Search NASA⌕ Search

SEARCH · Search NASA

Results for “contingency analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Model Checking Abstract PLEXIL Programs with SMART

We describe a method to automatically generate discrete-state models of abstract Plan Execution Interchange Language (PLEXIL) programs that can be analyzed using model checking tools. Starting from a high-level description of a PLEXIL program or a family of programs with common characteristics, the generator lays the framework that models the principles of program execution. The concrete parts of the program are not automatically generated, but require the modeler to introduce them by hand. As a case study, we generate models to verify properties of the PLEXIL macro constructs that are introduced as shorthand notation. After an exhaustive analysis, we conclude that the macro definitions obey the intended semantics and behave as expected, but contingently on a few specific requirements on the timing semantics of micro-steps in the concrete executive implementation.

Siminiceanu, Radu I.↗

Effectiveness of Redundant Communications Systems in Maintaining Operational Control of Small Unmanned Aircraft

NASA has been researching prototype technologies for an Unmanned Aircraft System (UAS) Traffic Management (UTM) system to facilitate enabling of safe and efficient civilian low-altitude airspace and UAS operations, in a series of Technical Capability Levels (TCL) activities that are increasingly complex. In TCL1, completed in 2015, visual line-of-sight operations such as agriculture, firefighting and infrastructure monitoring were addressed with a focus on geofencing and operations scheduling. Technologies and requirements needed for beyond visual line-of-sight (BVLOS) operations in sparsely populated areas were examined in TCL2 in 2016, and those for operations over moderately populated areas in TCL3 in 2017 and 2018. TCL4 will build on the earlier TCLs and focus on technologies and requirements for operations in higher-density urban areas for tasks such as news gathering, package delivery and for managing large-scale contingencies. This paper describes a communications test conducted in TCL3 and discusses insights gained from the test. In the test, operators were directed to equip UAS with redundant Command and Control (C2) communications systems, send a maneuver command to Unmanned Aircraft (UA) via the primary system, then verify execution of the sent command. This exercise was repeated with each redundant system. The test was designed to assess effectiveness of redundant C2 systems in maintaining operational control of UA. Several UAS were configured with varying arrangements to achieve redundancy, including two identical radio modems using the same frequency band, WiFi and Long-Term Evolution (LTE) cellular modems, etc. From the test, digital data such as time maneuver command sent, time maneuver verified, etc., were collected. Descriptions of methods to detect loss of C2 communications and contingency steps for such event were collected and assessed. The final paper will include a detailed analysis of the collected data leading to the following insights. First, effectiveness of redundant C2 systems depends on several factors, such as operational environment and communications service availability. For example, use of two identical point-to-point radio to connect operator and UA on the same frequency band can be effective in mitigating radio malfunction when operating in an environment where possibility of Radio Frequency (RF) interference is low, such as over open plains. However, the same arrangement may not be effective where high level of RF transmissions in broad spectrum ranges can be expected, such as over or near urban areas. For redundant systems that consist of external communications services, such as cellular and satellite communications network, redundancy is maintained only in the areas where more than one services are available. Therefore, UAS operators should have the means to plan for and monitor the performance of external communications services they are relying on to control UA. Second, communications performance needs, such as the minimum data transfer rate and the maximum tolerable latency, should be assessed to reflect the potential hazard that can come from loss of UA control. For example, UA operations over desolate area pose less hazard to people than operations over densely populated area and performance need for the former would be less than the latter.

Jung, Jaewoo↗

Using Open Standards and NASA Open Source Simulation Tools to Model Artemis Base Camp Mission Timelines

