of data across countries. A pilot study to test common guidelines for setting up surveys was considered a key step in this process. Through a bottom-up approach that included all stakeholders, a joint study protocol was elaborated. From September 2011 till February 2012, 17 European countries collected data from 1844 mother–child pairs in the frame of DEMOnstration of a study to COordinate and Perform Human Biomonitoring on a European Scale (DEMOCOPHES). Mercury in hair and urinary cadmium and cotinine were selected as biomarkers of exposure covered by sufficient analytical experience. Phthalate metabolites and Bisphenol A in urine were added to take into account increasing public and political awareness for emerging types of contaminants and to test less advanced markers/markers covered by less analytical experience. Extensive efforts towards chemo-analytical comparability were included. The pilot study showed that common approaches can be found in a context of considerable differences with respect to experience and expertize, socio-cultural background, economic situation and national priorities. It also evidenced that comparable Human Biomonitoring results can be obtained in such context. A European network was built, exchanging information, expertize and experiences, and providing training on all aspects of a survey. A key challenge was finding the right balance between a rigid structure allowing maximal comparability and a flexible approach increasing feasibility and capacity building. Next steps in European harmonization in Human Biomonitoring surveys include the establishment of a joint process for prioritization of substances to cover and biomarkers to develop, linking biomonitoring surveys with health examination surveys and with research, and coping with the diverse implementations of EU regulations and international guidelines with respect to ethics and privacy. - Highlights: • A common European Human Biomonitoring (HBM) survey protocol was developed through a bottom-up approach. • A joint process for prioritization was established to select a limited set of biomarkers, some covered by experience and others for emerging substances. • The protocol was tested in a pilot study, resulting in HBM results comparable on a European scale which sustained environmental health policy. • Ethics and privacy regulations were not an obstacle for transnational harmonization.

54 ENVIRONMENTAL SCIENCES↗

Phase 1 Study of Dose Escalation in Hypofractionated Proton Beam Therapy for Non-Small Cell Lung Cancer

Background: Many patients with locally advanced non-small cell lung cancer (NSCLC) cannot undergo concurrent chemotherapy because of comorbidities or poor performance status. Hypofractionated radiation regimens, if tolerable, may provide an option to these patients for effective local control. Methods and Materials: Twenty-five patients were enrolled in a phase 1 dose-escalation trial of proton beam therapy (PBT) from September 2010 through July 2012. Eligible patients had histologically documented lung cancer, thymic tumors, carcinoid tumors, or metastatic thyroid tumors. Concurrent chemotherapy was not allowed, but concurrent treatment with biologic agents was. The dose-escalation schema comprised 15 fractions of 3 Gy(relative biological effectiveness [RBE])/fraction, 3.5 Gy(RBE)/fraction, or 4 Gy(RBE)/fraction. Dose constraints were derived from biologically equivalent doses of standard fractionated treatment. Results: The median follow-up time for patients alive at the time of analysis was 13 months (range, 8-28 months). Fifteen patients received treatment to hilar or mediastinal lymph nodes. Two patients experienced dose-limiting toxicity possibly related to treatment; 1 received 3.5-Gy(RBE) fractions and experienced an in-field tracheoesophageal fistula 9 months after PBT and 1 month after bevacizumab. The other patient received 4-Gy(RBE) fractions and was hospitalized for bacterial pneumonia/radiation pneumonitis 4 months after PBT. Conclusion: Hypofractionated PBT to the thorax delivered over 3 weeks was well tolerated even with significant doses to the lungs and mediastinal structures. Phase 2/3 trials are needed to compare the efficacy of this technique with standard treatment for locally advanced NSCLC.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Determinants of Patient Satisfaction During Receipt of Radiation Therapy

