The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management

Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.

Schedule↗

Lessons Learned from NASA Goddard Space Flight Center’s Product Development Lead Training Schedule and Cost Development Workshop: Continuous Improvement

This presentation provides a status of the Goddard Space Flight Center (GSFC) effort to increase foundational knowledge of Product Development Leads (PDLs) in schedule and cost management including earned value management (EVM). In 2012, GSFC’s Engineering and Technology Directorate (ETD) implemented an in-house training program to prepare PDLs for managing the technical, cost, schedule, and risk aspects of spaceflight systems to meet their subsystem commitments. Developed in-house, the PDL training program provides an integrated approach to requirements development, risk, schedule and cost management, EVM, performance tracking, and other areas. The program has been held twice yearly since its inception with 531 participating and 451 completing the curriculum. In 2017, the program won the Robert H. Goddard award for Quality and Process Improvement. Program development and evolution were presented in the 2018 NASA Schedule and Cost Symposium. The presentation was so well received that this year we focus on one workshop within the program: Schedule and Cost Development, including EVM. We examine the on-going logic modeling process and how participant and stakeholder data influence workshop content and design, and how the disciplines of schedule and cost contribute to mission success. In this presentation we refresh you on how the approach integrates lecture, small group discussion, estimating, case study exercises, and problem solving. We update you on the data collected from participants and stakeholders, and we discuss how we use these data to measure training effectiveness. Specific topics include: • How the logic model is used as the backbone for continuous program improvement, • How feedback influences implementation and curriculum updates, • How data collection and analysis inform workshop content and development, including participant discoveries of EVM data, • How including the resource analyst and planner in the product development team supports project success.

Lessons Learned↗

Diagnostic yield and optimal duration of continuous-loop event monitoring for the diagnosis of palpitations. A cost-effectiveness analysis

BACKGROUND: Continuous-loop event recorders are widely used for the evaluation of palpitations, but the optimal duration of monitoring is unknown. OBJECTIVE: To determine the yield, timing, and incremental cost-effectiveness of each week of event monitoring for palpitations. DESIGN: Prospective cohort study. PATIENTS: 105 consecutive outpatients referred for the placement of a continuous-loop event recorder for the evaluation of palpitations. MEASUREMENTS: Diagnostic yield, incremental cost, and cost-effectiveness for each week of monitoring. RESULTS: The diagnostic yield of continuous-loop event recorders was 1.04 diagnoses per patient in week 1, 0.15 diagnoses per patient in week 2, and 0.01 diagnoses per patient in week 3 and beyond. Over time, the cost-effectiveness ratio increased from $98 per new diagnosis in week 1 to $576 per new diagnosis in week 2 and $5832 per new diagnosis in week 3. CONCLUSIONS: In patients referred for evaluation of palpitations, the diagnostic yield of continuous-loop event recording decreases rapidly after 2 weeks of monitoring. A 2-week monitoring period is reasonably cost-effective for most patients and should be the standard period for continuous-loop event recording for the evaluation of palpitations.

NASA Discipline Cardiopulmonary↗

Solar array cost reduction

A brief description is given of the cost of solar power systems over the last decade and means by which cost reductions may be achieved in the future. Costs were broken down into nonrecurring and recurring costs for solar array, battery, and power conditioning. Correlation of costs with power were poor; however, costs correlated reasonably well with the array area.

Bernatowicz, D. T.↗

Solar array cost reduction.

The costs regarding solar power systems are considered, giving attention to the total system cost index for the power system as a function of solar array area, and the recurring cost per square foot for the solar array versus the total area flight arrays built for each project. It is found that the costs decrease as production volume increases. Design standardization together with improvements in solar cell and array technology show promise of reducing costs. A long range program has been started to improve substantially the efficiency of silicon cells. Efficiencies approaching 20% are theoretically possible. One obstacle to cost reduction is that the volume of production required to satisfy the space program is not enough to justify a high degree of mechanization or automation.

