Search NASA⌕ Search

SEARCH · Search NASA

Results for “Task scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

An Aircraft Vortex Spacing System (AVOSS) for Dynamical Wake Vortex Spacing Criteria

A concept is presented for the development and implementation of a prototype Aircraft Vortex Spacing System (AVOSS). The purpose of the AVOSS is to use current and short-term predictions of the atmospheric state in approach and departure corridors to provide, to ATC facilities, dynamical weather dependent separation criteria with adequate stability and lead time for use in establishing arrival scheduling. The AVOSS will accomplish this task through a combination of wake vortex transport and decay predictions, weather state knowledge, defined aircraft operational procedures and corridors, and wake vortex safety sensors. Work is currently underway to address the critical disciplines and knowledge needs so as to implement and demonstrate a prototype AVOSS in the 1999/2000 time frame.

Hinton, D. A.↗

A Hierarchical and Distributed Approach for Mapping Large Applications to Heterogeneous Grids using Genetic Algorithms

In this paper, we propose a distributed approach for mapping a single large application to a heterogeneous grid environment. To minimize the execution time of the parallel application, we distribute the mapping overhead to the available nodes of the grid. This approach not only provides a fast mapping of tasks to resources but is also scalable. We adopt a hierarchical grid model and accomplish the job of mapping tasks to this topology using a scheduler tree. Results show that our three-phase algorithm provides high quality mappings, and is fast and scalable.

Sanyal, Soumya↗

Full Service

NASA is moving ahead with the sole-source procurement of a Canadian robot to service the Hubble Space Telescope, gaining confidence the International Space Station (ISS) technology can perform all of the tasks shuttle-launched astronauts were scheduled to do before the Columbia accident changed everything. The U.S. agency is negotiating with MD Robotics, a MacDonald Dettwiler unit located in Brampton, Ontario, for a version of the Special Purpose Dexterous Manipulator (SPDM) the company developed for the ISS. The SPDM would be the business end of a throwaway module designed to replace batteries and gyroscopes, pull old instruments and install new ones before plunging to a targeted reentry over the Pacific.

Morring, Frank, Jr.↗

Early Assessments of Crew Timelines for the Lunar Surface Habitat

As NASA progresses towards sustained crewed space missions, crew timelines will become increasingly important to achieving mission goals. While it is desirable to spend as much time as possible during crewed space missions on science activities and experiments, there are a large number of activities that crew members must perform each day in order to maintain both crew and vehicle health and safety. The time available for science activities in space is highly dependent on mandatory tasks required for crew and vehicle health and safety. The different crewed activities need to be planned accordingly long before the start of a mission in order to optimize crew time for science. To begin assessing the potential crew time for available for science, an understanding of the requirements to maintain crew and vehicle health and safety is needed. These additional activities may include sleep, exercise, vehicle maintenance, logistics handling, crew personal time, as well as many other tasks. The remaining time outside of these required tasks, within a reasonable crew work schedule, can be dedicated to science operations. This paper will detail a collaborative effort to analyzing crew times for sustained spaceflight missions and how the results of that analysis are applied to the crew timeline for the proposed Lunar Surface Habitat (SH).To determine the crew time for all of these required activities, an analysis was conducted utilizing defined agency requirements and historical crewed mission data. Predicted crew activity times were integrated into a daily schedule in order to optimize the crew’s time during the mission. This methodology was utilized to produce expected crew timelines for NASA’s proposed Artemis Base Camp (ABC) missions. The current plans for the ABC contain two different sustained habitats, the Pressurized Rover (PR) and the Surface Habitat (SH). While the crew are separated between the two habitats, the timelines for each element are dependent on the other element’s operations, so the two element timelines are formed in conjunction with one another. The results described in this paper, however, will focus solely on the crew timeline in the SH. This paper will explain the methodology behind predicting the required crew time spent in the SH for each activity, and the process of incorporating these predicted crew times into a coherent schedule.

Crew Time↗

Innovative IO Psychology Research for Future Space Exploration

Crewed space exploration is evolving. The commercialization of space includes Private Astronauts who interact with NASA astronauts on the International Space Station. Astronauts are scheduled to complete a variety of tasks within a fast paced timeline. Future exploration missions to Mars will include challenges such as a small crew living and working in an isolated and confined environment for up to 2 ½ years, with significant communication delays from Earth. This symposium brings together four innovative studies designed to mitigate the risks associated with space flight.

Suzanne Tamara Bell↗

Maintenance and operations tasks accomplished at DSS 12 during the antenna panel replacement downtime

The heavy schedule of tracking activities at the Echo Deep Space Station (DSS 12) prevents some time-consuming maintenance tasks from being performed. Careful coordination prior to and during a mandatory task (antenna panel replacement) made it possible to do a large number of unrelated tasks that ordinarily would have to be deferred. The maintenance and operations tasks accomplished during the downtime are described.

Butcher, L.↗

Time-critical multirate scheduling using contemporary real-time operating system services

Although real-time operating systems provide many of the task control services necessary to process time-critical applications (i.e., applications with fixed, invariant deadlines), it may still be necessary to provide a scheduling algorithm at a level above the operating system in order to coordinate a set of synchronized, time-critical tasks executing at different cyclic rates. The scheduling requirements for such applications and develops scheduling algorithms using services provided by contemporary real-time operating systems.