The United States’ National Aeronautics and Space Administration (NASA) has announced that the Artemis Program will return humans to the Moon, establishing a persistent presence with the Artemis Base Camp (ABC), and extend human exploration to Mars. The NASA Exploration Systems Simulations (NExSyS) team at NASA’s Johnson Space Center is using internationally developed simulation interoperability standards and NASA open source simulation tools to support Artemis concept, analysis, designs, development, training, and ultimately operations. The NExSyS team has been tasked to support early ABC architecture and mission analysis using mission time lines developed by the crew operations mission planning team. The NExSyS team is developing a distributed simulation framework with initial Artemis element implementations to model the ABC mission timelines using the international simulation interoperability standard High Level Architecture (HLA), the Simulation Interoperability Standards Organization’s Space Reference Federation Object Model (SpaceFOM), the NASA open source Trick Simulation Environment, and another NASA open source interface package called TrickHLA. The ABC architecture is composed of a number of key surface elements and resources. Some examples of modeled elements (also known as entities) are landers, habitats, rovers, logistics carriers, and astronauts. Some examples of modeled transferable and consumable resources are power, water, oxygen, nitrogen, scientific samples, and food. These entities and resources are modeled in a collection of individual simulations called Federates. A coordinated collection of interoperable federates is called a Federation and when these federates are tied together in a coordinated simulation run, it is referred to as a Federation Execution. The federates communicate through HLA using data exchange formats defined by a collection of machine readable files called Federation Object Models (FOMs). These FOM files are based on extensions to the SpaceFOM. This enables the instantiation and sharing of objects and interactions between federates in the federation. These provide for entity and resource tracking, object transfer, and data collection. Federate interactions are used to trigger events and notify federates of entity or resource transfers. For the initial implementation, the constituent federates are Trick-based simulations that use TrickHLA to provide the required HLA-base interoperability. These Trick-based simulations provide the required modeling for the individual Artemis elements along with the associated element resources. These federates provide a means to explore traverses between surface elements and exploration sites as scheduled in a mission timeline and explore the affects traverse times have on the overall mission timeline. The mission time lines are modeled using a Trick input file event handling capabilities. Each timeline operation is handled as individual simulation events, and triggered based on previous event status, time of operation, and simulated task completions. In addition, the ABC Federation can be used to perform Monte Carlo analysis. The Monte Carlo tool can vary the inputs, timings, and malfunctions to show how various contingencies in the mission can affect the mission timeline.

Keaton Craig Dodd↗

Hydrogen Production Cost from Proton-Conducting Solid Oxide Electrolysis

Rigorous stakeholder-vetted techno-economic analysis (TEA) was conducted to estimate the cost of hydrogen (H 2 ) production using Proton-Conducting Solid Oxide (PSO) electrolysis. The analysis evaluates Current (2025) and Future (2035) technology cases at centralized plant scales of 50 and 500 metric tonnes per day (MTD), assuming electricity, water, and air as the only system inputs. Untaxed, unsubsidized levelized cost of hydrogen (LCOH) is projected to range from 2020 $\$$1.81 to $\$$2.47/kg H 2 at an electricity price of $\$$0.03/kWh and 97% capacity factor under Nth-of-a-kind (NOAK) deployment assumptions. Total installed capital cost was developed using bottom-up Design for Manufacture and Assembly (DFMA) stack cost modeling and detailed balance-of-plant estimates, including mechanical and electrical subsystems, installation, site preparation, engineering, and contingency. Stack performance assumptions include thermoneutral operation, degradation over time, and periodic replacement. LCOH was calculated using the Hydrogen Analysis (H2A) discounted cash flow model in constant 2020 dollars. Results indicate PSO electrolysis has potential for competitive hydrogen production costs under low-cost electricity and mature manufacturing conditions.

08 HYDROGEN↗

Advanced flight design systems subsystem performance models. Executive summary

Subsystem performance analysis required in flight design to assess the capability of the environmental control and life support system (ECLSS) to support the flight requirements and define operational procedures under contingency flight conditions is described. Current ECLSS modeling techniques are limited in the variety of configurations and they employ batch mode computer programs execution methods. Improvements in the variety of configurations that are modeled and a reduction in effort required for modeling and analysis is accomplished by developing a modular computer program which operates interactively.

Parker, K. C.↗

Feasibility and strategic implications of deploying nuclear power reactors in Africa

