Search NASA⌕ Search

SEARCH · Search NASA

Results for “aircraft scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Air Cargo Transportation Route Choice Analysis

Using a unique feature of air cargo transshipment data in the Northeast Asian region, this paper identifies the critical factors that determine the transshipment route choice. Taking advantage of the variations in the transport characteristics in each origin-destination airports pair, the paper uses a discrete choice model to describe the transshipping route choice decision made by an agent (i.e., freight forwarder, consolidator, and large shipper). The analysis incorporates two major factors, monetary cost (such as line-haul cost and landing fee) and time cost (i.e., aircraft turnaround time, including loading and unloading time, custom clearance time, and expected scheduled delay), along with other controls. The estimation method considers the presence of unobserved attributes, and corrects for resulting endogeneity by use of appropriate instrumental variables. Estimation results find that transshipment volumes are more sensitive to time cost, and that the reduction in aircraft turnaround time by 1 hour would be worth the increase in airport charges by more than $1000. Simulation exercises measures the impacts of alternative policy scenarios for a Korean airport, which has recently declared their intention to be a future regional hub in the Northeast Asian region. The results suggest that reducing aircraft turnaround time at the airport be an effective strategy, rather than subsidizing to reduce airport charges.

Obashi, Hiroshi↗

Challenges in modeling the X-29 flight test performance

Presented are methods, instrumentation, and difficulties associated with drag measurement of the X-29A aircraft. The initial performance objective of the X-29A program emphasized drag polar shapes rather than absolute drag levels. Priorities during the flight envelope expansion restricted the evaluation of aircraft performance. Changes in aircraft configuration, uncertainties in angle-of-attack calibration, and limitations in instrumentation complicated the analysis. Limited engine instrumentation with uncertainties in overall in-flight thrust accuracy made it difficult to obtain reliable values of coefficient of parasite drag. The aircraft was incapable of tracking the automatic camber control trim schedule for optimum wing flaperon deflection during typical dynamic performance maneuvers; this has also complicated the drag polar shape modeling. The X-29A was far enough off the schedule that the developed trim drag correction procedure has proven inadequate. However, good drag polar shapes have been developed throughout the flight envelope. Preliminary flight results have compared well with wind tunnel predictions. A more comprehensive analysis must be done to complete performance models. The detailed flight performance program with a calibrated engine will benefit from the experience gained during this preliminary performance phase.

John W Hicks↗

Challenges in modeling the X-29A flight test performance

The paper presents the methods, instrumentation, and difficulties associated with drag measurement of the X-29A aircraft. The initial performance objective of the X-29A program emphasized drag polar shapes rather than absolute drag levels. Priorities during the flight envelope expansion restricted the evaluation of aircraft performance. Changes in aircraft configuration, uncertainties in angle-of-attack calibration, and limitations in instrumentation complicated the analysis. Limited engine instrumentation with uncertainties in overall in-flight thrust accuracy made it difficult to obtain reliable values of coefficient of parasite drag. The aircraft was incapable of tracking the automatic camber control trim schedule for optimum wing flaperon deflection during typical dynamic performance maneuvers; this has also complicated the drag polar shape modeling. The X-29A was far enough off the schedule that the developed trim drag correction procedure has proven inadequate. Despite these obstacles, good drag polar shapes have been developed throughout the flight envelope. Preliminary flight results have compared well with wind tunnel predictions. A more comprehensive analysis must be done to complete the performance models. The detailed flight performance program with a calibrated engine will benefit from the experience gained during this preliminary performance phase.

Hicks, John W.↗

Integrated flight/propulsion control design for a STOVL aircraft using H-infinity control design techniques

Results are presented from an application of H-infinity control design methodology to a centralized integrated flight propulsion control (IFPC) system design for a supersonic Short Takeoff and Vertical Landing (STOVL) fighter aircraft in transition flight. The emphasis is on formulating the H-infinity control design problem such that the resulting controller provides robustness to modeling uncertainties and model parameter variations with flight condition. Experience gained from a preliminary H-infinity based IFPC design study performed earlier is used as the basis to formulate the robust H-infinity control design problem and improve upon the previous design. Detailed evaluation results are presented for a reduced order controller obtained from the improved H-infinity control design showing that the control design meets the specified nominal performance objectives as well as provides stability robustness for variations in plant system dynamics with changes in aircraft trim speed within the transition flight envelope. A controller scheduling technique which accounts for changes in plant control effectiveness with variation in trim conditions is developed and off design model performance results are presented.