Eckhardt, D. E., Jr.↗

IOPS advisor: Research in progress on knowledge-intensive methods for irregular operations airline scheduling

Our research focuses on the problem of recovering from perturbations in large-scale schedules, specifically on the ability of a human-machine partnership to dynamically modify an airline schedule in response to unanticipated disruptions. This task is characterized by massive interdependencies and a large space of possible actions. Our approach is to apply the following: qualitative, knowledge-intensive techniques relying on a memory of stereotypical failures and appropriate recoveries; and quantitative techniques drawn from the Operations Research community's work on scheduling. Our main scientific challenge is to represent schedules, failures, and repairs so as to make both sets of techniques applicable to the same data. This paper outlines ongoing research in which we are cooperating with United Airlines to develop our understanding of the scientific issues underlying the practicalities of dynamic, real-time schedule repair.

Borse, John E.↗

The Effect of Information Feedback Upon Psychophysical Judgments

An analysis was made of the role of presentation schedules and information feedback on performance in a forced-choice signal detection task. The experimental results indicate that information feedback facilitates performance, but only for certain presentation schedules. The present study was designed to assess performance in a signal detection task under two conditions of information feedback. In the I-condition, S was told on each trial whether his detection response was correct or incorrect; in the !-condition S was given no feedback regarding the correctness of his response. The task involved a 2-response, forced-choice auditory detection problem. On each trial 2 temporal intervals were defined and S was required to report which interval he believed contained the signal; i. e., in one interval a tone burst in a background of white noise was presented, while the other interval contained only white noise. A trial will be denoted as s1 or s2, depending on whether the signal was embedded in the 1st or 2nd interval; the S's response will be denoted A1 or A2 to indicate which interval he reported contained the signal. The probability of an s1 trial will be denoted as y. In this study two values of y were used (.50 and.75) and, as indicated above, two conditions of information feedback. Thus there were 4 experimental conditions (501, · 50I, 751, 75I); each S was run under all 4 conditions. Method Gaussian noise was presented binaurally in S's headphones throughout a test session and the signal was a 1000-cps sinusoid tone; the tone was presented for 100 msec. including equal fall and rise times of 20 msec. The ratio of signal energy to noise power in a unit bandwidth was 2.9, and was constant throughout the study. The. S was seated before a stimulus display board. On each trial a red warning light was flashed for 100 msec. Two amber lights then came on successively each for 1 sec.; these lights defined the 2 observation intervals. The onset of the signal occurred 500 msec. after the onset of one of the observation intervals. After the second amber light went off, S indicated his response by pressing 1 of 2 wand switches under cards reading "1st interval" and "2nd interval." For the !-condition a green light flashed on above the correct response key after S's response; the green light was omitted in the !-condition. Each trial lasted 6 sec. The S's were 12 male college students with normal hearing. They were run for two practice sessions followed by 20 test sessions. Test sessions were run on consecutive days, 350 trials/day. Each day S ran on 1 of the 4 experimental conditions; in successive 4-day blocks S ran one day on each of the 4 experimental conditions in a random order. Thus, over 20 days each of the experimental conditions was repeated 5 times.

Atkinson, Richard C.↗

Effects of n-dominance and group composition on task efficiency in laboratory triads.

Task-oriented triads were formed into various homogeneous and heterogeneous combinations according to their scores on the n-dominance personality trait of the Edwards Personal Preference Schedule. Five group categories were used. The group task required a consensus decision on each trial. High cooperation and interdependence were reinforced by partially restricting the communication network. Results showed heterogeneous groups significantly better at organizing their group communication processes. They consequently performed the task more efficiently than homogeneous triads.

Lampkin, E. C.↗

Constraint-based scheduling

The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

Zweben, Monte↗

Constraint-based scheduling

The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

Zweben, Monte↗

Maximizing Dust Devil Follow-up Observations on Mars Using Cubesats and On-board Scheduling

Several million dust devil events occur on Mars every day. These events last, on average, about 30 minutes and range in size from meters to hundreds of meters in diameter. Designing low-cost missions that will improve our knowledge of dust devil formation and evolution, and their connection to atmospheric dynamics and the dust cycle, is fundamental to informing future crewed Mars lander missions about surface conditions. In this paper we present a mission for a constellation of low orbiting Mars cubesats, each carrying imagers with agile pointing capabilities. The goal is to maximize the number of dust devil follow-up observations through real-time, on-board scheduling. We study scenarios where cubesats are equipped with a 2.5 degree boresight angle camera that accommodates five slew positions (including nadir). We assume a concept of operations where the cubesats autonomously survey the surface of Mars and can autonomously detect dust devils from their surface imagery. When a dust devil is detected, the constellation is autonomously re-tasked through an on-board distributed scheduler to capture as many follow-on images of the event as possible, so as to study its evolution. The cubesat orbits are propagated assuming two-body dynamics and the ground tracks and camera field of view are computed assuming a spherical Mars. Realistic inter-agent communication link opportunities are computed and included in our optimization, which allow for real-time event detection information to be shared within the constellation. We compare against a powerful ``omniscient'' mission which has a priori knowledge of all dust devil activity to show the gap between predicted performance and the best possible outcome. In particular, we show that the communications are especially important for acquiring follow-up observations, and that a realistic distributed scheduling mechanism is sufficient to capture nearly all dust devil observations that are possible for a given orbit configuration.