Bernatowicz, D. T.↗

Development of termination and utilization concepts for flat conductor cables. Volume 3: Cost study comparison, flat versus round conductor cable

A cost study comparing flat conductor cable (FCC) with small-gage wire (SGW) and conventional round conductor cable (RCC) is presented. This study was based on a vehicle wiring system consisting of 110,000 ft of conventional RCC equally divided between AWG sizes 20,22, and 24 using MIL-W-81044-type wire and MIL-C-26500 circular connectors. Basic cost data were developed on a similar-sized commercial jet airplane wiring system on a previous company R&D program in which advanced wiring techniques were carried through equivalent installations on an airplane mockup; and on data developed on typical average bundles during this program. Various cost elements included were engineering labor, operations (manufacturing) labor, material costs, and cost impact on payload. Engineering labor includes design, wiring system integration, wiring diagrams and cable assembly drawings, wire installations, and other related supporting functions such as the electronic data processing for the wiring. Operations labor includes mockup, tooling and production planning, fabrication, assembly, installation, and quality control cost impact on payload is the conversion of wiring system weight variations through use of different wiring concepts to program payload benefits in terms of dollars.

Source record↗

Benefit-cost methodology study with example application of the use of wind generators

An example application for cost-benefit methodology is presented for the use of wind generators. The approach adopted for the example application consisted of the following activities: (1) surveying of the available wind data and wind power system information, (2) developing models which quantitatively described wind distributions, wind power systems, and cost-benefit differences between conventional systems and wind power systems, and (3) applying the cost-benefit methodology to compare a conventional electrical energy generation system with systems which included wind power generators. Wind speed distribution data were obtained from sites throughout the contiguous United States and were used to compute plant factor contours shown on an annual and seasonal basis. Plant factor values (ratio of average output power to rated power) are found to be as high as 0.6 (on an annual average basis) in portions of the central U. S. and in sections of the New England coastal area. Two types of wind power systems were selected for the application of the cost-benefit methodology. A cost-benefit model was designed and implemented on a computer to establish a practical tool for studying the relative costs and benefits of wind power systems under a variety of conditions and to efficiently and effectively perform associated sensitivity analyses.

Zimmer, R. P.↗

Preliminary estimates of operating costs for lighter than air transports

Presented is a preliminary set of operating cost relationships for airship transports. The starting point for the development of the relationships is the direct operating cost formulae and the indirect operating cost categories commonly used for estimating costs of heavier than air commercial transports. Modifications are made to the relationships to account for the unique features of airships. To illustrate the cost estimating method, the operating costs of selected airship cargo transports are computed. Conventional fully buoyant and hybrid semi-buoyant systems are investigated for a variety of speeds, payloads, ranges, and altitudes. Comparisons are made with aircraft transports for a range of cargo densities.

Smith, C. L.↗

Preliminary estimates of operating costs for lighter than air transports

A preliminary set of operating cost relationships are presented for airship transports. The starting point for the development of the relationships is the direct operating cost formulae and the indirect operating cost categories commonly used for estimating costs of heavier than air commercial transports. Modifications are made to the relationships to account for the unique features of airships. To illustrate the cost estimating method, the operating costs of selected airship cargo transports are computed. Conventional fully buoyant and hybrid semi-buoyant systems are investigated for a variety of speeds, payloads, ranges, and altitudes. Comparisons are made with aircraft transports for a range of cargo densities.

Smith, C. L.↗

Optimal periodic proof test based on cost-effective and reliability criteria

An exploratory study for the optimization of periodic proof tests for fatigue-critical structures is presented. The optimal proof load level and the optimal number of periodic proof tests are determined by minimizing the total expected (statistical average) cost, while the constraint on the allowable level of structural reliability is satisfied. The total expected cost consists of the expected cost of proof tests, the expected cost of structures destroyed by proof tests, and the expected cost of structural failure in service. It is demonstrated by numerical examples that significant cost saving and reliability improvement for fatigue-critical structures can be achieved by the application of the optimal periodic proof test. The present study is relevant to the establishment of optimal maintenance procedures for fatigue-critical structures.

Yang, J.-N.↗

Cost as a technology driver

Cost managment as a guiding factor in optimum development of technology, and proper timing of cost-saving programs in the development of a system or technology with payoffs in development and operational advances are discussed and illustrated. Advances enhancing the performance of hardware or software advances raising productivity or reducing cost, are outlined, with examples drawn from: thermochemical thrust maximization, development of cryogenic storage tanks, improvements in fuel cells for Space Shuttle, design of a spacecraft pyrotechnic initiator, cost cutting by reduction in the number of parts to be joined, and cost cutting by dramatic reductions in circuit component number with small-scale double-diffused integrated circuitry. Program-focused supporting research and technology models are devised to aid judicious timing of cost-conscious research programs.

