Search NASA⌕ Search

SEARCH · Search NASA

Results for “Solid Rocket Engine”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Wave Rotor Enhanced Nuclear (WREN) Propulsion: NASA Innovative Advanced Concepts (NIAC) - Phase I Final Report

Nuclear Thermal Propulsion (NTP) is identified as one of the preferred propulsion technologies for manned missions throughout the solar system (NASA MSFC).[1, 2] The state-ofthe-art NTP cycle is based on a solid core Nuclear Engine for Rocket Vehicle Application (NERVA)[3] class technology (Fig. 1) that is envisioned to provide a specific impulse of 900 seconds doubling chemical rocket performance (450 seconds). Even with this impressive increase, the NTP NERVA designs still have issues providing adequate initial to final mass fractions for high ΔV missions.[4] Nuclear Electric Propulsion (NEP) can provide extremely high Isp (2,000 to over 10,000 seconds) but with only low thrust and limits on mass to power ratios. The need for an electric power source also adds the issue of heat rejection in space where thermal energy conversion is at best 30-40% under ideal conditions. NASA Space Technology Mission Directorate (STMD) has recently expressed interest in finding advanced nuclear propulsion technology through the NASA Go:Thrust RFI.[5, 6] A novel Wave Rotor (WR) topping cycle has been proposed for our NASA NIAC concept. It promises to deliver similar thrust as NERVA class NTP propulsion, but with Isp in the 1,200-2,000 second range. Coupled with an NEP cycle, the duty cycle Isp can further be increased (1,800-4,000 seconds) with minimal addition of dry mass. This bimodal design enables fast transit trajectories for manned missions to Mars and revolutionizes the deep space exploration of our solar system.

Nuclear Thermal Propulsion↗

Space Shuttle Solid Rocket Booster Lightweight Recovery System

The cancellation of the Advanced Solid Rocket Booster Project and the earth-to-orbit payload requirements for the Space Station dictated that the National Aeronautics and Space Administration (NASA) look at performance enhancements from all Space Transportation System (STS) elements (Orbiter Project, Space Shuttle Main Engine Project, External Tank Project, Solid Rocket Motor Project, & Solid Rocket Booster Project). The manifest for launching of Space Station components indicated that an additional 12-13000 pound lift capability was required on 10 missions and 15-20,000 pound additional lift capability is required on two missions. Trade studies conducted by all STS elements indicate that by deleting the parachute Recovery System (and associated hardware) from the Solid Rocket Boosters (SRBS) and going to a lightweight External Tank (ET) the 20,000 pound additional lift capability can be realized for the two missions. The deletion of the parachute Recovery System means the loss of four SRBs and this option is two expensive (loss of reusable hardware) to be used on the other 10 Space Station missions. Accordingly, each STS element looked at potential methods of weight savings, increased performance, etc. As the SRB and ET projects are non-propulsive (i.e. does not have launch thrust elements) their only contribution to overall payload enhancement can be achieved by the saving of weight while maintaining adequate safety factors and margins. The enhancement factor for the SRB project is 1:10. That is for each 10 pounds saved on the two SRBS; approximately 1 additional pound of payload in the orbiter bay can be placed into orbit. The SRB project decided early that the SRB recovery system was a prime candidate for weight reduction as it was designed in the early 1970s and weight optimization had never been a primary criteria.

Wolf, Dean↗

Space Shuttle Reusable Solid Rocket Motor (RSRM) Hand Cleaning Solvent Replacement at Kennedy Space Center (KSC)

At Kennedy Space Center (KSC), Thiokol Corporation provides the engineering to assemble and prepare the Space Shuttle Reusable Solid Rocket Motor (RSRM) for launch. This requires hand cleaning over 86 surfaces including metals, adhesives, rubber and electrical insulations, various painted surfaces and thermal protective materials. Due to the phase-out of certain ozone depleting chemical (ODC) solvents, all RSRM hand wipe operations being performed at KSC using l,l,1-trichloroethane (TCA) were eliminated. This presentation summarizes the approach used and the data gathered in the effort to eliminate TCA from KSC hand wipe operations.