This report assesses the feasibility and strategic implications of deploying nuclear power reactors, including large-scale plants, advanced small modular reactors (SMRs), and microreactors, in African countries. Case studies focus on South Africa, Egypt, Kenya, Ghana, and Nigeria, examining nuclear energy’s role in Africa’s rapidly evolving energy landscape, marked by fast-growing demand, significant electricity access gaps, increasing renewable penetration, and strong policy commitments to industrialization and energy security. Several U.S. reactor technologies and designs are considered based on their development status and readiness for deployment. The analysis finds that nuclear power can provide reliable, clean baseload and flexible generation, as well as high-temperature process heat for desalination, hydrogen production, and industrial applications. However, suitability is highly country-specific, depending on grid size and stability, transmission capacity, cooling water availability, regulatory readiness, and fuel supply chains. Near-term deployment opportunities are strongest for light-water reactors (such as NuScale, BWRX-300, AP300, and SMR-300) that use low-enriched uranium and build on proven technology. More advanced concepts, including gas-cooled, sodium-cooled, molten-salt cooled reactors, and microreactors, will likely be relevant for African deployment in the 2030s or later, contingent on demonstration projects, high-assay low-enriched uranium (HALEU) fuel availability, and mature international licensing frameworks. Economic analysis shows that SMRs are capital-intensive, with projected overnight costs for 300 MWe units in 2025 ranging from approximately 1.4 to 2.6 billion USD per module. The levelized cost of electricity (LCOE) is highly sensitive to the weighted average cost of capital (WACC). Given typically higher financing costs and utility balance-sheet weaknesses in many African countries, bankable project structures will require sovereign guarantees, robust offtake arrangements, and layered financing from export credit agencies, development finance institutions, and vendor nations. Comparisons with recent large nuclear projects in the United Arab Emirates (UAE) and Egypt underscore the central role of state-backed loans, long tenors, and concessional terms. Country case studies illustrate a spectrum of readiness and opportunity. South Africa operates two 920 MWe pressurized light water reactors (totaling 1,840 MWe) at Koeberg and has the most mature regulatory and industrial base, positioning it as a prime candidate for both large reactors and SMRs to replace coal, support desalination, and anchor industrial hubs. Egypt is constructing four VVER-1200 units at El Dabaa with strong state leadership and could later complement this fleet with SMRs for coastal and industrial applications. Kenya and Ghana are advancing through IAEA Milestones with growing institutional capacity and clear interest in SMRs that match their smaller grids and industrialization plans. Nigeria has the largest demand potential but faces acute constraints in grid reliability, project bankability, and regulatory capacity; targeted deployments of large reactors and SMRs near coastal or industrial sites could have high impact if accompanied by major grid upgrades and institutional reforms. The report identifies cross-cutting challenges such as financing, political continuity, public acceptance, nonproliferation and security, waste and back-end management, regulatory capacity, grid adequacy, and long deployment timelines for first-of-a-kind designs, and ANL/NSE-26/3 ii proposes broad directions for resolution. These include stronger multifaceted financing for nuclear, long-term national energy strategies that transcend electoral cycles, proactive stakeholder engagement, strengthened regional and national regulators, and systematic workforce development through centers of excellence and expanded training. The United States should develop partnerships with African countries and offer end-to-end nuclear package similar to those used effectively by competitors: coordinated project development, state-backed financing, long-term fuel services, and durable in-country support through regional offices and sustained workforce/regulatory training. With timely planning, sustained political commitment, and appropriate financing and institutional support, nuclear energy, both large reactors and advanced SMRs, can become a meaningful, though not dominant, pillar of Africa’s future power mix, enhancing energy security, enabling industrial growth, and supporting climate goals.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Demand Response Availability Profiles for California in the Year 2020

Demand response (DR) is being considered as a valuable resource for keeping the electrical grid stable and efficient, and deferring upgrades to generation, transmission, and distribution systems. However, simulations to determine how much infrastructure upgrades can be deferred are necessary in order to plan optimally. Production cost modeling is a technique, which simulates the dispatch of generators to meet demand and reserves in each hour of the year, at minimal cost. By integrating demand response resources into a production cost model (PCM), their value to the grid can be estimated and used to inform operations and infrastructure planning. DR availability profiles and constraints for 13 end-uses in California for the year 2020 were developed by Lawrence Berkeley National Laboratory (LBNL), and integrated into a production cost model by Lawrence Livermore National Laboratory (LLNL), for the California Energy Commission’s Value of Energy Storage and Demand Response for Renewable Integration in California Study. This report summarizes the process for developing the DR availability profiles for California, and their aggregate capabilities. While LBNL provided potential DR hourly profiles for regulation product in the ancillary services market and five-minute load following product in the energy market for LLNL’s study, additional results in contingency reserves and an assumed flexible product are also defined. These additional products are included in the analysis for managing high ramps associated with renewable generation and capacity products and they are also presented in this report.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluation of several classification schemes for mapping forest cover types in Michigan