Garg, Sanjay↗

B-70 Aircraft Study

This Phase 2 final report for the B-70 aircraft study contains the data location matrix, which provides a summary of the major cost, schedule, and technical items provided in the report; work breakdown structure; cost definitions; and B-70 program level summary data. The Phase 2 objective was to provide the B-70 aircraft data in accordance with the approved study plan. Several minor modifications to the original plan have been made as the result of the Phase 2 effort.

Johnson, V. T.↗

Complex Permittivities of Candidate Radome Materials at W-band

This report presents the results of w-band complex permittivity measurements performed in NASA Langley's Electromagnetics Research Branch. The test articles included in the permittivity study were flat panels of materials which are under consideration for use in a radome for the Passive Millimeter Wave Camera (PMMWC) flight experiment. This experiment is scheduled to fly on the Air Force's 'Speckled Trout' aircraft in late 1997. The radome design is very important because the PMMWC can tolerate only a small amount of electromagnetic loss through the radome. A free space measurement system was used to obtain complex reflection and transmission coefficients of the samples. The frequency of interest was 89 GHz, so measurements were performed over a range of 79 to 99 GHz. The transmission and reflection coefficients were used, along with the measured sample thickness, to calculate complex permittivity over the frequency range. The material samples measured in this study can be divided into four categories: skin materials, core materials, coating materials, and layered samples.

Cravey, Robin↗

NASA Global Hawk Project Overview

This viewgraph presentation reviews the Global Hawk project planning. Global Hawk is the only available system capable of simultaneously meeting the requirements for high altitude (65K ft), long endurance (>31 hours), power (10 KVA), and a large payload capacity (2000 lbs). There are important science data gathering and satellite validation requirements that can only be met with the combination of capabilities provided by the Global Hawk system. Global Hawk will give a unique range, shown in maps, at a high altitude. An overview of the design of the aircraft, and the ground station is given. The flights are scheduled to begin in 2009, and will carry instruments that will be used to validate the Aura satellite data and also be used in hurricane and severe storm research.

DelFrate, John↗

Case Study: Influences of Uncertainties and Traffic Scenario Difficulties in a Human-in-the-Loop Simulation

This paper presents a case study of how factors such as wind prediction errors and metering delays can influence controller performance and workload in Human-In-The-Loop simulations. Retired air traffic controllers worked two arrival sectors adjacent to the terminal area. The main tasks were to provide safe air traffic operations and deliver the aircraft to the metering fix within +/- 25 seconds of the scheduled arrival time with the help of provided decision support tools. Analyses explore the potential impact of metering delays and system uncertainties on controller workload and performance. The results suggest that trajectory prediction uncertainties impact safety performance, while metering fix accuracy and workload appear subject to the scenario difficulty.

air traffic control↗

Fiber optics for controls

The design, development, and testing of a fiber optic integrated propulsion/flight control system for an advanced supersonic dash aircraft (flies at supersonic speeds for short periods of time) is the goal of the joint NASA/DOD Fiber Optic Control System Integration (FOCSI) program. Phase 1 provided a comparison of electronic and optical control systems, identified the status of current optical sensor technology, defined the aircraft sensor/actuator environment, proposed architectures for fully optical control systems, and provided schedules for development. Overall, it was determined that there are sufficient continued efforts to develop such a system. It was also determined that it is feasible to build a fiber optic control system for the development of a data base for this technology, but that further work is necessary in sensors, actuators, and components to develop an optimum design, fully fiber optic integrated control system compatible with advanced aircraft environments. Phase 2 is to design, construct, and ground test a fly by light control system. Its first task is to provide a detailed design of the electro-optic architecture.

Seng, Gary T.↗

New Model Exhaust System Supports Testing in NASA Lewis' 10- by 10-Foot Supersonic Wind Tunnel

In early 1996, the ability to run NASA Lewis Research Center's Abe Silverstein 10- by 10- Foot Supersonic Wind Tunnel (10x10) at subsonic test section speeds was reestablished. Taking advantage of this new speed range, a subsonic research test program was scheduled for the 10x10 in the fall of 1996. However, many subsonic aircraft test models require an exhaust source to simulate main engine flow, engine bleed flows, and other phenomena. This was also true of the proposed test model, but at the time the 10x10 did not have a model exhaust capability. So, through an in-house effort over a period of only 5 months, a new model exhaust system was designed, installed, checked out, and made ready in time to support the scheduled test program.

