Search NASA⌕ Search

SEARCH · Search NASA

Results for “assembly processes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Metrology Plan for the Lightweight Technology Demonstration Mirror Program

The purpose of this document is to establish the requirements and procedures for in-process and acceptance testing of the Goddard Primary Mirror and Primary Mirror Assembly. In-process testing is an iterative cycle of testing and figuring until the PM optical surface meets the criteria with considerations for mount induced errors.

Krill, Daniel↗

Preflight and postflight processing of Spacelab missions at KSC

The Spacelab program is discussed in the context of the preparation of assembly, test, and processing facilities at the Kennedy Space Center (KSC). The management of the program within NASA is reviewed, along with flight tests of experimental packages, the first Spacelab mission, payload mission management, Spacelab processing responsibilities at the KSC, Space Shuttle processing and launch, Spacelab deintegration, OSS-1 management functions, and the OSS-1 processing flow at the KSC. The four levels of payload integration and checkout on a Spacelab are described, and testing at the four levels is briefly examined.

Neilon, J. J.↗

Robotics System Process and Concept for On-orbit Assembly for Potential Mars Sample Return

Proposed Mars Sample Return (MSR) missions would require on-orbit assembly of containment vessels to meet backward Planetary Protection requirements and transfer of the sample container through various stations and positions. Some operations would have to be performed autonomously, and others would require ground-in-loop decision-making stages and verification processes. One concept design for an Earth Return Orbiter (ERO) Capture, Contain, and Return System (CCRS) Transfer Mechanism (TM) is a multi-Degree of Freedom (DOF) manipulator that utilizes a passive End Effector (EE) to assist in containment vessel assembly. To converge on a feasible design, a robotic system process has been instantiated. This process is composed of three main phases: robotic problem definition (operating environment, operations/functions, system goals), robotic solution selection (trade studies on the number of degrees of freedom, number of mechanisms, types of mechanisms), robotic solution design, implementation, and verification and validation (kinematic configuration, robotic and kinematic analysis and topology optimization of components). As a final product of this process, a half-scale functional prototype of the TM was developed to demonstrate the end-to-end operation capability.

Strahle, Jackson W↗

Processing of IN-718 Lattice Block Castings

Recently a low cost casting method known as lattice block casting has been developed by JAM Corporation, Wilmington, Massachusetts for engineering materials such as aluminum and stainless steels that has shown to provide very high stiffness and strength with only a fraction of density of the alloy. NASA Glenn Research Center has initiated research to investigate lattice block castings of high temperature Ni-base superalloys such as the model system Inconel-718 (IN-718) for lightweight nozzle applications. Although difficulties were encountered throughout the manufacturing process , a successful investment casting procedure was eventually developed. Wax formulation and pattern assembly, shell mold processing, and counter gravity casting techniques were developed. Ten IN-718 lattice block castings (each measuring 15-cm wide by 30-cm long by 1.2-cm thick) have been successfully produced by Hitchiner Gas Turbine Division, Milford, New Hampshire, using their patented counter gravity casting techniques. Details of the processing and resulting microstructures are discussed in this paper. Post casting processing and evaluation of system specific mechanical properties of these specimens are in progress.

Hebsur, Mohan G.↗

Technology needs development and orbital support requirements for manned lunar and Mars missions

This paper presents an overview of the critical technology needs and the Space Station Freedom focused support requirements for the Office of Exploration's manned lunar and Mars missions. The emphasis is on e directed at the technology needs associated with the low earth orbit (LEO) transportation node assembly and vehicle processing functions required by the lunar Mars mission flight elements. The key technology areas identified as crucial to support the LEO node function include in-space assembly and construction, in-space vehicle processing and refurbishment, space storable cryogenics, and autonomous rendezvous and docking.

Brender, Karen D.↗

Fabrication of capsule assemblies, phase 3

Thirteen capsule assemblies were fabricated for evaluation of fuel pin design concepts for a fast spectrum lithium cooled compact space power reactor. These instrumented assemblies were designed for real time test of prototype fuel pins. Uranium mononitride fuel pins were encased in AISI 304L stainless steel capsules. Fabrication procedures were fully qualified by process development and assembly qualification tests. Instrumentation reliability was achieved utilizing specially processed and closely controlled thermocouple hot zone fabrication and by thermal screening tests. Overall capsule reliability was achieved with an all electron beam welded assembly.

Keeton, A. R.↗

Technology development, demonstration, and orbital support requirements for manned lunar and Mars missions

An overview of the critical technology needs and the Space Station Freedom (SSF) focused support requirements for the Office of Exploration's (OEXP) manned lunar and Mars missions is presented. Major emphasis is directed at the technology needs associated with the low earth orbit (LEO) transportation node assembly and vehicle processing functions required by the lunar and Mars mission flight elements. The key technology areas identified as crucial to support the LEO node function include in-space assembly and construction, in-space vehicle processing and refurbishment, space storable cryogenics, and autonomous rendezvous and docking.