Landsat MSS data were evaluated for mapping forest cover types in the northern Lower Peninsula of Michigan. The study examined seasonal variations, interpretation procedures and vegetation composition/distribution and their effect on overall classification accuracy and ability to identify individual pine species. Photographic images were used for visual interpretations while digital analysis was performed using a common (ERDAS) microcomputer image processing system. The classification schemes were evaluated using contingency tables and were ranked using the KAPPA statistic. The various classification schemes were ranked differentially according to study site location. Visual interpretation procedures ranked best, or least accurate, depending on the spatial distribution and complexity of the forest cover. Supervised classification techniques were more accurate than unsupervised clustering over all sites and seasons. Maximum likelihood classification of June data was superior to any digital classification technique of February data. The study indicates that classification accuracy is more dependent on the composition and distribution of forests in the northern lower Peninsula of Michigan than on the selection of a particular classification scheme.

Hudson, W. D.↗

Statistical Steady-State Stability Analysis for Transmission System Planning for Offshore Wind Power Plant Integration

This paper presents a statistical steady-state stability analysis for transmission system planning studies in order to identify operational issues inherent in the integration of offshore wind power plants. It includes normal and contingency operation. This study considers the integration of a 1000-MW offshore wind power plant into the FirstEnergy/PJM service territory in the U.S. Great Lakes region as a case study and uses a realistic computer model of the U.S. Eastern Interconnection, a 63,000-bus test system. The results show the utility of this statistical analysis tool and its effectiveness in identification of the operational impacts as a result of the integration of offshore wind power plant.

Sajadi, Amirhossein↗

NASA Ares I Launch Vehicle First Stage Roll Control System Cold Flow Development Test Program Overview

The Ares I launch vehicle is the selected design, chosen to return humans to the moon, Mars, and beyond. It is configured in two inline stages: the First Stage is a Space Shuttle derived five-segment Solid Rocket Booster and the Upper Stage is powered by a Saturn V derived J-2X engine. During launch, roll control for the First Stage (FS) is handled by a dedicated Roll Control System (RoCS) located on the connecting Interstage. That system will provide the Ares I with the ability to counteract induced roll torque while any induced yaw or pitch moments are handled by vectoring of the booster nozzle. This paper provides an overview of NASA s Ares I FS RoCS cold flow development test program including detailed test objectives, types of tests run to meet those objectives, an overview of the results, and applicable lessons learned. The test article was built and tested at the NASA Marshall Space Flight Center in Huntsville, AL. The FS RoCS System Development Test Article (SDTA) is a full scale, flight representative water flow test article whose primary objective was to obtain fluid system performance data to evaluate integrated system level performance characteristics and verify analytical models. Development testing and model correlation was deemed necessary as there is little historical precedent for similar large flow, pulsing systems such as the FS RoCS. The cold flow development test program consisted of flight-similar tanks, pressure regulators, and thruster valves, as well as plumbing simulating flight geometries, combined with other facility grade components and structure. Orifices downstream of the thruster valves were used to simulate the pressure drop through the thrusters. Additional primary objectives of this test program were to: evaluate system surge pressure (waterhammer) characteristics due to thruster valve operation over a range of mission duty cycles at various feed system pressures, evaluate temperature transients and heat transfer in the pressurization system, including regulator blowdown and propellant ullage performance, measure system pressure drops for comparison to analysis of tubing and components, and validate system activation and re-activation procedures for the helium pressurant system. Secondary objectives included: validating system processes for loading, unloading, and purging, validating procedures and system response for multiple failure scenarios, including relief valve operation, and evaluating system performance for contingency scenarios. The test results of the cold flow development test program are essential in validating the performance and interaction of the Roll Control System and anchoring analysis tools and results to a Critical Design Review level of fidelity.

Butt, Adam↗

Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

Initial "Big 14" work was put to the test for the first time in 2010. Deficiencies were found in some of the planning and approaches to that work; Failure Response Assessment Team created in 2010 to address deficiencies -Identify and perform engineering analysis in operations products prior to failure; incorporate results into operations products -Identify actions for protecting ISS against a Next Worse Failure after the first failure occurs -Better document not only EVA products but also planning products, assumptions, and open actions; Pre-failure investments against critical failures best postures ISS for swift response and recovery -A type of insurance policy -Has proven effective in a number of contingency EVA cases since 2010. Planning for MBSU R&R in 2012, Second PM R&R in 2013, EXT MDM R&R in 2014; Current FRAT schedule projects completion of all analysis in 2018