Keen, Jill M.↗

Measuring Fluctuating Pressure Levels and Vibration Response in a Jet Plume

The characterization of loads due to solid rocket motor plume impingement allows for moreaccurate analyses of components subjected to such an environment. Typically, test verification of predicted loads due to these conditions is widely overlooked or unsuccessful. ATA Engineering, Inc., performed testing during a solid rocket motor firing to obtain acceleration and pressure responses in the hydrodynamic field surrounding the jet plume. The test environment necessitated a robust design to facilitate measurements being made in close proximity to the jet plume. This paper presents the process of designing a test fixture and an instrumentation package that could withstand the solid rocket plume environment and protect the required instrumentation.

Osterholt, Douglas J.↗

Probabilistic failure assessment with application to solid rocket motors

A quantitative methodology is being developed for assessment of risk of failure of solid rocket motors. This probabilistic methodology employs best available engineering models and available information in a stochastic framework. The framework accounts for incomplete knowledge of governing parameters, intrinsic variability, and failure model specification error. Earlier case studies have been conducted on several failure modes of the Space Shuttle Main Engine. Work in progress on application of this probabilistic approach to large solid rocket boosters such as the Advanced Solid Rocket Motor for the Space Shuttle is described. Failure due to debonding has been selected as the first case study for large solid rocket motors (SRMs) since it accounts for a significant number of historical SRM failures. Impact of incomplete knowledge of governing parameters and failure model specification errors is expected to be important.

Jan, Darrell L.↗

Ground and Space-Based Measurement of Rocket Engine Burns in the Ionosphere

On-orbit firings of both liquid and solid rocket motors provide localized disturbances to the plasma in the upper atmosphere. Large amounts of energy are deposited to ionosphere in the form of expanding exhaust vapors which change the composition and flow velocity. Charge exchange between the neutral exhaust molecules and the background ions (mainly O+) yields energetic ion beams. The rapidly moving pickup ions excite plasma instabilities and yield optical emissions after dissociative recombination with ambient electrons. Line-of-sight techniques for remote measurements rocket burn effects include direct observation of plume optical emissions with ground and satellite cameras, and plume scatter with UHF and higher frequency radars. Long range detection with HF radars is possible if the burns occur in the dense part of the ionosphere. The exhaust vapors initiate plasma turbulence in the ionosphere that can scatter HF radar waves launched from ground transmitters. Solid rocket motors provide particulates that become charged in the ionosphere and may excite dusty plasma instabilities. Hypersonic exhaust flow impacting the ionospheric plasma launches a low-frequency, electromagnetic pulse that is detectable using satellites with electric field booms. If the exhaust cloud itself passes over a satellite, in situ detectors measure increased ion-acoustic wave turbulence, enhanced neutral and plasma densities, elevated ion temperatures, and magnetic field perturbations. All of these techniques can be used for long range observations of plumes in the ionosphere. To demonstrate such long range measurements, several experiments were conducted by the Naval Research Laboratory including the Charged Aerosol Release Experiment, the Shuttle Ionospheric Modification with Pulsed Localized Exhaust experiments, and the Shuttle Exhaust Ionospheric Turbulence Experiments.

Bernhardt, P. A.↗

Dynamic certification of a thrust-measuring system for large solid rocket motors

The J-4 Rocket Test Cell and its Thrust Measuring System (TMS) at Arnold Engineering Development Center were modified to provide multicomponent force measurement of large solid rocket motors having nozzle gimbaling capability. To verify the structural integrity of a combined TMS and motor system, a large finite element model of the TMS and motor was developed using the NASTRAN computer program. Due to the importance of obtaining accurate estimates for the dynamic force levels, it was necessary to certify that the model adequately simulated the physical system. This was accomplished by performing a modal analysis test on the TMS and motor combination. The objectives were to discuss the physical characteristics of the TMS and motor that influence the NASTRAN model; to compare the frequency response characteristics computed using the NASTRAN model to those obtained from the modal analysis test; to discuss the experiences gained in modal analysis testing; and to demonstrate how state-of-the-art experimental and analytical methods are used in the design of ground test facilities.