Purpose: To evaluate the correlations and relative contributions of components of a radiation oncology-specific patient satisfaction survey to their overall satisfaction scores. Methods and Materials: From September 2006 through August 2012, we prospectively collected data from 8069 patients receiving radiation treatments with a 26-question survey. Each question was rated on a 10-point Likert scale. We analyzed the correlation between scores for each question and the overall satisfaction question. We also dichotomized the scores to reflect satisfaction versus dissatisfaction and used logistic regression to assess the relationship between items in 4 domains (the patient–provider relationship, access and environmental issues, wait times, and educational information) and overall satisfaction. Results: Scores on all questions correlated with overall patient satisfaction scores (P<.0001). Satisfaction with patient–provider relationships had the greatest influence on overall satisfaction (R{sup 2}=0.4219), followed by wait times (R{sup 2}=0.4000), access/environment (R{sup 2}=0.3837), and patient education (R{sup 2}=0.3700). The specific variables with the greatest effect on patient satisfaction were the care provided by radiation therapists (odds ratio 1.91) and pain management (odds ratio 1.29). Conclusions: We found that patients' judgment of provider relationships in an outpatient radiation oncology setting were the greatest contributors to their overall satisfaction ratings. Other measures typically associated with patient satisfaction (phone access, scheduling, and ease of the check-in process) correlated less strongly with overall satisfaction. These findings may be useful for other practices preparing to assess patient ratings of quality of care.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Silent Corticotroph Adenomas After Stereotactic Radiosurgery: A Case–Control Study

Purpose: To investigate the safety and effectiveness of stereotactic radiosurgery (SRS) in patients with a silent corticotroph adenoma (SCA) compared with patients with other subtypes of non–adrenocorticotropic hormone staining nonfunctioning pituitary adenoma (NFA). Methods and Materials: The clinical features and outcomes of 104 NFA patients treated with SRS in our center between September 1994 and August 2012 were evaluated. Among them, 34 consecutive patients with a confirmatory SCA were identified. A control group of 70 patients with other subtypes of NFA were selected for review based on comparable baseline features, including sex, age at the time of SRS, tumor size, margin radiation dose to the tumor, and duration of follow-up. Results: The median follow-up after SRS was 56 months (range, 6-200 months). No patients with an SCA developed Cushing disease during the follow-up. Tumor control was achieved in 21 of 34 patients (62%) in the SCA group, compared with 65 of 70 patients (93%) in the NFA group. The median progression-free survival (PFS) was 58 months in the SCA group. The actuarial PFS was 73%, 46%, and 31% in the SCA group and was 94%, 87%, and 87% in the NFA group at 3, 5, and 8 years, respectively. Silent corticotroph adenomas treated with a dose of ≥17 Gy exhibited improved PFS. New-onset loss of pituitary function developed in 10 patients (29%) in the SCA group, whereas it occurred in 18 patients (26%) in the NFA group. Eight patients (24%) in the SCA group experienced worsening of a visual field deficit or visual acuity attributed to the tumor progression, as did 6 patients (9%) in the NFA group. Conclusion: Silent corticotroph adenomas exhibited a more aggressive course with a higher progression rate than other subtypes of NFAs. Stereotactic radiosurgery is an important adjuvant treatment for control of tumor growth. Increased radiation dose may lead to improved tumor control in SCA patients.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Concurrent Chemo-Radiation With or Without Induction Gemcitabine, Carboplatin, and Paclitaxel: A Randomized, Phase 2/3 Trial in Locally Advanced Nasopharyngeal Carcinoma

Purpose: To compare survival, tumor control, toxicities, and quality of life of patients with locally advanced nasopharyngeal carcinoma (NPC) treated with induction chemotherapy and concurrent chemo-radiation (CCRT), against CCRT alone. Patients and Methods: Patients were stratified by N stage and randomized to induction GCP (3 cycles of gemcitabine 1000 mg/m{sup 2}, carboplatin area under the concentration-time-curve 2.5, and paclitaxel 70 mg/m{sup 2} given days 1 and 8 every 21 days) followed by CCRT (radiation therapy 69.96 Gy with weekly cisplatin 40 mg/m{sup 2}), or CCRT alone. The accrual of 172 was planned to detect a 15% difference in 5-year overall survival (OS) with a 5% significance level and 80% power. Results: Between September 2004 and August 2012, 180 patients were accrued, and 172 (GCP 86, control 86) were analyzed by intention to treat. There was no significant difference in OS (3-year OS 94.3% [GCP] vs 92.3% [control]; hazard ratio 1.05; 1-sided P=.494]), disease-free survival (hazard ratio 0.77, 95% confidence interval 0.44-1.35, P=.362), and distant metastases–free survival (hazard ratio 0.80, 95% confidence interval 0.38-1.67, P=.547) between the 2 arms. Treatment compliance in the induction phase was good, but the relative dose intensity for concurrent cisplatin was significantly lower in the GCP arm. Overall, the GCP arm had higher rates of grades 3 and 4 leukopenia (52% vs 37%) and neutropenia (24% vs 12%), but grade 3 and 4 acute radiation toxicities were not statistically different between the 2 arms. The global quality of life scores were comparable in both arms. Conclusion: Induction chemotherapy with GCP before concurrent chemo-irradiation did not improve survival in locally advanced NPC.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

