Search NASA⌕ Search

SEARCH · Search NASA

Results for “automated scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

The application of automated operations at the Institutional Processing Center

The JPL Institutional and Mission Computing Division, Communications, Computing and Network Services Section, with its mission contractor, OAO Corporation, have for some time been applying automation to the operation of JPL's Information Processing Center (IPC). Automation does not come in one easy to use package. Automation for a data processing center is made up of many different software and hardware products supported by trained personnel. The IPC automation effort formally began with console automation, and has since spiraled out to include production scheduling, data entry, report distribution, online reporting, failure reporting and resolution, documentation, library storage, and operator and user education, while requiring the interaction of multi-vendor and locally developed software. To begin the process, automation goals are determined. Then a team including operations personnel is formed to research and evaluate available options. By acquiring knowledge of current products and those in development, taking an active role in industry organizations, and learning of other data center's experiences, a forecast can be developed as to what direction technology is moving. With IPC management's approval, an implementation plan is developed and resources identified to test or implement new systems. As an example, IPC's new automated data entry system was researched by Data Entry, Production Control, and Advance Planning personnel. A proposal was then submitted to management for review. A determination to implement the new system was made and elements/personnel involved with the initial planning performed the implementation. The final steps of the implementation were educating data entry personnel in the areas effected and procedural changes necessary to the successful operation of the new system.

Barr, Thomas H.↗

A Comparison of a Brain-Based Adaptive System and a Manual Adaptable System for Invoking Automation

Two experiments are presented that examine alternative methods for invoking automation. In each experiment, participants were asked to perform simultaneously a monitoring task and a resource management task as well as a tracking task that changed between automatic and manual modes. The monitoring task required participants to detect failures of an automated system to correct aberrant conditions under either high or low system reliability. Performance on each task was assessed as well as situation awareness and subjective workload. In the first experiment, half of the participants worked with a brain-based system that used their EEG signals to switch the tracking task between automatic and manual modes. The remaining participants were yoked to participants from the adaptive condition and received the same schedule of mode switches, but their EEG had no effect on the automation. Within each group, half of the participants were assigned to either the low or high reliability monitoring task. In addition, within each combination of automation invocation and system reliability, participants were separated into high and low complacency potential groups. The results revealed no significant effects of automation invocation on the performance measures; however, the high complacency individuals demonstrated better situation awareness when working with the adaptive automation system. The second experiment was the same as the first with one important exception. Automation was invoked manually. Thus, half of the participants pressed a button to invoke automation for 10 s. The remaining participants were yoked to participants from the adaptable condition and received the same schedule of mode switches, but they had no control over the automation. The results showed that participants who could invoke automation performed more poorly on the resource management task and reported higher levels of subjective workload. Further, those who invoked automation more frequently performed more poorly on the tracking task and reported higher levels of subjective workload. and the adaptable condition in the second experiment revealed only one significant difference: the subjective workload was higher in the adaptable condition. Overall, the results show that a brain-based, adaptive automation system may facilitate situation awareness for those individuals who are more complacent toward automation. By contrast, requiring operators to invoke automation manually may have some detrimental impact on performance but does appear to increases subjective workload relative to an adaptive system.

Bailey, Nathan R.↗

Using Planning, Scheduling and Execution for Autonomous Mars Rover Operations

With each new rover mission to Mars, rovers are traveling significantly longer distances. This distance increase raises not only the opportunities for science data collection, but also amplifies the amount of environment and rover state uncertainty that must be handled in rover operations. This paper describes how planning, scheduling and execution techniques can be used onboard a rover to autonomously generate and execute rover activities and in particular to handle new science opportunities that have been identified dynamically. We also discuss some of the particular challenges we face in supporting autonomous rover decision-making. These include interaction with rover navigation and path-planning software and handling large amounts of uncertainty in state and resource estimations. Finally, we describe our experiences in testing this work using several Mars rover prototypes in a realistic environment.

automated rover operations↗

The Human Research Program Grant Lifecycle & Data Integration Schedule: Infographic