Lemaster, R. A.↗

NASA's Space Launch System: Payload Opportunities for Lunar Exploration, Science Missions

Nearing its first launch, the Space Launch System (SLS), NASA’s new super heavy-lift launch vehicle, offers highly energetic launches that deliver more mass and provide more volume in 8.4 m-diameter and potentially larger fairings to make a new generation of deep space missions possible. An evolvable launcher available in crew, crew with a co-manifested payload (CPL) and cargo-only configurations, SLS is a crucial capability to enable astronauts to return to the Moon, but it also offers key benefits for science missions. NASA’s 21st-century return to the Moon recently received a formal name: the Artemis program. In addition to the core enabling capabilities of SLS and the Orion crew spacecraft, NASA will also enlist international and commercial partnerships for Artemis. The Agency intends to build a scientific outpost in lunar orbit, the Gateway, from which human and robotic missions to and from the surface can rendezvous. SLS will launch Orion on a series of missions leading to landing the first woman and the next man on the Moon as part of Artemis. SLS uses proven propulsion systems: two solid rocket boosters and four RS-25s engines that have been upgraded to provide more thrust and operate in the SLS environment. SLS Block 1 uses a modified Delta IV Heavy upper stage, called the Interim Cryogenic Propulsion Stage (ICPS) and lifts at least 26 metric tons (t) to trans-lunar injection (TLI). The Block 1 vehicle can also be outfitted with a 5 m-diameter fairing. Block 1B, the next major variant, also uses solid rocket boosters and RS-25 engines to achieve Earth escape velocity, but replaces the single-engine liquid hydrogen (LH2)/liquid oxygen (LOX) ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS) to increase mass to TLI to 34-37 t, depending on crew or cargo configuration. In the Block 1B crew configuration, a 10 m-tall Universal Stage Adapter (USA) connects the vehicle to Orion and can carry a CPL up to 10 t. The USA provides 286 m3 of unpressurized volume for payloads. For large payloads, 8.4 m- and 10 m-diameter cargo fairings in 19.1 m and 27.4 m lengths are possible. The ultimate SLS vehicle, Block 2, incorporates evolved boosters to reach a lift capacity of more than 45 t to TLI. The capabilities of SLS not only make new missions to the Moon possible, but also game-changing science missions, such as deployment of large-aperture space telescopes, spacecraft to the ice giants or even probes to the interstellar medium. This paper will discuss the capabilities of SLS, the vehicle’s planned evolution, missions that can effectively utilize the vehicle and manufacturing status of the vehicle.

Creech, Stephen D.↗

NASA's Space Launch System: Payload Opportunities for Lunar Exploration, Science Missions

Nearing its first launch, the Space Launch System (SLS), NASA’s new super heavy-lift launch vehicle, offers highly energetic launches that deliver more mass and provide more volume in 8.4 m-diameter and potentially larger fairings to make a new generation of deep space missions possible. An evolvable launcher available in crew, crew with a co-manifested payload (CPL) and cargo-only configurations, SLS is a crucial capability to enable astronauts to return to the Moon, but it also offers key benefits for science missions. NASA’s 21st-century return to the Moon recently received a formal name: the Artemis program. In addition to the core enabling capabilities of SLS and the Orion crew spacecraft, NASA will also enlist international and commercial partnerships for Artemis. The Agency intends to build a scientific outpost in lunar orbit, the Gateway, from which human and robotic missions to and from the surface can rendezvous. SLS will launch Orion on a series of missions leading to landing the first woman and the next man on the Moon as part of Artemis. SLS uses proven propulsion systems: two solid rocket boosters and four RS-25s engines that have been upgraded to provide more thrust and operate in the SLS environment. SLS Block 1 uses a modified Delta IV Heavy upper stage, called the Interim Cryogenic Propulsion Stage (ICPS) and lifts at least 26 metric tons (t) to trans-lunar injection (TLI). The Block 1 vehicle can also be outfitted with a 5 m-diameter fairing. Block 1B, the next major variant, also uses solid rocket boosters and RS-25 engines to achieve Earth escape velocity, but replaces the single-engine liquid hydrogen (LH2)/liquid oxygen (LOX) ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS) to increase mass to TLI to 34-37 t, depending on crew or cargo configuration. In the Block 1B crew configuration, a 10 m-tall Universal Stage Adapter (USA) connects the vehicle to Orion and can carry a CPL up to 10 t. The USA provides 286 m3 of unpressurized volume for payloads. For large payloads, 8.4 m- and 10 m-diameter cargo fairings in 19.1 m and 27.4 m lengths are possible. The ultimate SLS vehicle, Block 2, incorporates evolved boosters to reach a lift capacity of more than 45 t to TLI. The capabilities of SLS not only make new missions to the Moon possible, but also game-changing science missions, such as deployment of large-aperture space telescopes, spacecraft to the ice giants or even probes to the interstellar medium. This paper will discuss the capabilities of SLS, the vehicle’s planned evolution, missions that can effectively utilize the vehicle and manufacturing status of the vehicle.