The role of inflammation in age-related disease

The National Institutes of Health (NIH) Geroscience Interest Group (GSIG) sponsored workshop, The Role of Inflammation in Age-Related Disease, was held September 6th-7th, 2012 in Bethesda, MD. It is now recognized that a mild pro-inflammatory state is correlated with the major degenerative diseases of the elderly. The focus of the workshop was to better understand the origins and consequences of this low level chronic inflammation in order to design appropriate interventional studies aimed at improving healthspan. Four sessions explored the intrinsic, environmental exposures and immune pathways by which chronic inflammation are generated, sustained, and lead to age-associated diseases. At the conclusion of the workshop recommendations to accelerate progress toward understanding the mechanistic bases of chronic disease were identified.

59 BASIC BIOLOGICAL SCIENCES↗

Closure Report for Corrective Action Unit 465: Hydronuclear Nevada National Security Site, Nevada, Revision 0 ROTCs 1-2

The corrective action sites (CASs) within CAU 465 are located within Areas 6 and 27 of the NNSS. CAU 465 comprises the following CASs: 00-23-01, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie site. 00-23-02, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Dog site. 00-23-03, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie Prime and Anja sites. 06-99-01, Hydronuclear, located in Area 6 of the NNSS and known as the Trailer 13 site. The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 465 were met. From September 2011 through July 2012, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 465: Hydronuclear, Nevada National Security Site, Nevada.

54 ENVIRONMENTAL SCIENCES↗

Navier-Stokes Solvers and Generalizations for Reacting Flow Problems

This is an overview of our accomplishments during the final term of this grant (1 September 2008 -- 30 June 2012). These fall mainly into three categories: fast algorithms for linear eigenvalue problems; solution algorithms and modeling methods for partial differential equations with uncertain coefficients; and preconditioning methods and solvers for models of computational fluid dynamics (CFD).

97 MATHEMATICS AND COMPUTING↗

Dynamic defense workshop :

On September 5th and 6th, 2012, the Dynamic Defense Workshop: From Research to Practice brought together researchers from academia, industry, and Sandia with the goals of increasing collaboration between Sandia National Laboratories and external organizations, de ning and un- derstanding dynamic, or moving target, defense concepts and directions, and gaining a greater understanding of the state of the art for dynamic defense. Through the workshop, we broadened and re ned our de nition and understanding, identi ed new approaches to inherent challenges, and de ned principles of dynamic defense. Half of the workshop was devoted to presentations of current state-of-the-art work. Presentation topics included areas such as the failure of current defenses, threats, techniques, goals of dynamic defense, theory, foundations of dynamic defense, future directions and open research questions related to dynamic defense. The remainder of the workshop was discussion, which was broken down into sessions on de ning challenges, applications to host or mobile environments, applications to enterprise network environments, exploring research and operational taxonomies, and determining how to apply scienti c rigor to and investigating the eld of dynamic defense.

Crosby, Sean Michael↗

Final Technical Report for DE-SC0008098 [The Seventh International Workshop on the CKM Unitarity Triangle]

The Seventh International Workshop on the CKM Unitarity Triangle (http://ckm2012.uc.edu/) was held at the University of Cincinnati September 28-October 2, 2012. This workshop series is one of the leading meetings in the field of quark flavor physics. The Cincinnati workshop provided a venue for theorists and experimentalists to discuss the latest results and to develop new ideas for improved analyses. The most recent measurements from current experiments as well as the status of future experiments were discussed. On the theoretical side, progress in lattice QCD and other calculational techniques that allow more precise determinations of CKM matrix elements were presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Integrated FHR technology development: Tritium management, materials testing, salt chemistry control, thermal hydraulics and neutronics, associated benchmarking and commercial basis

