Search NASA⌕ Search

SEARCH · Search NASA

Results for “automatic loading”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost, and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Work Stealing and Persistence-based Load Balancers for Iterative Overdecomposed Applications

Applications often involve iterative execution of identical or slowly evolving calculations. Such applications require good initial load balance coupled with efficient periodic rebalancing. In this paper, we consider the design and evaluation of two distinct approaches to addressing this challenge: persistence-based load balancing and work stealing. The work to be performed is overdecomposed into tasks, enabling automatic rebalancing by the middleware. We present a hierarchical persistence-based rebalancing algorithm that performs localized incremental rebalancing. We also present an active-message-based retentive work stealing algorithm optimized for iterative applications on distributed memory machines. These are shown to incur low overheads and achieve over 90% efficiency on 76,800 cores.

persistence-based load balancing↗

Simultaneous compression of NaCl, Au, and ruby: toward mutually consistent pressure scales

Here, we evaluate pressure consistency of equations of state (EOS) for NaCl and Au at 300 K. The simultaneous measurements of unit-cell volumes (V) with ruby R1 line shifts (Δλ) in a helium (He) loaded diamond cell effectively remove potential systematic errors. Compression and decompression data were automatically collected at 1 sec interval, yielding a dense dataset with >8,000 (V, Δλ) pairs each for NaCl and Au. Solidification of He has noticeable effects on both V and Delta lambda (hence P). Only data up to similar to 14 GPa, or 6000 (V, P) pairs, can be considered hydrostatic within the resolution. The P-V data are fitted to the Rydberg-Vinet and the 3 rd order Birch-Murnaghan EOS. Predicted pressures of these EOSs agree with those given by the Ruby2020 ruby scale to within +/- 0.05 GPa. Overall, pressures predicted by the Rydberg-Vinet EOS are in better agreement with the average of commonly used NaCl and Au pressure scales.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

An Integrated Indexing and Search Service for Distributed File Systems

Data services such as search, discovery, and management in scalable distributed environments have traditionally been decoupled from the underlying file systems, and are often deployed using external databases and indexing services. However, modern data production rates, looming data movement costs, and the lack of metadata, entail revisiting the decoupled file system-data services design philosophy. In this article, we present TagIt, a scalable data management service framework aimed at scientific datasets, which can be integrated into prevalent distributed file system architectures. A key feature of TagIt is a scalable, distributed metadata indexing framework, which facilitates a flexible tagging capability to support data discovery. Furthermore, the tags can also be associated with an active operator, for pre-processing, filtering, or automatic metadata extraction, which we seamlessly offload to file servers in a load-aware fashion. We have integrated TagIt into two popular distributed file systems, i.e., GlusterFS and CephFS. Our evaluation demonstrates that TagIt can expedite data search operation by up to 10× over the extant decoupled approach.

97 MATHEMATICS AND COMPUTING↗

Acoustic Levitator Maintains Resonance

Transducer loading characteristics allow resonance tracked at high temperature. Acoustic-levitation chamber length automatically adjusted to maintain resonance at constant acoustic frequency as temperature changes. Developed for containerless processing of materials at high temperatures, system does not rely on microphones as resonance sensors, since microphones are difficult to fabricate for use at temperatures above 500 degrees C. Instead, system uses acoustic transducer itself as sensor.

Barmatz, M. B.↗

Effect of accuracy of wind power prediction on power system operator

This research project proposed a modified unit commitment that schedules connection and disconnection of generating units in response to load. A modified generation control is also proposed that controls steam units under automatic generation control, fast responding diesels, gas turbines and hydro units under a feedforward control, and wind turbine array output under a closed loop array control. This modified generation control and unit commitment require prediction of trend wind power variation one hour ahead and the prediction of error in this trend wind power prediction one half hour ahead. An improved meter for predicting trend wind speed variation is developed. Methods for accurately simulating the wind array power from a limited number of wind speed prediction records was developed. Finally, two methods for predicting the error in the trend wind power prediction were developed. This research provides a foundation for testing and evaluating the modified unit commitment and generation control that was developed to maintain operating reliability at a greatly reduced overall production cost for utilities with wind generation capacity.