Creech, Steve↗

Designing Liquid Rocket Engine Injectors for Performance, Stability, and Cost

NASA is developing the Space Launch System (SLS) for crewed exploration missions beyond low Earth orbit. Marshall Space Flight Center (MSFC) is designing rocket engines for the SLS Advanced Booster (AB) concepts being developed to replace the Shuttle-derived solid rocket boosters. One AB concept uses large, Rocket-Propellant (RP)-fueled engines that pose significant design challenges. The injectors for these engines require high performance and stable operation while still meeting aggressive cost reduction goals for access to space. Historically, combustion stability problems have been a critical issue for such injector designs. Traditional, empirical injector design tools and methodologies, however, lack the ability to reliably predict complex injector dynamics that often lead to combustion stability. Reliance on these tools alone would likely result in an unaffordable test-fail-fix cycle for injector development. Recently at MSFC, a massively parallel computational fluid dynamics (CFD) program was successfully applied in the SLS AB injector design process. High-fidelity reacting flow simulations were conducted for both single-element and seven-element representations of the full-scale injector. Data from the CFD simulations was then used to significantly augment and improve the empirical design tools, resulting in a high-performance, stable injector design.

Westra, Douglas G.↗

NASA’s Space Launch System: Progress Toward Launch

The Space Launch System (SLS), NASA’s cornerstone launch capability for a new generation of deep space exploration, has begun assembly at Kennedy Space Center (KSC) in preparation for launch in 2021. SLS will provide an unparalleled launch capability for human and robotic deep space exploration missions. Its proven propulsion system, upgrade path to more powerful vehicles, and high-volume payload fairings make it the foundation for ambitious and demanding as part of the Artemis program. Artemis is NASA’s 21st-century plan to put boots on the Moon and to perform sustainable, long-term science in deep space, with eyes toward sending explorers to Mars. The initial SLS vehicle to fly, Block 1 in the crew configuration – with the new Orion spacecraft – is scheduled to lift off from revitalized launch facilities at KSC in 2021 for an uncrewed test flight known as Artemis I. Manufacturing is complete on the vehicle and all elements have been delivered to the Exploration Ground Systems (EGS) Program, except the core stage. The program’s all-new development, the core stage is currently in the midst of a “Green Run” test campaign at Stennis Space Center (SSC). Eight progressively more challenging tests in the Green Run series will culminate in a hot-fire of four flight-proven liquid hydrogen/liquid oxygen (LH2/LOX) RS25 engines. Following the Green Run hotfiring, the core stage will ship to KSC. Already at KSC, aft sections of the fivesegment solid rocket boosters are being assembled. Previously delivered elements, including the upper stage, are undergoing final checkouts in preparation for stacking. An exciting 2021 will include such milestones as stacking SLS and Orion in KSC’s Vehicle Assembly Building (VAB), modal testing, roll out to Launch Pad 39B, Wet Dress Rehearsal (WDR), and launch. Teams across the country are preparing for launch by finalizing procedures, defining launch constraints and flight rules, training console operators, performing simulations, and more. With the SLS Block 1 vehicle for Artemis I nearing integration and launch, the second Block 1 vehicle in the crew configuration, which will carry astronauts on an Artemis II hybrid lunar flyby mission, has several elements manufactured. In fact, the solid rocket motor segments and RS-25 engines are complete. Those program elements are processing hardware for the third flight and working toward manufacturing the second SLS variant to fly, Block 1B, which will onramp a powerful new upper stage, the Exploration Upper Stage (EUS).