This report summarizes the results of a 3-year Integrated Research Project (IRP) sponsored by the U.S. Department of Energy to address major technical challenges in the development of the Fluoride-salt-cooled High-temperature Reactor (FHR). The IRP universities included the Massachusetts Institute of Technology (MIT), the University of California at Berkeley (UCB), the University of Wisconsin (UW), and the University of New Mexico (UNM). The FHR is a new reactor concept less than 20 years old that combines (1) a clean fluoride salt coolant, (2) the graphite-matrix coated-particle fuel originally developed for High- Temperature Gas-Cooled Reactors and (3) passive decay heat removal systems from sodium fast reactors. The base-line design is a pebble-bed FHR that delivers heat between 600 to 700°C with a 7 Li 2 BeF 4 (flibe) salt coolant to the power cycle or industrial users. The Executive Summary describes what was accomplished and summarizes major conclusions. The main report contains stand-alone sections in each major area of work. Highlights are summarized below. Tritium. The coolant salt produces tritium necessitating understanding and control of tritium. Experimental work included measuring hydrogen uptake on carbon, tritium uptake during irradiation of graphite in 700°C salt and the permeability of tritium through metals with and without coatings. An FHR systems model was developed to predict tritium behavior and enable design of tritium control systems. The leading candidate for tritium removal from the flibe salt is carbon bed outside the reactor core. Thermal hydraulics and Neutronics. A 10-meter high FHR integral effects test facility, using Dowtherm A®, has been built and used to simulate the integral response of a representative FHR to improve understanding of FHR thermal hydraulics and validate thermal hydraulics codes used for the FHR. Neutronic analysis included code-to-code benchmarking, multiphysics modeling, uncertainty analysis for nuclear data uncertainties and shielding analysis. Twisted-tube heat exchangers were examined that may provide significant cost reductions because of their improved heat-transfer performance with liquid salts. The impacts on safety and design caused by uncertainties in physical properties of the salt were assessed with recommendations on where added physical property measurements are needed. Work began on understanding radiative heat transfer that becomes important in salt systems at higher temperatures. Materials. Static corrosion tests were conducted on graphite and materials in 700°C salt -- both in the UW laboratory and in the MIT reactor. In addition to static corrosion testing, a circulating salt corrosion loop was built and is operating. Methods to measure salt properties including redox were developed. The presence of carbon increases corrosion. With good redox control, the evidence indicates stainless steel can be used as a material of construction. Benchmarking. An additional series of workshops where held to enable benchmarking and comparison of results between different investigators. Commercialization. The FHR delivers higher average-temperature (~650°C) heat to the power cycle or industry than other reactors. This enables power cycles with lower-cost heat storage for variable electricity to the grid while the reactor operates at base-load -- providing a major competitive advantage by maximizing revenue from electricity sales. In October, 2016, a new startup company named Kairos Power was formed, and opened its first office in Jack London Square, Oakland, California, in January 2017. Kairos Power exists largely due to the work that was accomplished by this IRP and the previous DOE-funded FHR IRP that performed research on FHR technology from 2012 to 2015. In September, 2018, as this IRP is concluding, Kairos Power was staffed at 60 full time employees, working to develop technology derived from this IRP. Many of these employees worked with the IRP before joining Kairos Power 1 (https://kairospower.com). Other students and researchers from this IRP have joined other startup companies, including the Terrapower Molten Chloride Fast Reactor and the Terrestrial Energy development efforts.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SECARB Annual Report on In-Situ Monitoring Program

The Southeast Carbon Sequestration Partnership Phase III Anthropogenic Test at Citronelle Field is the United States’ largest prototype of commercial CO 2 capture from a coal-fired power station and transportation, injection, storage and monitoring. This report details the results of the second and third year of injection monitoring results for the Anthropogenic Test. Monitoring methods include both direct and indirect measurements. The Class V Experimental Permit requires extensive monitoring of injected CO 2 at the surface and at deep and shallow depths. The safety, integrity and information objectives of the CO 2 monitoring plan are in place to: (1) create and sustain wellbore integrity; (2) assure safe CO 2 injection operations; 3) verify the location and migration of the injected CO 2 plume; and (4) monitor for any CO 2 leakage. A robust suite of monitoring approaches are utilized for the insitu monitoring and include, pressure monitoring, various seismic surveys, pulsed neutron logging, reservoir fluid sampling and injection surveys. Data and observations collected using these monitoring methods will be used in the numerical model to inform the post-injection site care monitoring plan. This report describes actions pertaining to in situ monitoring at the Anthropogenic Test Site that were undertaken during the period of October 2013 to January 2015. This report details the results of the second and third year of injection monitoring results for the Anthropogenic Test. Work Product 9.2.2.b details the shallow monitoring results for 2014. CO 2 injection operations began on August 20, 2012 and terminated on September 1st 2014.

