Search NASA⌕ Search

SEARCH · Search NASA

Results for “Shuttle Payloads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Environmental Measurements Session summaries

Emphasis was placed on data from payloads flown on the subject flights including results from the Induced Environment Contamination monitor (IECM). Brief summaries of the vibroacoustics, loads, electromagnetic and thermal aspects of the environment, as derived from Shuttle system measurements, were presented primarily to indicate where the environment was different than observed and, therefore, where specification changes may be forthcoming. In addition, brief summaries of two somewhat unexpected effects, the vehicle glow and interaction between the low Earth environment and Shuttle payload by materials were presented as an aid in interpreting other environmental data. Papers for each payload/experiment involved in Shuttle flights were presented essentially in flight related chronological order. A significant portion of time was allocated for presentation of IECM data since this payload was flown on STS-2, STS-3, and STS-4 and, therefore, represents the largest data base relative to the contamination environment. Summaries of papers are presented.

Lehmann, J.↗

A mass additive technique for modal testing as applied to the Space Shuttle ASTRO-1 payload

Traditionally, a fixed base modal test has been performed as a means of verifying the coupled loads math model for Space Shuttle flight payloads. An alternate method, a free-free configured payload using mass loaded boundary conditions, is presented as a means of verifying the coupled loads model of the ASTRO-1 flight payload. This method allows evaluation of the influence of local load paths into the frequency range of the free-free test. The method is cost effective and does not contaminate the modal test results with fixture coupled modes or boundary condition uncertainties. This paper describes the mass additive modal test technique as applied to the Space Shuttle ASTRO-1 flight payload.

Coleman, A. D.↗

Future capabilities of the Delta launch vehicle

Design features and payload delivery capabilities of the Delta 3920 launch vehicle are presented. The 3920 is the 14th iteration in a series that was first launched in 1960 and has in recent years surpassed a 97 percent success rate. Capacity is 2800 lb to GEO. The second stage has a propellant capacity of 13,244 lb and a specific impulse of 319.2 sec and produces 9443 lb thrust. The first mission is the Landsat-D satellite and 27 more launches are scheduled through 1985, some associated with different upper stage configurations. The 3924 configuration delivers payload to GEO at a cost of $7500/lb. A fairing has been designed to provide back-up for Shuttle payloads, although the larger size reduces the GEO payload to 2715 lb. Performance enhancements may, however, be gained through pneumatic thrusters for the Castor IV engine separation, higher Castor IV thrust levels, increased booster thrust, and a cryogenic second stage.

Grimes, D. W.↗

Follow-the-leader algorithm for the payload inspection and processing system

This report summarizes the author's summer 1995 work at NASA Kennedy Space Center in the Advanced System Division. The assignment was path planning for the Payload Inspection and Processing System (PIPS). PIPS is an automated system, programmed off-line for inspection of Space Shuttle payloads after integration and prior to launch. PIPS features a hyper-redundant 18-dof serpentine truss manipulator capable of snake-like motions to avoid obstacles. The path planning problem was divided into two segments: (1) determining an obstacle-free trajectory for the inspection camera at the manipulator tip to follow; and (2) development of a follow-the-leader (FTL) algorithm which ensures whole-arm collision avoidance by forcing ensuing links to follow the same tip trajectory. The summer 1995 work focused on the FTL algorithm. This report summarizes development, implementation, testing, and graphical demonstration of the FTL algorithm for prototype PIPS hardware. The method and code was developed in a modular manner so the final PIPS hardware may use them with minimal changes. The FTL algorithm was implemented using MATLAB software and demonstrated with a high-fidelity IGRIP model. The author also supported implementation of the algorithm in C++ for hardware control. The FTL algorithm proved to be successful and robust in graphical simulation. The author intends to return to the project in summer 1996 to implement path planning for PIPS.

Williams, Robert L., II↗

STS operations planning - Current status and outlook for the future

Consideration is given to the status of Space Shuttle operations planning and outlook for the period 1982-94, with some speculations on Shuttle-related space operations early in the next century. Attention is given to the evolution of Shuttle payload capabilities over the next five years. The following list of near-earth environment factors to be exploited by the Space Shuttle is given: (1) easy control of gravity; (2) absence of atmosphere; (3) a comprehensive view of the earth's surface and atmosphere; (4) isolation of hazardous processes from earth biosphere; (5) freely available light, heat and photovoltaic power; (6) an infinite natural reservoir for the disposal of radioactive waste products; and (7) a super-cold heat sink.