The Human Research Program (HRP) Grant Lifecycle process can be described using information from several government authoritative sources with overlapping generalizations. It is the responsibility of the HRP Program Planning & Control (PP&C) Office and the Data Management Integration Office (DMIO)to interpret this information into a cohesive process that can be communicated to the human research organization. PP&C and DMIO have been exploring training opportunities to facilitate understanding through the form of infographics. This communication tool combines eye-catching visuals and text making complex information and data more digestible and shareable. The infographic poster tells a short story about a federally awarded grant and is intended to help both the new and experienced HRP workforce understand the timeline for a research procurement and where their specific tasks fall within the 4 phases of the grant lifecycle. The Pre-Award, Award, Post-Award, and Closeout phases are overlayed with business swimlanes so HRP stakeholders can see where they fit into the timeline rather than working in an isolated part. This includes the Chief Scientist Office (CSO), PP&C, the Data Management Integration Office (DMIO), the Principal Investigator (PI), the Element stakeholders, the LSDA Archivists, and the Research & Operations Integration (ROI) team along with the stakeholders in the Human Health and Performance Directorate. Additionally, the poster introduces (1) the HRP Data Integration Schedule identified in the HRP Data Management Plan HRP-48047, Table 8-2 and (2) a Smartsheet Solution to automate the grants tracking business process. Emphasis is given to the Data Integration Schedule which is the basis for the milestone tasks that are to be completed during the Post-Award phase in the grant lifecycle. The poster is also an opportunity to present the Smartsheet Solution, a software collaboration and work management tool used to assign tasks and track project progress. This PP&C FY24 effort will facilitate an end-to-end solution to track grants and provide insight to the health of HRP grant research procurements using metrics, reports, and dashboards.

J Peace↗

Cost and schedule analytical techniques development

This contract provided technical services and products to the Marshall Space Flight Center's Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) for the period of 3 Aug. 1991 - 30 Nov. 1994. Accomplishments summarized cover the REDSTAR data base, NASCOM hard copy data base, NASCOM automated data base, NASCOM cost model, complexity generators, program planning, schedules, NASA computer connectivity, other analytical techniques, and special project support.

Source record↗

TechEdSat-11: Prototyping Autonomous Communications in Orbit

Cognitive Engine 1 (CE-1) is a state-of-the-art automated system designed to manage routine operations and respond to adverse events without requiring human operator input. CE-1 will optimize scheduling capabilities, detect and react to link failures, and ensure data delivery deadlines are met efficiently. Seamless roaming between government and commercial providers will allow for a robust and cost-effective network. TechEdSat-11 will demonstrate two key components of CE-1: User Initiated Services (UIS) and Delay Tolerant Networking (DTN). The first phase of the experiment will use UIS to automate on-demand scheduling of a commercial S-band ground station. Later phases of the experiment will demonstrate DTN store-and-forward and space internetworking capabilities through the TechEdSat-11 S-band radio. This paper will discuss the CE-1 main components relevant to the experiment, the flight and ground software architecture, experiment concept of operations and preliminary results.

Rachel Dudukovich↗

The Role of Trust and Usability in Enabling Spaceflight Crew Autonomy

Future long duration exploration missions will require an increased use of onboard automated systems as spaceflight crews venture further than before and have longer communications delays with ground support. The design of these systems must support appropriate crew trust and have sufficient usability to enable spaceflight crew autonomy or risk being misused while crews wait to communicate with ground support. We evaluated trust & usability in our self-scheduling tool, Playbook, for crew mission timelines. Data was collected in a controlled lab experiment with 31 participants. Participants in the study conducted two tasks: scheduling, where participants were responsible for scheduling a majority of a day's operational tasks, and rescheduling, where participants were provided a schedule and asked to reschedule higher priority activities. We found a significant correlation between system trust and usability, irrespective of self-scheduling tasks. We conclude that system usability may play a bigger role in how trust is learned while conducting novel crew autonomy tasks such as self-scheduling. Future research should investigate the role of usability to encourage appropriate trust in onboard automated crew systems and enable crew autonomy.