Fitzgerald, P. E., Jr.↗

Cost analysis of advanced turbine blade manufacturing processes

A rigorous analysis was conducted to estimate relative manufacturing costs for high technology gas turbine blades prepared by three candidate materials process systems. The manufacturing costs for the same turbine blade configuration of directionally solidified eutectic alloy, an oxide dispersion strengthened superalloy, and a fiber reinforced superalloy were compared on a relative basis to the costs of the same blade currently in production utilizing the directional solidification process. An analytical process cost model was developed to quantitatively perform the cost comparisons. The impact of individual process yield factors on costs was also assessed as well as effects of process parameters, raw materials, labor rates and consumable items.

Barth, C. F.↗

Research requirements to reduce civil helicopter life cycle cost

The problem of the high cost of helicopter development, production, operation, and maintenance is defined and the cost drivers are identified. Helicopter life cycle costs would decrease by about 17 percent if currently available technology were applied. With advanced technology, a reduction of about 30 percent in helicopter life cycle costs is projected. Technological and managerial deficiencies which contribute to high costs are examined, basic research and development projects which can reduce costs include methods for reduced fuel consumption; improved turbine engines; airframe and engine production methods; safety; rotor systems; and advanced transmission systems.

Blewitt, S. J.↗

Optimizing costs of VLSI circuits

Report analyzes costs of developing and producing low-production-volume, customized VLSI (very large-scale, integrated) circuits. Relationship is developed between IC cost and electronic system cost using IC cost models based on design/fabrication approach. Emphasis is on development of understanding between cost and volume for custom circuits to be used by NASA. Reliability is major cost component in models. Report is divided into five sections and includes four appendices with useful reference literature.

Cook, K. B., Jr.↗

The effects of regional insolation differences upon advanced solar thermal electric power plant performance and energy costs

The performance and cost of four 10 MWe advanced solar thermal electric power plants sited in various regions of the continental United States was studied. Each region has different insolation characteristics which result in varying collector field areas, plant performance, capital costs and energy costs. The regional variation in solar plant performance was assessed in relation to the expected rise in the future cost of residential and commercial electricity supplied by conventional utility power systems in the same regions. A discussion of the regional insolation data base is presented along with a description of the solar systems performance and costs. A range for the forecast cost of conventional electricity by region and nationally over the next several decades is given.

Latta, A. F.↗

Cost and price estimate of Brayton and Stirling engines in selected production volumes

The methods used to determine the production costs and required selling price of Brayton and Stirling engines modified for use in solar power conversion units are presented. Each engine part, component and assembly was examined and evaluated to determine the costs of its material and the method of manufacture based on specific annual production volumes. Cost estimates are presented for both the Stirling and Brayton engines in annual production volumes of 1,000, 25,000, 100,000 and 400,000. At annual production volumes above 50,000 units, the costs of both engines are similar, although the Stirling engine costs are somewhat lower. It is concluded that modifications to both the Brayton and Stirling engine designs could reduce the estimated costs.

Fortgang, H. R.↗

Orbit transfer vehicle engine study. Volume 3: Program costs

Budgetary and planning cost estimates are presented that were prepared for the development, production and operation and flight support phases for each of the engines proposed for OTV propulsion. The major features of each category engine are described. The development program estimates were structured to the preliminary program Work Breakdown Structures (WBS). Program costs are provided within the applicable WBS elements to Level 4 for each category engine. The production program cost estimates assume a first production lot of 50 units produced at a rate of two units per month. Cumulative average unit costs assume a 90% learning capability. The operations and flight support cost estimates are based on 15, 30 and 45 missions per year for the period 1988 through 1999. Estimated funding requirements were developed for each category and program phase. All cost estimates and funding data are presented in 1979 dollars. The assumptions and ground rules for these estimates are summarized.

Source record↗

Coal gasification systems engineering and analysis. Appendix E: Cost estimation and economic evaluation methodology

The cost estimation and economic evaluation methodologies presented are consistent with industry practice for assessing capital investment requirements and operating costs of coal conversion systems. All values stated are based on January, 1980 dollars with appropriate recognition of the time value of money. Evaluation of project economic feasibility can be considered a two step process (subject to considerable refinement). First, the costs of the project must be quantified and second, the price at which the product can be manufacturd must be determined. These two major categories are discussed. The summary of methodology is divided into five parts: (1) systems costs, (2)instant plant costs, (3) annual operating costs, (4) escalation and discounting process, and (5) product pricing.

Source record↗