John Honeycutt↗

Modal survey of the space shuttle solid rocket motor using multiple input methods

The ability to accurately characterize propellant in a finite element model is a concern of engineers tasked with studying the dynamic response of the Space Shuttle Solid Rocket Motor (SRM). THe uncertainties arising from propellant characterization through specimem testing led to the decision to perform a model survey and model correlation of a single segment of the Shuttle SRM. Multiple input methods were used to excite and define case/propellant modes of both an inert segment and, later, a live propellant segment. These tests were successful at defining highly damped, flexible modes, several pairs of which occured with frequency spacing of less than two percent.

Brillhart, Ralph↗

Pressure Oscillations and Structural Vibrations in Space Shuttle RSRM and ETM-3 Motors

The complex interactions between internal motor pressure oscillations resulting from vortex shedding, the motor's internal acoustic modes, and the motor's structural vibration modes were assessed for the Space Shuttle four-segment booster Reusable Solid Rocket Motor and for the five-segment engineering test motor ETM-3. Two approaches were applied 1) a predictive procedure based on numerically solving modal representations of a solid rocket motor s acoustic equations of motion and 2) a computational fluid dynamics two-dimensional axi-symmetric large eddy simulation at discrete motor burn times.

Mason, D. R.↗

Space Shuttle Program progress report

A status report devoted to progress of design, manufacturing and test activities for each element of the Space Shuttle is presented. In particular, attention is given to system engineering and integration, the orbiter and its subsystems, the carrier aircraft, the main engine, the external tank, the solid rocket booster, the launch and landing facilities, and ground and orbital flight tests.

Thompson, R. F.↗

Annual report to the NASA Administrator by the Aerospace Safety Advisory Panel. Part 2: Space shuttle program. Section 2: Summary of information developed in the Panel's fact-finding activities

The management areas and the individual elements of the shuttle system were investigated. The basic management or design approach including the most obvious limits or hazards that are significant to crew safety was reviewed. Shuttle program elements that were studied included the orbiter, the space shuttle main engine, the external tank project, solid rocket boosters, and the launch and landing elements.

Source record↗

Shuttle operational expectations

The results of orbital flight tests (OFT) of the Space Shuttle are reviewed, and modifications planned for upcoming operational flights are discussed. The performance of the solid rocket boosters, external tank, main engines, structural system, propulsion system, reaction control system, electric power system, heat rejection system, hydraulic system, avionics, and other systems is described and evaluated as generally highly satisfactory. Payload servicing and deployment were also successfully demonstrated by OFT. Additional facilities planned for the operational flights are briefly described, and improvements that will make the Challenger spacecraft lighter than Columbia, provide it with more thrust, and give it a larger payload are summarized. Some software modifications being introduced are also mentioned.

Abrahamson, J. A.↗

NOVA 201 ultrasonic thickness gage (NOVA Gage)

The measurement integrity of the NOVA 201 digital ultrasonic thickness gage (NOVA gage) was demonstrated by comparing the NOVA gage measurements to the thickness gage measurements, and determining the bias and uncertainty of the NOVA gage when measuring redesigned solid rocket motor (RSRM) hardware per engineering test plans (ETP). The NOVA gage was tested by three different operators on steel and aluminum RSRM hardware for wall thickness. The results show that the measurement bias is not consistent. The uncertainty of the bias is caused by the heterogeneous material properties of the RSRM components that influence the time of flight of ultrasonic waves. The measurement uncertainty inherent to the design and operation of the NOVA gage is less in comparison to the uncertainty of the bias. The total measurement uncertainty cannot be substantially reduced by taking more than one measurement. There is no correlation between bias and the surface finish range of this test unless 3-in-One oil is used as a couplant, in which case there appears to be a slight trend. There is no correlation between uncertainty and the surface finish range. The measurement uncertainty of the NOVA gage can be reduced using 3-in-One oil as a couplant.

Garecht, Diane↗