Schlueter, R. A.↗

Litter-Spinning Retarders

Aerodynamic plates stop litter from spinning during hoisting by helicopter. Features of proposed litter-spinning retarders include convenience of deployment and independence from ground restraint. Retarder plate(s) folded flat against bottom of litter during storage or while litter is loaded. Plate(s) held in storage position by latch that releases manually or automatically as litter is hoisted. Upon release, springs move plates into deployed position.

Wilson, John C.↗

An Online Tool for Preliminary Design and Techno-Economic Analysis of District Geothermal Heating and Cooling Systems

District geothermal heating and cooling systems (DGHCS) have significant benefits for reducing energy consumption as well as building- and grid-level peak electric demand. Currently, no publicly available tools are available to effectively design and conduct techno-economic analysis of DGHCS. GeoWISE was originally developed for preliminary design and techno-economic analysis of geothermal heating and cooling systems in an individual commercial or residential building. This paper introduces recent upgrades of GeoWISE that allow users to design and conduct techno-economic analysis of DGHCS. Several new features are implemented in GeoWISE to allow selection and specification of multiple new or existing buildings. A database of information for over 125 million existing U.S. buildings was used in GeoWISE that allows users easily locate existing buildings of interest based on street addresses, and optionally edit information of the buildings (e.g., footprint, vintage, principal functions, number of floors, window-to-wall ratio). Unique energy simulation models of the selected buildings are then automatically created using the Automatic Building Energy Modeling (AutoBEM) and EnergyPlus simulations are performed to predict thermal loads of the buildings. A simplified DGHCS is then designed and simulated to predict its energy use. A central borehole heat exchanger (BHE) of the DGHCS is sized using the RowWise algorithm of GHEDesigner to meet the thermal loads within user-specified land areas for installing BHE. The upgraded GeoWISE reports the needed capacity of heating and cooling equipment in each building, design of the central BHE, energy consumption reduction, and energy cost saving resulting from using DGHCS compared with conventional HVAC systems. A case study is showcased using the upgraded GeoWISE to design and conduct techno-economic analysis of a simplified DGHCS.

Prem Anand Jayaprabha, Jyothis Anand [ORNL] (ORCID↗

Automated Work Package: Initial Wireless Communication Platform Design, Development, and Evaluation

The Department of Energy's Light Water Reactor Sustainability Program is developing the scientific basis to ensure long-term reliability, productivity, safety, and security of the nuclear power industry in the United States. The Instrumentation, Information, and Control (II and C) pathway of the program aims to increase the role of advanced II and C technologies to achieve this objective. One of the pathway efforts at Idaho National Laboratory (INL) is to improve the work packages execution process by replacing the expensive, inefficient, bulky, complex, and error-prone paper-based work orders with automated work packages (AWPs). An AWP is an automated and dynamic presentation of the work package designed to guide the user through the work process. It is loaded on a mobile device, such as a tablet, and is capable of communicating with plant equipment and systems to acquire plant and procedure states. The AWP replaces those functions where a computer is more efficient and reliable than a human. To enable the automatic acquisition of plant data, it is necessary to design and develop a prototype platform for data exchange between the field instruments and the AWP mobile devices. The development of the platform aims to reveal issues and solutions generalizable to large-scale implementation of a similar system. Topics such as bandwidth, robustness, response time, interference, and security are usually associated with wireless communication. These concerns, along with other requirements, are listed in an earlier INL report. Specifically, the targeted issues and performance aspects in this work are relevant to the communication infrastructure from the perspective of promptness, robustness, expandability, and interoperability with different technologies. The development of a prompt system entailed significant performance optimization, including the use of parallel processing, parallel communication, modularity, noise filtering, and frequency tuning. A robust system was achieved by enforcing a persistent continuous data exchange that automatically detects and conveys a failure of any link or component in any part of the system, and that automatically restores the communication once the link or component is restored. An expandable topology was enabled by modularity and load sharing. The number of servers, mobile devices, and field instruments is not limited from a system structure point of view. The system interoperability was achieved by enforcing the independence of the field communication application from the mobile device application. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Development of Benchmark Examples for Delamination Onset and Fatigue Growth Prediction