Van Cise, Edward A.↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I -- National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Thanks to advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India's RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU's anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD $920 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment - from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India's 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India’s Electric Grid, Vol. 1. National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Using advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India’s RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (Berkeley Lab), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU’s anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD 980 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment—from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India’s 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Sensor performance report, volume 4 (S-190A)

A summary of efforts expended to determine the radiometric accuracy and signal to noise ratio achieved by the S190A multispectral camera is reported. The technique used was to computer model the photographic system and to compare theoretical results to known or measured radiometric values. The two sources used as known targets for radiometric evaluation were the film broadband sensitometry and the lunar disc. From the analysis it appears feasible to attain an accuracy of 10% or better in radiometric accuracy. This however is contingent on contemporaneously exposing the target and spectral sensitometry.

Mendlowitz, R. A., Sr.↗

Compressive Failure of Fiber Composites under Multi-Axial Loading

This paper examines the compressive strength of a fiber reinforced lamina under multi-axial stress states. An equilibrium analysis is carried out in which a kinked band of rotated fibers, described by two angles, is sandwiched between two regions in which the fibers are nominally straight. Proportional multi-axial stress states are examined. The analysis includes the possibility of bifurcation from the current equilibrium state. The compressive strength of the lamina is contingent upon either attaining a load maximum in the equilibrium response or satisfaction of a bifurcation condition, whichever occurs first. The results show that for uniaxial loading a non-zero kink band angle beta produces the minimum limit load. For multi-axial loading, different proportional loading paths show regimes of bifurcation dominated and limit load dominated behavior. The present results are able to capture the beneficial effect of transverse compression in raising the composite compressive strength as observed in experiments.

Basu, Shiladitya↗

Lignite-plus-Biomass to Synthetic Jet Fuel with CO2 Capture and Storage: Design, Cost, and Greenhouse Gas Emissions Analysis for a Near-Term First-of-a-Kind Demonstration Project and Prospective Future Commercial Plants