01 COAL, LIGNITE, AND PEAT↗

Automated Data Production For A Novel Airborne Multiangle Spectropolarimetric Imager (AIRMSPI)

A novel polarimetric imaging technique making use of rapid retardance modulation has been developed by JPL as a part of NASA's Instrument Incubator Program. It has been built into the Airborne Multiangle SpectroPolarimetric Imager (AirMSPI) under NASA's Airborne Instrument Technology Transition Program, and is aimed primarily at remote sensing of the amounts and microphysical properties of aerosols and clouds. AirMSPI includes an 8-band (355, 380, 445, 470, 555, 660, 865, 935 nm) pushbroom camera that measures polarization in a subset of the bands (470, 660, and 865 nm). The camera is mounted on a gimbal and acquires imagery in a configurable set of along-track viewing angles ranging between +67 deg and -67 deg relative to nadir. As a result, near simultaneous multi-angle, multi-spectral, and polarimetric measurements of the targeted areas at a spatial resolution ranging from 7 m to 20 m (depending on the viewing angle) can be derived. An automated data production system is being built to support high data acquisition rate in concert with co-registration and orthorectified mapping requirements. To date, a number of successful engineering checkout flights were conducted in October 2010, August-September 2011, and January 2012. Data products resulting from these flights will be presented.

Multi-angle↗

Interpretation of Probabilistic Surface Ozone Forecasts: A Case Study for Philadelphia

The use of probabilistic forecasting has been growing in a variety of disciplines because of its potential to emphasize the degree of uncertainty inherent in a prediction. Interpretation of probabilistic forecasts, however, is oftentimes difficult, deterring users who may benefit from such forecasts. To encourage broader use of probabilistic forecasts in the field of air quality, a process for interpreting forecasts from a statistical probabilistic air quality surface ozone model [the Regression in Self Organizing Map (REGiS)] is demonstrated. Four procedures to convert probabilistic to deterministic forecasts are explored for the Philadelphia, Pennsylvania, metropolitan area. These procedures calibrate the predicted probability of daily maximum 8-h-average ozone exceeding a standard value by 1) estimating climatological relative frequency, 2) establishing a probability of an exceedance threshold as 50%, 3) maximizing the threat score, and 4) determining the unit bias ratio. REGiS is trained using 2000–11 ozone-season (1 May–30 September) data, calibrated using 2012–14 data, and evaluated using 2015–18 data. Assessment of the calibration data with the Pierce skill score suggests an exceedance threshold based on climatological relative frequency for the conversion from probabilistic to deterministic forecasts. Calibrated REGiS generally compares well to predictions from the U.S. national air quality model and operational “expert” forecasts over the evaluation period. For other probabilistic models and situations, different procedures of converting probabilistic to deterministic forecasts may be more beneficial. The methods presented in this paper represent an approach for operational air quality forecasters seeking to use probabilistic model output to support forecasts designed to protect public health.

Nikolay Balashov↗

Environmental effects of marine energy development around the world. Annex IV Final Report