An approach for assessing the delamination propagation and growth capabilities in commercial finite element codes was developed and demonstrated for the Virtual Crack Closure Technique (VCCT) implementations in ABAQUS. The Double Cantilever Beam (DCB) specimen was chosen as an example. First, benchmark results to assess delamination propagation capabilities under static loading were created using models simulating specimens with different delamination lengths. For each delamination length modeled, the load and displacement at the load point were monitored. The mixed-mode strain energy release rate components were calculated along the delamination front across the width of the specimen. A failure index was calculated by correlating the results with the mixed-mode failure criterion of the graphite/epoxy material. The calculated critical loads and critical displacements for delamination onset for each delamination length modeled were used as a benchmark. The load/displacement relationship computed during automatic propagation should closely match the benchmark case. Second, starting from an initially straight front, the delamination was allowed to propagate based on the algorithms implemented in the commercial finite element software. The load-displacement relationship obtained from the propagation analysis results and the benchmark results were compared. Good agreements could be achieved by selecting the appropriate input parameters, which were determined in an iterative procedure.

Krueger, Ronald↗

SCALE Enhancements for Detailed Cask Dose Rate Analysis - Paper 37

The Nuclear Fuels Storage and Transportation Planning Project and the Used Fuel Disposition Campaign, both under the US Department of Energy (DOE) Office of Nuclear Energy, require the ability to predict k{sub eff}, heat generation and temperature distributions, and external dose rates from any combination of commercial spent nuclear fuel assemblies loaded into any type of licensed cask. Work in the Reactor and Nuclear Systems Division at Oak Ridge National Laboratory has begun to develop the UNF-ST[and]DARDS system (Used Nuclear Fuel Storage, Transportation and Disposal Analysis Resource and Data System) that uses many of the nuclear analysis codes from the SCALE package, a comprehensive database of used nuclear fuel inventories from utilities, and a library of model template files to produce complete input files for the various types of UNF computational analyses. UNF-ST[and]DARDS uses the template files and input parameters that are applicable to a safety analysis to assemble and execute a complete input file, collect the output files and relevant information for subsequent calculations, and illustrate calculation results as a function of decay time and other relevant analysis parameters. This paper will focus on the shielding aspects and the ability to predict external dose rates from as-loaded casks. Realistic dose rate values based on actual canister fuel contents may be used in developing appropriate plans, procedures, and methods to keep personnel radiation exposures as low as reasonably achievable during cask repackaging and transportation operations, as well as in performing total system analyses and transportation risk evaluations. The MAVRIC shielding sequence of the SCALE package was created for the US Nuclear Regulatory Commission for analyzing dose rates outside of storage, transfer, or transportation casks loaded with spent nuclear fuel. MAVRIC contains automated variance reduction capabilities based on the CADIS and FW-CADIS methods that are effective for optimizing deep penetration Monte Carlo shielding problems for achieving low relative uncertainties in short computing times. MAVRIC uses the Denovo discrete ordinates code to compute importance maps and biased source terms for the Monaco fixed-source Monte Carlo code, which can use multi-group or continuous-energy cross section data. ORIGEN (Oak Ridge Isotope Generation and Depletion) is the SCALE computer code for calculating time-dependent isotopic concentrations during irradiation and decay for more than 2,200 nuclides that can be produced by nuclear fuel irradiation and activation. A series of SCALE enhancements was implemented to enable automatic decay heat and radiation source term generation and shielding safety analysis of as-loaded casks. The enhancements to SCALE made under this project will be a part of the SCALE 6.2 release expected in fall 2014. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Design description of the Schuchuli Village photovoltaic power system

A stand alone photovoltaic (PV) power system for the village of Schuchuli (Gunsight), Arizona, on the Papago Indian Reservation is a limited energy, all 120 V (d.c.) system to which loads cannot be arbitrarily added and consists of a 3.5 kW (peak) PV array, 2380 ampere-hours of battery storage, an electrical equipment building, a 120 V (d.c.) electrical distribution network, and equipment and automatic controls to provide control power for pumping water into an existing water system; operating 15 refrigerators, a clothes washing machine, a sewing machine, and lights for each of the homes and communal buildings. A solar hot water heater supplies hot water for the washing machine and communal laundry. Automatic control systems provide voltage control by limiting the number of PV strings supplying power during system operation and battery charging, and load management for operating high priority at the expense of low priority loads as the main battery becomes depleted.