Hook, Joshua Vander↗

NASA Schedule Management Handbook

The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

Source record↗

Scheduling Operations for Massive Heterogeneous Clusters

High-performance computing (HPC) programming has become increasingly difficult with the advent of hybrid supercomputers consisting of multicore CPUs and accelerator boards such as the GPU. Manual tuning of software to achieve high performance on this type of machine has been performed by programmers. This is needlessly difficult and prone to being invalidated by new hardware, new software, or changes in the underlying code. A system was developed for task-based representation of programs, which when coupled with a scheduler and runtime system, allows for many benefits, including higher performance and utilization of computational resources, easier programming and porting, and adaptations of code during runtime. The system consists of a method of representing computer algorithms as a series of data-dependent tasks. The series forms a graph, which can be scheduled for execution on many nodes of a supercomputer efficiently by a computer algorithm. The schedule is executed by a dispatch component, which is tailored to understand all of the hardware types that may be available within the system. The scheduler is informed by a cluster mapping tool, which generates a topology of available resources and their strengths and communication costs. Software is decoupled from its hardware, which aids in porting to future architectures. A computer algorithm schedules all operations, which for systems of high complexity (i.e., most NASA codes), cannot be performed optimally by a human. The system aids in reducing repetitive code, such as communication code, and aids in the reduction of redundant code across projects. It adds new features to code automatically, such as recovering from a lost node or the ability to modify the code while running. In this project, the innovators at the time of this reporting intend to develop two distinct technologies that build upon each other and both of which serve as building blocks for more efficient HPC usage. First is the scheduling and dynamic execution framework, and the second is scalable linear algebra libraries that are built directly on the former.

Humphrey, John↗

Adapting ASPEN for Orbital Express

By studying the Orbital Express mission, modeling the spacecraft and scenarios, and testing the system, a technique has been developed that uses recursive decomposition to represent procedural actions declaratively, schema-level uncertainty reasoning to make uncertainty reasoning tractable, and lightweight, natural language processing to automatically parse procedures to produce declarative models. Schema-level uncertainty reasoning has, at its core, the basic assumption that certain variables are uncertain, but not independent. Once any are known, then the others become known. This is important where a variable is uncertain for an action and many actions of the same type exist in the plan. For example, if the number of retries to purge pump lines was unknown (but bounded), and each attempt required a sub-plan, then, once the correct number of attempts required for a purge was known, it would likely be the same for all subsequent purges. This greatly reduces the space of plans that needs to be searched to ensure that all executions are feasible. To accommodate changing scenario procedures, each is ingested into a tabular format in temporal order, and a simple natural-language parser is used to read each step and to derive the impact of that step on memory, power, and communications. Then an ASPEN (Activity Scheduling and Planning Environment) model is produced based on this analysis. The model is tested and further changed by hand, if necessary, to reflect the actual procedure. This results in a great savings of time used for modeling procedures. Many processes that need to be modeled in ASPEN (a declarative system) are, in fact, procedural. ASPEN includes the ability to model activities in a hierarchical fashion, but this representation breaks down if there is a practically unbounded number of sub-activities and decomposition topologies. However, if recursive decomposition is allowed, HTN-like encodings are enabled to represent most procedural phenomena. For example, if a switch requires a variable (but known at the time of the attempt) number of attempts to switch on, one can recurse on the number of remaining switch attempts and decompose into either the same switching activity with one less required attempt, or not decompose at all (or decompose into a dummy task), resulting in the end of the decomposition. In fact, any bounded procedural behavior can be modeled using recursive decompositions assuming that the variables impinging the disjunctive decomposition decision are computable at the time that the decision is made. This enables one to represent tasks that are controlled outside of the scheduler, but that the scheduler must accommodate, without requiring one to give a declarative model of the procedural behavior.

Chouinard, Caroline↗

Operations mission planner

The findings are documented of the OMP research task, which investigated the applicability of artificial intelligence (AI) technology in support of automated scheduling. The goals of the effort are summarized and the technical accomplishments are highlighted. The OMP task succeeded in identifying how AI technology could be applied and demonstrated an AI-based automated scheduling approach through the OMP prototypes.

Biefeld, Eric↗

General Aviation Task Force report

General aviation is officially defined as all aviation except scheduled airlines and the military. It is the only air transportation to many communities throughout the world. In order to reverse the recent decline in general aviation aircraft produced in the United States, the Task Force recommends that NASA provide the expertise and facilities such as wind tunnels and computer codes for aircraft design. General aviation manufacturers are receptive to NASA's innovations and technological leadership and are expected to be effective users of NASA-generated technologies.

Source record↗