We report on a 30-month design study for a first-of-a-kind (FOAK) demonstration plant that would be built at a site near Meridian, Mississippi, to coprocess lignite coal and woody biomass into jet fuel. The design uses an oxygen-blown TRIG™ gasifier developed by KBR and Southern Company. Fischer-Tropsch conversion of the syngas produces synthetic paraffinic kerosene (SPK) as the primary product, plus naphtha. Other co-products include electricity sold to the grid and CO 2 sold for use in enhanced oil recovery (EOR). Previous studies have identified coprocessing of various coals and biomass with CO 2 capture as promising options for cost-competitive production of low net lifecycle greenhouse gas (GHG) emissions synthetic fuels. The effort reported here goes beyond earlier studies in the level of detail in process design and cost estimation with the aim of improving the understanding of the economic prospects for lignite and woody biomass coprocessing systems. Key objectives in the design of the FOAK lignite/biomass-to-jet (LBJ) plant were to achieve net lifecycle GHG emissions for the SPK that are less than for conventional petroleum-derived jet fuel and to make process design and equipment selections such that the plant could be built and operated in the near term, e.g., before 2025. The process design was developed by researchers at Princeton University and the University of Queensland and validated by engineers at the WorleyParsons Group (WP). Commercial vendors provided design and cost estimates for several major plant components. Bare-erected capital costs and operating and maintenance costs were estimated by WP. The primary objective in building and operating the FOAK plant would be to demonstrate the technical viability of the LBJ concept as an essential first step toward launching commercial-scale plants in the longer term. With this in mind, the project team developed a set of principles to help guide the process design: the total plant cost should be less than 2 billion USD (to limit investment risk); the level of input biomass should be both proportionally significant to reflect biomass/lignite co-gasification and sufficient to achieve GHG emissions goals; process design decisions and vendor/equipment selections should prioritize the likelihood of technical success over minimizing the cost of jet fuel production. The resulting FOAK plant design capacity is 1,551 metric t/d (45.5% moisture) lignite and 556 t/d (43.3% moisture) biomass, for a total input of 295 MW HHV , of which 25% is biomass. The design output is 1,252 actual barrels per day of liquids, of which 80% is SPK (62.3 MW LHV ) and 20% is naphtha (13.9 MW LHV ). It exports 15 MW e of electricity after satisfying a 38 MW e onsite auxiliary load. Additional products are 1,326 t/d of pressurized pipeline-quality CO 2 and 49 t/day of sulfuric acid (93 wt% H 2 SO 4 ). With thinnings from sustainably-managed southern pine plantations as the biomass, and with captured CO 2 stored underground via EOR, the net lifecycle emissions for the SPK product are estimated to be about one-quarter of those for petroleum-derived jet fuel. The bare-erected cost (BEC) estimated by WP for this plant is 588 million USD (2015). The authors’ best estimate of total plant cost (TPC) is 1,230 million USD, arrived at by assuming engineering, procurement and construction management services (20% of BEC), process 5 contingencies (35% of BEC), and project contingencies (35% of the sum of all other costs, i.e., 35% of 1.55xBEC). Not surprisingly, an annual discounted cash flow (DCF) analysis determined that it would be impossible to generate a positive net present value (NPV) over a wide range in key input assumptions. An SPK production cost subsidy of nearly 400/bbl USD over a 20-year plant life would be required to achieve zero NPV under a baseline set of assumptions (including 3% real weighted average cost of capital and a levelized crude oil price of 80/bbl USD). Alternatively, a capital grant in excess of the TPC value would also achieve zero NPV. The poor financial results reflect the small scale of the plant, the design principle to prioritize technical success, the levels of contingencies appropriate for the relatively early stage of project development, and the first-of-a-kind nature of the plant. Technology innovations, learning via construction and operating experience, alternative plant configurations, and larger scale should improve economics of future plants. To help understand these prospects, a preliminary analysis of N th -of-a-kind (NOAK) plants was developed, but with the limitation that plants would use only equipment components that for the most part are already commercial today: consideration of advanced, not-yet-commercial technologies and of R&D-driven improvements in existing technologies were beyond the scope of this analysis. The analysis found that a variety of NOAK plant designs that coprocess lignite and woody biomass to make jet fuel are unlikely to be economically competitive without subsidy even in the presence of a high future carbon tax or equivalent greenhouse gas mitigation policy. This conclusion applies to process configurations and input biomass/lignite ratios that result in net GHG emissions as high as those for petroleum-derived jet fuel and as low as zero. In contrast, encouraging results were found for plants processing only biomass. The economics of these “BECCS” plants (biomass energy with CCS) improve dramatically with the strength of carbon mitigation policies because of their strongly negative net GHG emissions. These findings do not imply that coal/biomass coprocessing strategies for making synfuels with CCS are not economically promising – only that, in the case of lignite, much more than a 25% biomass coprocessing rate would be needed. However, our analysis shows that all such systems are unlikely to be economic in the absence of a strong carbon mitigation policy. Future R&D driven technological innovations could modify this conclusion. Among other R&D priorities, an emphasis on better understanding and reducing plant auxiliary loads is warranted.

09 BIOMASS FUELS↗

System Calibration Including Time Delay Estimation for GNSS/INS-Assisted Pushbroom Scanners Onboard UAV Platforms

Unmanned aerial vehicles (UAVs ) equipped with imaging sensors and integrated global navigation satellite system/inertial navigation system (GNSS/INS ) units are used for numerous applications. Deriving reliable 3D coordinates from such UAVs is contingent on accurate geometric calibration, which encompasses the estimation of mounting parameters and synchronization errors. Through a rigorous impact analysis of such systematic errors, this article proposes a direct approach for spatial and temporal calibration (estimating system parameters through a bundle adjustment procedure) of a GNSS/INS -assisted pushbroom scanner onboard a UAV platform. The calibration results show that the horizontal and vertical accuracies are within the ground sampling distance of the sensor. Unlike for frame camera systems, this article also shows that the indirect approach is not a feasible solution for pushbroom scanners due to their limited ability for decoupling system parameters. This finding provides further support that the direct approach is recommended for spatial and temporal calibration of UAV pushbroom scanner systems.

47 OTHER INSTRUMENTATION↗

Software predicts disaster-driven grid failures

A new, free, open-source software reliably predicts how damage from hurricanes, ice storms, earthquakes, and other extreme events will restrict power delivery from utility grids. The Severe Contingency Solver for Electric Power Transmission is the only software available—commercially or open-source—that reliably supports analysis of extreme events that cause widespread damage.

24 POWER TRANSMISSION AND DISTRIBUTION↗