Ratajczak, A. F.↗

Off-policy deep reinforcement learning with automatic entropy adjustment for adaptive online grid emergency control

Electric overloading conditions and contingencies put modern power systems at risk of voltage collapse and blackouts. Load shedding is crucial to maintain voltage stability for grid emergency control. However, the rule- or model-based schemes rely on accurate dynamic system models and face considerable challenges in adapting to various operating conditions and uncertain event occurrences. Here, to address these issues, this paper proposes a novel deep reinforcement learning (DRL)-based voltage stability control algorithm with automatic entropy adjustment (AEA) for grid emergency control. Various dynamic network components for complex system operations are modeled to construct the DRL environment. An off-policy soft actor-critic architecture is developed to maximize the expected reward and policy entropy simultaneously. The AEA mechanism is proposed to facilitate the policy maximum entropy procedure, and the proposed method can automatically provide effective discrete and continuous actions against various fault scenarios. Our approach accomplishes high sampling efficiency, scalability, and auto-adaptivity of the control policies under high uncertainties. Comparative studies with the existing DRL-based control methods in IEEE benchmarks indicate salient performance improvement of the proposed method for dynamic system emergency control.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic remapping of parallel computations with varying resource demands

The issue of deciding when to invoke a global load remapping mechanism is studied. Such a decision policy must effectively weigh the costs of remapping against the performance benefits, and should be general enough to apply automatically to a wide range of computations. The authors propose a general mapping decision heuristic, then study its effectiveness and its anticipated behavior on two very different models of load evolution. Assuming only that the remapping cost is known, this policy dynamically minimizes system degradation (including the cost of remapping) for each computation step. This policy is quite simple, choosing to remap when the first local minimum in the degradation function is detected. Simulations show that the decision obtained provides significantly better performance than that achieved by never remapping. The authors also observe that the average intermapping frequency is quite close to the optimal fixed remapping frequency.

Nicol, David M.↗

Tests on a mock-up of the feedback controlled matching options of the ITER ICRH system

Automatic control of the matching of the ITER ICRH antenna array on a reference load is presently developed and tested for optimization on a low-powered scaled (1:5) mock-up. Resilience to fast load variations is obtained either by 4 Conjugate-T (CT) or 4 quadrature hybrid circuits, the latter being the reference option. The main results are (i) for the CT option: successful implementation of the simultaneous feedback control of 11 actuators for the matching of the 4 CT and for the control of the array toroidal phasing; (ii) for the hybrid option: the matching and the array current control via feedback control of the decouplers and double stub tuners. This system is being progressively implemented and the simultaneous control of matching and antenna current has already been successfully tested on half of the array for heating and current drive phasings.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

NEW EPICS/RTEMS IOC BASED ON ALTERA SOC AT JEFFERSON LAB

A new EPICS/RTEMS IOC based on the Altera System-on-Chip (SoC) FPGA is being designed at Jefferson Lab. The Altera SoC FPGA integrates a dual ARM Cortex-A9 Hard Processor System (HPS) consisting of processor, peripherals and memory interfaces tied seamlessly with the FPGA fabric using a high-bandwidth interconnect backbone. The embedded Altera SoC IOC has features of remote network boot via U-Boot from SD card or QSPI Flash, 1Gig Ethernet, 1GB DDR3 SDRAM on HPS, UART serial ports, and ISA bus interface. RTEMS for the ARM processor BSP were built with CEXP shell, which will dynamically load the EPICS applications at runtime. U-Boot is the primary bootloader to remotely load the kernel image into local memory from a DHCP/TFTP server over Ethernet, and automatically run RTEMS and EPICS. The first design of the SoC IOC will be compatible with Jefferson Lab’s current PC104 IOCs, which have been running in CEBAF 10 years. The next design would be mounting in a chassis and connected to a daughter card via standard HSMC connectors. This standard SoC IOC will become the next generation of low-level IOC for the accelerator controls at Jefferson Lab.

Yan, Jianxun↗

Energy-Efficient and Comfortable Buildings through Multivariate Integrated Control (ECoMIC)