Roeder, James W., Jr.↗

Controller Strategies for Automation Tool Use under Varying Levels of Trajectory Prediction Uncertainty

A human-in-the-loop simulation was conducted to examine the effects of varying levels of trajectory prediction uncertainty on air traffic controller workload and performance, as well as how strategies and the use of decision support tools change in response. This paper focuses on the strategies employed by two controllers from separate teams who worked in parallel but independently under identical conditions (airspace, arrival traffic, tools) with the goal of ensuring schedule conformance and safe separation for a dense arrival flow in en route airspace. Despite differences in strategy and methods, both controllers achieved high levels of schedule conformance and safe separation. Overall, results show that trajectory uncertainties introduced by wind and aircraft performance prediction errors do not affect the controllers' ability to manage traffic. Controller strategies were fairly robust to changes in error, though strategies were affected by the amount of delay to absorb (scheduled time of arrival minus estimated time of arrival). Using the results and observations, this paper proposes an ability to dynamically customize the display of information including delay time based on observed error to better accommodate different strategies and objectives.

Strategy↗

Simulation of 4D RNAV in the terminal area

A terminal area control concept based on 4D RNAV (3D plus time) has been developed to take full advantage of STOL aircrafts' unique performance capabilities. The 4D RNAV concept involves an airborne system, a ground system and a protocol for information exchange between aircraft and ground. The function of the airborne system is to synthesize the curved three dimensional (3D) flight path, to predict and control the landing time (4D) and to generate flight director or autopilot commands. The airborne system assumes the ground system will specify the 3D path and assign a conflict-free landing time. A real time simulation of this concept has been developed to evaluate its effectiveness for terminal areas control of STOL aicraft. Key elements of the simulation are a computer graphics traffic display, a scheduling display and a keyboard language for issuing controller commands to simulated aircraft. Initial results and planned experiments are described.

Tobias, L.↗

Performance Evaluation of Conflict-Free Trajectory Taxiing in Airport Ramp Area Using Fast-Time Simulations

The German Aerospace Center (DLR) and the National Aeronautics and Space Administration (NASA) have been collaborating to conduct joint research addressing future surface traffic management challenges. The surface management tool from DLR, called Taxi Routing for Aircraft: Creation and Controlling (TRACC), was adapted to be integrated in NASA's fast-time simulation environment called Surface Operations Simulator and Scheduler (SOSS). The research described in this paper 1) applied TRACC to trajectory-based ramp traffic management, where TRACC generates conflict-free aircraft trajectories in a congested ramp area, 2) investigated the feasibility of the concept through the integrated TRACC-SOSS fast-time simulation, and 3) evaluated the performance of the integrated system. For this activity, TRACC was adapted for ramp operations at Charlotte Douglas International Airport, called TRACC_PB (TRACC for pushback optimization). TRACC_PB provides four-dimensional taxi trajectories with a command speed profile for each aircraft following standard taxi routes within the ramp area. In this study, departures are given the Target Movement Area entry Times (TMATs) provided by the baseline surface metering scheduler based on NASA's Spot and Runway Departure Advisor (SARDA). TRACC_PB also calculates optimal pushback times for departures, as well as the times when arrivals shall enter the ramp, the Target Movement area Exit Times (TMETs). The initial results showed that the TRACC_PB successfully generated conflict-free trajectories for the ramp area taxi operations and improved taxiing efficiency compared to the baseline results. TRACC_PB aimed to provide conflict-free taxi routes avoiding any stops while taxiing. This resulted in longer gate hold times for departures and postponed throughput values compared to the baseline simulation without trajectory optimization. Having conflict-free routes without stoppage also created shorter taxi times but required renegotiation of the given TMATs. TRACC_PB also achieved reductions in both fuel consumption and engine emissions (17% for departures and 10% for arrivals), which correlate with the ramp taxi time reduction.