crew autonomy↗

SIRTF Science Operations System Design

SIRTF Science Operations System Design William B. Green Manager, SIRTF Science Center California Institute of Technology M/S 310-6 1200 E. California Blvd., Pasadena CA 91125 (626) 395 8572 Fax (626) 568 0673 bgreen@ipac.caltech.edu. The Space Infrared Telescope Facility (SIRTF) will be launched in December 2001, and perform an extended series of science observations at wavelengths ranging from 20 to 160 microns for five years or more. The California Institute of Technology has been selected as the home for the SIRTF Science Center (SSC). The SSC will be responsible for evaluating and selecting observation proposals, providing technical support to the science community, performing mission planning and science observation scheduling activities, instrument calibration during operations and instrument health monitoring, production of archival quality data products, and management of science research grants. The science payload consists of three instruments delivered by instrument Principal Investigators located at University of Arizona, Cornell, and Harvard Smithsonian Astrophysical Observatory. The SSC is responsible for design, development, and operation of the Science Operations System (SOS) which will support the functions assigned to the SSC by NASA. The SIRTF spacecraft, mission profile, and science instrument design have undergone almost ten years of refinement. SIRTF development and operations activities are highly cost constrained. The cost constraints have impacted the design of the SOS in several ways. The Science Operations System has been designed to incorporate a set of efficient, easy to use tools which will make it possible for scientists to propose observation sequences in a rapid and automated manner. The use of highly automated tools for requesting observations will simplify the long range observatory scheduling process, and the short term scheduling of science observations. Pipeline data processing will be highly automated and data-driven, utilizing a variety of tools developed at JPL, the instrument development teams, and Space Telescope Science Institute to automate processing. An incremental ground data system development approach has been adopted, featuring periodic deliveries that are validated with the flight hardware throughout the various phases of system level development and testing. This approach minimizes development time and decreases operations risk. This paper will describe the top level architecture of the SOS and the basic design concepts. A summary of the incremental development approach will be presented. Examples of the unique science user tools now under final development prior to the first proposal call scheduled for mid-2000 will be shown.

Green, William↗

The Fluids Integrated Rack and Light Microscopy Module Integrated Capabilities

The Fluids Integrated Rack (FIR), a facility class payload, and the Light Microscopy Module (LMM), a subrack payload, are scheduled to be launched in 2005. The LMM integrated into the FIR will provide a unique platform for conducting fluids and biological experiments on ISS. The FIR is a modular, multi-user scientific research facility that will fly in the U.S. laboratory module, Destiny, of the International Space Station (ISS). The first payload in the FIR will be the Light Microscopy Module (LMM). The LMM is planned as a remotely controllable, automated, on-orbit microscope subrack facility, allowing flexible scheduling and control of fluids and biology experiments within the FIR. Key diagnostic capabilities for meeting science requirements include video microscopy to observe microscopic phenomena and dynamic interactions, interferometry to make thin film measurements with nanometer resolution, laser tweezers for particle manipulation, confocal microscopy to provide enhanced three-dimensional visualization of structures, and spectrophotometry to measure photonic properties of materials. The LMM also provides experiment sample containment for frangibles and fluids. This paper will provide a description of the current FIR and LMM designs, planned capabilities and key features. In addition a brief description of the initial five experiments planned for LMM/FIR will be provided.

Motil, Susan M.↗

Scheduling Onboard Processing for the Proposed HyspIRI Mission

The proposed Hyspiri mission is evaluating a X-band Direct Broadcast (DB) capability that would enable data to be delivered to ground stations virtually as it is acquired. However the HyspIRI VSWIR and TIR instruments will produce 1 Gbps data while the DB capability is 15 M bps for a ~60x oversubscription. In order to address this data volume mismatch a DB concept has been developed thatdetermines which data to downlink based on both: 1. The type of surface the spacecraft is overflying and 2. Onboard processing of the data to detect events. For example when the spacecraft is overflying polar regions it might downlink a snow/ice product. Additionally the onboard software will search for thermal signatures indicative of a volcanic event or wild fire and downlink summary information (extent, spectra) when detected. The process of determining which products to generate when, based on request prioritization and onboard processing and downlink constraints is inherently a prioritized scheduling problem - we describe work to develop an automated solution to this problem.

visible shortwave infrared (VSWIR)↗

FASTER -- A Tool for DSN Forecasting and Scheduling

FASTER (Forecasting And Scheduling Tool for Earth-based Resources) is a suite of tools designed for forecasting and scheduling of JPL's DSN. The DSN is a set of antennas and other associated resources that must be scheduled for satellite communications, astronomy, maintenance, and testing. FASTER is a MS-Windows based program that replaces two existing programs (RALPH and PC4CAST). FASTER was designed to be more flexible, maintainable, and user friendly. FASTER makes heavy use of commercial software to allow for customization by users. FASTER implements scheduling as a two pass process: the first pass calculates a predictive profile of resource utilization; the second pass uses this information to calculate a cost function used in a dynamic programming optimization step. This information allows the scheduler to "look ahead" at activities that are not as yet scheduled. FASTER has succeeded in allowing wider access to data and tools, reducing the amount of effort expended and increasing the quality of analysis.