This project aims to develop an integrated control solution for enhanced energy efficiency and user comfort in commercial buildings. The developed technology is a zone-based control framework that minimizes energy usage while maintaining occupants’ visual and thermal comfort through control of electric lights, motorized venetian blinds and thermostats. The control framework is designed following a modular, scalable and flexible architecture to facilitate easy integration with exiting building management systems. The control framework contains two key algorithms: 1) the lighting load balancing algorithm and 2) the thermostat control algorithm. The lighting load balancing algorithm adopts a model-based closed-loop control approach to determine the optimal electric light and venetian blind settings. It is formulated into an optimization problem with minimizing lighting-related energy consumptions as the objective and delivering adequate task light and preventing daylight glare as the constraints. The thermostat control algorithm is based on a well-established thermal comfort model and formulated as a root-finding problem to dynamically determine the optimal thermostat setpoint for both energy savings and improved thermal comfort. To address building-wide scalability, a system architecture was developed for the zone-based control technology. Three levels of services are defined in the architecture: external services, facility level services and zone level services. The zone-level service includes the control algorithms described above as well as the corresponding interfaces, profiles, sensors and actuators to realize the zone controller. The facility level services connect to the zones through a backbone network, handle supervisory level information and controls, and thus facilitate building-wide scalability. The external services provide communication capability to entities outside of the building for grid interaction and remote access. Various aspects of the developed control technology were evaluated and verified through both simulations and testbed implementations. Simulations coupling a DOE medium office reference building in EnergyPlus building simulation software and a prototype controller in Matlab were performed. During summer time in a mixed-humid climate zone, the simulations revealed reductions of 27% and 42% in electric lighting load and cooling load, respectively, when compared to an advanced base case with daylight dimming and blinds automatically tilted to block direct sun. Two single-room testbeds were established. The testbed at Philips Lighting business building (Rosemont, IL) was designed for quantifying energy performance of integrated controls. This particular implementation achieved 40% and 79% savings on lighting and HVAC energy, respectively, compared to a relatively simple base case operated on predefined schedules. While the resulting energy savings was very encouraging, it should be noted that there may be several caveats associated with it. 1) The test was run during late spring and early summer, and the savings numbers might not be directly used to extrapolate the annual energy savings. 2) Due to the needs for separate control and metering of the small-scale demonstrator within a large building, the HVAC system, hence the corresponding savings, did not represent a typical energy code-compliant design. 3) The light level in the control case was regulated at a particular setpoint, which was lower than then the full-on light level in the base case, and the savings resulted from tuning down the light level to the setpoint was not attributable to the contribution of the developed technology. The testbed at the Lawrence Berkeley National Laboratory (Berkeley, CA) specifically focused on glare control integration, and has demonstrated the feasibility and capability of the glare detection and prevention technique. While the short one-month test in this testbed provided a functional indication of the developed technology, and it would require at least a full solstice-to-solstice cycle to ruinously quantify the performance, which was not possible within the project timeframe. There are certain limitations inherited from the operational assumptions, which could potentially affect the effectiveness and applicability of the developed control technologies. The system takes a typical ceiling-mounting approach for the photosensor locations, and therefore, the control performance relies on proper commissioning or the built-in intelligence of the photosensor for pertinent task light level estimations. For spaces where daylight penetration diminishes significantly deeper into the zone, certain modification to the control algorithms is required to accommodate multiple lighting control subzones and the corresponding sensors for providing a more uniform light level across the entire zone. Integrated control of visual and thermal comfort requires the lighting control zone and thermal control zone to coincide with each other. In other words, the area illuminated by a lighting circuit needs to be the same area served by the thermostat. Thus, the original zoning will potentially constrain the applicability of this technology in retrofitting projects. This project demonstrated the technical feasibility of a zone-based integrated control technology. From the simulation results and testbed implementations, up to 60% lighting energy savings in daylit areas relative to a “no-controls” case can easily be achieved. A 20% reduction of whole building energy consumption is also attainable. In the aspect of occupant comfort, the testbed demonstrated the ability to maintain specified light level on the workplane while promptly mitigate daylight glare 90% of the time. The control system also managed to maintain the thermal environment at a comfortable level 90% of the time. The aspect of system scalability was guaranteed by the system architecture design, based on which the testbeds were instantiated. Analysis on the aspect of economic benefit has yielded an about 6-year payback time for a medium-sized building, including the installation of all hardware and software, such as motorized blinds and LED luminaires. The payback time can be significantly reduced if part of the hardware is already in place for retrofitting projects. It needs to be noted that since the payback analysis was partly based on the testbed performance results, it is constrained by the caveats associated with the testbed implementations. The main uncertainty lies in the contribution from the space conditioning energy savings as it was non-trivial to realistically configure a room-size HVAC system for directly extrapolating whole-building HVAC energy savings. It is recommended to further evaluate the developed technology at a larger scale, where the lighting and HVAC energy consumption can be realistically measured at the building level, to more rigorously quantify the performance potentials.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Grid-Connected Modular Soft-Switching Solid State Transformers (M-S4T)