Lee, C. M.↗

STS-96: SPACEHAB Double MOD into PGHM at Launch Complex 39B

This NASA Kennedy Space Center (KSC) video release presents the SPACEHAB double module moving into the Payload Ground Handling Mechanism (PGHM) which is located in the Payload Change-out Room of Launch Complex 39B at the Kennedy Space Center. PGHM is used to remove or insert the shuttle payload from the Orbiter.

Source record↗

Utilization of solid-propellant upper stages in STS payload orbital operations

The main purpose of this report is to discuss techniques of trajectory design, maneuver execution, and stage loading that are compatible with the use of SRM's (solid rocket motors) which, once ignited, must burn to propellant depletion. It is anticipated that some shuttle payloads will use non-IUS (interim upper stage) solid propellant kick stages; therefore this subject is also pertinent to shuttle flights other than those involving the use of the IUS. The SRM utilization techniques can be divided into two major categories: (1) those in which the stage performance is adjusted to match the velocity increment magnitude requirements of a preselected trajectory, and (2) those in which the trajectory is designed to match the velocity increment magnitude capability of the stage(s).

Wilson, S. W.↗

Low-G fluid transfer technology study

Technology gaps and system characteristics critical to cryogenic and noncryogenic in-orbit fluid transfer were identified. Four different supply systems were conceptually designed as space shuttle payloads. These were; (1) space tug supply - LH2, LO2, N2H4, He - linear acceleration for liquid acquisition with supply module and tug separated from shuttle, (2) tug supply using orbiter drag, (3) orbiter supply - N2O4,MMH,He, H2,O2 - surface tension screens, (4) multiple receivers supply 0 solar electric propulsion stage, Hg, diaphragm - HEAO B, HEe, paddle fluid rotation-satellite control section, N2H4, screens. It was found that screens had the best overall potential for low weight and simplicity, however, thermal problems with cryogenics still need final resolution.

Stark, J. A.↗

STS-55 Space Shuttle mission report

A summary of the Space Shuttle Payloads, Orbiter, External Tank, Solid Rocket Booster, Redesigned Solid Rocket Motor, and the Main Engine subsystems performance during the 55th flight of the Space Shuttle Program and the 14th flight of Columbia is presented.

Fricke, Robert W., Jr.↗

Computer graphics aid mission operations

The application of computer graphics techniques in NASA space missions is reviewed. Telemetric monitoring of the Space Shuttle and its components is discussed, noting the use of computer graphics for real-time visualization problems in the retrieval and repair of the Solar Maximum Mission. The use of the world map display for determining a spacecraft's location above the earth and the problem of verifying the relative position and orientation of spacecraft to celestial bodies are examined. The Flight Dynamics/STS Three-dimensional Monitoring System and the Trajectroy Computations and Orbital Products System world map display are described, emphasizing Space Shuttle applications. Also, consideration is given to the development of monitoring systems such as the Shuttle Payloads Mission Monitoring System and the Attitude Heads-Up Display and the use of the NASA-Goddard Two-dimensional Graphics Monitoring System during Shuttle missions and to support the Hubble Space Telescope.

Jeletic, James F.↗

Increasing the usefulness of Shuttle with SPACEHAB

SPACEHAB is a pressurized laboratory, approximately 10 feet long and 13 feet in diameter, which fits in the forward position of the Shuttle payload bay and connects to the crew compartment through the Orbiter airlock. SPACEHAB modules may contain up to 61 standard middeck lockers, providing 1100 cubic feet of pressurized work space. SPACEHAB'S capacity offers crew-tended access to the microgravity environment for experimentation, technology development, and small-scale production. The modules are designed to facilitate the user's ability to quickly and inexpensively develop and integrate a microgravity payload. Payloads are typically integrated into the SPACEHAB module in standard SPACEHAB lockers or SPACEHAB racks. Lockers are designed to offer identical user interfaces as standard Space Shuttle middeck lockers. SPACEHAB racks are interchangeable with Space Station Freedom racks, allowing hardware to be qualified for early station use.

Stone, Barbara A.↗

An evaluation of Space Shuttle STS-2 payload bay acoustic data and comparison with predictions

Space average sound pressure levels computed from measurements at 18 locations in the payload bay of the Space Shuttle orbiter vehicle during the STS-2 launch were compared with predicted levels obtained using the PACES computer program. The comparisons were performed over the frequency range 12.5 Hz to 1000 Hz, since the test data at higher frequencies are contaminated by instrumentation background noise. In general the PACES computer program tends to overpredict the space average sound levels in the payload bay, although the magnitude of the discrepancy is usually small. Furthermore the discrepancy depends to some extent on the manner in which the payload is modeled analytically, and the method used to determine the "measured' space average sound pressure levels. Thus the difference between predicted and measured sound levels, averaged over the 20 one third octave bands from 12.5 Hz to 1000 Hz, varies from 1 dB to 3.5 dB.

