Search NASASearch

SEARCH · Search NASA

Results for “TEST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

991 records · Page 15

Extending mARC II Arc-Jet Test Duration via Design and Implementation of Model System Cooling Sleeve

The mARC II is a 30 kW arc-jet facility at NASA Ames Research Center used to generate high-enthalpy flows for low-cost thermal protection system (TPS) technology development. Sustained operation of downstream instrumentation and material samples is constrained by thermal loading transmitted through the arc-jet test environment, limiting achievable run times and experimental throughput. This work presents the design, integration, and validation of a cooling sleeve implemented on the sweep arm drive motor feedthrough to mitigate thermal accumulation during testing. The addition of the cooling sleeve is a simple, robust upgrade that translates directly into enhanced facility capability by supporting longer run durations, reduced turnaround time, and higher throughput.

numerical simulations

Extending mARC II Arc-Jet Test Duration via Design and Implementation of Model System Cooling Sleeve

The mARC II is a 30 kW arc-jet facility at NASA Ames Research Center used to generate high-enthalpy flows for low-cost thermal protection system (TPS) technology development. Sustained operation of downstream instrumentation and material samples is constrained by thermal loading transmitted through the arc-jet test environment, limiting achievable run times and experimental throughput. This work presents the design, integration, and validation of a cooling sleeve implemented on the sweep arm drive motor feedthrough to mitigate thermal accumulation during testing. The addition of the cooling sleeve is a simple, robust upgrade that translates directly into enhanced facility capability by supporting longer run durations, reduced turnaround time, and higher throughput.

sting arm

NTF Test 201 - FAVOR - F-111 Check Standard

Presentation of test process at the National Transonic Facility, Nasa Langley Research Center. The test showcased was part of a cooperative test effort between ARC, LaRC, GRC, and AEDC collecting aerodynamic and process data on the modified F-111 FAVOR model.

Michael D Treece

Life test of NiH2 flight battery

Life cycle tests being run on the 50 A lightweight nickel hydrogen flight battery are discussed and the preliminary results are presented.

Gandel, M. G.

Developmental and Cryogenic Thermal Vacuum (TVAC) Testing Lessons Learned

Developmental thermal vacuum (TVAC) testing is a critical step in maturing hardware designs and validating performance prior to flight qualification. Unlike qualification or acceptance testing, developmental testing provides flexibility to explore design margins, uncover integration challenges, and refine test approaches before formal verification activities begin. This presentation highlights the value of developmental testing while sharing common pitfalls encountered during developmental TVAC campaigns. Lessons learned from hands-on testing experience, including extensive developmental testing at cryogenic temperatures, will be shared in this presentation. Topics include test planning and preparation, instrumentation strategies, contamination control considerations, troubleshooting unexpected anomalies, and approaches for staying on schedule while meeting test objectives. The audience will gain practical insights and best practices that can improve test efficiency, reduce risk, and enhance the overall success of future developmental TVAC efforts.

Mackenzie Byrnes

Research Achievements Review, Volume II

Materials research - diffusion bonding methods, stress corrosion tests, nondestructive testing, material designs for electronic equipment, and nonmetallic material development.

Materials Science

Life test of 50 AH NiH2 battery

Life cycle testing on a battery is reported. The cells were built in 1975, put into battery in 1976, and flown in 1977 in low Earth orbit.

Warnoc, D. H.