trajectory-based taxi operations↗

NASA's ATM Technology Demonstration-1: Integrated Concept of Arrival Operations

This paper describes operations and procedures envisioned for NASA s Air Traffic Management (ATM) Technology Demonstration #1 (ATD-1). The ATD-1 Concept of Operations (ConOps) demonstration will integrate three NASA technologies to achieve high throughput, fuel-efficient arrival operations into busy terminal airspace. They are Traffic Management Advisor with Terminal Metering (TMA-TM) for precise time-based schedules to the runway and points within the terminal area, Controller-Managed Spacing (CMS) decision support tools for terminal controllers to better manage aircraft delay using speed control, and Flight deck Interval Management (FIM) avionics and flight crew procedures to conduct airborne spacing operations. The ATD-1 concept provides de-conflicted and efficient operations of multiple arrival streams of aircraft, passing through multiple merge points, from top-of-descent (TOD) to touchdown. It also enables aircraft to conduct Optimized Profile Descents (OPDs) from en route altitude to the runway, using primarily speed control to maintain separation and schedule. The ATD-1 project is currently addressing the challenges of integrating the three technologies, and implantation into an operational environment. Goals of the ATD-1 demonstration include increasing the throughput of high-density airports, reducing controller workload, increasing efficiency of arrival operations and the frequency of trajectory-based operations, and promoting aircraft ADS-B equipage.

Baxley, Brian T.↗

Mixing 4D equipped and unequipped aircraft in the terminal area

The problem of mixing four-dimensional (4D) equipped aircraft (aircraft equipped with on-board guidance systems that can predict and control the touchdown-time of an aircraft to an accuracy of a few seconds throughout the descent) with unequipped aircraft in the terminal area has been investigated via a real-time air traffic control simulation study. The objective of this study was to develop scheduling algorithms and operational procedures for various traffic mixes that ranged from 25 percent to 75 percent 4D equipped aircraft. Results indicate substantial reduction in controller workload and an increase in orderliness when more than 25 percent of the aircraft are 4D equipped. Moreover, this is accomplished without increasing the workload or adding delays for the unequipped aircraft.

Tobias, L.↗

The development of an augmentor wing jet STOL research aircraft (modified C-8A). Volume 2: Analysis of contractor's flight test

The initial flight test phase of the modified C-8A airplane was conducted. The primary objective of the testing was to establish the basic airworthiness of the research vehicle. This included verification of the structural design and evaluation of the aircraft's systems. Only a minimum amount of performance testing was scheduled; this has been used to provide a preliminary indication of the airplane's performance and flight characteristics for future flight planning. The testing included flutter and loads investigations up to the maximum design speed. The operational characteristics of all systems were assessed including hydraulics, environmental control system, air ducts, the vectoring conical nozzles, and the stability augmentation system (SAS). Approaches to stall were made at three primary flap settings: up, 30 deg and 65 deg, but full stalls were not scheduled. Minimum control speeds and maneuver margins were checked. All takeoffs and landings were conventional, and STOL performance was not scheduled during this phase of the evaluation.

Skavdahl, H.↗

Advanced supersonic propulsion study, phase 3

The variable stream control engine is determined to be the most promising propulsion system concept for advanced supersonic cruise aircraft. This concept uses variable geometry components and a unique throttle schedule for independent control of two flow streams to provide low jet noise at takeoff and high performance at both subsonic and supersonic cruise. The advanced technology offers a 25% improvement in airplane range and an 8 decibel reduction in takeoff noise, relative to first generation supersonic turbojet engines.

Howlett, R. A.↗

LANDSAT-D band 6 data evaluation

A filter, fabricated to match the spectral response of the LANDSAT band 6 sensors, was received and the combined system response function computed. The half power points for the aircraft system are 10.5 micrometer and 11.55 micrometer compared to the 10.4 and 11.6 micrometer values for the satellite. These discrepancies are considered acceptable; their effect on the apparent temperature observed at the satellite is being evaluated. The filter was installed in the infrared line scanner and the line scanner was installed in the aircraft and field checked. A daytime underflight of the satellite is scheduled for the next clear overpass and the feasibility of a nightime overpass is being discussed with NASA. The LOWTRAN 5 computer code was obtained from the Air Force Geophysical Laboratory and is being implemented for use on this effort.

Source record↗