Annex IV is an international collaborative project to examine the environmental effects of marine energy devices among countries through the International Energy Agency’s Ocean Energy Systems Initiative (OES). The U.S. Department of Energy (DOE) serves as the Operating Agent for the Annex, in partnership with the Bureau of Ocean Energy Management (BOEM; formerly the Minerals Management Service), the Federal Energy Regulatory Commission (FERC), and National Oceanographic and Atmospheric Administration (NOAA). Numerous ocean energy technologies and devices are being developed around the world, and the few data that exist about the environmental effects of these technologies are dispersed among countries and developers. The purpose of Annex IV is to facilitate efficient government oversight of the development of ocean energy systems by compiling and disseminating information about the potential environmental effects of marine energy technologies and to identify methods of monitoring for these effects. Beginning in 2010, this three-year effort produced a publicly available searchable online database of environmental effects information (Tethys). It houses scientific literature pertaining to the environmental effects of marine energy systems, as well as metadata on international ocean energy projects and research studies. Two experts’ workshops were held in Dublin, Ireland (September 2010 and October 2012) to engage with international researchers, developers, and regulators on the scope and outcomes of the Annex IV project. Metadata and information stored in the Tethys database and feedback obtained from the two experts’ workshops were used as resources in the development of this report. This Annex IV final report contains three case studies of specific interactions of marine energy devices with the marine environment that survey, compile, and analyze the best available information in one coherent location. These case studies address 1) the physical interactions between animals and tidal turbines; 2) the acoustic impact of marine energy devices on marine animals; and 3) the effects of energy removal on physical systems. Each case study contains a description of environmental monitoring efforts and research studies, lessons learned, and analysis of remaining information gaps. The information collected through the Annex IV effort and referenced in this report, can be accessed on the Tethys database at http://mhk.pnnl.gov/wiki/index.php/Tethys_ Home.

16 TIDAL AND WAVE POWER↗

ARM Radiosondes for National Polar-Orbiting Operational Environmental Satellite System Preparatory Project Validation Field Campaign Report

This IOP has been a coordinated effort involving the U.S. Department of Energy (DOE) Atmospheric Radiation (ARM) Climate Research Facility, the University of Wisconsin (UW)-Madison, and the JPSS project to validate SNPP NOAA Unique Combined Atmospheric Processing System (NUCAPS) temperature and moisture sounding products from the Cross-track Infrared Sounder (CrIS) and the Advanced Technology Microwave Sounder (ATMS). In this arrangement, funding for radiosondes was provided by the JPSS project to ARM. These radiosondes were launched coincident with the SNPP satellite overpasses (OP) at four of the ARM field sites beginning in July 2012 and running through September 2017. Combined with other ARM data, an assessment of the radiosonde data quality was performed and post-processing corrections applied producing an ARM site Best Estimate (BE) product. The SNPP targeted radiosondes were integrated into the NOAA Products Validation System (NPROVS+) system, which collocated the radiosondes with satellite products (NOAA, National Aeronautics and Space Administration [NASA], European Organisation for the Exploitation of Meteorological Satellites [EUMETSAT], Geostationary Operational Environmental Satellite [GOES], Constellation Observing System for Meteorology, Ionosphere, and Climate [COSMIC]) and Numerical Weather Prediction (NWP forecasts for use in product assessment and algorithm development. This work was a fundamental, integral, and cost-effective part of the SNPP validation effort and provided critical accuracy assessments of the SNPP temperature and water vapor soundings.

54 ENVIRONMENTAL SCIENCES↗

How Tropical Pacific Surface Cooling Contributed to Accelerated Sea Ice Melt from 2007 to 2012 as Ice is Thinned by Anthropogenic Forcing

Over the past 40 years the Arctic sea ice minimum in September has declined. The period between 2007 and 2012 showed accelerated melt contributed to the record minima of 2007 and 2012. Here, observational and model evidence shows that the changes in summer sea ice since the 2000s reflects a continuous anthropogenically forced melting masked by interdecadal variability of Arctic atmospheric circulation. This variation is partially driven by teleconnections originating from sea surface temperature (SST) changes in the east-central tropical Pacific via a Rossby wave train propagating into the Arctic (hereafter referred to as the “Pacific-Arctic teleconnection (PARC)”), which represents the leading internal mode connecting the pole to lower latitudes. This mode has contributed to accelerated warming and Arctic sea ice loss from 2007 to 2012, followed by slower declines in recent years, resulting in the appearance of a slowdown over the past 11 years. A pacemaker model simulation, in which we specify observed SST in the tropical eastern Pacific, demonstrates a physically plausible mechanism for the PARC mode. However, the model-based PARC mechanism is considerably weaker and only partially accounts for the observed acceleration of sea ice loss from 2007 to 2012. Further research is needed to identify the reasons for model limitations in reproducing the PARC mode.

Baxter, Ian↗