Wilby, J. F.↗

Hitchhiker: Customer Accommodations and Requirements Specifications (CARS)

In 1984, NASA Headquarters established projects at the Goddard Space Flight Center (GSFC) and the Marshall Space Flight Center (MSFC) to develop quick-reaction carrier systems for low-cost 'flight of opportunity' or secondary payloads on the Space Transportation System (STS). One of these projects is the Hitchhiker (HH) Program. GSFC has developed a family of carrier equipment known as the Shuttle Payload of Opportunity Carrier (SPOC) system for mounting small payloads such as HH to the side of the Orbiter payload bay. The side-mounted HHs are referred to as Hitchhiker-G (HH-G). MSFC developed a cross-bay 'bridge-type' carrier structure called the Hitchhiker-M (HH-M). In 1987, responsibility for the HH-M carrier was transferred to and is now managed by the HH Project Office at the GSFC. The HH-M carrier now uses the same interchangeable SPOC avionics unit and the same electrical interfaces and services developed for HH-G. National Aeronautics and Space Administration (NASA) has created this document to acquaint potential HH system customers with the facilities NASA provides and the requirements which customers must satisfy to use these facilities. This publication defines interface items required for integrating customer equipment with the HH carrier system. Those items such as mounting equipment and electrical inputs and outputs; configuration, environmental, command, telemetry, and operational constraints are described as well as weight, power, and communications. The purpose of this publication is to help the customer understand essential integration documentation requirements and to prepare a Customer Payload Requirements (CPR) document.

Source record↗

Determination of ASPS performance for large payloads in the shuttle orbiter disturbance environment

A high fidelity simulation of the annular suspension and pointing system (ASPS), its payload, and the shuttle orbiter was used to define the worst case orientations of the ASPS and its payload for the various vehicle disturbances, and to determine the performance capability of the ASPS under these conditions. The most demanding and largest proposed payload, the Solar Optical Telescope was selected for study. It was found that, in all cases, the ASPS more than satisfied the payload's requirements. It is concluded that, to satisfy facility class payload requirements, the ASPS or a shuttle orbiter free-drift mode (control system off) should be utilized.

Keckler, C. R.↗

Vibroacoustic test plan evaluation: Parameter variation study

Statistical decision models are shown to provide a viable method of evaluating the cost effectiveness of alternate vibroacoustic test plans and the associated test levels. The methodology developed provides a major step toward the development of a realistic tool to quantitatively tailor test programs to specific payloads. Testing is considered at the no test, component, subassembly, or system level of assembly. Component redundancy and partial loss of flight data are considered. Most and probabilistic costs are considered, and incipient failures resulting from ground tests are treated. Optimums defining both component and assembly test levels are indicated for the modified test plans considered. modeling simplifications must be considered in interpreting the results relative to a particular payload. New parameters introduced were a no test option, flight by flight failure probabilities, and a cost to design components for higher vibration requirements. Parameters varied were the shuttle payload bay internal acoustic environment, the STS launch cost, the component retest/repair cost, and the amount of redundancy in the housekeeping section of the payload reliability model.

Stahle, C. V.↗

An impedance technique for determining low-frequency payload environments

The technique presented is based on frequency domain analysis and eliminates the necessity of final eigen solution for coupled payload/booster systems. A demonstration of the technique using Titan flight data and a low frequency environment prediction for a Shuttle payload are included. Criteria and philosophy for the technique for future payloads is discussed.

Payne, K. R.↗

Space shuttle

The transportation cost associated with space materials processing were studied to determine the feasibility of space manufacturing. The assumptions use to determining the cost estimates for a 12 year planning period are listed, and the orbitor is described in terms of payloads. Shuttle operational costs, ground operational costs, and nonrecurring investment and development costs were analyzed.

Source record↗

Spacelab Hitchhiker, a quick reaction carrier

It is pointed out that NASA is developing a new way to get payloads into orbit in a short time and at a low cost. The 'Spacelab Hitchhiker' is the carrier program which will accomplish this objective. The Spacelab Hitchhiker carrier is a Shuttle payload. The primary application of the considered program will be related to science and technology payloads. Attention is given to the Hitchhiker concept, details regarding the Hitchhiker-G and Hitchhiker-M, aspects of integration and operations, Orbiter resources and STS interfaces, the conduction of Hitchhiker flights as 'flights of opportunity', questions of payload selection, and organizational interfaces.

James, E. F.↗