Llewellyn, Charles P.↗

Assembly of a Full-Scale External Tank Barrel Section Using Friction Stir Welding

A full-scale pathfinder barrel section of the External Tank for the National Aeronautics and Space Administration (NASA) Space Transport System (Space Shuttle) has been assembled at Marshall Space Flight Center (MSFC) via a collaborative effort between NASA/MSFC and Lockheed Martin Michoud Space Systems. The barrel section is 27.5 feet in diameter and 15 feet in height. The barrel was assembled using Super-Light-Weight (SLWT), orthogrid, Al-Li 2195 panel sections and a single longeron panel. A vertical weld tool at MSFC was modified to accommodate FSW and used to assemble the barrel. These modifications included the addition of a FSW weld head and new controller hardware and software, the addition of a backing anvil and the replacement of the clamping system with individually actuated clamps. Weld process 4evelopment was initially conducted to optimize the process for the welds required for completing the assembly. The variable thickness welds in the longeron section were conducted via both two-sided welds and with the use of a retractable pin tool. The barrel assembly was completed in October 1998. Details of the vertical weld tool modifications and the assembly process are presented.

Jones, Chip↗

Thermal Protection Systems Technology Transfer from Apollo and Space Shuttle to the Orion Program

This paper describes how the Orion program is utilizing the Thermal Protection System (TPS) experience from the Apollo and Space Shuttle programs to reduce program risk and improve affordability to meet NASA's future manned exploration missions. The Orion program successfully completed the Exploration Flight Test (EFT-1) mission in 2014 and is currently assembling, integrating, and testing the next spacecraft for the Exploration Mission (EM-1) to meet the flight test objectives of an unmanned orbital mission to the moon and return to earth in 2019. The Orion spacecraft production operations are located in the Neil Armstrong Operations and Checkout (O&C) facility at the Kennedy Space Center (KSC) providing an affordable and seamless delivery approach of vehicles directly to the launch site eliminating spacecraft transportation and additional checkout testing. Innovative vehicle design, manufacturing and test operations approaches are maturing and evolving with each Orion vehicle build to support the challenging NASA exploration mission requirements beyond Low Earth Orbit (LEO) while reducing program cost and schedule impacts. An example of Orion's evolution is the incorporation of an improved heat shield design, assembly and testing approach to meet the higher re-entry velocities for a lunar return for the EM-1 mission. The EFT- 1 heat shield was based on the Apollo heat shield manufacturing processes and was assembled at a supplier location and then transported to KSC for final integration. The EM-1 heat shield is now manufactured, assembled, tested, and installed into the spacecraft at the O&C facility reducing program cost and production schedules. The transition of the Space Shuttle TPS capabilities has enabled Orion to provide a human rated capsule design using proven materials and processes established over years of orbiter re-entry missions. The Orion Crew Module (CM) TPS configuration is derived from the Apollo CM approach utilizing improved materials and processes developed from the Space Shuttle program. The Orion EFT-1 heat shield utilized the Avcoat ablative material from Apollo which was injected into a honeycomb substrate and has been updated for EM-1 incorporating a block configuration bonded to a composite shell structure. This approach utilizes the proven Avcoat material for the heat shield ablator and is utilizing derived bonding and inspection methods and techniques from the Space Shuttle tile experience. The Orion back shell TPS configuration is based on Space Shuttle tile designs using proven tile materials and coatings. The Orion forward bay cover utilizes the high temperature tiles similar to the back shell tiles and low temperature blankets derived from the Space Shuttle program reducing weight impacts. Space Shuttle Multi-Layer Insulation (MLI) is installed in the Orion capsule to control the interior temperature environment providing a light weight design. These TPS design approaches have performed successfully on the Orion first flight test on EFT-1 and are incorporated in the configuration for the next flight test for EM-1. Completion of these two flight tests will certify the TPS for the Orion program for human rated exploration missions and has reduced the development cost to the Orion program. In addition to transitioning the Space Shuttle TPS design configurations to Orion, the supporting manufacturing infrastructure, manufacturing processes, and inspection methods are also incorporated into the Orion assembly operations at KSC. This has avoided significant startup schedule and costs impacts of new capabilities and development of support operations necessary to fabricate, install, inspect, and validate the TPS installations for the Orion spacecraft. The Thermal Protection System Facility (TPSF) which supported the Space Shuttle program provides the heat shield Avcoat blocks and the back shell AETB-8 tiles for Orion program. Extending the existing Space Shuttle TPS operations at KSC provides onsite support to the Orion spacecraft assembly operations. A significant benefit to the Orion program is the transition of the Space Shuttle technician work force at KSC. This highly skilled workforce was able to transition to the Orion program and immediately support the TPS installation operations. They brought with them the human rated manufacturing and assembly operations culture that was critical to the Space Shuttle success avoiding the retraining cost and schedule impacts of a new workforce to Orion. The technician skills certification program from the Space Shuttle was found to be compatible with the Lockheed Martin technician certification programs enabling a seamless training process utilizing process similarity avoiding the cost of retraining the work force to Orion standards. The existing workforce is certificated for multiple processes enabling reassignment of technicians to other tasks in the Orion AI&P operations reducing the overall touch labor manpower requirements. Additional benefits of using the Space Shuttle workforce is the incorporation of the lessons learned from Space Shuttle processes to improve the Orion TPS processes. This has resulted in a continuous evolution of TPS processes to improve the producibility and reduce the program cost for the TPS for the Orion program. Transitioning the Apollo and Space Shuttle TPS designs, processes, and technician workforce has been instrumental in enabling Orion to successfully meet the program challenges for NASA's exploration missions of the future.