The objective of this project is to develop and verify the concept of a flexible and modular soft-switching solid-state transformer (M-S4T) for direct grid-connected applications. The ability to directly connect power electronics converters to the medium voltage grid (4 kV – 13 kV), and to potentially replace the passive and bulky, but ubiquitous 60 hertz service transformer in the 25 kVA to 100 kVA range, with a more flexible and controllable device, has been regarded as the ‘holy grail’ in grid control. However, this has proven to be extremely difficult. This project has developed the solutions to several key challenges of the direct grid-connected power electronics and realized a 7.2 kV M-S4T prototype. First, a protection method to protect the M-S4T from the high voltages (110 kV for the 13 kV system) that occur on the grid due to transients and lightning strikes have been developed and experimentally verified. Second, the realization and the operation of the M-S4T based on high-voltage SiC devices (>3.3 kV) and a medium-frequency medium-voltage low-leakage transformer in a single-stage solid-state transformer with zero-voltage switching, low dv/dt, and low electromagnetic interference has been successfully demonstrated up to 7.5 kV peak. Third, an oil-cooling system and stable communication and distributed control system for converter module voltage sharing have been developed and experimentally verified. The developed M-S4T has realized a modular universal high-performance power conversion system. This conversion system is scalable to different voltage and power levels and adaptable to four-quadrant bidirectional operation. Moreover, the use of passive cooling techniques meets the equipment life requirements, and the lightning protection scheme fulfills the basic insulation level specifications for direct grid connection. Such power conversion system opens up near-term opportunities, including energy storage, solar PV, or electric vehicle charging with significant cost and footprint savings. In the longer term, the possibility of replacing the utility distribution transformer with an M-S4T will be transformative for future distribution grids with a compact footprint and full controllability to enable high renewable energy and storage penetration. In addition to the main project, this report expands on the Plus-Up projected including as part of the main award. This project developed and demonstrated the technology for autonomous collaborative inverters that can be connected in an ad hoc manner to the grid. The aim of the project was to: (1) evaluate the existing techniques for grid-connected inverters and find their limitations; (2) develop detailed requirements for grid-connected inverters in the modern grid with millions of active nodes; (3) design a unified control strategy that brings more autonomy and intelligence to grid-connected inverters, and addresses parts of the issues with the existing techniques. The proposed technique, called UniCon, enables inverters to 1) connect/disconnect to/from the grid in an ad hoc manner; (2) work based on local sensing. Slow communication could be used for a more optimized behavior; (3) work automatically in both grid-forming/grid-following mode; (4) handle large disturbances, e.g., big load step and fault, in an oscillation-free manner; (5) work collaboratively with other inverters in steady-state and during transients. UniCon can be implemented in the middle-level control; hence it is agnostic to the vendor and to the implementation of the inner voltage/current and protection loops. Furthermore, a new synchronization scheme, based on deep learning, was developed that can extract the grid voltage phase and amplitude in a stable manner. The method is cheap to implement can improve the dynamic performance of the grid-connected inverters during fast transients, e.g., fault. The proposed control scheme was validated by (1) MATLAB/Simulink; (2) hardware-in-the-loop results, and; (3) experimental results using three inverters that form a microgrid in a down-scaled feeder. Lastly, both the M-S4T and UniCon have achieved promising tangible paths to markets. In the case of the M-S4T, the underlying technology — the Soft Switching Solid State Transformer (S4T) developed at the Georgia Tech Center for Distributed Energy (GT-CDE) has been licensed by GridBlock from the Georgia Tech Research Corporation, and GridBlock has been working with manufacturing partner Jabil (one of the largest US-based contract manufacturers) and system integrator Power Secure (largest deployer of microgrids in the US with 4.7 GW under management), to meet the strong initial demand. Similarly, GridBlock has an exclusive license to the UniCon technology, developed under this award by GT-CDE. The UniCon provides an intermediate control layer that enables the implementation of the higher-level ‘transactive’ control commands for the system. The architecture of the system - slow communications with the cloud for system optimization and setpoints, and the use of locally measured quantities for real-time control, provide a very robust and secure way of implementing a real-time must-run grid that is also secure and stable. This is a brand-new functionality that is critical for the future grid and key to GridBlock’s business model.

24 POWER TRANSMISSION AND DISTRIBUTION↗