forecasting↗

Towards a Characterization of Scheduling Task Complexity

Future long-duration missions will require astronauts to act more autonomously, manage their schedules, and replan timelines as anomalies and discoveries occur. Astronauts are not professional planners, however, and the complexity of schedules that novice planners can complete successfully is not fully understood. To identify the primary factors which contribute to scheduling task complexity, we conducted a human-in-the-loop study and developed planning algorithms to investigate how the type and amount of constraints affect the difficulty of scheduling and rescheduling. We created rankings of difficulty using a combination of human performance metrics from experimental planning tasks and metrics describing the final plans that participants scheduled. Using the results of our scheduling and rescheduling algorithm algorithms, we created a similar ranking with which to compare. We created rankings which compared well between the experimental and algorithm results for the scheduling task, but the rescheduling task proved more difficult to estimate.

scheduling↗

Towards a Characterization of Scheduling Task Complexity

Future long-duration missions will require astronauts to act more autonomously, manage their schedules, and replan timelines as anomalies and discoveries occur. Astronauts are not professional planners, however, and the complexity of schedules that novice planners can complete successfully is not fully understood. To identify the primary factors which contribute to scheduling task complexity, we conducted a human-in-the-loop study and developed planning algorithms to investigate how the type and amount of constraints affect the difficulty of scheduling and rescheduling. We created rankings of difficulty using a combination of human performance metrics from experimental planning tasks and metrics describing the final plans that participants scheduled. Using the results of our scheduling and rescheduling algorithm algorithms, we created a similar ranking with which to compare. We created rankings which compared well between the experimental and algorithm results for the scheduling task, but the rescheduling task proved more difficult to estimate.

scheduling↗

BUBBLES: an Automated Decision Support System for Final Approach Controllers

With the assumptions that an explicit schedule exists for landings (and takeoffs) at each runway, that each aircraft has declared an IAS for final approach and will be obligated to fly it as accurately as possible, and that there is a continuous estimate of average windspeed on approach, the objective was to provide automated cues to assist controllers in the spacing of landing aircraft. The cues have two characteristics. First, they are adaptive to estimation errors in position and speed by the radar tracking process and piloting errors in the execution of turns and commanded speed reductions. Second, the cues are responsive to the desires of the human controller. Several diagrams are used to help explain the system.

Chi, Zhizang↗

On optimal scheduling and air traffic control in the near terminal area

A scheme is proposed for automated air traffic control of landing aircraft in the vicinity of the airport. Each aircraft is put under the control of an airport-based computer as soon as it enters the near-terminal area (NTA). Scheduling is done immediately thereafter. The aircraft is given a flight plan which, if followed precisely, will lead it to the runway at a prespecified time. The geometry of the airspace in the NTA is chosen so that delays are executed far from the outer marker, and violations of minimum altitude and lateral separations are avoided. Finally, a solution to the velocity mix problem is proposed.

Sarris, A. H.↗

An Augmented Ground Station Architecture for Spacecraft-Initiated Communication Service Requests

Spacecraft performing science and exploration missions have increasingly complex and event-driven objectives, making communication needs difficult to predict in advance. Additional flexibility is required in space communication provider networks to effectively meet time-varying demand. We envision a framework for automated resource allocation in which requests for communications service are initiated by spacecraft based on current mission needs. We propose an augmented ground station configuration featuring a wide field-of-view antenna to receive transmissions from spacecraft requesting high-rate communications. A software suite to automate the service fulfillment process, including interfacing with external scheduling systems such as NASA’s Near Space Network, is described. Experimental results characterizing the physical-layer link between the wide field-of-view antenna and a software-defined radio testbed on the International Space Station are presented. We also discuss long-duration software testing on a ground-based testbed. Taken together, these proof-of-concept results demonstrate the feasibility of the concept to improve the responsiveness of space communications.

user-initiated service↗

Development and Preliminary Results of CTAS on Airline Operational Control Center Operations

Continued growth and expansion of air traffic and increased air carrier economic pressures have mandated greater flexibility and collaboration in air traffic management. The ability of airspace users to select their own routes, so called "free-flight", and to more actively manage their fleet operations for maximum economic advantage are receiving great attention. A first step toward greater airspace user and service provider collaboration is information sharing. In this work, arrival scheduling and airspace management data generated by the NASA/FAA Center/TRACON Automation System (CTAS) and used by the FAA service provider is shared with an airline with extensive operations within the CTAS operational domain. The design and development of a specialized airline CTAS "repeater" system is described, as well as some preliminary results of the impact and benefits of this information on the air carrier's operations. FAA controller per aircraft scheduling information, such as that provided by CTAS, has never before been shared in real-time with an airline. Expected airline benefits include improved fleet planning and arrival gate management, more informed "hold-go" decisions, and avoidance of costly aircraft diversions to alternate airports when faced with uncertain airborne arrival delays.

Zelenka, Richard↗