Stewart, Michael↗

Discrete Assemblers Utilizing Conventional Motion Systems

An alternative to additive manufacturing is disclosed, introducing an end-to-end workflow in which discrete building blocks are reversibly joined to produce assemblies called digital materials. Described is the design of the bulk-material building blocks and the devices that are assembled from them. Detailed is the design and implementation of an automated assembler, which takes advantage of the digital material structure to avoid positioning errors within a large tolerance. To generate assembly sequences, a novel CAD/CAM workflow is described for designing, simulating, and assembling digital materials. The structures assembled using this process have been evaluated, showing that the joints perform well under varying conditions and that the assembled structures are functionally precise.

Langford, William Kai↗

Space Station assembly sequence planning - An engineering and operational challenge

This paper discusses the Space Station assembly sequence planning and development process. It presents the planning methodologies from both historial and current perspectives. It is shown that planning the assembly sequence is a new and unique challenge and its solution requires the simultaneous satisfaction of many diverse variables and constants. The considerations which influence the development of the assembly sequence include launch vehicle integration and lift capabilities, on-orbit assembly flight operations, vehicle flight dynamics, spacecraft system capabilities and resource availability. Many of these considerations are described in this paper. In addition, the examples presented demonstrate the current process for assembly sequence planning and show many of the complex trade-offs that must be performed.

Kaidy, James T.↗

Strut-node joint conjugates for the assembly of semi-permanent or reusable truss structures

When strut and node components are used for truss construction an assembly problem occurs if a strut must be fitted between nodes whose separation distance is either closer or farther than the design intended. This condition is the result of normal dimensional variations that occur in any manufacturing process. In such circumstances two actions would permit continued assembly: change the effective strut length, and move the nodes. Assuming continued assembly is the most attractive alternative, attention is focused on accomplishing these actions as part of the assembly process.

Brewer, W. V.↗

ISS Logistics Hardware Disposition and Metrics Validation

I was assigned to the Logistics Division of the International Space Station (ISS)/Spacecraft Processing Directorate. The Division consists of eight NASA engineers and specialists that oversee the logistics portion of the Checkout, Assembly, and Payload Processing Services (CAPPS) contract. Boeing, their sub-contractors and the Boeing Prime contract out of Johnson Space Center, provide the Integrated Logistics Support for the ISS activities at Kennedy Space Center. Essentially they ensure that spares are available to support flight hardware processing and the associated ground support equipment (GSE). Boeing maintains a Depot for electrical, mechanical and structural modifications and/or repair capability as required. My assigned task was to learn project management techniques utilized by NASA and its' contractors to provide an efficient and effective logistics support infrastructure to the ISS program. Within the Space Station Processing Facility (SSPF) I was exposed to Logistics support components, such as, the NASA Spacecraft Services Depot (NSSD) capabilities, Mission Processing tools, techniques and Warehouse support issues, required for integrating Space Station elements at the Kennedy Space Center. I also supported the identification of near-term ISS Hardware and Ground Support Equipment (GSE) candidates for excessing/disposition prior to October 2010; and the validation of several Logistics Metrics used by the contractor to measure logistics support effectiveness.

Rogers, Toneka R.↗

Liquid-Oxygen-Compatible Cement for Gaskets

Fluorelastomer and metal bonded reliably by new procedure. To cure fluoroelastomer cement, metal plate/gasket assembly placed in vacuum bag evacuated to minimum vacuum of 27 inches (69 cm) of mercury. Vacuum maintained throughout heating process and until assembly returns to ambient room temperature. Used to seal gaskets and O-rings or used to splice layers of elastomer to form non-standard sized O-rings. Another possible use is to apply protective, liquid-oxygen-compatible coating to metal parts.

Elmore, N. L.↗

The 60 GHz IMPATT diode development

The objective is to develop 60 GHz IMPATT diodes suitable for communications applications. The performance goals of the 60 GHz IMPATT is 1W CW output power with a conversion efficiency of 15 percent and 10-year lifetime. The final design of the 60 GHz IMPATT structure evolved from computer simulations performed at the University of Michigan. The initial doping profile, involving a hybrid double-drift (HDD) design, was derived from a drift-diffusion model that used the static velocity-field characteristics for GaAs. Unfortunately, the model did not consider the effects of velocity undershoot and delay of the avalanche process due to energy relaxation. Consequently, the initial devices were oscillating at a much lower frequency than anticipated. With a revised simulation program that included the two effects given above, a second HDD profile was generated and was used as a basis for fabrication efforts. In the area of device fabrication, significant progress was made in epitaxial growth and characterization, wafer processing, and die assembly. The organo-metallic chemical vapor deposition (OMCVD) was used. Starting with a baseline X-Band IMPATT technology, appropriate processing steps were modified to satisfy the device requirements at V-Band. In terms of efficiency and reliability, the device requirements dictate a reduction in its series resistance and thermal resistance values. Qualitatively, researchers were able to reduce the diodes' series resistance by reducing the thickness of the N+ GaAs substrate used in its fabrication.

Dat, Rovindra↗

A Software Platform for Post-Processing Waveform-Based NDE

Ultrasonic, microwave, and terahertz nondestructive evaluation imaging systems generally require the acquisition of waveforms at each scan point to form an image. For such systems, signal and image processing methods are commonly needed to extract information from the waves and improve resolution of, and highlight, defects in the image. Since some similarity exists for all waveform-based NDE methods, it would seem a common software platform containing multiple signal and image processing techniques to process the waveforms and images makes sense where multiple techniques, scientists, engineers, and organizations are involved. This presentation describes NASA Glenn Research Center's approach in developing a common software platform for processing waveform-based NDE signals and images. This platform is currently in use at NASA Glenn and at Lockheed Martin Michoud Assembly Facility for processing of pulsed terahertz and ultrasonic data. Highlights of the software operation will be given. A case study will be shown for use with terahertz data. The authors also request scientists and engineers who are interested in sharing customized signal and image processing algorithms to contribute to this effort by letting the authors code up and include these algorithms in future releases.

Roth, Donald J.↗

3D Scanning Laboratory

The 3D Scanning Lab uses a number of technologies to capture 3D surface data. Those technologies are structured light scanning, discrete point measurement photogrammetry and Light Detecting and Ranging(LIDAR). Structured light is a non-contact optical technique used to capture as built surface geometries quickly and accurately. LIDAR is a laser scanning technique used to capture 3D surfaces. And photogrammetry uses a certified DSLR camera to measure discrete registered and non-registered points in 3D space. MSFC’s 3D Scanning Team uses 3D scanning to provide hardware inspections, reverse engineered CAD models, manufacturing/process development and digital assemblies. The inspection process compares the captured data to CAD, providing a color plot detailing the deviations of the scan data to the CAD model. Dimensional measurements and GD&T can also be interrogated. Inspection can provide scan-to-scan data comparisons which is ideal for assessing tested hardware, e.g. comparing data captured before and after hardware testing. Reverse engineering is used to develop CAD models from scan data. This is useful for heritage hardware studies, developing building or structural models and inputs for simulation studies and design efforts. The lab uses the 3D surface scan data to drive manufacturing/machining processes, termed match machining. This technique has been used to modify nozzles, injectors, additive manufactured parts, composite barrel sections, etc. Parts of an assembly can be scanned and assembled in a virtual environment providing an accurate 3D representation of the assembled hardware in its as-scanned state. This can provide detailed information of internal components that would otherwise not be accessible.

Advanced Manufacturing↗

Joule-Thomson valves for long term service in space cryocoolers

Joule-Thomson valves for small cryocoolers have throttling passages on the order of 0.1 millimeter in diameter. Consequently, they can become plugged easily and stop the operation of the cooler. Plugging can be caused by solid particles, liquids or gases. Plugging is usually caused by the freezing of contaminant gases from the process stream. In small open loop coolers and in closed loop coolers where periodic maintenance is allowed, the problem is overcome by using careful assembly techniques, pure process gases, warm filters and cold adsorbers. A more thorough approach is required for closed loop cryocoolers which must operate unattended for long periods. This paper presents the results of an effort to solve this problem. The causes of plugging are examined, and various ways to eliminate plugging are discussed. Finally, the development of a J-T defroster is explained. It is concluded that a combination of preventive measures and a defroster will reduce the chance of cooler failure by plugging to such a degree that J-T coolers can be used for long term space missions.

Lester, J. M.↗